A.01__Amendment_0007_09_Sep_2019_WSLP.pdf
PDF 440 KB Posted
- Solicitation number
- W912P819B0045
About this file
The purpose of Amendment 0007 is the following: 1) The location for the Bid Opening is the follow ing: U.S. Army Corps of Engineers, New Orleans District 7400 Leake Avenue, Roon 179 New Orleans, LA 70118. 2) To provide clarifications to Government Responses. 3) The Solicitation Closing/ Bid Opening remains unchanged at 12 September 2019 at 11:00AM (CST).
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED-19-007
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0007 is the follow ing:
1) The location for the Bid Opening is the follow ing:
U.S. Army Corps of Engineers, New Orleans District 7400 Leake Avenue, Roon 179 New Orleans, LA 70118.
2) To provide clarifications to Government Responses.
3) The Solicitation Closing/ Bid Opening remains unchanged at 12 September 2019 at 11:00AM (CST).
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P819B0045
X 9B. DATED (SEE ITEM 11)
06-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Sep-2019
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P819B0045
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
The following have been added by full text:
GOVERNMENT RESPONSES
Clarifications to Government Responses
Industry Question: The bid form requires that bidders total all optional items, therefore bond that total. The notes clearly say that Options "CLIN 0005 and CLIN 0007 will not both be exercised." That is requiring contractors to bond 1M CY of material that will not be awarded and is expensive to bond. Please consider Amending this contract to clearly separate Option 0005 or 0007 into separate totals. This in addition to the situation stated below about the late notification of a new bid bond is making bidding on this project problematic for several, if not all, contractors.
Government Response: Bid, performance and payment bonds are required by law on public construction projects.
Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
Industry Question: In amendment 0004, question 13, the last sentence of the government response states “The specifications will be updated accordingly in a forthcoming amendment.” The only other amendment issued was 0005, which only updated the bid bond form. Will another amendment be issued in relation to question 13?
Government Response: Please see Amendment number 0004.
Section 32 12 16.00 12
Page 8, paragraph 3.7.1, delete the paragraph in its entirety and substitute the following therefore:
“3.7.1 Placement The asphaltic concrete pavement shall consist of 9-inches of base course (Class II Stone), 4 inches of superpave asphaltic concrete binder course (Level A) and two layers of 2 inches of superpave asphaltic concrete wearing course (Level A). Placing of asphaltic mixtures shall be in accordance with the specified lift thicknesses shown on the drawings and in accordance with LSSRB 502. Asphalt shall be placed and compacted in lifts of thicknesses specified herein and as shown on the drawings.”
Industry Question: Specifications indicate construction deliverables are in section 52.214.12 of the issued plans and specifications. At this time, this section is NOT included in the material that is available to contractors to bid.
This project has a bid opening scheduled for Monday September 9 at 11:00 am.
Can you please issue some type of information as to what we are to return as a complete bid package (deliverables) to you?
Government Response: FAR Clause 52.214-12, is the guidance for Bidders to follow in preparing bids. Page 00700-22, para (e), provides the specifications and contract drawings.
Industry Question: Section 00600 Representations and Certifications are to be turned in with the bid. Usually we print this information from SAM.gov, but when changes need to be made we have to manually complete the documents that are typically located in section 00600. These documents seem to be missing from this solicitation, as there are no documents for the contractor to complete in section 00600 or any other section. Attached for your reference are the Certs. and Reps. that are included in another solicitation. Please advise.
Government Response: Section 00600 – Representations and Certifications begin on page 00600-1 of the solicitation, it is intact.
(End of Summary of Changes)