This document includes an amendment to a solicitation and responses to industry questions. The solicitation is for stockpiling services in support of the West Shore Lake Pontchartrain hurricane protection project in St. Charles Parish, Louisiana. The U.S. Army Corps of Engineers, New Orleans District will award a firm fixed-price contract between $25-100 million. The small business set-aside solicitation requires clay excavation, processing, and stockpiling, as well as clearing and grubbing within the Bonnet Carre Spillway. The amendment provides responses to seven industry questions that clarify requirements around road construction and maintenance, soil testing procedures, and optional work authorization. The bid opening remains December 3, 2019 at 1:00 PM in New Orleans.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B01 WSLP STOCKPILE 2_20B0020 Abstract.pdf | ||
| A21 Amendment 0004_FINAL.pdf | ||
| A21 W912P820B0020-0003 package.pdf | ||
| A21_AMENDMENT_0002_(SITE_VISIT_POC_CHANGE).pdf | ||
| A21__AMENDMENT_0001.pdf | ||
| WSLP_BC-Contract_2_Plans.pdf | ||
| A21__20-B-0020_WSLP_PACKAGE_SOLICITATION_25_Oct_2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED 19-049
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0005 is the follow ing:
1) To provide the Government Responses to the Industry Questions. Please see continuation sheet.
2) The solicitation closing remains the same, 03 Dec 2019 at 1:00PM (CST) in Conference Room 328 at the U.S. Army Corps of Engineers (USACE), New Orleans District (MVN), 7400 Leake Avenue, New Orleans, LA 70118.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0020
X 9B. DATED (SEE ITEM 11)
25-Oct-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Nov-2019
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820B0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Government Response to Industry Questions for the: West Shore Lake Pontchartrain (WSLP) Stockpile 2 Solicitation #: W912P8-20-B-0020 Amendment 0005
1. Industry Question: Section 31 24 00.0012, Paragraph 3.2.2 states that the Contractor shall anticipate having to haul up to 6 miles on an unimproved road at a speed not to exceed 15 mph to reach the new stockpile location. Please define unimproved road or describe the type of road Contractor will be allowed to construct (if necessary) to reach the offsite Stockpile Area.
Government Response: Unimproved road could be considered unpaved, gravel or dirt road.
2. Industry Question: Should OW 0006 be exercised, Section 31 24 00.0012, Paragraph 3.2.2 states that an equitable adjustment will be made pursuant to the Contract Clause in Section 00700 entitled CHANGES to handle clearing and grubbing, culvert installation or road construction at the relocated Stockpile Area. Will the cost of maintaining the road leading to the offsite Stockpile Area be included in the Change?
Government Response: No, the contractor should anticipate maintaining up to 6 miles of unimproved roads within CLIN 0006
3. Industry Question: Should OW 0006 be exercised, Section 31 24 00.0012, Paragraph 3.2.2 states that an equitable adjustment will be made pursuant to the Contract Clause in Section 00700 entitled CHANGES to handle clearing and grubbing, culvert installation or road construction at the relocated Stockpile Area. Will the cost of improving and maintaining the unimproved road in the spillway be included in the Change?
Government Response: No, the contractor should anticipate maintaining up to 6 miles of unimproved roads within CLIN 0006.
4. Industry Question: Section 31 24 00.0012, Paragraph 1.5.1(9)1 Soil Classification Tests states that one classification test and one Atterburg Liquid and Plastic Limits test shall be performed per 3,000 cubic yards of stockpile fill. As written, all the required testing could be conducted on the last 18 inches of fill placed in the stockpile. Please clarify.
Government Response: The paragraph cited states, "One classification test and one Atterberg Liquid and Plastic Limits test shall be performed per 3,000 cubic yards of stockpile fill." Testing shall be performed on an ongoing basis every time 3,000 cubic yards is placed within the
W912P820B0020 stockpile location. Testing cannot just be performed on the last 18 inches of fill placed in the stockpile.
5. Industry Question: Does the complete footprint of Stockpile ONE (1) have to be grubbed/filled/balanced prior to being able to start the placement and processing on the clay or could a sizeable portion be acceptable.
Government Response: The entire footprint of stockpile area 1 must be cleared, grubbed and graded prior to stockpiling and processing to allow for Govenrment surveys over the entire area as specified in paragraph 3.2.3 “Government Surveys” of specification section 31 11 00.00 12 “Clearing and Grubbing”.
6. Industry Question: At what time will the Optional Work items be authorized for this contract.
Government Response: Optional Work could be authorized at any time during the contract.
7. Industry Question: Can the government lump sum qtys be provided as instructed in amend 003?
Government Response:
Borrow Pit Development Perimeter Dike Construction: 7,220 LF Sand Overburden: 128,260 CY
Development of Bonnet Carre Stockpile Area #1 Clearing: 26 Acres
Development of Bonnet Carre Stockpile Area #2 Clearing: 18 Acres
(End of Summary of Changes)