A21 Amendment 0004_FINAL.pdf

PDF 395 KB Posted

Attached to
WSLP STOCKPILE 2 Federal contract opportunity
Solicitation number
W912P820B0020
Issued by
Department of the Army Corps of Engineers Engineering District New Orleans

About this file

This solicitation requests stockpiling services in support of the West Shore Lake Pontchartrain Hurricane and Storm Damage Risk Reduction Project located in St. Charles Parish, Louisiana. The U.S. Army Corps of Engineers, New Orleans District will award a firm fixed-price contract between $25-100 million to excavate, process, stockpile clay material and perform clearing, grubbing and other incidental work within the Bonnet Carre Spillway. The solicitation is set aside for small businesses under NAICS code 237990 with a size standard of $39.5 million. The bid opening is December 3, 2019. Bidders must be registered in SAM and visit the site prior to bidding. Questions are due by November 22 with Anthony Maiore as point of contact. The contractor will improve access roads if optional item 0006 is exercised.

View the file

Other files for this federal contract opportunity

Other files attached to WSLP STOCKPILE 2, newest first.
File Type Posted
B01 WSLP STOCKPILE 2_20B0020 Abstract.pdf PDF
A21 Amendment 0005_20B0020-0005.pdf PDF
A21 W912P820B0020-0003 package.pdf PDF
A21_AMENDMENT_0002_(SITE_VISIT_POC_CHANGE).pdf PDF
A21__AMENDMENT_0001.pdf PDF
WSLP_BC-Contract_2_Plans.pdf PDF
A21__20-B-0020_WSLP_PACKAGE_SOLICITATION_25_Oct_2019.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ED 19-049

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0004 is the follow ing:

1) To provide the Government Responses to an Industry Questions. Please see continuation sheet.

2) To provide the amended Section 31 23 00.00 12. Please see continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Nov-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0020

X 9B. DATED (SEE ITEM 11)

25-Oct-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Nov-2019

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P820B0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

The following have been added by full text:

Government Responses to Industry Questions for the: West Shore Lake Pontchartrain (WSLP) Stockpile 2 Solicitation #: W912P8-20-B-0020

Amendment 0004

1) Industry Question: Could please furnish the XY coordinates for the locations of the two (2) existing pits within the Contract 2 borrow pit area.

Government Response: The approximate coordinates of the two (2) existing pits are the following:

Existing pit:

X 3564146.806, Y 552963.217 X 3564514.585, Y 552772.500 X 3563838.771, Y 552545.094 X 3564262.959, Y 552306.742

Existing pit:

X 3565389.500, Y 552450.636 X 3565146.991, Y 551782.400 X 3565440.555, Y 551635.559 X 3565687.318, Y 552201.643

2) Industry Question: Section 31 24 00.00 12, Paragraph 3.2.2 states that “The Contractor shall anticipate having to haul up to 6 miles on an unimproved road” should Optional Work Item 0006 be exercised. Does the 6 miles include the +/- 2 miles Contractor must haul within the spillway on unimproved roads.

Government Response: Yes.

3) Industry Question: If Optional Work Item 0006 is exercised, Contractor will have to improve the access road from the borrow pit to Airline Highway 61. With Stockpile Contract No. 1 bidding shortly after this solicitation, both Contractors will include the cost of this work in their proposals, but only one will perform the work. Please consider making the road improvements an optional item in this solicitation.

Government Response: Multiple contractors may be hauling various types of materials within and out of the Bonnet Carre Spillway at any given time. It is the Contractor responsibility to maintain any necessary roads to complete the contract work. A separate bid item will not be created.

4) Industry Question: Amendment No. 3 changed the typical borrow pit section shown on Drawing Sheet C-02 to where the sand/silt deposited in the existing holes will remain. Will the Contractor be allowed to place the sand/silt overburden which covers the borrow pit and the sand/silt layer located below the natural ground into the existing holes? If so, is there a height limitation?

Government Response: Yes, the existing depressions can be filled, but can not exceed existing ground elevations adjacent to the borrow area.

SECTION 31 23 00.00 12

W912P820B0020

Page 2, paragraph 1.2.2. Delete this paragraph in its entirety and substitute the following therefore:

“1.2.3 Borrow Pit Development No measurement will be made for borrow pit development satisfactorily performed. Payment will be made at the contract job price for "Borrow Pit Development". Price and payment shall constitute full compensation for furnishing all plant, labor, materials, and equipment required to complete construction access; removal of sand overburden from borrow areas; clearing and grubbing in borrow areas and Stockpile Area # 1; constructing and maintaining protection dikes around the perimeter of the borrow pit; preparation for stockpiling; dewatering operations necessary for excavation; moisture control processing; and removal of retaining dikes upon completion of borrow operations; and other work incidental thereto; all as specified herein and as shown on the drawings.”

(End of Summary of Changes)