A21 - W912P819B0050 AM0003.pdf
PDF 382 KB Posted
- Solicitation number
- W912P819B0050
About this file
This document is an amendment to a solicitation for a federal contract. The U.S. Army Corps of Engineers Engineering District New Orleans is seeking offers for the removal and satisfactory disposal of all material excavated from the Hopper Dredge Disposal Area in Plaquemines Parish, Louisiana. Material will be excavated with a hydraulic cutterhead dredge and placed at approved disposal sites including West Bay Marsh Creation, C Disposal Area, D Disposal Area, Chenier Pass, and Camp Disposal Area. The response due date is extended from July 28, 2020 to August 4, 2020 at 11:00 AM CST. The anticipated contract award amount ranges between $25 million to $100 million. Offerors must use any combination of the designated disposal sites and prioritize use of the West Bay site due to limited capacity elsewhere. Overflow of fines outside disposal limits is permitted with certain restrictions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01 - W912P819B0050 Bid Abstract.pdf | ||
| B01 - W912P820B0050 Abstract signed.pdf | ||
| A21 - W912P819B0050 AM0004.pdf | ||
| A21 - AM0004 Survey Data O12C0028B.txt | TXT text file | |
| A21 - AM0004 Survey Data O12C0028A.txt | TXT text file | |
| A21 - W912P819B0050 AM0002.pdf | ||
| A21 - W912P819B0050 AM0001.pdf | ||
| W912P819B0050_Solicitation_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED-19-041
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject Solicitation Mississippi River, Baton Rouge to Gulf of Mexico, Head of Passes Hopper Dredge Disposal Area Project No. 19-1, Plaquemines Parish, Louisiana (ED 19-041) has been modified to correct Block 10 of the SF 1442, post responses to questions received on 22 July 2020, establish the cutoff date for submission of questions to be 4:00pm CST on 24 July 2020, and extend the Bid Opening by one w eek from 28 July 2020 to 04 August 2020. See follow ing pages for the Q&Rs.
The Contracting Officer and Contract Specialist w ill begin dow nloading bids at 11:00 AM CST, w hich is the bid receipt cutoff time. All bids received after 11:00 AM CST on Tuesday, 04 August 2020 w ill be considered late. Bid Opening w ill be held on Tuesday, 04 August 2020 at 11:30 AM CST. Please note that call-in information remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P819B0050
X 9B. DATED (SEE ITEM 11)
20-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jul-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P819B0050
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - SF 30 CONTINUATION
The required response date/time has changed from 28-Jul-2020 11:00 AM to 04-Aug-2020 11:00 AM.
The required performance has changed from Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area Project (#19-1), Plaquemines Parish, LA (ED 19-041)This is an UNRESTRICTED procurement.The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge on a rental basis. Work will be performed at the Mississippi River, Baton Rouge to the Gulf, Head of Passes Areas of the New Orleans District. ** TO BE ESTABLISHED BY AMENDMENT to Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area Project (#19-1), Plaquemines Parish, LA (ED 19-041)This is an UNRESTRICTED procurement.The work consists of the removal and satisfactory disposal of all material excavated from the Hopper Dredge Disposal Area. Material will be excavated with a hydraulic cutter-head dredge and placed at locations identified in the solicitation. Work will be performed at the Mississippi River, Baton Rouge to the Gulf, Head of Passes Areas of the New Orleans District. ** TO BE ESTABLISHED BY
AMENDMENT.
The following have been added by full text:
QUESTIONS & RESPONSES
Q1: Would the Owner please allow a 2 week bid extension to allow Contractors ample time to study the disposal area requirements and make proper site visits?
R1: A one week extension for bid opening date will be made. New bid opening date will be 04AUG20.
Q2: Section 10 of the SF1442 states, “The work consists of furnishing one fully crewed and equipped self-propelled trailing suction type hopper dredge on a rental basis.”
a. Can the Owner please clarify if this Work is for a hopper dredge or cutter suction dredge?
b. Can the Owner please confirm this Contract is not on a rental basis?
R2: Revised work should read "The work consists of the removal and satisfactory disposal of all material excavated from the Hopper Dredge Disposal Area. Material will be excavated with a hydraulic cutter- head dredge and placed at locations identified in the solicitation."
Q3: How soon following the bid date does the government envision making award and issuing the notice to proceed?
R3: Per guidance from management of the criticality of the work, award and issuance of notice to proceed will occur shortly after a successful bid opening. Anticipate both occurring within one month from the successful bid opening.
Q4: Please provide the government’s Magnitude of Work ($) for this project.
R4: Anticipated contract award amount is in the range of $25,000,000 to $100,000,000.
Q5: The CLIN schedule notes that the government may award the option “while the contractor’s plant is within the limits of the dredging base work”. Late award of options often leads to planning issues and contractor’s ability to respond to addition work within the district. Please consider limiting the option award window to 90 days after
NTP.
R5: Consideration will be made to reduce the option award window per your question in keeping with the sensitivity of the current market and dredge availability.
W912P819B0050
Q6: Are contractors allowed to make use of any/all of the disposal sites shown on the revised Plan Sheet C-01, and any combination thereof, in any order and manner they desire?
R6: Yes. Contractors are allowed to make use of any combination of the disposal areas and in the order chosen by the Contractor. Due to limited capacity of disposal sites on the east side of the Mississippi River, the Contractor shall use the West Bay Marsh Creation Site in its combination of desired disposal areas.
Q7: Please provide estimated disposal capacity for each of the disposal sites shown?
R7: West Bay (18Mcy), C (300kcy), D (380kcy), Chenier Pass (2.5Mcy), Camp (230kcy).
Q8: We note that all of the areas provided are unconfined. Please confirm that material will be allowed to run outside of the limits shown.
R8: With the exception of major canals and passes adjacent to the disposal areas, the overflow of fines outside the disposal limits is allowed. The contractor would be responsible for controlling excessive runoff into navigable routes (including those for shallow-draft recreational vessels) such that no significant changes in depth and width are made in these major canals and passes.
Q9: For the West Bay and Delta Wildlife Refuge disposal sites, it is specifically noted that a maximum of 1.0’ of fill will be allowed to run upon existing wetlands for nourishment purposes. Does this also apply to the Chenier Pass and Camp Disposal Sites?
R9: Fill directly placed on wetlands within the disposal polygons for the Chenier Pass and Camp disposal areas may be stacked to an elevation not to exceed +8'. The overflow or runoff of material outside the disposal polygon should not result in the burial of wetland plants by more than about 1'.
Q10: Please clarify the horizontal extent of the allowed runoff noted in Question Q9.
R10: The intent is for existing marsh plants on the periphery of the disposal site to act as filters for controlling or trapping fines that will run out of the disposal area. The horizontal extent is unknown and trapping efficiency will largely depend on plant type and thickness that has not been measured by the government.
Q11: We observe the bid date established by yesterday’s amendment is July 28th. This allows only four business days for contractors to prepare bids. Given the scale of this project, and in the interest of preparing a competitive bid, we request an extension of the bid date of two weeks.
R11: A one week extension for bid opening date will be made. New bid opening date will be 04AUG20.
(End of Summary of Changes)