W912P820B0049 AM_0004.pdf
PDF 809 KB Posted
- Attached to
- Houma Inland Channel Maintenance Dredging
- Solicitation number
- W912P820B0049
About this file
This document is an amendment to a solicitation for dredging services on the Houma Navigation Canal in Louisiana. The amendment provides responses to contractor questions, updates the wage rate determination, and extends the duration for base work from 140 to 170 calendar days while keeping the option work duration unchanged. Required services include satisfactory removal and disposal of all material excavated from the canal as well as minor deflection dike work and refurbishment of existing dikes. The solicitation number is W912P820B0049 and is issued by the Department of the Army Corps of Engineers New Orleans District. The bid opening due date and time remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P820B0049 Bid Abstract.pdf | ||
| W912P820B0049 AM_0003.pdf | ||
| W912P820B0049 AM_0002.pdf | ||
| W912P820B0049 AM_0002.pdf | ||
| W912P820B0049 AM_0001.pdf | ||
| 20B0049 Solicitation package w specs.pdf | ||
| 20B0049 Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED-18-074
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Houma Navigation Canal Inland Channel Maintenance Dredging, is hereby amended to provide responses to contractor questions, and updated Wage Rate Determination.
Bid opening due date and time remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P820B0049
X 9B. DATED (SEE ITEM 11)
25-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jun-2022
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820B0049
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
QUESTIONS AND RESPONSES
1. Are there any previous Q&A documents from the original solicitation period that we can review?
No.
2. What are the exact details of the Containment Dikes that are to be constructed? Typical sketch, elevation, slope, and distances? What are the current conditions of the existing containment dikes?
As stated in the specifications, “The Contractor shall submit to the Contracting Officer for review prior to construction, a typical sketch of the dike repair and/or dike re-construction showing all slopes, distances, and elevations.” The dike section including freeboard is dependent upon dredge plant to be used and, therefore, Contractor specific.
3. Is there a possibility for an extension of the work period? We estimated around 210 days needed for Dredging and Containment Dike construction.
Further review of scope has yielded a change in duration for the Base Work from 140 calendar days to 170 calendar days. The duration for the Option Work Items remains unchanged.
4. Page C-11 the template appears to be upside down on station 930+00, can you please verify that what is on the cross sections is correct and should not be reversed. There are several of these cross sections that seem as if they are reversed, that one cross section is the one mentioned here.
This cross section is correct. Based on surveys from September 2021, the channel is below the required dredge cut. Dredging would not be required in this reach based on date of the survey. Final determination of need will be made upon review of the before dredging sections.
5. Plan Sheet C-03 shows the northerly limits of Disposal Area 10. The limits are not continued on sheet C-04. Please provide the southerly limits of disposal for Disposal
Area 10.
A revised Plan Sheet C-04 showing southern boundary of disposal area 10 will be included in next amendment.
6. Will the Owner please provide anticipated capacities for each disposal area?
Surveys were not completed for disposal areas prior to advertisement. Contractor shall base capacity on disposal area footprints and a site visit prior to bid opening.
7. Will the Owner please provide any known elevation data in the provided disposal areas?
Surveys were not completed for disposal areas prior to advertisement. Contractor shall base capacity on disposal area footprints and a site visit prior to bid opening.
8. Can the Owner please clarify if the motorboat for exclusive use of the Government, required under Section 35 20 23.00 12 Paragraph 1.7.4, shall include a dedicated operator?
Contractor shall provide an operator for the boat. Dedicated operator is not necessary as long as someone on-site can safely operate the boat.
9. Is dragging or bed leveling permitted as a method of clean-up?
W912P820B0049
As related to the channel, bed leveling can not result in deficient section as the receiving area for this material. Contractor may not level the beds and raise elevations adjacent to the channel. As related to the disposal areas, dragging of areas that exceed maximum elevation is permitted.
10. Can the Owner please provide the applicable wage rates?
Applicable wage rates are included in Amendment 0004.
11. Is the Contractor allowed to choose which disposal areas to use for each dredging area?
Yes.
12. The method by which bids are to be delivered is unclear. Will the Owner please clarify how bids are to be submitted for this solicitation?
Instructions to Bidders was issued via amendment 0003.
13. Per specifications, a centerline profile shall be taken along the existing foreshore dike and shall extend 50-feet from either side of the access corridor. Does the centerline profile mean that we only need to survey 50’ on either side of the access corridor?
Paragraph 3.1.6 addresses surveys of each of the disposal areas. The profile required across the foreshore dike is included to verify no damages to the foreshore dike during access operations. The profile extensions do not have to extend beyond 50 foot of the access corridor per specification.
14. In Amendment 2 under SECTION 35 20 23.33, item 1.3 regarding “No separate measurement or payment will be made for installation, operation, and maintenance of the
DQM-certified system specified herein …………………
Is the above referenced certification a prerequisite to bidding the project? Or may the
DQM system be installed after award of the project?
Due to the timeframe of award and NTP, it is recommended that the Contractor already have the DQM certification in place at the time of award.
Y
,2
.8
X ,4
,8
.6
.7
P .I. 9
Az. 187° 38' 46.0"( Geodetic )
T E
R R
E B
O N
N E P
A R
IS
H L
A
H O
U M
A N
A V
IG
A T
IO
N C
A N
A L
IN
L
A N
D C
H A
N N
E L
A U
G U
S T
0 500' 1000'
SCALE:1"=500'
C-04
P L
A N
S -0
.d g n
:1
N
ACCESS CORRIDOR
DREDGE PIPELINE
DISPOSAL AREA 13
DISPOSAL AREA 16
27 ACRES
TARGET AREA
OPEN WATER
11 ACRES
TARGET AREA
OPEN WATER
31 ACRES
TARGET AREA
OPEN WATER
C -0
M A
T
H
-0
M A
T C
H
F
T
EAGLE NEST #3
200-FT. ACCESS CORRIDOR
DREDGE PIPELINE
X 3475324.224
Y 341539.630
X 3474788.176
Y 341606.040
X 3474782.321
Y 336813.374
X 3474548.710
Y 336851.468 X 3474541.534
Y 337131.294
X 3473512.587
Y 337020.424
X 3473018.858
Y 337309.812
STA. 0585+00
DREDGING
LIMIT OF
APPROXIMATE
S .J .T
A
P R
R
E P
R
IN
T D
R A
W
IN
G T
O S
H O
W A
L
IG
N M
E N
T
DISPOSAL AREA 10
S .J .T
A
D D D
IS
P O
S A
L A
R E
A
B
O U
N D
A R
Y J
U N
3,480,0
3,478,0
,0
,0
,0
3,476,0
3,474,0
3,472,0
3,476,0
3,474,0
3,478,0
,0
,0
,0
,0
,0
,0
,0
,0
,0
,0
,0
90°42'5 5"
90°43'2 0"
90°42'3 0"
°2
'5
°2
'2
90°43'4 5"
90°43'4 5"
90°44'1 0"
90°43'2 0"
90°44'1 0"
90°42'5 5"
°2
'4
°2
'1
°2
3,470,0
°2
'3
°2
'5
°2
'4
°2
'1
°2
°2
'2
°2
'3
A N
S I
D
IDENTIFICATION
SHEET
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
S A
R A J
E A
N T
U R
N E
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
E D -1
-0
H -1
-4
H -1
-4
J A
S O
N A
B
IN
E T P .E
S .J T
U R
N E
R W
P
B
/0
/2
R
B R
O U
S S
A R
D
ELEV. -25.0 M.L.G.
30" GAS PIPELINE
COLUMBIA GULF TRANSMISSION
(ABANDONED IN PLACE)
ELEV. -27.0 M.L.G.
SUBMARINE CABLE
SOUTH LA. ELECTRIC COOP.
WELL MARIE MARMANDE #1
M
IL
E
M
IL
E
M
IL
E
U.S. Department of Labor Wage and Hour Division Washington, DC 20010
Response to SF-308 Request for Davis-Bacon Project Wage Determination
Project Wage Decision Number: 2022LA-11037308-060322
Superseded Project Wage Decision: LA20200007
State: Louisiana
County: Statewide
Construction Type: Heavy/Heavy Dredging
Agency: U.S. Army Corps of Engineers
Project Name: Houma Navigation Canal – Inland Channel
Solicitation Number: W912P820B0049
Description of Work (as clarified):
Removal and disposal all of material excavated from the canal.
Date of Decision: June 3, 2022
Expires: November 30, 2022
Modification Number: 0
Classification Hourly Rate Fringe Benefits Derrick Operator $15.00 $0.00 Dozer Operator $15.00 $0.00
Dredge Over 16" Deck Hand $15.00 $0.00 Dredge Tender Operator $15.00 $0.00 Fireman $15.00 $0.00
First Assistant Engineer $15.00 $0.00 Leverman $15.00 $0.00 Oiler $15.00 $0.00 Second Assistant Engineer $15.00 $0.00 Shoreman $15.00 $0.00 Third Assistant Engineer $15.00 $0.00 Truck Driver $15.00 $0.00
Dredge Under 16" Deck Hand $15.00 $0.00 Dredge Tender Operator $15.00 $0.00 Fireman $15.00 $0.00 First Assistant Engineer $15.00 $0.00 Leverman $15.00 $0.00 Oiler $15.00 $0.00
Hydraulic Dredging $15.00 $0.00 First Cook $15.00 $0.00 Handyman $15.00 $0.00 Janitor, Cabin Person $15.00 $0.00 Second Cook $15.00 $0.00 Marsh Buggy Dragline, Oiler $15.00 $0.00 Marsh Buggy Dragline, Operator $15.00 $0.00 Self Propelled Hopper Dredge, Drag Tender $17.45 $3.45 + a Self Propelled Hopper Dredge, Drag Tender Footnote: Fourteen paid vacation day and eight paid holidays: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day and Christmas Day provided the employee has one year of service.
Asbestos Workers $15.00 $0.00 Boilermakers $15.00 $0.00 Bricklayers $15.00 $0.00 Carpenters $15.00 $0.00 Cement Masons $15.00 $0.00 Electricians $15.00 $0.00 Glaziers $15.00 $0.00 Ironworkers $15.00 $0.00 Laborer $15.00 $0.00 Lather $15.00 $0.00 Marble and Tile Setters, Terrazzo Workers $15.00 $0.00 Painters $15.00 $0.00 Piledriverman $15.00 $0.00 Plasterers $15.00 $0.00
Plumbers $15.00 $0.00 Roofers $15.00 $0.00 Sheet Metal Workers $15.00 $0.00 Soft Floor Layers $15.00 $0.00 Steamfitters $15.00 $0.00 Truck Drivers $15.00 $0.00 Power Equipment Operators $15.00 $0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
This wage determination is specifically for the project listed above. It cannot be used for any other purpose, including contracts or projects.
Further, in the event the above referenced contract is subject to Executive Order (EO) 14026 and the approved conformed hourly rate (not including any fringe benefits) is less than the EO minimum wage, you are required to comply with the minimum wage requirements of EO 14026, codified at 29 CFR Part 10. Please note that this EO 14026 applies to contracts entered into by the federal government that are subject to the Davis Bacon Act itself but does not apply to contracts subject only to the Davis Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). See https://www.dol.gov/agencies/whd/government-contracts/eo14026 for additional information regarding EO 14026, including coverage and minimum wage requirements.
If you have any questions or concerns, please do not hesitate to contact me at thomas.rhontia@dol.gov .
Sincerely.
RhonTia Thomas-Johnson Chief Branch of Construction Wage Determinations 202-693-0806 Thomas.rhontia@dol.gov http://www.dol.gov/agencies/whd/government-contracts/eo14026 mailto:thomas.rhontia@dol.gov mailto:Thomas.rhontia@dol.gov
| A21- 20B0049 AM_0004.pdf |
| AM-0004 attachments |
| H-16-48205C-04.pdf |
| A19- Wage Rate Determiantion- Response to SF 308 request USACE LA 20B0049.pdf |
File details come from the government source that posted it. Updated .