AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for Calcasieu Dredging Maintenance FY18, Mile 5.0 to 17.0, Including Beneficial Use w ithin SNWR & Devil's Elbow is hereby amended to respond to contractor questions show n on the continuation pages.

THE BID OPENING DATE/TIME of 11 SEPTEMBER 2018 AT 2:00 PM CST REMAINS THE SAME.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P818B0022

X 9B. DATED (SEE ITEM 11)

08-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Sep-2018

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P818B0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMD 0003 - RESPONSES

Question 1. Will the Government’s availability of funds be determined by the Government Estimate provided on the Bid Date or some other factor?

Response 1. The Government’s availability of funds will be determined based on availability of funds within the Programs that are funding this project (O&M and BUDMAT) with respect to the lowest bid on Alternative 1.

Question 2. Will Alternative 1 or 2 be awarded on the Bid Date or at some time after the Bid Date?

Response 2. Award will not be made on the bid date. An apparent successful bidder will be identified on the bid date based on the low bid received in comparison with all other competitive bids received, and a comparison with the Independent Government Estimate. Prior to award, the low bid will be reviewed for responsiveness to all requirements of the solicitation and a determination of the low bidder's responsibility will be made.

Question 3. Will the 2 staging areas along Highway 27 be for the exclusive use of the contractor or will they need to be accessible to the public during construction?

Response 3. The Contractor will not be impacted in regards to usage of these two staging areas. The Government has obtained a special use permit for construction/access/egress within the refuge at these two sites as required by the Contractor for the time required to complete all work within the Sabine Refuge. All work and scheduling will be coordinated with the Sabine Refuge manager through the Government COR. While the area(s) may be restricted to the public during dredging operations, all efforts shall be made on the part of the Contractor to maintain public access during the Contract duration when possible.

Question 4. Please confirm that the Total Work under the column “Estimated Amount Alternative 1” is the sum of Base Work + Alternative 1 + Optional Work

Response 4. Correct: “TOTAL WORK” for column “Estimated Amount Alternative 1” is the summation of “TOTAL BASE WORK” + “TOTAL ALTERNATIVE 1” + “TOTAL OPTIONAL WORK” in that column.

Question 5. Please confirm that the Total Work under the column “Estimated Amount Alternative 2” is the sum of Base Work + Alternative 2 + Optional Work

Response 5. Correct: “TOTAL WORK” for column “Estimated Amount Alternative 2” is the summation of “TOTAL BASE WORK” + “TOTAL ALTERNATIVE 2” + “TOTAL OPTIONAL WORK” in that column.

Question 6. Is the scope of work included under the Base Work (CLIN’s 1‐7) and the Optional Work (CLIN’s 13‐19) the same for both Alternative 1 & Alternative 2? If yes, why is the Bid Schedule structured in such a format that the Bidder must provide separate pricing for both Alternatives?

W912P818B0022

Response 6. Yes, the scope of work under the Base Work (CLIN’s 1‐7) and the Optional Work (CLIN’s 13‐19) is the same for both Alternative 1 & Alternative 2. However, though certainly allowable, the Contractor is not mandated to provide the same Unit Price for each alternative. For instance, the Contractor may elect to bid a different “Mobilization and Demobilization” unit price for Alternative 1 versus Alternative 2 to accommodate pipeline assembly into the Sabine Refuge.

Question 7. Is there an existing pipeline running through West Cove Canal that the contractor may utilize for Alternative 1? If so, what is the size of this pipeline?

Response 7. No, there is no existing dredge pipeline running through West Cove Canal. The contractor will have to furnish their own temporary pipeline.

To better clarify the concerns raised in questions 4 and 5 above, Note 12 of the Bidding Schedule is revised to read as follows:

Note 12: As per Note 1 of the bidding schedule, the intent of the Government is to award “Alternative 1”. Bidders must bid on both alternatives, and shall insert a unit price for all items listed on the bidding schedule. The Row entitled “TOTAL BASE WORK” is the summation of bid items 0001 through 0007 for each respective column “Estimated Amount Alternative 1” and “Estimated Amount Alternative 2”. The Row entitled “TOTAL ALTERNATIVE 1” is the summation of bid items 0008 through 0010 for column “Estimated Amount Alternative 1”. The Row entitled “TOTAL ALTERNATIVE 2” is the summation of bid items 0011 through 0012 for column “Estimated Amount Alternative 2”. The Row entitled “TOTAL OPTIONAL WORK” is the summation of bid items 0013 through 0019 for each respective column “Estimated Amount Alternative 1” and “Estimated Amount Alternative 2”. The Row entitled “TOTAL WORK” for column “Estimated Amount Alternative 1” is the summation of “TOTAL BASE WORK” + “TOTAL ALTERNATIVE 1” + “TOTAL OPTIONAL WORK” in that column. The Row entitled “TOTAL WORK” for column “Estimated Amount Alternative 2” is the summation of “TOTAL BASE WORK” + “TOTAL ALTERNATIVE 2” + “TOTAL OPTIONAL WORK” in that column. Award will be made as a whole to one bidder, based on the TOTAL WORK price for column “Estimated Amount Alternative 1” or “Estimated Amount Alternative 2” based on Government availability of funds at the moment of award.

(End of Summary of Changes)