B01_Revised_Official__Abstract.pdf
PDF 190 KB Posted
- Solicitation number
- W912P8-16-B-0038
About this file
Revised Abstract
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINE
ITEM
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $930,000.00 0002 Video and Photographic Documentation 1 JOB FOR $16,000.00 0003 Web Camera System 1 JOB FOR $53,000.00 0004 Removal of Existing 72” Dia. Siphon Discharge Pipe 1 JOB FOR $79,000.00
0005 DELETED 1 JOB FOR DELETED
0006 Elevated Work Platform/Floating Plant 1 JOB FOR $630,000.00 0007 Existing Pump Station Relocation Work 1 JOB FOR $195,000.00
0008 DELETED 1 JOB FOR DELETED
0009 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $173,000.00 0010 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $1,525,000.00 0011 Silt Fences 1 JOB FOR DELETED
0011AA First 1,000 Linear Feet 1,000 LF $11.50 $11,500.00 0011AB All Over 1,000 Linear Feet 500 LF $9.50 $4,750.00
0012 Truck Wash-Down Rack (Gulf South Area) 1 JOB FOR $5,300.00 0013 Truck Wash-Down Rack (Siphon Area) 1 JOB FOR $89,000.00 0014 Drainage Pumping Assessment 1 JOB FOR $36,000.00 0015 Demolition Work 1 JOB FOR $105,000.00 0016 Reinforced Concrete Floodwall 1 JOB FOR $1,625,000.00 0017 Reinforced Concrete Scour Protection 1 JOB FOR $26,000.00 0018 Miscellaneous Metalwork 1 JOB FOR $315,000.00 0019 Walkway Ramps 1 EA $10,500.00 $10,500.00 0020 Pump House Construction 1 JOB FOR $157,000.00 0021 Discharge Pipe, Fittings, Valves, and Pipe Supports 1 JOB FOR $315,000.00 0022 Installation of 72" Dia. Siphon Discharge Pipes 496 LF $1,175.00 $582,800.00 0023 Electrical Work 1 JOB FOR $63,000.00 0024 Seperator Geotextile 286 SY $6.50 $1,859.00 0025 Reinforcement Geotextile 825 SY $26.00 $21,450.00 0026 Clearing and Grubbing 1 JOB FOR $160,000.00 0027 Construction Dewatering 1 JOB FOR $37,000.00 0028 Embankment, Compacted Fill $0.00
0028AA First 13,000 CY 13,000 CY $36.50 $474,500.00 0028AB All Over 13,000 CY 3,000 CY $31.50 $94,500.00
0029 Embankment, Uncompacted Fill 0029AA First 2,900 CY 2,900 CY $47.25 $137,025.00 0029AB All Over 2,900 CY 435 CY $31.50 $13,702.50
0030 Sand Fill 4,000 CY $36.75 $147,000.00 0031 Diposal of Unsuitable Excavated Material
0031AA First 11,100 CY 11,100 CY $8.40 $93,240.00 0031AB All Over 11,100 CY 3,350 CY $8.40 $28,140.00
0032 Grouted Rip Rap 1,630 CY $246.00 $400,980.00 0033 Piling, Steel Sheet, Type PZ-22 15,973 SF $29.35 $468,807.55 0034 Piling, Steel Sheet, Type PZ-35 2,533 SF $58.00 $146,914.00 0035 Compression Pile Test
0035AA First 3 Compression Test 3 EA $26,250.00 $78,750.00 0035AB All Over 3 Compression Test 3 EA $5,000.00 $15,000.00
0036 Tension Pile Test 0036AA First 3 Tension Test 3 EA $26,250.00 $78,750.00 0036AB All Over 3 tension Test 3 EA $5,000.00 $15,000.00
0037 Load Frame and Test Piles 1 JOB FOR $580,000.00 0038 Furnish Steel Pipe Pilies 33,091 LF $74.00 $2,448,734.00 0039 Drive Steel Piple Piles 33,091 LF $20.00 $661,820.00 0040 Asphaltic Paving 245 SY $290.00 $71,050.00 0041 Surfacing 50 CY $100.00 $5,000.00 0042 Turf Establishment and Maintenance 3 ACRE $3,675.00 $11,025.00
BID ABSTRACT
For Bids Under Solicitation, W912P8-16-B-0038
New Orleans To Venice, Hurricane Protection System, NOV-NF-W-06B3, West Pointe A La Hache, Gulf South Pipeline And Siphon T-Walls, Plaquemines Parish, Louisiana
CHENIERE CONSTRUCTION, INC. - MANDEVILLE, LA 70470
0043 Utility Modificaitons (Gulf South Gas Pipelines) 1 JOB FOR $42,000.00 0044 Utility Modificaitons ((72" Dia. Siphons) 1 JOB FOR $21,000.00 0045 Corrugated Metal Arch Pipe 60 LF 262.00 $15,720.00 0046 Fuel Storage Tank and Supply System 1 JOB FOR $95000.00.
0047 Riprap (T-Wall M-8 and M-9) 477 TON 152.00 $72,504.00 0048 Riprap (T-Wall M-6) 56 TON 141.50 $7,924.00
0049 Furnishing New 72" Dia. Siphon Discharge Pipes - (OW) 496 LF 100.00 $49,600.00 0050 Modificaiton and Delivery of Existing 72" Dia. Siphone Discharge Pipe - (OW) 1 JOB FOR $49,600.00
TOTAL OPTIONAL WORK
$13,395,445.05TOTAL BASE WORK + OPTIONAL WORK
$99,200.00
OPTIONAL WORK AREA (OW)
$13,296,245.05TOTAL BASE WORK
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $1,529,815.00 0002 Video and Photographic Documentation 1 JOB FOR $2,566.00 0003 Web Camera System 1 JOB FOR $49,353.00 0004 Removal of Existing 72” Dia. Siphon Discharge Pipe 1 JOB FOR $86,656.00
0005 DELETED 1 JOB FOR DELETED
0006 Elevated Work Platform/Floating Plant 1 JOB FOR $455,691.00 0007 Existing Pump Station Relocation Work 1 JOB FOR $43,234.00
0008 DELETED 1 JOB FOR DELETED
0009 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $547,715.00 0010 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $2,644,449.00 0011 Silt Fences
0011AA First 1,000 Linear Feet 1,000 LF $10.00 $10,000.00 0011AB All Over 1,000 Linear Feet 500 LF $13.00 $6,500.00
0012 Truck Wash-Down Rack (Gulf South Area) 1 JOB FOR $16,101.00 0013 Truck Wash-Down Rack (Siphon Area) 1 JOB FOR $16,101.00 0014 Drainage Pumping Assessment 1 JOB FOR $20,493.00 0015 Demolition Work 1 JOB FOR $95,421.00 0016 Reinforced Concrete Floodwall 1 JOB FOR $1,826,146.00 0017 Reinforced Concrete Scour Protection 1 JOB FOR $38,186.00 0018 Miscellaneous Metalwork 1 JOB FOR $159,605.00 0019 Walkway Ramps 1 EA $27,480.00 $27,480.00 0020 Pump House Construction 1 JOB FOR $258,169.00 0021 Discharge Pipe, Fittings, Valves, and Pipe Supports 1 JOB FOR $396,937.00 0022 Installation of 72" Dia. Siphon Discharge Pipes 496 LF $126.00 $62,496.00 0023 Electrical Work 1 JOB FOR $135,778.00 0024 Seperator Geotextile 286 SY $19.00 $5,434.00 0025 Reinforcement Geotextile 825 SY $36.00 $29,700.00 0026 Clearing and Grubbing 1 JOB FOR $16,385.00 0027 Construction Dewatering 1 JOB FOR $384,505.00 0028 Embankment, Compacted Fill
0028AA First 13,000 CY 13,000 CY $39.00 $507,000.00 0028AB All Over 13,000 CY 3,000 CY $39.00 $117,000.00
0029 Embankment, Uncompacted Fill 0029AA First 2,900 CY 2,900 CY $40.00 $116,000.00 0029AB All Over 2,900 CY 435 CY $41.00 $17,835.00
0030 Sand Fill 4,000 CY $36.00 $144,000.00 0031 Diposal of Unsuitable Excavated Material
0031AA First 11,100 CY 11,100 CY $7.00 $77,700.00 0031AB All Over 11,100 CY 3,350 CY $5.00 $16,750.00
0032 Grouted Rip Rap 1,630 CY $205.00 $334,150.00 0033 Piling, Steel Sheet, Type PZ-22 15,973 SF $42.00 $670,866.00 0034 Piling, Steel Sheet, Type PZ-35 2,533 SF $66.00 $167,178.00 0035 Compression Pile Test
0035AA First 3 Compression Test 3 EA $57,781.00 $173,343.00 0035AB All Over 3 Compression Test 3 EA $16,259.00 $48,777.00
0036 Tension Pile Test 0036AA First 3 Tension Test 3 EA $35,640.00 $106,920.00 0036AB All Over 3 tension Test 3 EA $16,259.00 $48,777.00
0037 Load Frame and Test Piles 1 JOB FOR $327,247.00 0038 Furnish Steel Pipe Pilies 33,091 LF $78.00 $2,581,098.00 0039 Drive Steel Piple Piles 33,091 LF $33.00 $1,092,003.00 0040 Asphaltic Paving 245 SY $157.00 $38,465.00 0041 Surfacing 50 CY $40.00 $2,000.00
BID ABSTRACT
For Bids Under Solicitation, W912P8-16-B-0038
New Orleans To Venice, Hurricane Protection System, NOV-NF-W-06B3, West Pointe A La Hache, QUALITY FIRST CONSTRUCTION, LLC -- COVINGTON, LA 70433
0042 Turf Establishment and Maintenance 3 ACRE $5,761.00 $17,283.00 0043 Utility Modificaitons (Gulf South Gas Pipelines) 1 JOB FOR $77,254.00 0044 Utility Modificaitons ((72" Dia. Siphons) 1 JOB FOR $255,998.00 0045 Corrugated Metal Arch Pipe 60 LF $449.00 $26,940.00 0046 Fuel Storage Tank and Supply System 1 JOB FOR $81,884.00 0047 Riprap (T-Wall M-8 and M-9) 477 TON $170.00 $81,090.00 0048 Riprap (T-Wall M-6) 56 TON $195.00 $10,920.00
0049 Furnishing New 72" Dia. Siphon Discharge Pipes - (OW) 496 LF $810.00 $401,760.00 0050 Modificaiton and Delivery of Existing 72" Dia. Siphone Discharge Pipe - (OW) 1 JOB FOR $591,771.00
TOTAL BASE WORK $16,003,394.00
TOTAL OPTIONAL WORK $993,531.00
TOTAL BASE WORK + OPTIONAL WORK $16,996,925.00
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $1,900,000.00 0002 Video and Photographic Documentation 1 JOB FOR $33,000.00 0003 Web Camera System 1 JOB FOR $45,000.00 0004 Removal of Existing 72” Dia. Siphon Discharge Pipe 1 JOB FOR $1,200,000.00
0005 DELETED 1 JOB FOR DELETED
0006 Elevated Work Platform/Floating Plant 1 JOB FOR $860,000.00 0007 Existing Pump Station Relocation Work 1 JOB FOR $280,000.00
0008 DELETED 1 JOB FOR DELETED
0009 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $1,050,000.00 0010 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $2,000,000.00 0011 Silt Fences
0011AA First 1,000 Linear Feet 1,000 LF $5.00 $5,000.00 0011AB All Over 1,000 Linear Feet 500 LF $5.00 $2,500.00
0012 Truck Wash-Down Rack (Gulf South Area) 1 JOB FOR $35,000.00 0013 Truck Wash-Down Rack (Siphon Area) 1 JOB FOR $70,000.00 0014 Drainage Pumping Assessment 1 JOB FOR $120,000.00 0015 Demolition Work 1 JOB FOR $138,000.00 0016 Reinforced Concrete Floodwall 1 JOB FOR $1,700,000.00 0017 Reinforced Concrete Scour Protection 1 JOB FOR $17,000.00 0018 Miscellaneous Metalwork 1 JOB FOR $130,000.00 0019 Walkway Ramps 1 EA $17,000.00 $17,000.00 0020 Pump House Construction 1 JOB FOR $160,000.00 0021 Discharge Pipe, Fittings, Valves, and Pipe Supports 1 JOB FOR $260,000.00 0022 Installation of 72" Dia. Siphon Discharge Pipes 496 LF $650.00 $322,400.00 0023 Electrical Work 1 JOB FOR $65,000.00 0024 Seperator Geotextile 286 SY $9.00 $2,574.00 0025 Reinforcement Geotextile 825 SY $24.00 $19,800.00 0026 Clearing and Grubbing 1 JOB FOR $150,000.00 0027 Construction Dewatering 1 JOB FOR $225,000.00 0028 Embankment, Compacted Fill
0028AA First 13,000 CY 13,000 CY $48.00 $624,000.00 0028AB All Over 13,000 CY 3,000 CY $46.00 $138,000.00
0029 Embankment, Uncompacted Fill 0029AA First 2,900 CY 2,900 CY $28.00 $81,200.00 0029AB All Over 2,900 CY 435 CY $28.00 $12,180.00
0030 Sand Fill 4,000 CY $28.00 $112,000.00 0031 Diposal of Unsuitable Excavated Material
0031AA First 11,100 CY 11,100 CY $16.00 $177,600.00 0031AB All Over 11,100 CY 3,350 CY $16.00 $53,600.00
0032 Grouted Rip Rap 1,630 CY $135.00 $220,050.00 0033 Piling, Steel Sheet, Type PZ-22 15,973 SF $45.00 $718,785.00 0034 Piling, Steel Sheet, Type PZ-35 2,533 SF $67.00 $169,711.00 0035 Compression Pile Test
0035AA First 3 Compression Test 3 EA $45,000.00 $135,000.00 0035AB All Over 3 Compression Test 3 EA $45,000.00 $135,000.00
0036 Tension Pile Test 0036AA First 3 Tension Test 3 EA $45,000.00 $135,000.00 0036AB All Over 3 tension Test 3 EA $45,000.00 $135,000.00
0037 Load Frame and Test Piles 1 JOB FOR $800,000.00 0038 Furnish Steel Pipe Pilies 33,091 LF $78.00 $2,581,098.00 0039 Drive Steel Piple Piles 33,091 LF $19.00 $628,729.00 0040 Asphaltic Paving 245 SY $110.00 $26,950.00
BID ABSTRACT
For Bids Under Solicitation, W912P8-16-B-0038
New Orleans To Venice, Hurricane Protection System, NOV-NF-W-06B3, West Pointe A La Hache, PHYLWAY CONSTRUCTION, LLC -- THIBODAUX, LA 70301
0041 Surfacing 50 CY $80.00 $4,000.00 0042 Turf Establishment and Maintenance 3 ACRE 4,500.00 $13,500.00 0043 Utility Modificaitons (Gulf South Gas Pipelines) 1 JOB FOR $270,000.00 0044 Utility Modificaitons ((72" Dia. Siphons) 1 JOB FOR $325,000.00 0045 Corrugated Metal Arch Pipe 60 LF 550.00 $33,000.00 0046 Fuel Storage Tank and Supply System 1 JOB FOR $220,000.00 0047 Riprap (T-Wall M-8 and M-9) 477 TON 84.00 $40,068.00 0048 Riprap (T-Wall M-6) 56 TON 84.00 $4,704.00
0049 Furnishing New 72" Dia. Siphon Discharge Pipes - (OW) 496 LF 454.00 $225,184.00 0050 Modificaiton and Delivery of Existing 72" Dia. Siphone Discharge Pipe - (OW) 1 JOB FOR $450,000.00
TOTAL BASE WORK + OPTIONAL WORK $19,276,633.00
OPTIONAL WORK AREA (OW)
TOTAL BASE WORK $18,601,449.00
TOTAL OPTIONAL WORK $675,184.00
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $749,934.74 0002 Video and Photographic Documentation 1 JOB FOR $5,247.61 0003 Web Camera System 1 JOB FOR $13,119.02 0004 Removal of Existing 72” Dia. Siphon Discharge Pipe 1 JOB FOR $68,228.13
0005 DELETED 1 JOB FOR DELETED
0006 Elevated Work Platform/Floating Plant 1 JOB FOR $1.31 0007 Existing Pump Station Relocation Work 1 JOB FOR $28,470.10
0008 DELETED 1 JOB FOR DELETED
0009 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $907,964.41 0010 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $2,029,695.05 0011 Silt Fences
0011AA First 1,000 Linear Feet 1,000 LF $8.55 $8,550.00 0011AB All Over 1,000 Linear Feet 500 LF $8.55 $4,275.00
0012 Truck Wash-Down Rack (Gulf South Area) 1 JOB FOR $14,974.43 0013 Truck Wash-Down Rack (Siphon Area) 1 JOB FOR $14,974.43 0014 Drainage Pumping Assessment 1 JOB FOR $10,766.64 0015 Demolition Work 1 JOB FOR $26,742.22 0016 Reinforced Concrete Floodwall 1 JOB FOR $2,218,674.91 0017 Reinforced Concrete Scour Protection 1 JOB FOR $71,063.30 0018 Miscellaneous Metalwork 1 JOB FOR $58,671.98 0019 Walkway Ramps 1 EA $22,700.74 $22,700.74 0020 Pump House Construction 1 JOB FOR $280,209.75 0021 Discharge Pipe, Fittings, Valves, and Pipe Supports 1 JOB FOR $396,076.58 0022 Installation of 72" Dia. Siphon Discharge Pipes 496 LF $211.53 $104,918.88 0023 Electrical Work 1 JOB FOR $52,476.08 0024 Seperator Geotextile 286 SY $4.58 $1,309.88 0025 Reinforcement Geotextile 825 SY $3.56 $2,937.00 0026 Clearing and Grubbing 1 JOB FOR $20,323.11 0027 Construction Dewatering 1 JOB FOR $46,621.78 0028 Embankment, Compacted Fill
0028AA First 13,000 CY 13,000 CY $28.57 $371,410.00 0028AB All Over 13,000 CY 3,000 CY $28.43 $85,290.00
0029 Embankment, Uncompacted Fill 0029AA First 2,900 CY 2,900 CY $27.91 $80,939.00 0029AB All Over 2,900 CY 435 CY $28.33 $12,323.55
0030 Sand Fill 4,000 CY $20.55 $82,200.00 0031 Diposal of Unsuitable Excavated Material
0031AA First 11,100 CY 11,100 CY $8.20 $91,020.00 0031AB All Over 11,100 CY 3,350 CY $8.19 $27,436.50
0032 Grouted Rip Rap 1,630 CY $325.13 $529,961.90 0033 Piling, Steel Sheet, Type PZ-22 15,973 SF $44.43 $709,680.39 0034 Piling, Steel Sheet, Type PZ-35 2,533 SF $72.33 $183,211.89 0035 Compression Pile Test
0035AA First 3 Compression Test 3 EA $23,891.71 $71,675.13 0035AB All Over 3 Compression Test 3 EA $24,927.68 $74,783.04
0036 Tension Pile Test 0036AA First 3 Tension Test 3 EA $20,383.58 $61,150.74 0036AB All Over 3 tension Test 3 EA $34,790.00 $104,370.00
0037 Load Frame and Test Piles 1 JOB FOR $201,536.69 0038 Furnish Steel Pipe Pilies 33,091 LF $86.95 $2,877,262.45 0039 Drive Steel Piple Piles 33,091 LF $13.21 $437,132.11 0040 Asphaltic Paving 245 SY $79.43 $19,460.35 0041 Surfacing 50 CY $85.04 $4,252.00 0042 Turf Establishment and Maintenance 3 ACRE $6,559.51 $19,678.53
BID ABSTRACT
For Bids Under Solicitation, W912P8-16-B-0038
New Orleans To Venice, Hurricane Protection System, NOV-NF-W-06B3, West Pointe A La Hache, KEVIN J. SMITH CONSTRUCTION COMPANY --- LACOMBE, LA 70445
0043 Utility Modificaitons (Gulf South Gas Pipelines) 1 JOB FOR $70,382.84 0044 Utility Modificaitons ((72" Dia. Siphons) 1 JOB FOR $312,554.63 0045 Corrugated Metal Arch Pipe 60 LF $247.19 $14,831.40 0046 Fuel Storage Tank and Supply System 1 JOB FOR $150,554.53 0047 Riprap (T-Wall M-8 and M-9) 477 TON $108.23 $51,625.71 0048 Riprap (T-Wall M-6) 56 TON $102.69 $5,750.64
0049 Furnishing New 72" Dia. Siphon Discharge Pipes - (OW) 496 LF $1,143.23 $567,042.08 0050 Modificaiton and Delivery of Existing 72" Dia. Siphone Discharge Pipe - (OW) 1 JOB FOR $394,357.29
TOTAL BASE WORK
TOTAL BASE WORK + OPTIONAL WORK $14,770,800.47
$13,809,401.10
TOTAL OPTIONAL WORK $961,399.37
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $1,262,300.00 0002 Video and Photographic Documentation 1 JOB FOR $5,300.00 0003 Web Camera System 1 JOB FOR $17,000.00 0004 Removal of Existing 72” Dia. Siphon Discharge Pipe 1 JOB FOR $164,000.00
0005 DELETED 1 JOB FOR DELETED
0006 Elevated Work Platform/Floating Plant 1 JOB FOR $130,000.00 0007 Existing Pump Station Relocation Work 1 JOB FOR $63,300.00
0008 DELETED 1 JOB FOR DELETED
0009 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $530,000.00 0010 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $1,187,000.00 0011 Silt Fences
0011AA First 1,000 Linear Feet 1,000 LF $5.50 $5,500.00 0011AB All Over 1,000 Linear Feet 500 LF $5.50 $2,750.00
0012 Truck Wash-Down Rack (Gulf South Area) 1 JOB FOR $17,500.00 0013 Truck Wash-Down Rack (Siphon Area) 1 JOB FOR $52,800.00 0014 Drainage Pumping Assessment 1 JOB FOR $21,000.00 0015 Demolition Work 1 JOB FOR $37,000.00 0016 Reinforced Concrete Floodwall 1 JOB FOR $1,846,000.00 0017 Reinforced Concrete Scour Protection 1 JOB FOR $21,000.00 0018 Miscellaneous Metalwork 1 JOB FOR $5,300.00 0019 Walkway Ramps 1 EA $7,300.00 $7,300.00 0020 Pump House Construction 1 JOB FOR $116,000.00 0021 Discharge Pipe, Fittings, Valves, and Pipe Supports 1 JOB FOR $290,000.00 0022 Installation of 72" Dia. Siphon Discharge Pipes 496 LF $979.00 $485,584.00 0023 Electrical Work 1 JOB FOR $68,600.00 0024 Seperator Geotextile 286 SY $5.00 $1,430.00 0025 Reinforcement Geotextile 825 SY $23.00 $18,975.00 0026 Clearing and Grubbing 1 JOB FOR $47,500.00 0027 Construction Dewatering 1 JOB FOR $158,000.00 0028 Embankment, Compacted Fill
0028AA First 13,000 CY 13,000 CY $39.00 $507,000.00 0028AB All Over 13,000 CY 3,000 CY $37.50 $112,500.00
0029 Embankment, Uncompacted Fill 0029AA First 2,900 CY 2,900 CY $34.50 $100,050.00 0029AB All Over 2,900 CY 435 CY $33.00 $14,355.00
0030 Sand Fill 4,000 CY $22.00 $88,000.00 0031 Diposal of Unsuitable Excavated Material
0031AA First 11,100 CY 11,100 CY $12.50 $138,750.00 0031AB All Over 11,100 CY 3,350 CY $12.00 $40,200.00
0032 Grouted Rip Rap 1,630 CY $211.00 $343,930.00 0033 Piling, Steel Sheet, Type PZ-22 15,973 SF $30.50 $487,176.50 0034 Piling, Steel Sheet, Type PZ-35 2,533 SF $50.00 $126,650.00 0035 Compression Pile Test
0035AA First 3 Compression Test 3 EA $9,000.00 $27,000.00 0035AB All Over 3 Compression Test 3 EA $9,000.00 $27,000.00
0036 Tension Pile Test 0036AA First 3 Tension Test 3 EA $9,000.00 $27,000.00 0036AB All Over 3 tension Test 3 EA $9,000.00 $27,000.00
0037 Load Frame and Test Piles 1 JOB FOR $528,000.00 0038 Furnish Steel Pipe Pilies 33,091 LF $64.50 $2,134,369.50 0039 Drive Steel Piple Piles 33,091 LF $38.00 $1,257,458.00 0040 Asphaltic Paving 245 SY $130.00 $31,850.00 0041 Surfacing 50 CY $93.00 $4,650.00 0042 Turf Establishment and Maintenance 3 ACRE $4,500.00 $13,500.00
BID ABSTRACT
For Bids Under Solicitation, W912P8-16-B-0038
New Orleans To Venice, Hurricane Protection System, NOV-NF-W-06B3, West Pointe A La Hache, K-BELLE CONSULTANTS, LLC -- NEW ORLEANS, LA 70119
0043 Utility Modificaitons (Gulf South Gas Pipelines) 1 JOB FOR $74,000.00 0044 Utility Modificaitons ((72" Dia. Siphons) 1 JOB FOR $132,000.00 0045 Corrugated Metal Arch Pipe 60 LF $440.00 $26,400.00 0046 Fuel Storage Tank and Supply System 1 JOB FOR $90,000.00 0047 Riprap (T-Wall M-8 and M-9) 477 TON $82.00 $39,114.00 0048 Riprap (T-Wall M-6) 56 TON $90.00 $5,040.00
0049 Furnishing New 72" Dia. Siphon Discharge Pipes - (OW) 496 LF $226.00 $112,096.00 0050 Modificaiton and Delivery of Existing 72" Dia. Siphone Discharge Pipe - (OW) 1 JOB FOR $11,400.00
TOTAL OPTIONAL WORK $123,496.00
TOTAL BASE WORK + OPTIONAL WORK $13,087,628.00
TOTAL BASE WORK $12,964,132.00
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $524,100.00 0002 Video and Photographic Documentation 1 JOB FOR $7,500.00 0003 Web Camera System 1 JOB FOR $34,200.00 0004 Removal of Existing 72” Dia. Siphon Discharge Pipe 1 JOB FOR $72,500.00
0005 DELETED 1 JOB FOR DELETED
0006 Elevated Work Platform/Floating Plant 1 JOB FOR $461,800.00 0007 Existing Pump Station Relocation Work 1 JOB FOR $67,500.00
0008 DELETED 1 JOB FOR DELETED
0009 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $449,600.00 0010 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR $1,817,100.00 0011 Silt Fences
0011AA First 1,000 Linear Feet 1,000 LF $3.87 $3,870.00 0011AB All Over 1,000 Linear Feet 500 LF $3.87 $1,935.00
0012 Truck Wash-Down Rack (Gulf South Area) 1 JOB FOR $13,200.00 0013 Truck Wash-Down Rack (Siphon Area) 1 JOB FOR $143,800.00 0014 Drainage Pumping Assessment 1 JOB FOR $3,500.00 0015 Demolition Work 1 JOB FOR $32,000.00 0016 Reinforced Concrete Floodwall 1 JOB FOR $1,805,100.00 0017 Reinforced Concrete Scour Protection 1 JOB FOR $176,000.00 0018 Miscellaneous Metalwork 1 JOB FOR $94,400.00 0019 Walkway Ramps 1 EA $7,100.00 $7,100.00 0020 Pump House Construction 1 JOB FOR $53,500.00 0021 Discharge Pipe, Fittings, Valves, and Pipe Supports 1 JOB FOR $293,150.00 0022 Installation of 72" Dia. Siphon Discharge Pipes 496 LF $326.00 $161,696.00 0023 Electrical Work 1 JOB FOR $73,900.00 0024 Seperator Geotextile 286 SY $2.60 $743.60 0025 Reinforcement Geotextile 825 SY $18.32 $15,114.00 0026 Clearing and Grubbing 1 JOB FOR $28,300.00 0027 Construction Dewatering 1 JOB FOR $203,300.00 0028 Embankment, Compacted Fill
0028AA First 13,000 CY 13,000 CY $37.36 $485,680.00 0028AB All Over 13,000 CY 3,000 CY $37.37 $112,110.00
0029 Embankment, Uncompacted Fill 0029AA First 2,900 CY 2,900 CY $30.72 $89,088.00 0029AB All Over 2,900 CY 435 CY $30.72 $13,363.20
0030 Sand Fill 4,000 CY $20.89 $83,560.00 0031 Diposal of Unsuitable Excavated Material
0031AA First 11,100 CY 11,100 CY $8.55 $94,905.00 0031AB All Over 11,100 CY 3,350 CY $8.55 $28,642.50
0032 Grouted Rip Rap 1,630 CY $186.80 $304,484.00 0033 Piling, Steel Sheet, Type PZ-22 15,973 SF $29.10 $464,814.30 0034 Piling, Steel Sheet, Type PZ-35 2,533 SF $44.40 $112,465.20 0035 Compression Pile Test
0035AA First 3 Compression Test 3 EA $16,083.00 $48,249.00 0035AB All Over 3 Compression Test 3 EA $16,083.00 $48,249.00
0036 Tension Pile Test 0036AA First 3 Tension Test 3 EA $16,083.00 $48,249.00 0036AB All Over 3 tension Test 3 EA $16,083.00 $48,249.00
0037 Load Frame and Test Piles 1 JOB FOR $705,160.00 0038 Furnish Steel Pipe Pilies 33,091 LF $118.00 $3,904,738.00 0039 Drive Steel Piple Piles 33,091 LF $33.10 $1,095,312.10 0040 Asphaltic Paving 245 SY $104.90 $25,700.50 0041 Surfacing 50 CY $66.75 $3,337.50 0042 Turf Establishment and Maintenance 3 ACRE $4,783.00 $14,349.00
INDEPENDENT GOVERNMENT ESTIMATE
BID ABSTRACT
For Bids Under Solicitation, W912P8-16-B-0038
New Orleans To Venice, Hurricane Protection System, NOV-NF-W-06B3, West Pointe A La Hache, 0043 Utility Modificaitons (Gulf South Gas Pipelines) 1 JOB FOR $163,700.00 0044 Utility Modificaitons ((72" Dia. Siphons) 1 JOB FOR $429,800.00 0045 Corrugated Metal Arch Pipe 60 LF $351.40 $21,084.00 0046 Fuel Storage Tank and Supply System 1 JOB FOR $38,550.00 0047 Riprap (T-Wall M-8 and M-9) 477 TON $64.70 $30,861.90 0048 Riprap (T-Wall M-6) 56 TON $55.40 $3,102.40
0049 Furnishing New 72" Dia. Siphon Discharge Pipes - (OW) 496 LF $1,296.60 $643,113.60 0050 Modificaiton and Delivery of Existing 72" Dia. Siphone Discharge Pipe - (OW) 1 JOB FOR $678,800.00
I CERTIFY THAT I HAVE OPENED, READ AND RECORDED ON THIS ABSTRACT,
ALL OFFERS RECEIVED IN RESPONSE TO THE SOLICITATION.
SIGNATURE AND DATE
TOTAL BASE WORK + OPTIONAL WORK $16,284,625.80
TOTAL BASE WORK $14,962,712.20
TOTAL OPTIONAL WORK $1,321,913.60
Sheet1
| 2016-08-01T09:35:03-0500 | |
| MEEKS.OLIVER.C.1184972979 |
File details come from the government source that posted it. Updated .