1) The purpose of Amendment 0001 is to incorporate the changes in the attachments. 2) The Bid Opening for Solicitation W912P8-19-B-0045 w ill take place on 27 August 2019 at 11:00AM (CST). The location of the Bid Opening is the follow ing: U.S. Army Corps of Engineers, New Orleans District Headquarters 7400 Leake Avenue Room 125 New Orleans, LA 70118 Please see attachments for revisions to specifications, bidding schedule, clauses, and drawings

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ED-19-007

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1) The purpose of Amendment 0001 is to incorporate the changes in the attachments.

2) The Bid Opening for Solicitation W912P8-19-B-0045 w ill take place on 27 August 2019 at 11:00AM (CST). The location of the Bid Opening is the follow ing:

U.S. Army Corps of Engineers, New Orleans District Headquarters 7400 Leake Avenue Room 125 New Orleans, LA 70118

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P819B0045

X 9B. DATED (SEE ITEM 11)

06-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2019

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P819B0045

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SECTION SF 30 - SF 30 CONTINUATION

The required response date/time 27-Aug-2019 11:00 AM has been added.

The number of offeror copies required has increased by 1 from 0 to 1.

See attachments for revisions to specifications, bidding schedule, clauses, and drawings

(End of Summary of Changes)

SECTION 00010

Pages 00010-3, 4, and 5. Delete these pages in their entirety and substitute the attached revised pages 00010-3, 4, 5, 6, and 7 therefore.

SECTION 31 11 00.00 12

Page 2, paragraph 1.2.2. Delete this paragraph in its entirety and substitute the following therefore:

“1.2.2 Stockpile Area 2

No separate measurement or payment will be made for clearing and grubbing of Stockpile Area 2. Payment will be included in the contract job price for "Stockpile Area 2 Development - OW", if Optional Work is exercised.”

SECTION 31 23 00.00 12

Page 2, paragraphs 1.2.1 and 1.2.2. Delete these paragraphs in their entirety and substitute the following therefore:

“1.2.1 Excavation/Waste Materials

No separate measurement or payment will be made for excavation; nor for materials ordered wasted. Payment will be included in the applicable contract unit price per cubic yard for "Clay Processing/Stockpiling - Bonnet Carre", "Additional Clay Processing/Stockpiling - Bonnet Carre – OW", if Optional Work is exercised, or “Clay Processing/Stockpiling, Hwy 61 - OW”, if Optional Work is exercised.

1.2.2 Borrow Pit Development

No measurement will be made for borrow pit development satisfactorily performed.

Payment will be made at the contract job price for "Borrow Pit Development". Price and payment shall constitute full compensation for furnishing all plant, labor, materials, and equipment required to complete construction access; clearing and grubbing; constructing and maintaining protection dikes around the perimeter of the borrow pit; preparation for stockpiling; dewatering operations necessary for excavation; moisture control processing; and removal of retaining dikes upon completion of borrow operations; and other work incidental thereto; all as specified herein and as shown on the drawings.”

SECTION 31 24 00.00 12

1. Page 4, paragraph 1.3.1. Delete this paragraph in its entirety and substitute the

“1.3.1 Clay Stockpile

Unless otherwise specified, stockpiled fill material at the HWY 61 Stockpile location, Stockpile Area 1 within the Spillway, and Stockpile Area 2 within the Spillway will be measured for payment by the cubic yard. Quantities will be determined by the average end area method. The basis for the measurement will be cross sections of the stockpile location taken after clearing and grubbing operations and the actual stockpile section at its final location. The cross sections shall be taken perpendicular to the control lines shown on the drawings. Clay material placed outside of the designated stockpile section and tolerances will not be measured for payment.”

2. Pages 5 and 6, paragraphs 1.4.1, 1.4.2, and 1.4.3. Delete these paragraphs in their entirety and substitute the following therefore:

“1.4.1 Clay Stockpile

Payment for all fill material placed and including additional material placed by reason of foundation settlement during construction, will be made at the applicable contract unit price per cubic yard for "Clay Processing/Stockpiling - Bonnet Carre", "Additional Clay Processing/Stockpiling - Bonnet Carre – OW", if Optional Work is exercised, or “Clay Processing/Stockpiling, Hwy 61 - OW”, if Optional Work is exercised is exercised. Price and payment shall constitute full compensation for furnishing all plant, labor, control testing, surveying, employment of professional engineering services, equipment and material, settlement gages, and performing all operations necessary for excavation, all testing, hauling, foundation preparation, material processing for moisture control and blending, placing and compacting the material and all other incidental work required to complete the stockpiling operations. The Government reserves the right to remove and utilize partially stockpiled material at any time after a measurement and acceptance of the partial stockpile. During this removal operation, the Government may occupy not more than four acres of the stockpile area during removal operations.

1.4.2 Relocate Bonnet Carre Stockpile (If Optional Work is Exercised)

Payment for relocating the Bonnet Carre stockpile to the HWY 61 Stockpile location will be made at the contract unit price per cubic yard for "Relocate Bonnet Carre Stockpile - OW", if Optional Work is exercised. Price and payment shall constitute full compensation for furnishing all plant, labor, haul road maintenance, dust control, surveying, traffic control, equipment, material, settlement gages, and performing all operations necessary for excavation, hauling, foundation preparation and placing stockpile material at the HWY 61 Stockpile location; and all other incidental work required to relocate the stockpile. This payment will be made in addition to the original bid item "Clay Processing/Stockpiling - Bonnet Carre" provided the original stockpile fill was constructed, measured and accepted by the Government. Some losses in material are to be expected when the stockpile is relocated; consequently, the quantity paid for under "Relocate Bonnet Carre Stockpile - OW" is based on its final location not the original stockpile quantity at the Bonnet Carre Spillway.

1.4.3 Reserved”

3. Page 13, paragraph 3.3. Delete this paragraph in its entirety and substitute the

“3.3 RELOCATE BONNET CARRE STOCKPILE TO HWY 61 STOCKPILE

LOCATION

The relocation of the Bonnet Carre Stockpile includes the Contractor moving all or part of the stockpiled fill from the Bonnet Carre Stockpile to the Hwy 61 Stockpile location. If clearing, grubbing, culvert installation or road construction at the HWY 61 Stockpile is required, an equitable adjustment will be made pursuant to the Contract Clause in Section 00700, entitled CHANGES (FAR 52.243-4).”

DRAWINGS

1. SHEET IDENTIFICATION Nos. G-02 and G-04. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos.

G-02 and G-04 therefore:

2. Add the attached new drawing SHEET IDENTIFICATION No. C-02A to this contract.

00010-3 Ed 19-007

SECTION 00010 – BIDDING SCHEDULE

West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, Bonnet Carre Stockpile, Contract 1, Charles Parish, Louisiana Item Description Estimated

Quantity Unit Unit Price Estimated Amount

BASE WORK

0001 Mobilization and Demobilization 1 JOB 0002 Borrow Pit Development 1 JOB 0003 Clay Processing/Stockpiling - Bonnet Carre

0003AA First 100,000 CY 100,000 CY 0003AB All Over 100,000 CY 400,000 CY 0004 Asphalt Ramp Reconstruction 1 JOB

TOTAL BASE WORK $

OPTIONAL WORK

Additional Clay Processing/Stockpiling - Bonnet Carre – OW 500,000 CY

0006 Relocate Bonnet Carre Stockpile - OW

0006AA First 100,000 CY 100,000 CY 0006AB All Over 100,000 CY 900,000 CY 0007 Clay Processing/Stockpiling, Hwy 61 - OW

0007AA First 500,000 CY 500,000 CY 0007AB All Over 500,000 CY 500,000 CY 0008 Stockpile Area 2 Development - OW 1 JOB

TOTAL OPTIONAL WORK $

TOTAL BASE WORK + OPTIONAL WORK $

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

Award will be made as a whole to one bidder.

NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE

DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR

AWARD.

00010-4 Ed 19-007

NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).

NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within ten (10) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. Failure to bid on all items will result in a non-responsive bid.

NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.

Evaluation of options will not obligate the Government to exercise the option(s).

NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF

OPTIONAL WORK.

(a) In the event that CLIN 0005 is exercised under the terms of the contract, the time required for completion of the contract shall be 250 calendar days in addition to the original contract duration of 320 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-211-10

– APR 1984)”.

(a) In the event that CLIN 0006 is exercised, the time required for completion of the contract will be an additional 1 calendar day for every 3,000 CY relocated, less the number of remaining days until required completion date, in addition to the original contract duration of 320 calendar days established for the BASE WORK items specified in the Contract Clause entitled "COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-211-10 http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

00010-5 Ed 19-007

– APR 1984)". If the resulting duration is negative, no change will be made to the contract duration. For Example: If 500,000 CY are to be relocated and 120 days remain until the required completion date, the number of days granted equals 500,000 CY/3000 CY/day =167 days minus 120 days, yields a total time extension of 47 calendar days. If CLINs 0006 and 0007 are both exercised, the greater of the two calculated durations will be granted but shall not be combined.

(b) In the event that CLIN 0007 is exercised, the time required for completion of the contract will be an additional 1 calendar day for every 2,000 CY required under CLIN 0007 (the estimated quantity required under CLIN 0007 will be 1,000,000 CYs minus the CLIN 0003 quantity as of the date the CLIN 0007 option is exercised), less the number of remaining days until required completion date, in addition to the original contract duration of 320 calendar days established for the BASE WORK items specified in the Contract Clause entitled "COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-211-10 – APR 1984)". If the resulting duration is negative, no change will be made to the contract duration. For Example: If 200,000 CYs have been stockpiled under CLIN 0003 at the time CLIN 0007 is exercised, then 800,000 CYs may be required under CLIN 0007. If 800,000 CYs are required under CLIN 0007 and 150 days remain until the required completion date, the number of days granted equals 800,000 CY/2000 CY/day =400 days minus 150 days, yields a total time extension of 250 calendar days. If CLINs 0006 and 0007 are both exercised, the greater of the two calculated durations will be granted but shall not be combined.

(c) In the event that CLIN 0008 is exercised, no additional time will be added to the contract.

NOTE 8: The Government will determine the total quantity to be acquired for any unit priced item under either the base or option CLINs. The maximum allowable fill to be processed and stockpiled will be limited to the available material within borrow pits 1, 2, and 3 as shown on contract drawing C-01. If CLIN 0005 is exercised, CLIN 0007 will not be exercised.

NOTE 9: Optional CLINs 0005, 0006, 0007, and 0008 can be individually exercised or in any combination except CLIN 0005 and CLIN 0007 will not both be exercised.

Note 10: If the CLIN 0007 option is exercised, the Contractor shall not add any additional material to the stockpile areas located in Bonnet Carre Spillway, and shall immediately prepare the stockpiles for measurement and relocation, unless approval to continue is granted by the Contracting Officer. Relocation operations shall proceed promptly, without interruption as soon as surveying the stockpile is complete and no further

00010-6 Ed 19-007 measurement or payment under CLIN 0003 will be made. After relocation of the clay stockpiles from the Bonnet Carre Spillway, the Contractor shall demobilize from the Bonnet Carre stockpile site and will not have any rights to the stockpile areas even if other optional work under this contract is granted.

00010-7 Ed 19-007

EVALUATION OF SUBDIVIDED ITEMS (Mar 1995) - UAI 5152.211-9000).

Item Nos. 0003, 0006 and 0007 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

(End of Clause)

VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (Mar 1995) - UAI 5152.211-9001).

The Variation in Estimated Quantities Subdivided Items clause is applicable only in Item Nos. 0003, 0006 and 0007.

a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

b. Where the actual quantity of work performed for Item Nos. 0003, 0006 and 0007 is less than 85% of the quantity of the first sub-item listed under such item, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity .

c. If the quantity of work performed under Item Nos. 0003, 0006 and 0007 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.

(End of Clause)

A N

S I

D

L H

H

X D

A V

ID

A

B E

C K

NEW ORLEANS DISTRICT

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

E

W O

R L E

A N

S D

IS

T R

IC

T

N E

W O

R L E

A N

S L

O U

IS

IA

N A

L A

U R

E N H

A T T E

N

/0

/1

H -8 -4

J .S

H A

H

A P

R

B O

N N

E T C

A R

R E S

T O

C K

P

IL

E C

O N

T R

A C

T

R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

H U

R R

IC

A N

E A

N D S

T O

R M D

A M

A G

E

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

L

O U

IS

IA

N A

W P -1

-B -0

S T

C H

A R

L E

S /S

T J

O H

N T

H E B

A P

T

IS

T P

A R

IS

H E

S L

A

H W

Y

ILLINOIS CENTRAL RAILROAD

B O

N N E T C

A R

R E U

P P E

R G

U

ID

E L

E V E E

K A N S A S C

ITY

R

A

ILR

O A D

BONNET CARRE SPILLWAY STRUCTURE

BONNET CARRE SPILLWAY

A T

C H

A F

A L A

Y A

R

IV

E R

A R K A N S A S

SHREVEPORT

MONROE

R

IV

E R

R

IV

E R

VICKSBURG

NATCHEZ

ALEXANDRIA

R E

D

R

IV

E R

LAKE CHARLES

BATON ROUGE

L O U I S I A N A

M I S S I S S I P P I

T E X A S

LAKE

PONTCHARTRAIN

LAKE BORGNE

G U L F

O F M E X I C O

M

IS

S

IS

S

IP

P I

SCALE OF MILES

40 400 80 120 160 200

CITY

MORGAN

ORLEANS

NEW

O U

A C

H

IT

A

LOCATION MAP

0 4000'2000'

SCALE:1"=2000'

S .T C H A R L E S

P A R I S H

A

IR

LIN

E H

IG

H W

A Y /H

W Y

PIT 2

PIT 1

PIT 3

N

G95-ECC

B O

N N E T

C A R R E L

O W

E R G

U

ID

E L

E V E E

S T O

C K P

IL

E

S T

O C

K P

IL

E

SAND STOCKPILE PIT

VICINITY MAP

LOCATION

PROJECT

S T J O

H N T

H E B

A P T

IS

T P

A R

IS

H

HWY 61 STOCKPILE

R E V I

R

I

P P

I S

S I

S S

I M

H

G .d g n

A D

D E

D H

W Y

S

T O

C K

P

IL

E /0

/1

M .A .B

V

IC

IN

IT

Y M

A P

:1

G-02

G-04

:1

H

G .d g n

B O

R R

O W S

T O

C K

P

IL

E

A N

D F

A C

IL

IT

IE

S T

A B

U L

A T

IO

N S

A D

D E

D A

C C

E S

S R

O A

D A

N D S

T O

C K

P

IL

E A

R E

A M

A B

/0

/1

(RAMP RECONSTRUCTION)

TEMPORARY WORK AREA

BORROW PIT 1 BORROW PIT 2 BORROW PIT 3

SAND STOCKPILE PIT

STOCKPILE AREA 1 STOCKPILE AREA 2

CONTROL POINTS STOCKPILE AREA 1

CONTROL POINTS STOCKPILE AREA 2

DISPOSITION

DESCRIPTION OF FACILITIES

DESIGNATION X Y

A

B

C

D

E

DESIGNATION X Y

A

B

C

D

E

DESIGNATION X Y

A

B

C

D

E

F

DESIGNATION X Y

A

B

C

D

DESIGNATION X Y

A

B

C

D 3572276.85

3572898.16

3572675.16

3572100.98

552827.06

553211.87

553391.45

553095.97

F 554562.25

553705.23

553182.07

553446.20

553311.48

553949.60

3564739.41

3564078.90

3564619.01

3564874.85

3565013.93

3565520.33

G-1

G-3

G-4

G-5

G-6

W-1

G-7

DESIGNATION

E-1

E-3

E-4

G-2

DO NOT DISTURB

DESCRIPTION

E-2 DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

ENTERGY OVERHEAD POWERLINE

ENTERGY OVERHEAD POWERLINE

ENTERGY OVERHEAD POWERLINE

ENTERGY OVERHEAD POWERLINE

GASLINE

BRIDGELINE HOLDINGS, L.P.

GAS PIPELINE

SHELL PIPELINE CO., LLC

GAS PIPELINE

ENTERPRISE PRODUCTS OPERATION, LLC

12" GAS PIPELINE

AIR PRODUCTS & CHEMICALS, INC.

18" GAS PIPELINE

BOARDWALK PIPELINE PARTNERS, LP

22" GAS PIPELINE

BOARDWALK PIPELINE PARTNERS, LP

WATERLINE

TBD

DO NOT DISTURB

DESIGNATION X Y

A

B

C

D

553910.73

553191.71

552911.71

552457.70

552521.21

553620.72

3562486.20

3561880.78

3562565.89

3563171.30

DESIGNATION X Y

A

B

C

D 553171.07

553846.07

553918.52

553280.40

3565216.64

3565667.88

3565559.50

3565053.09

553069.38

552861.59

551384.60

551339.59

551651.89

552498.78

E

F 3561368.40

3561103.11

3560781.64

3560983.49

3561619.77

3561804.10

554264.94

553428.44

552932.60

553769.10

DESIGNATION X Y

2 3561464.90

3561091.41

553051.78

551335.80

GAS PIPELINE

ABANDONED

DESIGNATION X Y

2 3561464.90

3561091.41

553051.78

551335.80

554942.33

554611.08

554411.53

553751.88

554813.00

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

DO NOT DISTURB

OE-01

GATE 01

PP-01

CULVERT

OVERHEAD POWER

ENTERGY

PRIVATE GATE

ENTERGY

PRIVATE

POWER POLE

THROUGH 24

CUL 01

DO NOT DISTURBG-002

DO NOT DISTURBC-005

DO NOT DISTURBG-068

AT&TBURIED FIBER OPTIC

BURIED NATURAL GAS LINE GULF SOUTH

DO NOT DISTURBWH-01 WELL HEAD ABANDONED

BURIED HYDROGEN LINE PRAXAIR, INC

3565771.25

3565290.58

3565356.62

3565963.53

3566304.63

3566497.73

NOTE: PIPELINE PROTECTION NOT REQUIRED

3566097.26

3565439.52

3565226.46

3566437.90

3566704.15

SECTIONS OF THE STOCKPILES FOR MEASUREMENT PURPOSES.

NOTE: CONTROL LINES SHALL BE USED TO ESTABLISH CROSS

3553345.30 568695.61

3553343.24 568716.74

3553367.46 568729.02

3553717.15 568869.52

3555035.15 569454.16

3556404.79 570057.31

3557127.07 570360.27

3557393.81 570471.82

3557733.34 570615.97

3558820.75 571054.45

3558587.01 570968.16

3559406.20 571311.22

3554466.75 569206.05

3554450.56 569242.63

3555019.09 569490.80

3556388.99 570094.06

3557111.62 570397.16

3557378.28 570508.68

3557717.90 570652.86

3558572.45 571005.43

3558805.78 571091.56

3559390.27 571347.91

3560658.43 571892.90

3560862.32 571970.85

3561055.46 572066.42

3561086.15 572075.51

3561177.04 572111.38

3561099.19 572037.66

3561070.12 572029.05

3560878.37 571934.16

3560673.48 571855.83

DESIGNATION X Y DESIGNATION X Y

DESIGNATION X Y

3560629.70 573178.12

3559341.12 572540.89

3559481.13 572260.13

3558562.84 571811.29

3558425.8 572091.49

3557027.93 571408.20

3554888.17 570295.13

3553282.79 568742.81

3553312.39 568745.94

3553350.93 568765.48

3553701.50 568906.34

3561223.03 572129.53

3561242.92 572094.38

3561192.12 572074.33

02 3555234.87 569585.82

DESIGNATION X Y

3561873.88 571303.39

3562704.11 571785.52

3562223.57 572475.96

3561245.85 572089.20

3555252.45 569549.86

3555589.15 568860.99

3558731.52 5700082.19

02A

3556388.99 570094.06

3557111.62 570397.16

3557378.28 570508.68

3557717.90 570652.86

3558572.45 571005.43

3558805.78 571091.56

3559390.27 571347.91

3560658.43 571892.90

3560862.32 571970.85

3561055.46 572066.42

3561086.15 572075.51

3561177.04 572111.38

3561223.03 572129.53

3556404.79 570057.31

3557127.07 570360.27

3557393.81 570471.82

3557733.34 570615.97

3558820.75 571054.45

3558587.01 570968.16

3559406.20 571311.22

3561099.19 572037.66

3561070.12 572029.05

3560878.37 571934.16

3560673.48 571855.83

3561242.92 572094.38

3561192.12 572074.33

ROAD EASEMENT

HWY 61 STOCKPILE

ROAD EASEMENT

HWY 61 STOCKPILE

CONSTRUCTION EASEMENT

HWY 61 STOCKPILE

CONSTRUCTION EASEMENT

HWY 61 STOCKPILE

A N

S I

D

L H

H

X D

A V

ID

A

B E

C K

NEW ORLEANS DISTRICT

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

W O

R L E

A N

S D

IS

T R

IC

T

N E

W O

R L E

A N

S L

O U

IS

IA

N A

L A

U R

E N H

A T T E

N

S T

C H

A R

L E

S P

A R

IS

H L

O U

IS

IA

N A

B O

N N

E T C

A R

R E S

T O

C K

P

IL

E C

O N

T R

A C

T

R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

H -8 -4

J S

H A

H W

P -1

-B -0

A P

R

/0

/1

1000'0 500'

SCALE:1"=500'

ST. JOHN THE BAPTIST PARISH, LA

K C S R R

11 12

02A

H W

Y

N

:1

G-002

C-005

/3

/1

M .A .B

H

C

A .d g n

H W

Y

S

T O

C K

P

IL

E

C-02A

200' X 200' STAGING AREA

ACCESS ROAD

CONSTRUCTION EASEMENT

HWY 61 STOCKPILE

A D

D E

D S

H E

E T

A N

S I

D

L H

H

X D

A V

ID

A

B E

C K

NEW ORLEANS DISTRICT

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

W O

R L E

A N

S D

IS

T R

IC

T

N E

W O

R L E

A N

S L

O U

IS

IA

N A

L A

U R

E N H

A T T E

N

/0

/1

H -8 -4

J .S

H A

H

A P

R

B O

N N

E T C

A R

R E S

T O

C K

P

IL

E C

O N

T R

A C

T

R

IS

K R

E D

U C

T

IO

N P

R O J E

C T

H U

R R

IC

A N

E A

N D S

T O

R M D

A M

A G

E

W E

S T S

H O

R E L

A K

E P

O N

T C

H A

R T

R A

IN

L

O U

IS

IA

N A

W P -1

-B -0

S T

C H

A R

L E

S /S

T J

O H

N T

H E B

A P

T

IS

T P

A R

IS

H E

S L

A

CUL-11

CUL-15

CUL-14

CUL-13

CUL-12

CUL-10

CUL-09

CUL-08

CUL-06

CUL-07

CUL-04

CUL-03

OE-01

CUL-02

CUL-05

CUL-16 CUL-17

CUL-18

CUL-19

GATE-01

CUL-01

WH-01

WH-03

G-002

C-005

PP-01

G-068

A.02 Amendment 0001
A.02 W912P819B0045_Am_0001_ED 19-007
“1.2.2 Stockpile Area 2
“1.2.1 Excavation/Waste Materials
1.2.2 Borrow Pit Development
“1.3.1 Clay Stockpile
“1.4.1 Clay Stockpile
1.4.2 Relocate Bonnet Carre Stockpile (If Optional Work is Exercised)
1.4.3 Reserved”
“3.3 RELOCATE BONNET CARRE STOCKPILE TO HWY 61 STOCKPILE LOCATION