About this file

Amendment 0002

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for Calcasieu Dredging Maintenance FY18, Mile 5.0 to 17.0, Including Beneficial Use w ithin SNWR & Devil's Elbow is hereby amended to provide a revised Section 00010 - Bidding Schedule as show n in the continuation pages.

THE BID OPENING DATE/TIME REMAINS THE SAME.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P818B0022

X 9B. DATED (SEE ITEM 11)

08-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Aug-2018

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION 00010 – BIDDING SCHEDULE

Calcasieu River and Pass, LA, Maintenance Dredging FY18, Mile 5.0 to Mile 17.0, Including Beneficial Use within Sabine National Wildlife Refuge and Devil’s Elbow, Calcasieu and Cameron Parishes, LA

00010-3 ED 17-052

Description Estimated Quantity Unit

Unit Price Alternative

Unit Price Alternative

Estimated Amount

Alternative 1

Estimated Amount

Alternative 2

BASE WORK

0001 Mobilization and Demobilization 1 JOB

0002 Dredging – Mile 14.0 to Mile 17.0

0002AA First 830,000 Cubic Yards 830,000 CY

0002AB All Over 830,000 Cubic Yards 120,000 CY

0003 Dredging – Mile 5.5 to Mile 6.5

0003AA First 110,000 Cubic Yards 110,000 CY

0003AB All Over 110,000 Cubic Yards 30,000 CY

0004 Dike Construction – Mile 5.5 – 6.5/ Mile 14.0 – 17.0 1 JOB

0005 Dredging – Devil’s Elbow

0005AA First 800,000 Cubic Yards 800,000 CY

0005AB All Over 800,000 Cubic Yards 300,000 CY

0006 Dike Construction - Devil’s Elbow 1 JOB

0007 Aerial Photography Documentation 1 JOB

ALTERNATIVE 1 – PLACEMENT OF MATERIAL WITHIN SNWR BUDMAT SITES

0008 Dredging at SNWR BUDMAT Sites – Mile 6.5 to Mile 14.0

0008AA First 1,300,000 Cubic Yards 1,300,000 CY 0008AB All Over 1,300,000 Cubic Yards 210,000 CY 0009 Sabine Weir Construction 12,055 LF 0010 Sabine Staging Areas 1 JOB

ALTERNATIVE 2 – PLACEMENT OF MATERIAL WITHIN CDF’S

0011 Dredging – Mile 6.5 to Mile 14.0 0011AA First 1,300,000 Cubic Yards 1,300,000 CY 0011AB All Over 1,300,000 Cubic Yards 210,000 CY 0012 Dike Construction - Mile 6.5 to

Mile 14.0 1 JOB

OPTIONALWORK

0013 Bird Nesting Prevention and Avoidance Measures - OW 80 DAYS

0014 Spill Box Removal and Replacement - OW 4 EACH

0015 Ditching/Draining CDF-12B - OW 26,439 LF

Mile 5.0 to Mile 17.0, Including Beneficial Use within Sabine National Wildlife Refuge and Devil’s Elbow, Calcasieu and Cameron Parishes, LA

00010-4 ED 17-052

Award will be made as a whole to one bidder, based on TOTAL WORK price for column “Estimated Amount Alternative 1” or “Estimated Amount Alternative 2”.

NOTE 1: The intent of the Government is to award “Alternative 1”. Due to limited availability of funds, final selection of Alternative to be awarded by the Government will be based on the Total Work price for column “Estimated Amount Alternative 1” or “Estimated Amount Alternative 2” and the Government availability of funds at the moment of award. Bidders must bid on both alternatives. If the bidder omits both the unit price and the extended amounts for any of the items in the base work, alternative 1, alternative 2, or optional work sections, then the bid will be declared non-responsive.

NOTE 2: The unit “Job” as used in this Bidding Schedule is synonymous with the term “Lump Sum” used elsewhere within these plans and specifications.

NOTE 3: Bidders shall furnish unit prices for all items listed on bidding schedule, which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the estimated quantity. IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE

EXTENDED ESTIMATED AMOUNT FOR ANY REQUIRED ITEM, HIS BID WILL BE DECLARED

NON-RESPONSIVE.

NOTE 4: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within 24 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

0016 Ditching/Draining CDF-13 - OW 33,716 LF

0017 Ditching/Draining CDF -17 - OW 22,121 LF

0018 Ditching/Draining CDF -22 - OW 19,400 LF

0019 Ditching/Draining CDF -H - OW 13,978 LF

TOTAL BASE WORK: $

TOTAL ALTERNATIVE 1: $

TOTAL ALTERNATIVE 2: $

TOTAL OPTIONAL WORK: $

TOTAL WORK: $

Mile 5.0 to Mile 17.0, Including Beneficial Use within Sabine National Wildlife Refuge and Devil’s Elbow, Calcasieu and Cameron Parishes, LA

00010-5 ED 17-052

NOTE 5: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (See FAR 14.404-2).

NOTE 6: OPTION WORK ITEMS: The Government may require the delivery of, in whole or part, the Optional Work Item(s) 0013, 0014, 0015, 0016, 0017, 0018, and 0019. The Government may exercise the Optional Item by written notice to the Contractor. If the Government activates an Optional Item, the activation will occur while the Contractor’s plant is within the limits of work. No additional mobilization/ demobilization will be paid to the Contractor for the Optional work.

NOTE 7: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

NOTE 8: The quantity shown in Item 0013 is for evaluation purposes only; payment for this line item will be based on the actual quantity used and they shall be excluded from the “VARIATIONS IN ESTIMATED QUANTITIES” clause.

NOTE 9: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices:

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

NOTE 10: OPTIONAL WORK Item 013 “Bird Nesting Prevention and Avoidance Measures” will occur concurrently with contract work, if Alternative 1 is awarded. The successful bidder is advised that the contract time required for Bird Nesting Prevention and Avoidance Measures is included in the performance period allowed for completion of the base work and will not be adjusted for Bird Nesting Prevention and Avoidance Measures work.

NOTE 11: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL

WORK. In the event that the remaining OPTIONAL WORK items are exercised under the terms of the contract, the time required for completion of the contract shall be 85 calendar days for Item 0016 through 0019 in addition to the original contract duration of 245 calendar days established for the BASE WORK items specified in Section 00700 CONTRACT CLAUSES paragraph entitled "COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK". In the event that not all OPTIONAL WORK items are exercised, the time required for completion of the contract will be adjusted by prorating the 85 calendar days using the linear footage of required ditching and draining for each specific item verses to total amount of ditching and draining for all subject OPTIONAL WORK items combined.

NOTE 12: As per Note 1, the intent of the Government is to award “Alternative 1”. Bidders must bid on both alternatives, and shall insert a unit price for all items listed on the bidding schedule. The Row entitled “TOTAL BASE WORK” is the summation of bid items 0001 through 0007 for each respective column “Estimated Amount Alternative 1” and “Estimated Amount Alternative 2”. The Row entitled “TOTAL ALTERNATIVE 1” is the summation of bid items 0008 through 0010 for each respective column “Estimated Amount Alternative 1” and “Estimated Amount Alternative 2”. The Row entitled “TOTAL ALTERNATIVE 2” is the summation of bid items 0011 through 0012 for each respective column “Estimated Amount http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

Mile 5.0 to Mile 17.0, Including Beneficial Use within Sabine National Wildlife Refuge and Devil’s Elbow, Calcasieu and Cameron Parishes, LA

00010-4 ED 17-052

Alternative 1” and “Estimated Amount Alternative 2”. The Row entitled “TOTAL OPTIONAL WORK” is the summation of bid items 0013 through 0019 for each respective column “Estimated Amount Alternative 1” and “Estimated Amount Alternative 2”. The Row entitled “TOTAL WORK” is the summation of “TOTAL BASE WORK” + “TOTAL ALTERNATIVE 1” + “TOTAL ALTERNATIVE 2” + “TOTAL OPTIONAL WORK” for each respective column “Estimated Amount Alternative 1” and “Estimated Amount Alternative 2”. Award will be made as a whole to one bidder, based on the TOTAL WORK price for column “Estimated Amount Alternative 1” or “Estimated Amount Alternative 2” based on Government availability of funds at the moment of award.

EVALUATION OF SUBDIVIDED ITEMS (Mar 1995) - UAI 5152.211-9000.

Item 0002, 0003, 0005, 0008, and 0011 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

(End of Clause)

VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (Mar 1995) - UAI 5152.211-9001.

The Variation in Estimated Quantities Subdivided Items clause is applicable only in Item 0002, 0003, 0005, 0008, and 0011.

a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

b. Where the actual quantity of work performed for Item 0002, 0003, 0005, 0008, and 0011 is less than 85% of the quantity of the first sub-item listed under such item, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity .

c. If the quantity of work performed under Item 0002, 0003, 0005, 0008, and 0011 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such

Mile 5.0 to Mile 17.0, Including Beneficial Use within Sabine National Wildlife Refuge and Devil’s Elbow, Calcasieu and Cameron Parishes, LA

00010-5 ED 17-052

variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.

(End of Clause)

(End of Summary of Changes)

00010 (REV, AMD 1).pdf
NOTE 1: The intent of the Government is to award “Alternative 1”. Due to limited availability of funds, final selection of Alternative to be awarded by the Government will be based on the Total Work price for column “Estimated Amount Alternative 1” ...
NOTE 2: The unit “Job” as used in this Bidding Schedule is synonymous with the term “Lump Sum” used elsewhere within these plans and specifications.
NOTE 3: Bidders shall furnish unit prices for all items listed on bidding schedule, which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated ...