W912P8-17-B-0007-0001_Released.pdf
PDF 991 KB Posted
- Solicitation number
- W912P8-17-B-0007
About this file
Amendment 0001
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation No. W912P8-17-B-0007 New Orleans to Venice Hurricane Protection Project, NOV-NF-W-06b.1 Woodpark Floodw alls, Plaquemines Parish, Louisiana. The subject solicitation is amended as follow s:
See continuation page for changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Dec-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-17-B-0007
X 9B. DATED (SEE ITEM 11)
09-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Dec-2016
CODE
USACE, CONTRACTING DIVISION
ATTN: HPO CT VICKSBURG
4155 CLAY STREET
VICKSBURG MS 39183-3435
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 00010
Delete pages 00010-3 and 4 in their entirety and substitute the attached revised pages 00010-3 and 4 therefore.
SECTION 09 97 02.01
Page 19, paragraph 3.5. Delete this paragraph in its entirety and substitute the following therefore:
“3.5 PAINTING SCHEDULES
SYSTEM NO. 6
Items or surfaces to be coated: pipe piles (exterior only); and PZ-22 sheet piles (both sides) starting at three inches above the top of the stabilization slab and continuing down the pile for a linear distance of 15 feet.
SURFACE
PREPARATION 1st COAT 2nd COAT 3rd COAT
White metal blast cleaning Coal tar- epoxy C- 200a (black)
Coal tar- epoxy C-200a (black)
Coal tar- epoxy C-200a (black) (if needed to attain required thickness)”
SECTION 31 23 16.16 12
Page 2, paragraphs 1.2.1 and 1.2.2. Delete these paragraphs in their entirety and substitute the following therefore:
“1.2.1 Structural Excavation
No separate measurement or payment will be made for structural excavation; excavation for the removal of preload embankment material; and non-select backfill. Payment for these items of work shall be distributed throughout the existing bid items.”
1.2.2 Embankment Backfill
No separate measurement or payment will be made for embankment backfill. Payment shall be distributed throughout the existing bid items.
1.2.3 Excavation and Removal of the Temporary Access Road
No measurement will be made for excavation for the removal of the temporary access road.
Payment will be will be made at the contract unit price per job for “Removal of Temporary
Access Road”. Price and payment shall constitute full compensation for furnishing all plant, labor, equipment, and performing all operations necessary for excavation, hauling, and removal of surfacing material, separator geotextile, the temporary 24-inch corrugated metal pipe, embankment material; and other incidental work required to remove the temporary access road; as specified herein and as shown on the drawings.”
DRAWINGS
SHEET IDENTIFICATION Nos. S-500 and S-501. Delete these drawings in their entirety and substitute the attached revised SHEET IDENTIFICATION Nos. S-500 and S-501 therefore.
W912P8-17-B-0007 REVISED AM01 00010-3 ED 14-029
SECTION 00010 – BIDDING SCHEDULE
Hurricane Protection System, NOV-NF-W-06B.1, Woodpark Floodwalls, Plaquemines Parish, Louisiana
Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount
0001 Mobilization and Demobilization 1 JOB
0002 Video and Photographic Documentation 1 JOB
0003 Web Camera System 1 JOB
0004 Traffic Control 1 JOB
0005 Temporary Retaining Structure 1 JOB
0006 Silt Fences 4,150 LF
0007 Truck Wash-Down Rack 1 JOB
0008 Demolition 1 JOB
0009 24-Inch RCP 770 LF
0010 42-Inch RCP 352 LF
0011 35 x 24 Inch Arch RCP 55 LF
0012 Catch Basin with Type B Grate 3 EA
0013 8 Ft. x 6 Ft. Manhole 1 EA
0014 8 Ft. x 8 Ft. Manhole 1 EA
0015 Adjusting Catch Basin 3 EA
0016 Reinforced Concrete Floodwall 1 JOB
0017 Miscellaneous Metalwork 1 JOB
0018 Separator Geotextile 1,800 SY
0019 Reinforcement Geotextile 13,100 SY
0020 Clearing and Grubbing 1 JOB
0021 Excavation, New Drainage Ditch 524 CY
W912P8-17-B-0007 REVISED AM01 00010-4 ED 14-029
0022 Embankment, Compacted Fill
0022AA First 65,000 CY 65,000 CY
0022AB All Over 65,000 CY 15,000 CY
0023 Embankment, Uncompacted Fill 4,000 CY
0024 Grouted Riprap 370 CY
0025 Piling, Steel Sheet, Type PZ-22 112,166 SF
0026 Compression Pile Test
0026AA First Pile Test 1 EA
0026AB All Over First Pile Test 1 EA
0027 Tension Pile Test
0027AA First Pile Test 1 EA
0027AB All Over First Pile Test 1 EA
0028 Load Frame and Test Piles 1 JOB
0029 Furnish Steel Pipe Piles 69,206 LF
0030 Drive Steel Pipe Piles 69,206 LF
0031 Asphaltic Paving 9,640 SY
0032 Surfacing
0032AA First 3,600 CY 3,600 CY
0032AB All Over 3,600 CY 500 CY
0033 Wire Mesh Fence 70 LF
0034 Barbed Wired Fencing 500 LF
0035 Farm Gates 2 EA
0036 Turf Establishment and Maintenance 12.5 AC
0037 Sodding 3,550 SY
0038 12-inch Water Main 1 JOB
0039 Exterior Lighting 1 JOB
0040* Removal of Temporary Access Road 1 JOB
TOTAL $
* Denotes a change from the previous Bidding Schedule.
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" if used elsewhere within these plans and specifications.
W912P8-17-B-0007 REVISED AM01 00010-5 ED 14-029
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPaym ent.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
W912P8-17-B-0007 REVISED AM01 00010-6 ED 14-029
EVALUATION OF SUBDIVIDED ITEMS.
Item Nos. 0022, 0026, 0027, and 0032 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS.
The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item Nos. 0022, 0026, 0027, and 0032.
a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Item Nos. 0022, 0026, 0027, and 0032 is less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
c. If the quantity of work performed under Item Nos. 0022, 0026, 0027, and 0032 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(End of Clause)
C O
M P
R E
S S
IO
N P
IL
E T
E S
T
PLAN
FOR GIRDER
SUPPORT BEAM
C L T
E S
T P
IL
E
FOR TEST LOAD
REACTOR BEAM
CL TEST PILE
R E
Q U
IR
E M
E N
T S
V A
R
IE
S W
IT
H D
E A
D L
O A
D
L E
N G
T H O
F S
U P
P O
R T P
IL
E S
SUPPORT PILE
FLANGE ASSEMBLY
TYPICAL WIDE
NTS
GROUND SURFACE
MEMBERS
LOADING FRAME
STIFFENER PLATES
TOP BEARING PLATE
FOR RIGIDITY
CROSS-CONNECTIONS
(STEEL OR WOOD)
REFERENCE BEAM
FIXED END
SUPPORT
REFERENCE BEAM
PILE
TEST
PLATE
BOTTOM BEARING
GAGE LOAD CELL
ELECTRICAL STRAIN
FOR TEST LOAD
REACTOR BEAMS
NTS
TEST APPARATUS
B
CL
PLATE
BEARING
HEAD
SELF-LEVELING BEARING
HYDRAULIC JACK WITH
THE CONTRACTOR HAS THE OPTION OF USING REACTION
PILES IN LIEU OF THE LOADING FRAME. (SEE SPECIFICATIONS)
SUPPORT BEAM
SUPPORT PILE
BLOCKING
GROUND SURFACE
PLATE
BOTTOM BEARING
(STEEL OR WOOD)
REFERENCE BEAM
SUPPORT
REFERENCE BEAM
PLATE
TOP BEARING
GAGE LOAD CELL
ELECTRICAL STRAIN
LOADING FRAME
(SEE NOTE)
DEAD LOAD
STIFFENER PLATES
REACTOR BEAM W/
BEARING HEAD
W/ SELF-LEVELING
HYDRAULIC JACK
PILE
OPPOSITE SIDES OF
ASSEMBLY LOCATED
DIAL GAGE
A
A
NTS
SUPPORT PILES
GROUND SURFACE
DEAD LOAD
SOIL OR STEEL)
(WATER, ROCK, CONCRETE,
LOAD MATERIAL
MEANS OF PROVIDING DEAD
WEIGHTED BOX-ALTERNATIVE
MEMBERS
LOADING FRAME
SUPPORT BEAM
DEAD LOAD WEIGHT OPTIONAL.
CONTRACTOR CAN USE WEIGHTED
BOX METHOD OR MATERIAL ON
HAND THAT WILL RESULT IN
REQUIRED DEAD LOAD. (EXAMPLE OF
WEIGHTED BOX SHOWN IN SECTION A)
MEMBERS
LOADING FRAME
UNLESS NOTED MANDATORY.
IS FOR ILLUSTRATION PURPOSES ONLY,
THE LOADING FRAME AND TEST APPARATUS
TEST PILE
SEE NOTE 4
SECTION
SECTION
1. LOADING FRAME SHOWN WITHOUT DEAD LOAD.
2. CONTRACTOR TO PROVIDE PILE LAYOUT FOR EACH PARTICULAR DEAD LOAD TEST.
3. SECURE DEAD WEIGHT LOAD TO LOADING FRAME WITH CHAINS AND BINDERS.
4. DESIGN OF THE LOADING FRAME IS THE RESPONSIBILITY OF THE CONTRACTOR
AND MUST BE SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL.
N U
M B
E R S
P A
C
IN
G A
N D
MANDATORY LOADING FRAME NOTES:
NOTE:
DEAD LOAD NOTES:
8'-0" MIN 8'-0" MIN
8'-0" MIN 8'-0" MIN
NTS
LOADING FRAME
ELEVATION
:1
B
S-500
H S -5 d g n
TEST PILE SCHEDULE
PILE NUMBER PILE TYPE REQ'D. TIP EL. TYPE OF TEST SERVICE LOAD
C-2 (OPT.)
C-1
COMPRESSION
COMPRESSION
A .G .W
/1
/2
-110.0'
-100.0'
(MANDATORY) (MANDATORY)
OR 5*D OF TEST PILE OR 5*D OF TEST PILE
(MANDATORY)
OR 5*D OF TEST PILE
(MANDATORY)
OR 5*D OF TEST PILE
SIDES OF PILE
LOCATEDOPPOSITE
DIAL GAGE ASSEMBLY
54 TONS
54 TONS
BY CONTRACTOR
TOP OF CASING TO BE DETERMINED
DETERMINED BY CONTRACTOR
TOP OF TEST PILE TO BE
DETERMINED BY CONTRACTOR
GROUND ELEVATION TO BE
CASING STEEL PILE
CASING DETAIL
PILE TEST (SEE NOTE 3)
SUPPORT DURING
TEST PILE LATERAL
FOR SMOOTH SURFACE
REFERENCE BEAM
MIRROR TAPED TO
BOTTOM OF CASING EL. -28 FT.
APPROVED METHOD
BY AUGER OR OTHER
INSTALLED. REMOVE SOIL
CASING HAS BEEN
SOIL REMOVED AFTER
NTS
A D
D E
D C
A S
IN
G A
N D C
H A
N G
E D S
E R
V
IC
E L
O A
D
DRIVING THE TEST PILES.
WATER ELEVATION INSIDE THE CASING AT THE GROUND SURFACE WHILE
GROUND SURFACE ELEVATION. THE CONTRACTOR SHALL MAINTAIN THE
CASING WITH WATER TO MAINTAIN A WATER ELEVATION AT THE
12. WHILE REMOVING SOIL FROM THE CONTRACTOR SHALL BACKFILL THE
TOP.
11. ALL TEST PILES SHALL EXTEND A MINIMUM OF 3FT ABOVE THE CASING
SOLIDS PER GALLON.
THE RESULTING SLURRY SHALL HAVE NO LESS THAN 12 POUNDS OF
PRODUCE A SLURRY VISCOUS ENOUGH TO THOROUGHLY FILL THE VOIDS.
BENTONITE, AND SIX PARTS SAND, MIXED WITH ENOUGH WATER TO
SLURRY SHALL CONSIST OF ONE PART CEMENT, TWO PARTS THE
WITH A BENTONITE SLURRY AFTER THE TESTING HAS BEEN COMPLETED.
THE VOID BETWEEN THE CASING AND TEST PILE SHALL BE BACKFILLED10.
EL. -2.5 FT
CASING SHALL BE ABANDONED INPLACE. CUT PILES AND CASING TO
AFTER PILES LOAD TESTING, THE REACTION PILES, TEST PILES, AND 9.
ALL TEST PILES REQUIRE THE USE OF A STEEL CASING.8.
7. SEE SHEET C-105 FOR PILE TEST LOCATION.
ACCORDING TO THE TEST PILE SCHEDULE BELOW.
TEST PILES AND OPTIONAL TEST PILES SHALL BE DRIVEN AND TESTED 6.
OFFICER FOR APPROVAL.
OF THE CONTRACTOR AND MUST BE SUBMITTED TO THE CONTRACTING
DESIGN OF THE TEST APPARATUS PILE SET-UP IS THE RESPONSIBILITY5.
TEMPERATURE VARIATIONS.
SHALL BE FREE TO MOVE AS THE LENGTH OF BEAMS CHANGE WITH
IF STEEL REFERENCE BEAMS ARE USED, ONE END OF EACH BEAM4.
THE ENTIRE AREA OF LOAD TEST FRAME.
THE DIRECT EFFECTS OF THE WEATHER. TARPAULINS SHALL COVER
BY CONTRACTOR TO PROTECT THE MEASURING EQUIPMENT FROM
A TARPAULIN OF MINIMUM DIMENSION 12' X 12' SHALL BE INSTALLED3.
READINGS ON THE OPPOSITE SIDES OF THE PILE ARE NECESSARY.2.
WILL BE AWAY FROM THE BEAM.
AND ON THAT SIDE OF THE REFERENCE BEAM WHERE THE MOVEMENT
RESTING ON THE REFERENCE BEAM IN THE COMPRESSED POSITION
DIAL GAGE SHOULD BE ATTACHED TO THE PILE WITH THE STEM1.
MANDATORY TEST APPARATUS NOTES:
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A N
S I
D
H -4 -4
X
N O
T E
D
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
R O
B D
A U
E N
H A
U E
R P .E
A G
W N
O V -N
F -W
-0
B .1 W
O O
D P
A R
K F
L O
O D
W A
L L S
D M
E /S
D C
W
S E
P T
E M
B E
R
O C
T
W P -1
-B -0
W912P8-17-B-0007 REVISED <<00010-3>> ED 14-029
S-501
T E
N S
IO
N P
IL
E T
E S
T
SUPPORT BEAM
CONNECTED TO
STABILIZER PLATE
C L T
E S
T P
IL
E
W/ STEEL RODS
YOKE PLATES
CL TEST PILE
SUPPORT BEAM
SUPPORT PILES
REACTOR BEAM
PLAN
NTS
M
IN
C L
R
(M A
N D
A T
O R
Y
GAGE LOAD CELL
ELECTRICAL STRAIN
BEARING HEAD
SELF-LEVELING
HYDRAULIC JACK W/
TOP YOKE PLATE
STEEL RODS
BEAM
REACTOR
SUPPORT BEAM
SUPPORT PILE
GROUND SURFACE
BOTTOM YOKE PLATE
PLATES
STIFFENER
SIDES OF PILE
LOCATED OPPOSITE
DIAL GAGE ASSEMBLY
TO BOTTOM YOKE PLATE
STRAP PLATES ATTACHED
BEAM SUPPORT
REFERENCE
(SEE SPECS)
PINS
OR WOOD)
BEAM (STEEL
REFERENCE
NTS
LOADING FRAME
ELEVATION
CL
A B
8'-0" MIN8'-0" MIN
SUPPORT PILES
GROUND SURFACE
SUPPORT BEAM
TO SUPPORT BEAM
STABILIZER PLATES CONNECTED
REACTOR BEAM
CL
A
NTS
REACTOR BEAM
CL
TOP YOKE PLATE
STEEL RODS
HEAD
SELF-LEVELING BEARING
HYDRAULIC JACK W/
STIFFENER PLATES
OPPOSITE SIDES OF PILE
DIAL GAGE ASSEMBLY LOCATED
BEAM FOR SMOOTH SURFACE
MIRROR TAPED TO REFERENCE
SEE NOTE 4
BOTTOM YOKE PLATE
TO BOTTOM YOKE PLATE
STRAP PLATE ATTACHED
(STEEL OR WOOD)
REFERENCE BEAM
FOR RIGIDITY
CROSS-CONNECTIONS
TEST PILE
GROUND SURFACE
8'-0" MIN 8'-0" MIN
FIXED END
SUPPORT
REFERENCE BEAM
B
NTS
TEST APPRARATUS
UNLESS NOTED MANDATORY.
IS FOR ILLUSTRATION PURPOSES ONLY,
THE LOADING FRAME AND TEST APPARATUS
(SEE SPECS)
PINS
SUPPORT BEAM.
STABILIZER PLATES CONNECTED TO
SECTION SECTION
(MANDATORY)
(MANDATORY)
P
IL
E S V
A R
IE
S L E
N G
T H O
F S
U P
P O
R T
(MANDATORY)(MANDATORY)
1. DIAL GAGE SHOULD BE ATTACHED TO
THE PILE W/ THE STEM RESTING ON THE
REFERENCE BEAM IN THE COMPRESSED
POSITION AND ON THAT SIDE OF THE
REFERENCE BEAM WHERE THE MOVEMENT
WILL BE AWAY FROM THE BEAM.
2. READINGS ON THE OPPOSITE SIDES OF THE
PILE ARE NECESSARY.
3. A TARPAULIN OF MINIMUM DIMENSION
12' X 12' SHALL BE INSTALLED BY THE
CONTRACTOR TO PROTECT THE MEASURING
EQUIPMENT FROM THE DIRECT EFFECTS OF
THE WEATHER.
4. IF STEEL REFERENCE BEAMS ARE USED, ONE
END OF EACH BEAM SHALL BE FREE TO MOVE
AS THE LENGTH OF BEAMS CHANGE WITH
TEMPERATURE VARIATIONS.
5.
1. DESIGN OF THE LOADING FRAME IS THE RESPONSIBILITY
MANDATORY LOADING FRAME NOTE:
MANDATORY TEST APPARATUS NOTES:
SCHEDULE)
TEST PILE
(FOR TIP EL SEE
TEST PILE
GAGE LOAD CELL
ELECTRICAL STRAIN
H S -5 d g n
OF THE CONTRACTOR AND MUST BE SUBMITTED TO THE
CONTRACTING OFFICER FOR APPROVAL.
7.
6.
TEST PILE SCHEDULE
PILE NUMBER PILE TYPE REQ'D. TIP EL. TYPE OF TEST SERVICE LOAD
T-2 (OPT.)
T-1
TENSION
TENSION
A .G .W
/1
/2
-110.0'
-100.0'
OR 5*D OF TEST PILE OR 5*D OF TEST PILE
OR 5*D OF TEST PILE OR 5*D OF TEST PILE
SEE SHEET C-105 FOR PILE TEST LOCATION.
ACCORDING TO THE TEST PILE SCHEDULE BELOW.
TEST PILES AND OPTION TEST PILES SHALL BE DRIVEN AND TESTED
OFFICER FOR APPROVAL
AND MUST BE SUBMITTED TO THE CONTRACTING
IS THE RESPONSIBILITY OF THE CONTRACTOR
DESIGN OF THE TEST APPARATUS PILE SET-UP
43 TONS
43 TONS
C H
A N
G E
D S
E R
V
IC
E L
O A
D S
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
P L
A Q
U E
M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
A N
S I
D
H -4 -4
X
N O
T E
D
H U
R R
IC
A N
E P
R O
T E
C T
IO
N S
Y S
T E
M
R O
B D
A U
E N
H A
U E
R P .E
A G
W N
O V -N
F -W
-0
B .1 W
O O
D P
A R
K F
L O
O D
W A
L L S
D M
E /S
D C
W
S E
P T
E M
B E
R
O C
T
W P -1
-B -0
W912P8-17-B-0007 REVISED <<00010-3>> ED 14-029
File details come from the government source that posted it. Updated .