A21 - W912P819B0050 AM0001.pdf
PDF 7 MB Posted
- Solicitation number
- W912P819B0050
About this file
This document provides details for a federal contract solicitation. The U.S. Army Corps of Engineers, New Orleans District is seeking a fully crewed and equipped self-propelled trailing suction hopper dredge to perform work at the Mississippi River from Baton Rouge to the Gulf of Mexico at the Head of Passes areas. The estimated value of the contract is over $10 million. The solicitation was scheduled to issue on or around August 20, 2019, with a bid opening date to be established in a future amendment. The work is unrestricted and offers are encouraged to register as interested vendors on FedBizOps. The NAICS code for the work is 237990. Offers must be registered in the System for Award Management to receive an award. Contact information is provided for two Contract Specialists supporting the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01 - W912P819B0050 Bid Abstract.pdf | ||
| B01 - W912P820B0050 Abstract signed.pdf | ||
| A21 - W912P819B0050 AM0004.pdf | ||
| A21 - AM0004 Survey Data O12C0028B.txt | TXT text file | |
| A21 - AM0004 Survey Data O12C0028A.txt | TXT text file | |
| A21 - W912P819B0050 AM0003.pdf | ||
| A21 - W912P819B0050 AM0002.pdf | ||
| W912P819B0050_Solicitation_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED-19-041
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject Solicitation Mississippi River, Baton Rouge to Gulf of Mexico, Head of Passes Hopper Dredge Disposal Area Project No. 19-1, Plaquemines Parish, Louisiana (ED 19-041) has been modified to provide specif ic details on how contractors are to submit Bids, Bonds and the Conference Call details for the Virtual Bid Opening w hich is now scheduled for Tuesday, July 28, 2020 at 11:30 AM CST. The Contracting Officer and Contract Specialist w ill begin dow nloading bids at 11:00 AM CST, w hich is the bid receipt cutoff time. All bids received after 11:00 AM CST on Tuesday, 28 April 2020 w ill be considered late. See the attached pages.
For any questions, please contact the Contracting Officer, (Veronica F. Garner-Flint 504-862-1515), or the Contract Specialist, (Karen Hargrave, 504-862-1561).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P819B0050
X 9B. DATED (SEE ITEM 11)
20-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jul-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P819B0050
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - BIDDING SCHEDULE
CLIN 0004
The pricing detail quantity has increased by 4,000,000.00 from 6,000,000.00 to 10,000,000.00.
CLIN 0005
The pricing detail quantity has decreased by 2,000,000.00 from 6,000,000.00 to 4,000,000.00.
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 (ten) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 400 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
NOTE: The term “work” includes tasks such as submission of submittals, performance of preliminary and/or BD surveys, and does not have to be dredging.”
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,385.00 or each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
SECTION SF 30 - SF 30 CONTINUATION
The required response date/time 28-Jul-2020 11:00 AM has been added.
The number of offeror copies required has increased by 1 from 0 to 1.
The description of performance has changed from 00800-3.2 to AM0001.
The contractor period of performance end 400 has been added.
The following have been added by full text:
AM0001
BIDDING SCHEDULE
Delete the Bidding Schedule in its entirety and substitute the attached revised Bidding Schedule therefore.
SECTION 00700
1. Page 36/284, Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. Delete this Clause in its entirety and substitute the following therefore:
“52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 10 (ten) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 400 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises.
NOTE: The term “work” includes tasks such as submission of submittals, performance of preliminary and/or BD surveys, and does not have to be dredging.”
2. Page 37/284, Clause 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION. Delete this Clause in its entirety and substitute the following therefore:
“52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,385.00 or each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)”
3. Page 50/284, Clause 52.236-4 PHYSICAL DATA, subparagraph (f). Delete this subparagraph in its entirety and substitute the following therefore:
“(f) Obstruction of Channel. With the exception of temporary shutdown in navigation, between 0600 and 1800 in order to allow the Contractor to install and remove the dredge pipeline to cross the Mississippi River channel for disposal into the West Bay Disposal Area, the Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor shall conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work, the Contractor shall promptly remove its plant, including ranges, buoys, piles and other markers placed by him/her under the contract in navigable water or on shore.”
WAGE RATES
Pages 58 thru 63 of 284. Delete General Decision Number: LA20190007 in its entirety and substitute the attached updated General Decision Number: LA202000007 therefore.
SUBMITTAL REGISTER
Delete the Submittal Register in its entirety and substitute the attached revised Submittal Register therefore.
SECTION 01 45 04.00 10
Page 2, paragraph 1.2. Delete this paragraph in its entirety and substitute the following therefore:
“1.2 ELECTRONIC TEST REPORT DATA
As part of the Contractor's Quality Control Program, the Contractor’s selected QC laboratory shall provide electronic transmission of test report data in the prescribed formats in addition to the original test report data shall be furnished to the Government. Tests results shall be emailed to mvn-cd-q-testresults@usace.army.mil and also to the Government's Inspector and
Project Engineer. In addition, all test results shall be uploaded into RMS. The New Orleans District Construction Control Manual (NODCC Manual) specifies the minimum number of tests to be made and includes forms which shall be used to report test data. The Technical Specification sections may include testing and/or frequency requirements other than those listed in the NODCC Manual. The more comprehensive requirements shall govern in case of conflict. A copy of the NODCC Manual is attached at the end of this section.
SECTION 01 57 20.01 12
1. Page 8, paragraph 3.3.1.3. Change “Mr. Ed Creef” to “Mr. Jeffrey Corbino”.
2. Page 10, paragraph 3.3.2.2. Change “Edward Creef, (504) 862-2521, email Edward.d.creef@usace.army.mil” to “Jeffrey Corbino 504.862.1958, email Jeffrey.M.Corbino@usace.army.mil”.
SECTION 01 78 02.00 10
Page, paragraph 1.3.1.2. subparagraph (g). Delete this subparagraph in its entirety and substitute the following therefore.
“(g) Dredge discharge pipeline location crossing Mississippi River along with xyz data defining the alignment and top of pipe elevation of the discharge line.”
SECTION 02 21 10.00 12
1. Page 9, paragraph 3.1.4.1. Delete this paragraph in its entirety and substitute the following
“3.1.4.1 General
The Contractor shall place material into the West Bay marsh creation site via a submerged pipeline under the Mississippi River ship channel and, as such, shall perform surveys of the proposed river crossing corridor. Prior to excavating and installing the line, the Contractor shall submit his proposed Crossing Plan to the COR for review and approval in order to assure that the pipeline will meet all the minimum requirements specified herein. Soundings shall be taken on intervals not to exceed 50 feet, as well as at all abrupt changes in grade. All survey data shall be plotted to scale of 1 inch = 50 feet horizontal and 1 inch = 10 feet vertical and shall also be provided in electronic format specified in the paragraph entitled "Compiled Survey Data". The above information shall also be provided in order to allow 72 hours for review and approval.”
2. Page 11, paragraph 3.1.7.1. Change “Edward Creef” to “Jeffrey Corbino”.
3. Pages 11 and 12, paragraphs 3.1.7.3, 3.1.7.4, 3.1.7.5, 3.1.7.6, and 3.1.7.7. Delete these paragraphs in their entirety and substitute the following therefore:
“3.1.7.3 Cheniere Pass East Disposal Site (Alternative 2)
If the Contractor elects to use the Cheniere Pass East disposal area, then disposal area surveys shall be taken on approximate 1000 foot intervals. Cross sections shall be taken extending from the existing marsh along the southern limit of disposal and across the disposal area approximately 2000 feet. The distance between soundings and/or rod readings shall be approximately 50 feet, and adjusted to capture all abrupt breaks in grade. Soundings and/or rod readings shall be recorded to the nearest tenth of a foot. All survey data shall be promptly plotted and furnished to the Contracting Officer's Representative. All survey data shall also be recorded in electronic format as per the paragraph entitled "Compiled Survey Data".
3.1.7.4 Camp Disposal Sites (Alternative 3)
If the Contractor elects to use the Camp disposal area, then disposal area surveys shall be taken on approximate 300 foot intervals. Cross sections shall be taken extending from the existing marsh along the western limit of disposal and east across the disposal area approximately 700 feet. The distance between soundings and/or rod readings shall be approximately 50 feet, and adjusted to capture all abrupt breaks in grade. Soundings and/or rod readings shall be recorded to the nearest tenth of a foot. All survey data shall be promptly plotted and furnished to the Contracting Officer's Representative. All survey data shall also be recorded in electronic format as per the paragraph entitled "Compiled Survey Data".
3.1.7.5 Delta Wildlife Refuge Site (Alternative 4)
For marsh creation sites (if used), the before and after surveys shall consist of a 500' grid as approved by the Contracting Officers Representative, with a minimum of one cross section in each direction. Sections shall be taken in the marsh creation sites via soundings and/or rod readings and shall encompass the entire limits of disposal. These sections shall be taken at intervals and locations to be determined later by the Contracting Officer. However, the before and after sections shall be taken in the same location. Soundings and/or rod readings shall be recorded to the nearest tenth of a foot and the distance between soundings and/or rod readings shall not exceed 50 feet.”
4. Page 13, paragraph 3.1.9. Delete this paragraph in it’s in its entirety, and substitute the following therefore: “3.1.9 Reserved”
SECTION 35 20 23.00 12
1. Page 3, subparagraph 1.1a). Delete this subparagraph in its entirety and substitute the following therefore:
a) The work provided for herein consists of furnishing all plant, labor, materials, and equipment and performing all operations necessary for the removal of all materials to the required dimensions as shown on the contract drawings, satisfactory disposal thereof, and all operations incidental thereto. Under this contract, the Contractor may use either the wetland creation areas along the east side of the Southwest Pass/Mississippi River Ship Channel in the Pass A Loutre Wildlife Refuge in addition to the West Bay marsh creation area.”
2. Page 5, paragraph 1.3.1. Delete this paragraph in its entirety and substitute the following
“1.3.1 Mobilization And Demobilization
An item to cover the cost of initial mobilization and final demobilization of the Contractor's plant and equipment under this contract is included and will be paid for as stipulated in the Contract Clause in Section 00700, entitled "PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DFARS 252.236-7004)". This shall also include all costs for mobilization and demobilization of equipment required for the installation and removal of a submerged dredge pipeline under the Mississippi River to pump material from the HDDA to the West Bay marsh creation sites via submerged pipeline.”
3. Page 6, paragraph 1.5. Under the submittal heading “Plan for Crossing Mississippi River with a Submerged Discharge Line”. Change the requirement to read “Submit for review and approval a plan for installation and removal of a submerged pipeline crossing from the HDDA to the West Bay marsh creation area”.
4. Page 12, paragraph 3.1.3.2. Delete this paragraph in its entirety and substitute the following
“3.1.3.2 Disposal in Pass A Loutre Wildlife Refuge
If the Contractor elects to place material within the wetland creation sites along the east side of the Southwest Pass/Mississippi River Ship channel and south of Pass A Loutre, there is no mandated order of disposal area usage. However for each disposal area used, the capacity of the disposal area shall be exhausted prior to moving to the next site. Access to the sites may be either through Cheniere Pass and Dennis Pass (all sites), Loomis Pass (Cheniere site), Johnson Pass (Camp site).”
3.1.3.3 Disposal in Delta Wildlife Refuge
If the Contractor elects to place material within the wetland creation sites along the eastside of the Southwest Pass/Mississippi River Ship Channel and north of Pass A Loutre, the material shall be deposited within the marsh creation areas C and D.“
5. Page 14, paragraph 3.2.2. In the table for PASS A LOUTRE WILDLIFE REFUGE DISPOSAL AREAS, delete the following utilities:
4" Flowline (proposed)
Runs adjacent to perimeter Castille disposal area
Permitted 3' below mudline
Dune Operating Co.
Chip Peltier 777 Walker Street Suite 2450 Houston,TX 77002 337-315-0657 cpeltier@duneenergy.com_
2-16" Gas Pipelines
Crossing South Pass
-43.5
High Point Robin Asvado 2402 Bayou Road St. Bernard, LA 72285 601- 799-4069 (x2023) robin.asvado@ americanmidstream.com
4" Flowline (proposed)
Within Castille Disposal Area
Permitted min 4' below mudline of disposal site and 8' below Cadro Pass
Whitney Oil and Gas Michael Francis 201 St. Charles Avenue New Orleans, LA 70170
985-799-1647
6. Page 18, paragraph 3.3.1, subparagraph a). Delete this paragraph and its subparagraphs in their entirety, and substitute the following therefore:
“a) Material dredged from the HDDA shall be deposited within the Wetland Creation Areas as shown on the contract drawings. Material shall be deposited in such a manner as to create marsh as shown on the contract drawings. Under this contract, the Contractor may use the marsh creation areas within the Pass A Loutre Wildlife Management Area (PALWMA) along South Pass in conjunction with the West Bay disposal area for marsh creation. The Contractor shall establish and maintain staff gages throughout the disposal area(s) as needed in order to monitor the elevation of the material for compliance with the plans and specifications. The staff gages shall be marked at one-half foot intervals, extending from water's surface to at least 1-foot above the maximum allowable disposal elevations. The Contractor shall retain earth moving equipment (marsh buggy) within the currently used disposal area for movement of pipeline and construction of retention/deflection dikes as required.
The Contractor shall submit, to the Contracting Officer for review and approval, a plan for the placement of dredged material within the Wetland Creation Areas. This plan shall be submitted a minimum of seven (7) days prior to the commencement of work. This plan shall include placement locations, access locations, and plans for retention of dredged material and for the protection of existing structures and utilities.
In general, areas of existing vegetation and bird nesting colonies shall be excluded from disposal activities, except as otherwise noted on the contract drawings. The Contracting Officer's Representative reserves the right to adjust the placement of the dredged material to best fit the work.”
7. Page 19, paragraph 3.3.2. Delete this paragraph in its entirety and substitute the following
“3.3.2 West Bay Marsh Creation Area
The Contractor shall adhere to the requirements below before, during, and after the dredging operations on the West Bay Marsh Creation Disposal site.”
8. Page 19, paragraph 3.3.2.2. Delete this paragraph in its entirety and substitute the following
“3.3.2.2 Disposal Template
The Contractor shall deposit the dredged material from the borrow area within the West Bay marsh creation area as shown on the contract drawings. Dredge material will be limited to a initial elevation of +4.5' feet, not to exceed +5.0 feet NAVD88. The initial buildup shall occur at the channel side limit of the West Bay marsh creation site and proceed towards the West Bay open waters with the marsh creation development to be adjacent to and along the bay side of the existing wetlands. At no time shall dredged material be placed directly upon existing wetlands. However a maximum of one (1) foot of fill will be allowed to run upon existing adjacent wetlands for nourishment purposes.”
9. Page 19, paragraph 3.3.2.3, subparagraph a). Delete this subparagraph in its entirety and substitute the following therefore:
“a) The Contractor shall submerge the temporary discharge line the entire limits of the Mississippi River/Southwest Pass navigation channel. The discharge line shall be trenched and anchored, if necessary, across the navigation channel and located within the channel access corridor depicted on the contract drawings. The limits of the corridor are between Miles 1.4 AHP and 1.2 AHP. The discharge line shall be installed and maintained throughout the duration of its use during this contract so that the top of pipe is always at or below elevation -52.5 feet MLLW. This minimum elevation criteria must apply for a minimum of 20 feet beyond the bottom edges of cut of the 750 foot wide navigation channel, and adjusted accordingly to account for any skew in the pipeline alignment. Material that is dredged from within the Mississippi River/Southwest Pass channel, in order to place the temporary dredge pipeline crossing at or below the minimum required grade of -52.5 feet MLLW, shall be disposed within any of the designated disposal areas or within the Hopper Dredge Disposal Site, material shall be placed inside and along the north shoreline of Pass A Loutre and in a southeasterly direction, with the discharge directed away from the Southwest Pass navigation channel. Disposal shall also be performed in a manner that will prevent impacting access to the western side of the hopper dredge disposal site.”
10. Page 21, paragraphs 3.3.3.1 and 3.3.3.2. Delete these paragraphs in their entirety, and substitute the following therefore:
“3.3.3.1 Cheniere Pass East Disposal Area
Dredged material shall be deposited inside of and along the boundary of the Cheniere Pass East disposal area, as depicted on drawings, to an initial elevation of +8.0' feet NAVD88. The intent of this disposal plan is to develop a marsh creation platform, beginning inside of and along the west bank of Cheniere Pass East disposal site, with filling of the site in a south-southeasterly direction and adjacent to the existing land. Access to the disposal area shall be via channel off Cheniere Pass. No excavation of channel will be allowed.
3.3.3.2 Camp Disposal Area
Dredged material shall be deposited inside of and along the boundary of the Camp disposal area, as depicted on drawings, to an elevation of +8.0' feet NAVD88. The intent of this disposal plan is to develop a marsh creation platform, beginning inside of and along the west bank of Camp disposal site, with filling of the site in a south-southeasterly direction and adjacent to the existing land. Access to the disposal area shall be via the 100 foot access corridor from Cheniere Pass. No excavation of access corridors will be allowed. Material will be allowed to overflow onto the PALWA camp site. However, the Contractor shall prevent dredged material from entering the canal along the PALWA camp site. If disposal material enters Dennis Pass, the Contractors shall return Dennis Pass to pre-disposal depth.
11. Pages 21, 22, 23, and 24, paragraphs 3.3.3.3, 3.3.3.4, 3.3.3.5, and 3.3.3.6. Delete these paragraphs in their entirety.
12. Page 24, paragraph 3.3.4. Delete this paragraph in its entirety and substitute the following
“3.3.4 East Side Disposal - Delta Wildlife Refuge
(a) If the Contractor elects to use the sites along the east side of the Mississippi River and north of Pass A Loutre, then dredged material from the borrow area shall be deposited first within the Marsh Creation Areas C and D, as shown on the contract drawings. Dredge material will be limited to a maximum initial elevation of between
+8.0 feet and 8.5 feet MLLW. At no time shall dredged material be placed directly upon existing wetlands. A maximum of one (1) foot of fill will, however, be allowed to run upon existing wetlands for nourishment purposes.
(b) The Contractor shall remain 300 feet from all structures, pipelines, and utilities for dredging and direct deposition of dredge material. Retention/deflection dikes shall be constructed as necessary in order to assure that dredged material does not enter areas that are not designated for disposal (i.e. adjacent water bodies such as Raphael Pass, Mississippi River, Pass A Loutre, etc). The Contractor may also construct earthen weirs in order to assist in containment of the dredged material within the marsh creation sites, while also allowing for drainage of effluent waters. The earthen weirs for Marsh Creation Areas C and D shall be located along the northeast sides of these sites, but if desired, Sites C and D can be constructed as a whole and no weir would be required between Sites C and D. All costs associated with retention/deflection dike and weir construction shall be included in the applicable unit price per yard for "Dredging" or "Dredging - OW" (if Optional Work is exercised).
(c) The Contractor shall be aware of shallow water depths in the disposal area. Flotation access channel may be necessary for equipment access. 48 hours prior to entering the refuge or beginning work, notification shall be made to James Harris, (985)-882-2027.
NEW SECTION 35 20 23.33
Add the attached new Section 35 20 23.33.
DRAWINGS
1. SHEET IDENTIFICATION Nos. G-02, G-03, G-04, C-01, and C-04. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos.
G-02, G-03, G-04, C-01, and C-04 therefore.
2. Add the attached new drawing SHEET IDENTIFICATION No. C-04A.
SECTION 00010 – BIDDING SCHEDULE
Mississippi River, Baton Rouge to the Gulf, Head of Passes Hopper Dredge Disposal Area Project (#19-1)
Plaquemines Parish, Louisiana
Item DESCRIPTION Estimated Quantity
Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
Aerial Photography Documentation
1 JOB
0003 Flotation Channels 1 JOB
0004* Dredging 10,000,000 CY
TOTAL BASE WORK: $
OPTIONAL WORK - OW
0005* Dredging - OW 4,000,000 CY
Bird Nesting Prevention and Avoidance Measures - OW
100 DAY
TOTAL OPTIONAL WORK: $
TOTAL BASE WORK + OPTIONAL WORK: $
*Denotes a change from the previous Bidding Schedule.
Award will be made as a whole to one bidder.
NOTE 1: The Contractor shall note that the area, shown as the borrow area, on the contract drawings is also designated as a disposal area for hopper dredges.
NOTE 2: It is the Government’s intent, under this contract, to dredge approximately 14,000,000 cubic yards of material (if Optional Work is exercised) from the hopper dredge disposal area (HDDA) and place it into the wetland creation areas, as shown on the contract drawings.
Circumstances may arise such that the Contractor may be required to coordinate this work with hopper dredges working in Southwest Pass of the Mississippi River. If such coordination is required, the Contractor may be directed to move dredging operations within the borrow area to an area which will cause the least impact to both dredging and disposal operations. In addition, the Contractor shall closely coordinate with the Corps of Engineers, US Coast Guard, River Pilots and Vessel Traffic Service (VTS) in order to assure safe operations and minimal impacts to navigation when placing material within the West Bay area.
NOTE 3: The unit “Job” as used in this Bidding Schedule is synonymous with the term “Lump Sum” used elsewhere within these plans and specifications.
NOTE 4: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE
UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS
BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 5: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).
NOTE 6: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within 24 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 7: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.
NOTE 8: OPTION FOR INCREASED QUANTITY -- SEPARATELY PRICED LINE ITEM (FAR
52.217-7). The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within three days prior to the estimated completion date of the basic line item or any previously exercised option. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
NOTE 9: OPTIONAL WORK ITEMS: The Government may require the delivery of the numbered line item(s), identified in the schedule as Optional Work items, in the quantity (total or part quantity) and price stated in the schedule. Bidders shall bid on all items including the Optional Work item (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid. If the Government activates the Optional Item, the activation will occur while the Contractor’s plant is within the limits of the dredging Base Work.
NOTE 10: TIME ADJUSTMENT IN THE EVENT OF OPTIONAL WORK. In the event that Optional Work Item 0005 Dredging – OW is exercised under the terms of this contract, the time required for completion of the contract will be increased by 130 calendar days beyond the original duration of 400 calendar days established for the Basic Work set forth in the Section 00700 Contract Clause paragraph entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK”. For partial award of Optional Work Item 0005 Dredging – OW, the 130 calendar day allowance will be prorated accordingly. Optional Work Item 0006 “Bird Nesting Prevention and Avoidance Measures – OW” requires work to be performed concurrent with Optional Work Item 0005 “Dredging – OW”. The successful bidder is advised that the contract time required for Optional Work Item 0006 “Bird Nesting Prevention and Avoidance Measures – OW” is included in the performance period allowed for completion of Optional Work Item 0005 “Dredging – OW”, thus the time required for completion of Optional Work will not be increased.
NOTE 11: ASSESSMENT OF LIQUIDATED DAMAGES. As this contract includes both Base and Optional Work items, and the durations allowed for completion of both the Base Work and awarded Optional work are independent of each other, liquidated damages will be assessed if and when the Contractor goes beyond the duration allowed for completion of the Base Work, and assessed until the Base Work is completed; and if Optional Work is awarded, liquidated damages will be assessed if and when the Contractor goes beyond the duration allowed for completion of the awarded Optional Work, and assessed until the Optional Work is completed."
NOTE 11: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
AM0001 VIRTUAL BID OPENING
INSTRUCTION TO BIDDERS
Due to the response for COVID-19, most federal employees have been mandated to telework, and currently only authorized personnel are allowed access to the District buildings throughout USACE. As a result, we have implemented the below procedures for all current and future bid openings, until such restrictions have been lifted and normal access has resumed at the MVN HQ Building.
Electronic Submission of Bids:
MVN will utilize the DoD Safe website for receipt of electronic bids under IFB Solicitations. In order to submit an electronic bid please follow these steps:
1. Send an email containing your name and email address to the Contracting Officer and Contract Specialist associated with the IFB:
Contracting Officer – Ms. Veronica Garner Flint, email: veronica.garner-flint@usace.army.mil Contract Specialist – Ms. Karen Hargrave, email: karen.d.hargrave@usace.army.mil
2. The Contracting Officer or Contract Specialist will go to the DoD Safe site, input your name and email address, and then will request the file from you. You will then receive an automated email from the site with a unique link in the email.
3. Once the email with the link is received, please click on the link in the email, which will take you to the DoD Safe site.
4. This will be a unique webpage where you can upload your file. The default page will load with the box checked off next to, “Send me an email when each recipient picks up the files”.
Please leave this box checked in order to receive a notification when the file is received from the Contracting Officer or Contract Specialist. Please leave unchecked, “Encrypt every file”. The site itself contains a high level of security in which additional encryption is not required.
5. When you are ready to upload your bid file (please use pdf format for bid submission), you can either click the blue button which says, “Click to Add Files or Drag Them Here” to locate the file on your computer, or simply drag the file onto the screen.
6. In the Description box that appears after uploading your file, please type your Company Name.
7. Click the button that appears at the bottom of the page, “Drop-off Files”. A banner will pop-up asking for confirmation that your upload does not contain Classified Information. Click ok on the banner.
8. You will be taken to a confirmation page that should say, “Drop-Off Completed” at the top.
This is your confirmation that your file was successfully uploaded to the site.
9. The Contracting Officer or Contract Specialist will receive an automated email stating that the file has been submitted. They will then send an email back to the company, confirming that they received the notice from the DoD Safe site.
The Bid Opening is currently scheduled for Tuesday, 28 July 2020 at 11:30 AM CST. The Contracting Officer and Contract Specialist will begin downloading bids at 11:00 AM CST, which is the bid receipt cutoff time. All bids received after 11:00 AM CST on Tuesday, 28 July 2020 will be considered late.
Audio Teleconference Bid Opening Information:
Bid Opening will be held on Tuesday, 28 July 2020 at 11:30 AM CST. Please use the following call-in information to attend the meeting:
Toll-Free: 844-721-7239 Access Code: 1221454
Following the conclusion of the bid opening, the Bid Abstract will be uploaded to Beta.SAM website under this solicitation, within 24 hours.
Bid Bonds (Offer Guarantee) should be submitted electronically with the Bid Package as per the scheduled Bid Opening on Amendment. As per Class Deviation 2020-O0016, Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. In addition, a Corporate Seal is not required, the SF 28 need not be sworn and notarized and a written authorization of the release signed by the surety is acceptable in lieu of the notarized authorization of release by the surety. Original Certified Bonds need not be submitted at time of bid. USACE MVN Contracting Division reserves the right to request the Original Certified Bonds, if deemed necessary to verify their authenticity.
The following deviation clauses now apply, in lieu of the corresponding FAR clauses:
52.228-11, Pledges of Assets (DEVIATION 2020-O0016), which removes the requirement for the Standard Form 28 to be sworn and notarized.
52.228-15, Performance and Payment Bonds—Construction (DEVIATION 2020- O0016), which removes the requirements for seals on Standard Forms.
52.228-16, Performance and Payment Bonds—Other than Construction (DEVIATION 2020-O0016), which removes requirements for seals on Standard Forms.
For any Questions please contact:
Contracting Officer – Ms. Veronica Garner Flint, email: veronica.garner-flint@usace.army.mil ;
Phone: 504-862-1515 Contract Specialist – Ms. Karen Hargrave, email: karen.d.hargrave@usace.army.mil ;
Phone: 504-862-1561
AM0001 WAGE DETERMINATION
"General Decision Number: LA20200007 01/03/2020
Superseded General Decision Number: LA20190007
State: Louisiana
Construction Type: Heavy Dredging
Counties: Louisiana Statewide.
DREDGING PROJECTS ALONG THE GULF COAST AREA INCLUDING THE
MISSISSIPPI RIVER AND ITS TRIBUTARIES TO THE OHIO RIVER
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020
* SULA1994-001 04/01/1994
Rates Fringes
Derrick Operator.................$ 7.25
Dozer Operator...................$ 7.25
Dredge 16"" and Over Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Fireman.....................$ 7.25 First assistant engineer....$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Second assistant engineer...$ 7.25 Shoreman....................$ 7.25 Third assistant engineer....$ 7.25 Truck driver................$ 7.25 Welder......................$ 7.25
Dredge Under 16"" Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Welder......................$ 7.25
Hydraulic Dredging First cook..................$ 7.25 Handyman....................$ 7.25 Janitor, cabin person.......$ 7.25 Second cook.................$ 7.25
Marsh Buggy Dragline, Oiler......$ 7.25
Marsh Buggy Dragline, Operator...$ 7.25
Self-Propelled Hopper Dredge, Drag Tender......................$ 9.70 3.45+a
FOOTNOTE: Fourteen paid vacation days and eight paid holidays: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day & Christmas Day provided the employee has one year of service.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
HOPPER DREDGE DISPOSAL AREA PROJECT 19-1
01 33 00 SD-01 Preconstruction Submittals
1.7 G CDSubmittal Register
01 45 04.00 10 SD-01 Preconstruction Submittals
3.2 G CDContractor Quality Control Plan
01 57 20.01 12 SD-01 Preconstruction Submittals
1.6.1 G OD-TEnvironment Pollution Control
Plan
1.6.1 G OD-TEnvironment Pollution Control
Plan SD-02 Shop Drawings
3.3.1.3 G OD-TBird Nesting Prevention Plan
01 78 02.00 10 SD-02 Shop Drawings
1.3.1 G EDC'As-Built' Drawings
1.3.1 G EDC'As-Built' Drawings
02 21 10.00 12 SD-01 Preconstruction Submittals
3.1.4.1 G EDCCrossing Plan
SD-02 Shop Drawings
3.1.3 G EDCPreliminary Field Surveys
3.1.5Before and After Dredging Cross
Sections 3.1.7.1Disposal Area Surveys
SD-03 Product Data G CDGrab Sampling Device Type
SD-04 Samples Grab Samples
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
02 21 10.00 12 1.6.6.2Compiled Survey Data
3.1.3 G EDCPreliminary Field Surveys
3.1.3 G EDCPreliminary Field Surveys
3.1.5Before and After Dredging Cross
Sections 3.1.7.1Disposal Area Surveys 3.1.4Mississippi River Pipeline
Corridor Surveys 3.1.8Flotation Access Channel Survey
Data SD-09 Manufacturer’s Field Reports
3.1.1Calibration checks 35 20 23.00 12 SD-01 Preconstruction Submittals
1.8.2Dredge Plant Data 3.2.1Plan of Operation
3.3 G EDCDisposal of Dredged Material
3.3.2.1 G EDCPlan for Crossing Mississippi
River with a Submerged Discharge Line
1.6.4 G EDCAccess Plan
1.6.3 G CTConstruction Schedule
SD-07 Certificates 3.2.1Certified Letter
SD-11 Closeout Submittals
1.6.2 G EDCReport of Operations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTIO…