AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation No. W912P8-16-B-0038, for New Orleans To Venice, Hurricane Protection System, NOV-NF-W-06B3, West Pointe A La Hache, Gulf South Pipeline And Siphon T-Walls, Plaquemines Parish, Louisiana, is amended as follow s:

Please see continuation pages for changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-16-B-0038

X 9B. DATED (SEE ITEM 11)

26-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jul-2016

CODE

VICKSBURG DISTRICT CONTRACTING OFFICE

4155 CLAY ST.

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P8-16-B-0038

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

TECHNICAL INQUIRIES VIA PROJNET: The final list of questions and answers that were provided via Projnet for the subject procurement is being added to the solicitation by this amendment. These pages have the notation ““Incorporated by Amendment 0009” at the bottom of the pages.

SECTION 00010

Pages 00010-3, 4, 5, and 6. Delete these pages in their entirety and substitute the attached revised pages 00010-3, 4, 5, and 6 therefore.

SECTION 01100

1. Page 32, paragraph 28, subparagraph c. Delete this subparagraph in its entirety and substitute the following therefore:

“c. Project NOV-6a.3 (Levee Construction): The work performed under this titled project includes levee construction south of the work being performed as part of the NOV-6b.3 project. A portion of this project (NOV-6b.3) area will be used as a construction offices/staging area for this contract (NOV-6a.3). No levee work will be performed as part of NOV-6a.3 within the limits of construction for the NOV-b.3 project.”

2. Page 32, paragraph 30. Delete the last sentence of this paragraph in its entirety.

3. Pages 33 and 34, paragraph 29. Delete this paragraph in its entirety and substitute the following therefore:

“29. REUSE OF EXISTING 72” DIA. DISCHARGE SIPHONS

1. Removal/Inspection of Existing Siphons. The Contractor shall remove and reinstall a portion of the existing 72” diameter discharge siphons, as shown on the drawings. After removal, the Contractor shall clean debris, mud, etc. from the pipes prior to inspecting.

After cleaning the pipes, the Contractor shall perform a visual inspection to determine their structural integrity and soundness. The removed pipe shall also be visually inspected by USACE Engineering Division prior to submission of the inspection report by the Contractor. The Contractor shall reinstall the existing 72” diameter discharge siphons, depending on results of inspection, when ordered by the Contracting Officers representative. Inspections required for the existing pipe are, but not limited to, the items listed below:

a. Inspect pipe walls (inside and outside) for excessive corrosion.

b. Inspect pipe joints for leaks.

2. Reports. Upon completion of the pipe inspections, the Contractor shall submit a detailed inspection report of his/her findings for review and approval by the Contracting Officer. The report shall be titled: “Existing 72” Dia. Siphons Inspection Report”. The inspection report shall include, but not be limited to:

a. A detailed write-up of findings with recommendation,

b. Inspection reports,

c. Photographs (digital & hard copy), etc, in order to make a determination of whether these pipes may be reused. Final approval and reuse of the existing discharge pipes will be determined by the Contracting Officer.

3. Reuse. After removal and inspection of the specified portions of the existing 72” diameter discharge siphons, and the determination is made by the Contracting Officer representative to reuse the existing discharge siphons, the Contractor shall:

(1) Ensure that all nuts, bolts, and washers are new which replace the existing, in accordance with the requirements specified in Section 22 14 20, “72" DIA.

SIPHON DISCHARGE PIPE”.

(2) Ensure that the interior and exterior surfaces receive protective coatings as specified in in Section 22 14 20, “72" DIA. SIPHON DISCHARGE PIPE”, paragraph PROTECTIVE COATINS.

(3) Ensure that all other requirements, for reinstallation of the existing 72” diameter discharge siphons are in accordance with the applicable requirements of Section 22 14 20, “72" DIA. SIPHON DISCHARGE PIPE”.

4. Removal of Existing Discharge Pipe. No measurement will be made for removal of the existing 72" diameter siphon discharge pipe as specified above in subparagraph “Removal/Inspection of Existing Siphons”. Payment will be made at the contract job price for "Removal of Existing 72” Dia. Siphon Discharge Pipe". Price and payment shall constitute full compensation for providing all plant, labor, equipment and materials for the removal, cleaning, and inspection of the 72" diameter siphon discharge pipes; as described herein and as shown on the drawings.

5. Modification, Surface Preparation and Delivery of Reused Discharge Pipe. No measurement will be made for modifying, repair, surface preparation, coating, and delivery of the existing siphon discharge pipe to be reinstalled. Payment will be made at the contract job price for "Modification and Delivery of Existing 72” Dia. Siphon Discharge Pipe - (OW)”, if Optional Work is Exercised. Price and payment shall constitute full compensation for providing all plant, labor, equipment and materials for the modification, repair, surface preparation, coating, and delivery of the removed 72" dia. diameter siphon discharge pipes, as described herein and as shown on the drawings.”

4. Page 34, paragraph 30. Delete this paragraph in its entirety and substitute the following therefore:

“30. CONSTRUCTION SPECIAL WORK REQUIREMENTS

1. As part of the first Order of Work, the Contractor shall construct the asphalt paving at locations shown on SHEET IDENTIFICATION No. C-104.

2. The Contractor shall perform pump station performance assessments of the pumps and all ancillary equipment prior to performing any work that may affect the existing pump station. The new pump station shall be fully closed-in and have at least one of the existing pumps transferred from the old station, fully operational and tested, prior to demolition of the existing station; or, an equivalent, acceptable, alternative plan for pumping capacity shall be in place and operational.

3. Levee preloads #1 and #2 shall remain unharmed for 1 year after installation and prior to constructing T-Wall Monoliths M-5 and M-11, the sheet pile to levee tie-ins, and the grouted rip-rap.

4. Drainage of the existing ditches shall remain throughout the duration of the contract.

The Contractor shall phase relocation of the existing pumps, such that one pump (at a minimum) remains in service at all times; or, the Contractor must have equivalent pumping capacity of 48 cfs at all times. Plaquemines Parish generally maintains a water elevation between El. -1.5 & El. -2.0 (NAVD88) via the existing pumps. The existing electric pump operates via float switches, which maintain the water level to the above elevations.

5. Plaquemines Parish will be responsible for operation and maintenance (O&M) of the existing pumps prior to the start of deconstruction/relocation/moving of the pumps.

Plaquemine Parish will resume O&M of each pump after its successful relocation and favorable post-performance assessment tests of each pump. Plaquemine Parish acceptance can be per pump. If the Contractor elects to provide alternate, acceptable, pumping equipment, the Contractor will be responsible for all operation and maintenance of the provided equipment, or they may allow Plaquemine Parish Drainage Personnel to operate the provided drainage equipment at the Contractor’s risk and expense.

6. During installation of piling (permanent and temporary sheet pile, pipe piles, and pile load test piles) near the existing West Pointe A La Hache Pump Station, the Contractor shall monitor the existing pump station for vibration levels. The Contractor shall adhere to the requirements set forth in Section 01100, paragraph entitled “VIBRATION

MONITORING”.

7. The Contractor shall conduct the work under this contract in such manner and sequence that will assure the stability of the existing diversion, drainage and flood protection features, safety of workmen and the general public, and insure the non-interference to the daily operation of the Plaquemines Parish Drainage Maintenance personnel. The Contractor shall submit, for approval, a plan outlining his proposed sequence of construction, allowing a minimum of 30 days for approval.

8. The seepage cut-off sheet piling (permanent sheets) and the temporary retaining structure sheet piling shall be installed using a non-impact, vibratory hammer near the Gulf South Gas pipelines. All sheet piling shall be driven to the depths shown on the approved sheet piling shop drawings, submitted by the Contractor to the Government.

The Contractor shall monitor the vibrations limits as stated in paragraph entitled

“VIBRATION MONITORING”.”

5. Page 35, paragraph 31. Delete this paragraph in its entirety and substitute the following therefore: “31. RESERVED”

6. Page 37, paragraph 34. Delete this paragraph in its entirety and substitute the following therefore: “34. RESERVED”

7. Page 39, paragraph 37. Delete this paragraph in its entirety and substitute the following

“37. TEMPORARY PILING DISPOSITION

Any temporary piling (including those used for an elevated work platform) within twenty-five

(25) feet of the T-walls and new pump house structures, shall be cut-off and left in place. Any temporary piling used to form an enclosure around a permanent structure for constructability purposes, that is driven deeper than the permanent foundation piling, shall be cut-off and left in place. Temporary piling required to be left in place shall be cut-off below the bottom of the stabilization slab inside the foundation limits of the floodwalls.”

SECTION 01 53 00.01 12

1. Page 2, paragraphs 1.1 and 1.2. Delete these paragraphs in their entirety and substitute the following therefore:

“1.1 SCOPE

The work covered by this section consists of furnishing all plant, labor, materials, equipment, and performing all operations necessary for designing, installing, and removing of temporary flood protection. The Contractor shall maintain flood protection up to required elevation specified in paragraph “DESIGN CRITERIA”.

1.2 MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for the work of designing, installing, and removing temporary flood protection as specified herein. Payment for the work shall be distributed throughout the existing bid items.”

2. Page 3, paragraph 1.5. Delete this paragraph in its entirety and substitute the following

“1.5 DESIGN CRITERIA

If the existing level of flood protection is degraded in any way at any time during the contract duration, the contractor shall submit for approval their temporary flood protection plan. The temporary flood control methods shall be designed for a minimum level of protection to elevation 6.0 feet (NAVD88). At his/her option, the Contractor may design the temporary flood control methods to a higher elevation to provide superiority over the adjacent existing flood protection structures (levees). The temporary flood protection shall be constructed of materials and in such manner that it will not be subject to detrimental erosion, overtopping, undermining, degradation over time, or in any way become ineffective, which could lead to its failure. Construction of the temporary flood control methods shall in no way affect the stability of the existing flood protection. Design of the temporary flood control methods is the sole responsibility of the Contractor, and shall be designed and sealed by a registered professional engineer. The Contractor shall submit to the Contracting Officer for his/her approval copies of the professional engineer’s design along with drawings showing the layout of the proposed temporary flood control methods with all pertinent dimensions and material types and sizes to be used in construction of the structures. The copies submitted shall be in bound form.”

SECTION 09 97 02.01 12

Page 19, paragraph entitled PAINTING SCHEDULES. Delete this paragraph in its entirety and substitute the following therefore:

“3.5 PAINTING SCHEDULES

SYSTEM NO. 6

Items Or Surfaces To Be Coated: pipe piles (exterior of pile); T-wall sheet pile (both sides);

retaining wall sheet pile. Pipe piles and T-wall sheet pile shall be painted starting at 3 inches above the stabilization slab, down to 15 feet below the stabilization slab (measured vertically along the pile section length). The top 15-ft of the retaining wall sheet pile shall be painted.

The full length of the sheet pile for the discharge area shall be painted.

SURFACE

PREPARATION 1st COAT 2nd COAT 3rd COAT

White metal Coal tar- Coal tar- Coal tar-blast epoxy C-200a epoxy C-200a epoxy C-200a cleaning (black) (black) (black) (if needed to attain required thickness)”

SECTION 22 14 20

Page 2, paragraph 1.3.1. In the last sentence, delete “and couplings”.

SECTION 26 05 00.00 40

Page 8, paragraph 3.2.6. Delete this paragraph in its entirety and substitute the following

“3.2.6 LAMPS AND LIGHTING FIXTURES

The Contractor shall supply new interior and exterior light fixtures and install them in the locations as shown on the drawings. The light fixtures shall be installed as per the manufacturer recommendations. The location of the fixtures shall be included on the metal building system shop drawings for review and approval by USACE. The fixtures from the existing pump station shall be removed and demolished by the Contractor.”

SECTION 31 24 00.00 12

1. Page 14, paragraph 3.2.1. Delete this paragraph in its entirety and substitute the following

“3.2.1 Compacted Fill

The location and extent of the compacted fill is shown on the drawings. Compacted fill shall not be placed in water. The materials for compacted fill shall be placed or spread in layers, the first or bottom layer and the last two layers not more than 6 inches in thickness and all layers between the first and the last two layers not more than 12 inches in thickness prior to compaction. Layers shall be started full out to the slope stakes and shall be carried substantially horizontal and parallel to the levee centerline with sufficient crown or slope to provide satisfactory drainage during construction. Lifts shall be placed in a manner that prevents shrinkage cracks and open voids from developing in previously placed lifts.”

2. Page 14, paragraph 3.3. Delete this paragraph in its entirety and substitute the following

“3.3 EMBANKMENT WORK ADVANCEMENT

(1) Embankment Work. The Contractor shall execute the embankment work such that no more than 5,000 linear feet of levee shall be under embankment construction at any time between the limits of the approved levee cross section that has been fertilized, seeded and mulched and the farthest extent of levee clearing ahead of the embankment work. If the Contractor elects to perform embankment work in multiple locations within the total contract length, the sum of the lengths of the multiple embankment construction locations allowed shall not exceed the above given total length of 5,000 linear feet. The limits of embankment work for each of the multiple locations as they fall within the total contract length, shall be between the limits of the approved levee cross section that has been fertilized, seeded and mulched and the farthest extent of levee clearing ahead of the embankment work as pertinent to that particular location. During the hurricane season (1 June – 30 Nov), all above mentioned embankment work limits shall be reduced to 1,000 linear feet.

(2) Soft Soils. The area to receive embankment fill material may contain near surface very soft soils. Special care and precautions shall be taken during fill operations to prevent pushing the soft soil (mud wave) to the right-of-way. Fill placement shall be performed by placing the embankment material in widths parallel to the existing levee at the levee toe and proceed in staggered passes to near the limits of the new ditch footprint.

The Contractor shall utilize low contact pressure equipment (less than 4.5 psi) for materials placement to perform this work. The Contractor shall grade any mud wave that develops to provide positive drainage to the new and existing pump station.

(3) Mud Wave. Should a mud wave occur that does not present the required grade (greater than 6-inch profile above the existing ground surface) and slope of the foundation, the soft soil shall be removed and disposed of off-site in a suitable landfill in accordance with Section 31 23 00.00 12 EXCAVATION. Payment will be made by an equitable adjustment in contract price under the Section 00700 Contract Clauses entitled CHANGES. Should this condition occur because the Contractor utilizes equipment that exceeds the low ground pressure specified (less than 4.5 psi), the soft soil shall be removed and disposed of at no additional cost to the Government.”

SECTION 32 15.00 12

1. Page 2, paragraph 1.1. Delete this paragraph in its entirety and substitute the following

“1.1 SCOPE

The work covered by this section consists of furnishing all plant, labor, and materials and performing all work necessary to construct and maintain surfacing for the levee access road, as shown on the drawings.”

2. Page 3, paragraph 1.4. Delete this paragraph in its entirety and substitute the following

“1.1 PAYMENT

Payment for the surfacing material required for the levee access road including their maintenance with the limitations specified in paragraph "MAINTENANCE" will be made at the contract unit price per cubic yard for "Surfacing". Price and payment shall constitute full compensation for subgrade preparation; furnishing all plant, labor, equipment, and materials required; placing, spreading, compacting, maintenance, removing and offsite disposal; for the levee access road and other incidental work; all as specified herein and as shown on the drawings.”

3. Page 5, paragraph 3.3. Delete this paragraph in its entirety and substitute the following

“3.3 MAINTENANCE

The levee access road shall be maintained by such shaping and addition of surfacing material as directed by the Contracting Officer to provide a usable and drivable road under all weather conditions during the construction period. No additional payment will be made for shaping operations. Additional surfacing materials required to repair any damages to the finished surfacing occasioned by the Contractor's construction operations will not be measured for payment. Additional surfacing materials required to repair any damages to the finished surfacing not occasioned by the Contractor's construction operations will be measured for payment.”

DRAWINGS

SHEET IDENTIFICATION Nos. C-201, C-206, C-207, C-208, C-209, C-301 through C-324, S- 106, S-502, S-505, and E-202. Delete this drawing in its entirety and substitute the attached revised SHEET IDENTIFICATION Nos. C-201, C-206, C-207, C-208, C-209, C-301 through C- 324, S-106, S-502, S-505, and E-202 therefore.

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: NOV-NF-W-06b.3 Review: Bidder Inquiry W912P8-16-B-0038 (00001) (sorted by CommentID ) Displaying 55 inquiries.

Id Discipline Sheet Detail Spec 6548568 Civil C-201 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

For the siphon fill area- sheet C-201 discusses uncompacted fill. There is no pay item or specification section for uncompacted fill. Further, the embankment section prohibits placing fill in water. Please clarify.

On: Jun 06 2016.

Government Response. . There is no accurate way of determining the quantity of uncompacted fill to be placed in the water. Payment for Uncompacted Fill shall be distributed amongst all bid items.

Furthermore, Spec Section 31 24 00.00 12, EMBANKMENT, Paragraph 3.2.1, is referring to placement of Embankment, Compacted Fill in lieu of Uncompacted Fill (sand). Uncompacted fill material can be placed in water. On: Jun 07 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6548584 Cost Engineering 00700-17 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We would like to request a copy of the Gov quantities in accordance with 00700-17 (52.236-4 e)

On: Jun 06 2016.

Government Response. . Estimated quantities provided to the requestor. On: Jun 07 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6548590 Structural 03 31 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) the table in the specs for concrete finish for the floodwall is fractured fin (as shown in the drawings) and grout cleaned finish for all other. The drawings do not show a fractured fin requirement or detail. Please clarify.

On: Jun 06 2016.

Government Response. . Amendment Forthcoming. On: Jun 09 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6548598 Structural 09 97 02 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

With regard to the coating requirements:

1.) coating lengths in 09 97 02 conflict with 31 41 16 (3.1.7) for sheet piles. Please clarify which is correct.

2.) 09 97 02 calls of CTE epoxy for the pump station handrails? Is this accurate/intended?

On: Jun 06 2016.

Government Response. . 1. Amendment Forthcoming.

2.) Yes. The pump station handrails are to be coated with Coal Tar Epoxy. On: Jun 09 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6548602 Mechanical 33 56 10

Page 1 of 13ProjNet: Logged In User

7/25/2016https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...

“Incorporated by Amendment 0009”

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are the day tanks re-used or supplied new? The drawings reference re-use and the specs reference new.

On: Jun 06 2016.

Government Response. . Amendment Forthcoming. On: Jun 09 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6549583 Cost Engineering 0700-17 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We would like to request a copy of the Gov quantities in accordance with 00700-17 (52.236-4 e).

On: Jun 07 2016.

Government Response. . Estimated quantities provided to the requestor. On: Jun 07 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6553003 Mechanical M-102 Dishcharge Bell APCO 5200 OR SIMILAR Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The APCO 5200 is no longer available. There is a high velocity combination air valve available, but it has no paddle.

It is also made by APCO - model ASU-CAV.

On: Jun 09 2016.

Government Response. . We are currently reviewing models to determine the best solution. Any changes to the specs/model type will be answered in an forthcoming amendment. On: Jun 15 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6557003 Contracting 22 14 13.13 Page 7 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide size for bearing pads referenced in specification section 22 14 13.13 Page 7 Paragraph 2.2.1.

On: Jun 13 2016.

Government Response. . The size & location of the bearing pads will be provided in an forthcoming amendment. On: Jun 15 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6558314 Civil 00700-17 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We would like to request a copy of the Gov quantities in accordance with 00700-17

On: Jun 14 2016.

Government Response. . Estimated quantities provided to the requestor. On: Jun 15 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6558770 Cost Engineering 00700-17 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We would like to request a copy of the Gov quantities in accordance with 00700-17 (52.236-4 e).

On: Jun 14 2016.

Government Response. . Estimated quantities provided to the requestor. On: Jun 15 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Page 2 of 13ProjNet: Logged In User

6558796 Contracting 01100-30

The recommended construction sequence for the siphon area shown in Section 01100, Paragraph 30 has the levee preload starting after several major features of work are completed. Given that the levee preload must remain unharmed for 1 year prior to commencing with the sheet pile levee tie-in, grouted riprap, T-wall monolith M-5 and the remainder of the project, the contract time of 580 calendar days is extremely aggressive. Please consider increasing the contract time to 700 calendar days.

On: Jun 14 2016.

Government Response. . The duration adjustment will be addressed within the forthcoming amendment.

On: Jul 07 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6559884 Civil C-201 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

As a follow up question to the Gov response to ID 6548568

Government Response.

There is no accurate way of determining the quantity of uncompacted fill to be placed in the water. Payment for Uncompacted Fill shall be distributed amongst all bid items.

Furthermore, Spec Section 31 24 00.00 12, EMBANKMENT, Paragraph 3.2.1, is referring to placement of Embankment, Compacted Fill in lieu of Uncompacted Fill (sand). Uncompacted fill material can be placed in water.

On: Jun 07 2016 Current Request Status: Request Closed

The Gov response alludes to the fact that "sand" is allowable for uncompacted fill. Nowhere does it mention that.

Can a specification and limits on the uncompacted fill be provided for clarity. Further, if the Gov cannot determine the qty of uncompacted fill, how can the bidders? We would suggest a pay item added for the uncompacted fill as we see on similar projects in the area.

On: Jun 15 2016.

Government Response. . Updated x-sections, new bid item for Uncompacted fill, etc will be added to the specs to further clarify uncompacted fill requirements. This will be within the forthcoming amendment. On:

Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562302 Mechanical 22 14 20-2.3 Protective Coating Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are the existing 72" diameter siphon pipes that are to be removed cement lined on the exterior as stated in specification section 22 14 20-2.3?

On: Jun 16 2016.

Government Response. . From drawing number REF-104, it appears that the existing pipe is Wall tape coated steel pipe.

There are no notes stating if the existing pipe is cement lined on the exterior. On: Jun 20 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562310 Specifications 01100-29 Subparagraph 2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please elaborate on the testing requirements on the existing 72" diameter siphons.

On: Jun 16 2016.

Government Response. . Paragraph 29, "REUSE OF THE EXISTING 72" DIA. DISCHARGE SIPHONS", will be revised and included within the forthcoming amendment. On: Jun 29 2016

Page 3 of 13ProjNet: Logged In User

Current Request Status: Request Closed Information for this report is procurement sensitive.

6562350 Mechanical 22 14 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide details of all required pipe flanges on the existing 72" diameter siphon pipes. How many per line of siphon pipes required and the location of the flanges is needed?

On: Jun 16 2016.

Government Response. . The required pipe flange locations are shown on Plan Sheets C-209 & S-107.

Essentially, there will be two flange locations per pipe. So a total of 16 locations ( 2 flange locations per pipe x 8 siphon pipes). On: Jun 20 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562353 Specifications 13 34 19 Metal Building Systems Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What is the coating system for the metal building framing?

On: Jun 16 2016.

Government Response. . The coating for the metal building framing is stated in Paragraph 2.1.3, "Primer". On: Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562357 Contracting 0700 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What pay item do we include the resetting of the pumps?

On: Jun 16 2016.

Government Response. . The measurement and payment for Relocation of the Existing Pumps and appurtenant items will be addressed in the forthcoming amendment. On: Jun 20 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562358 Specifications M-101 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide specifications for the metal louvers as shown on Sheet M-101.

On: Jun 16 2016.

Government Response. . A specification for the metal louvers shall be provided via forthcoming amendment. On: Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562375 Specifications 01100-9 (E) Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specifications section 01100-9 (E) indicates that the utility owner will install the pipe sleeves and filler material.

Please confirm who will supply the materials.

On: Jun 16 2016.

Government Response. . The pipe sleeve frame, filler material, and waterstop will be furnished and installed by the Utility Owner.

See below note on drawings S-508 & S-509.

Page 4 of 13ProjNet: Logged In User

*ALL ITEMS SHOWN (EXCEPT FOR THE STEEL SHEET PILE) TO BE FURNISHED & INSTALLED BY THE UTILITY OWNER. On: Jun 20 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562396 Specifications 00010 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We request that Bid Item 0006, Floating Plant be changed to allow for an elevated work platform. If allowable, please include design parameters and any pile removal limitations.

On: Jun 16 2016.

Government Response. . Spec language will be added to 01100 to allow for elevated work platforms within the forthcoming amendment. On: Jun 23 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562397 Specifications 22 14 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are there any known load restrictions over the existing siphon piping?

On: Jun 16 2016.

Government Response. . Prior to the start of excavation at the siphons, there are no known load restrictions. Upon commencement of excavation activities at the siphons, the loads shall be restricted to a maximum AASHTO HS-20 equivalent truck loading. On: Jun 20 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562406 Civil Civil Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Other than the TRS sheets noted to remain as part of the retaining wall structure, please confirm that all other sheeting and strut support piles can be pulled when no longer required. Note that some of these temporary piling will be in the footprint of the permanent structure.

On: Jun 16 2016.

Government Response. . Pulling of temporary sheet pile will be further clarified within the forthcoming amendment. On: Jun 20 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562408 Specifications 01 53 00 01 Temporary Flood Protection

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Due to the complexity of this project, we request that the government add a pay item for Temporary Flood Protection.

On: Jun 16 2016.

Government Response. . A separate bid item for temporary flood protection will be added to the bid schedule as part of the forthcoming amendment. On: Jun 23 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6562740 General 542 22 14 20 Page 4 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

To improve the overall quality, efficiency of fabrication and reduce cost of the 72" Discharge pipe, will spiral welded steel be acceptable? Spiral welded steel conforms to AWWA C200 and has become the preferred method of manufacturing steel pipe for water transmission. Spiral welded steel holds to tolerances and stress much better than rolled and welded steel.

On: Jun 16 2016.

Page 5 of 13ProjNet: Logged In User

Government Response. . Paragraph 2.1, sentence 3 will be deleted to allow for helical or spiral seamed pipe via the forthcoming amendment. On: Jul 07 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6563607 Engineering Support 09 97 02.01 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In Section 09 97 02.01, Para. 3.5 it states that the T-wall and retaining wall sheetpiling are to be coated on the top 15 feet. In the Steel Sheetpiling section 31 41 16.00, Para. 3.1.7 it states the levee sheetpiling are to be coated for top 24' and the the sheetpiling under the T-walls to be coated for top 10'. Which specification section rules and what are the actual lengths to be coated?

On: Jun 17 2016.

Government Response. . A similar question was asked with Contractor Question #6548598 (See Below response).

1.) The last sentence of Spec Section 31 41 16, Paragraph 3.1.7, shall be revised to as follows:

......"Painting of the sheet piling within the T-Walls will be limited to 3 inches above the stabilization slab, to a depth of 15-ft below the slab". Essentially the 10-ft will be revised to 15-ft to match Spec Section 09 97 02.

In regards to the levee sheet piling or levee tie-in sheet piling, the painting limits shall be as stated within Paragraph 3.1.7. On: Jun 20 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6563608 Engineering Support 09 97 02.01 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In Section 09 97 02.01, Para. 3.5 it states that the handrails for the pump house are to be Coal Tarred. Typically, handrails are galvanized, aluminum or painted. Is the requirement for handrails to be coal tar epoxy correct?

On: Jun 17 2016.

Government Response. . No. The handrails will be galvanized, and not coated with Coal Tar Epoxy. This will be corrected in the forthcoming amendment. On: Jun 20 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6571768 Contracting M-102 notes 22 14 13.13 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Drawing sheet M-102 call for the 18" pipe with a 3/8" wall made from A36 steel. The specification section 22 14 13.13, paragraph 2.1 call for the 18" pipe to be API-5L grade B or A139 grade B with a 1/2" wall thickness. What is the wall thickness of the 18" pipe?

On: Jun 23 2016.

Government Response. . Spec Section 22 14 13.13, paragraph 2.1 will be revised to match the ASTM and material thickness as shown in Note 3 on Plan Sheet M-102. This will be included within the forthcoming amendment. On: Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6571806 Contracting M-102 notes 22 14 13.13 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Note 3 on sheet call for the 18" pipe to be coated inside and outside with liquid epoxy per AWWA C-210.

Specification Section 22 14 13.13 paragraph 2.3 calls for liquid epoxy per AWWA C-210. Specification Section 22 14

13.13 paragraph 3.3.1 "Paintng" stated the pipe is painted with coal tar epoxy inside and outside. Specification Section 09 97 02.01 specifically states that coal tar epoxy(c-200) is required on the interior and exterior of the discharge pipes. What is the required coating for the interior and exterior of the 18" discharge pipes?

On: Jun 23 2016.

Page 6 of 13ProjNet: Logged In User

Government Response. . The required coating for the 18" diameter pipes shall meet the requirements of

AWWA C210.

The painting requirements listed for the 18" diameter pipe will be deleted from Spec Section 09 97 02.01, and revised in Paragraph 3.3.1 of Spec Section 22 14 13.13. These changes will be included within the forthcoming amendment. On: Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6571907 Contracting S-107 A 22 14 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We have not been able to find one reference in the plans indicating the 72" discharge pipes have a mortar coating on the exterior. The saddles(S-107), utility sleeve(S-507), Section A on sheet S-107, Section C on S-501, sheet S-502 and various other sections in the plan make no mention to nor does the design accommodate the mortar coating. Specification Section 22 14 20 paragraph 2.3 indicates that the interior of the pipe is coated with epoxy per AWWA C-210 and the exterior is to be coated with 2" of mortar which conflicts with the Specification Section 09 97

02.01 paint schedule that specifically states that the interior and exterior of the discharge pipes is coated with coal tar epoxy per C-200a. What is the required coating on the interior and exterior of the 72" discharge pipes?

On: Jun 23 2016.

Government Response. . The protective coating for the New & Existing 72" pipe shall meet the requirements of AWWA C210.

The existing plans (REF drawings) do not show a mortar coating on the exterior of the pipes.

Additionally, no concrete mortar coating will be required (interior & exterior) as part of this work. References to concrete mortar coatings, and coal tar epoxy coatings will be deleted from Spec Sections 22 14 20, and 09 97 02.01. On: Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6571967 Contracting S-107 A 22 14 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section A on sheet S-107 shows a set of flanges in the 72" pipe 11' from the floodwall. Plan sheet 309 shows a set of flanges between the existing and new 72" pipe about 42' from the floodwall but does not require a set of flanges 11' from the floodwall. Is it the governments intent to get a set of flanges between the existing 72" discharge pipe 42' away from the new floodwall, followed by a flexible coupling and then another set of flanges 11' from the floodwall? If this is not correct please clarify.

On: Jun 23 2016.

Government Response. . Yes that is the intent. We'll update plan sheets C-209 & C-309 to show the additional set of flanges (similar to Sheet S-107). The new sheets will be added to the forthcoming modification. On: Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6571975 Contracting s-501 & S-502 & S-107 C, A, A 22 14 20

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section C on sheet S-501 calls for an annular ring around the 72" discharge pipesat the centerline of the new floodwall. Section A on sheet S-107 calls for utility protection assembly per S-507 be installed around the 72" discharge pipes at the new floodwall. Is the government's intent to have both the annular ring embedded in the floodwall and the Utility protection assembly installed at each of the 72" discharge pipes? If not please clarify.

On: Jun 23 2016.

Government Response. . Yes, that is the intent. On: Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6576244 Electrical e-301 d1 d2

Page 7 of 13ProjNet: Logged In User

What size of conductors do you want from the new pole to the building?

On: Jun 27 2016.

Government Response. . The size of the conductors shall be 4-500MCM with #3 Ground. The service voltage shown on Sheet E-301 will be adjusted from 240V to 120/208V, within the forthcoming amendment.

On: Jul 11 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6576247 Electrical 3-301 d2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What size is the existing panel?

On: Jun 27 2016.

Government Response. . The existing service panel info will be added to Plan Sheet M-100.

Main Serve Panel: 120/208V, 3 phase, 400A, 42 Circuit On: Jun 30 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6576249 Electrical 26000 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The drawings indicate re-installing existing fixtures. Will a change be issued if it is determined they should be replaced?

On: Jun 27 2016.

Government Response. . Plan Sheet, E-202, will be revised for the Contractor to provide and install new light fixtures (interior & exterior of new pump house). Plan Sheet C-001 will be revised to demolish the existing fixtures and turn them over to Plaq. Parish in lieu of re-use. On: Jul 11 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6576252 Electrical e-202 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What is the horsepower and voltage of the electrical motor?

On: Jun 27 2016.

Government Response. . The horsepower and voltage is shown on Plan Sheet M-100.

Horsepower is 60 hp. The voltage will be revised from 460V to 208V, 3 phase via forthcoming amendment.

On: Jun 30 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6576260 Electrical e-201 note 1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will pole NP-2 be installed by the utility?

On: Jun 27 2016.

Government Response. . Yes. New Power Poles NP-1 and NP-2 shall be installed by Entergy. Power pole PP-4 is an existing pole. On: Jun 29 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6579398 Mechanical S-107 A 22 14 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 8 of 13ProjNet: Logged In User

Specification Section 22 14 20, paragraph 2.1 "Discharge Pipes" states that the "Pipe shall not be helical or spiral seamed". We have visited the jobsite and the existing pipe at the top of the Mississippi River Levee is in fact spiral seamed pipe (see attached photograph). Can the pipe specification be revised to allow for the use of spiral seamed discharge pipe to match the existing discharge pipe?

(Attachment: POINTE_A_LA_HACHE_SIPHON_@_MRL.pdf) On: Jun 29 2016.

Government Response. . This sentence will be removed via amendment to allow for helical or spiral seamed pipe. On: Jul 07 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6579401 Mechanical S-107 A 22 14 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification Section 22 14 20, paragraph 2.3 "Protective Coating" states that the exterior surface of the discharge pipe receive a 2" mortar coating. We have visited the jobsite and the existing pipe at the top of the Mississippi River Levee (see attached photograph) does not have a mortar coating. Can the pipe protective coating specification be revised to allow for the use of C200a Coal tar epoxy applied to the exterior of the discharge pipe?

(Attachment: POINTE_A_LA_HACHE_SIPHON_@_MRL1.pdf) On: Jun 29 2016.

Government Response. . Concur. From the Ref drawings, it appeared that no 2" Concrete Mortar coating existed. With that being stated, the 2" mortar coating will be deleted from this spec section via the forthcoming amendment. Coating requirements for the new and existing 72" siphons will be addressed in the amendment as well. On: Jun 30 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6584623 Contracting C-206 Note 4 33 05 00.00 12 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What are estimated durations for Gulf South to excavate TRS, install sleeve, and backfill TRS?

On: Jul 01 2016.

Government Response. . The contractor is required to coordinate with Gulf South (Boardwalk) to determine their actual schedule of work/duration at the 8" & 20" Dia. Gas Pipelines. Note that the work at the Gulf South Pipelines was not determined critical path when developing the 580 Construction Duration.

In addition, the construction duration of 580 calendar days is being reviewed and will be increased with the forthcoming amendment based on previous Contractor Question submitted. On: Jul 11 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6584628 Contracting C-104 31 23 16.16 12 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can pipe piles and sheet piles be driven before the installation of the structural fill for the pre-load areas?

On: Jul 01 2016.

Government Response. . No, the preload shall be constructed prior to any feature for the tie-in t-walls to reduce settlement of the surrounding soil. Refer to spec section 01100, Paragraph 30 for sequencing requirements. On: Jul 07 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6599031 Electrical e-202 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Ammendment 6 added clouds on this sheet saying "New Exterior Light Fixture" and "New Flourescent Light Fixtures".

Note 7 Indicates reusing existing fixtures. How many fixtures will be reused and how many will be new? Is a specification on new fixtures available so we can match if needed?

On: Jul 14 2016.

Government Response. . All Light fixtures shown on this Sheet shall be supplied new & installed by the Contractor. Note 7 will be deleted from this Plan Sheet. The specifications for the Flourescent Light Fixtures

Page 9 of 13ProjNet: Logged In User and the Exterior Light fixtures will be added to the drawing. Sheet E-202 will be issued in an forthcoming amendment. On: Jul 19 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6599438 Structural C-206 Note 5 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What is the limitation of TRS sheeting to remain in place, i.e. all installed or only within a certain distance of the new T-Wall?

On: Jul 14 2016.

Government Response. . Temporary piling shall be cut-off and left in place, if it is within 25-ft of a permanent pile (top of pile). The limitation for temporary piling to be left in-place, is specified within New Paragraph 37, "Temporary Piling Disposition", which was included within amendment 0006. On: Jul 19 2016 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6599439 Structural C-208 Note 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What is the limitation of TRS sheeting to remain in place, i.e. all installed or only within a certain distance of the new T-Wall?

On: Jul 14 2016.

Government…