Amendment_0002.pdf
PDF 112 KB Posted
- Solicitation number
- W912P8-16-R-0038
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_01.pdf | ||
| W912P8-16-R-0038.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W42HEM60958961
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Electrical Equipment and Repair Maintenance for the Dredge Wheeler, New Orleans, Louisiana is hereby amended as follow s:
1. Delete Addendum A-3, Past Performance Questionnaire in it's entirely.
2. Replace w ith attached new Addendum A-3, Past Performance Questionnaire.
3. All others remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-16-R-0038
X 9B. DATED (SEE ITEM 11)
15-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jun-2016
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
ADDENDUM A-3
Past Performance Questionnaire
PART 1: INSTRUCTIONS. The company who has provided your name is participating in a Request for Proposal (RFP) with US Army Corps of Engineers New Orleans District for work on the Dredge Wheeler marine electrical equipment. We would greatly appreciate your taking the time to complete this from.
Please provide an honest assessment and immediately return to the following address or fax not later than 29 June 2016.
This completed form is to be provided directly to the address below:
US Army Corps of Engineers ATTN: Michelle Y. Lappen (CEMVN-CT-W) Commercial: (504) 862-1612 PO Box 60267 FAX: (504) 862-2892 New Orleans, LA. 70160-0267
PART 2: GENERAL INFORMATION
1. Company's Name and Address (Contractor and/or sub being evaluated)
NOTE: offerer fill out before forwarding
2. Respondent Organization Name and Address
3. a. Evaluator’s Name __________________________________________________
b. Evaluator’s involvement with contractor:
c. Title/Telephone Number:______________________________________________
4. Contract Number _______________________________________________ ________
5. Contract Value (Basic and Options) _________________________________________
6. Award Date __________________________________________________________
7. Contract or Task Order Completion Date (Include extensions): _________________
8. Contract Type: Firm Fixed Price (FFP) _____________________________________ Cost Plus Fixed Fee (CPFF)__________________________________ Cost Plus Award Fee (CPAF)_________________________________ Other (Please Specify)_______________________________________ Note: If an award fee contract, please provide a synopsis of available award fee pool and percentage of that pool awarded the contractor each evaluation period over the life of the contract.
9. Brief description of YOUR contract requirements including type of work, trades involved, type of vessel, degree of self direction:
10. Additional data:
a. Approximate number of repair orders performed under this contract: ______________
b. Approximate value of work serviced by this contract: __________________________
11. Type and extent of any subcontracting support:
12. How was the quality of work produced by field service mechanics and machinists:
PART THREE: PERFORMANCE RATING. Please summarize performance in each of the rating factors. Determine the rating that most nearly represents your experience with this company and indicate your assessment by placing the appropriate rating in the space provided.
Please include descriptive comments to supplement ratings provided.
Ratings are defined below and should be used as a reference in assessing performance.
Rating “E” for Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Rating “G” for Very Good – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Rating “S” for Satisfactory – Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Rating “M” for Marginal – Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Rating “U” for Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective action appear or were ineffective.
Rating "N/A" for Not Applicable - was not required to perform in this area.
____1. Preparation, use and quality of contractor’s internal Quality Control plan/program in identifying, correcting, and preventing problems.
____2. Were the safety rules, regulations and practices properly followed?
____3. How many accident/incident reports were filed for the duration of the contract?
____4. Was there an unusually high turnaround rate in management employees?
____5. Did the work teams report on time with proper working equipment?
____6. Was the contractor able to consistently maintain a qualified and experienced workforce to perform necessary services?
___7. Did the contractor respond timely and effectively to unexpected changes and emergency requirements?
___8. Did the contractor respond timely and effectively in resolving poor performance problems associated with its employees?
___9. How would you rate contractor’s adherence to contract/delivery schedules?
___10. Were reports and documentation submitted timely and in a professional manner?
___11. Prompt response to technical direction and change orders?
___12. Timely responses to resolving problems?
___13. How was the quality of the work produced by the electrical shop ?
COMMENTS:
___14. Effectiveness of Project Manager.
___15. Effectiveness of Management with geographically separated personnel.
___16. Recruiting, training and retention of staff maintained to service contract at required levels of performance ___a. Recruiting, training and retention of staff considered a management problem ___b. Recruiting, training and retention of staff considered a regional problem
___17. The problem, if any, experienced with recruiting, training and retention was in the staffing area(s) of ____________________________________________?
___18. The specific issues surrounding problems experienced with recruiting, training, and retention were__________________________________________________________________________
COMMENTS:
Would you award another contract to this company? Why?
Yes No
ADDITIONAL COMMENTS (PRO AND CON)
PART FOUR: EVALUATOR'S CERTIFICATION:
I HEREBY CERTIFY THAT THE INFORMATION IN THIS FORM IS ACCURATE AND
COMPLETE TO THE BEST OF MY KNOWLEDGE.
Signature of Evaluator Date
Title of Evaluator
| Addendum A-3.pdf |
| C-1. GENERAL INFORMATION |
| C-2. SPECIFIC TASKS |
| C-3. REQUIREMENTS/PERFORMANCE STANDARDS |
| C-4. CONTRACTOR FURNISHED PROPERTY |
| C-5. GOVERNMENT FURNISHED PROPERTY AND SERVICES |
| SAFE CLEARANCE LOG |
| HAZARDOUS ENERGY CONTROL PROGRAM, US DREDGE WHEELER |
File details come from the government source that posted it. Updated .