ED 14-031
IFB NO. W912P8-16-B-0038
US Army Corps of Engineers � Vicksburg District
New Orleans to Venice Hurricane Protection System
NOV-NF-W-06B.3, West Pointe A LA Hache, Gulf South Pipeline and Siphon T-Walls
Plaquemines Parish, Louisiana
Construction Solicitation and Specifications
Ed 14-031
DEPARTMENT OF THE ARMY
VICKSBURG DISTRICT, CORPS OF ENGINEERS
4155 CLAY STREET
VICKSBURG, MISSISSIPPI 39183-3435
REPLY TO
ATTENTION OF
SOLICITATION: W912P8-16-B-0038
19 MAY 2016
FOR: New Orleans to Venice, Hurricane Protection System, NOV-NF-W-06B.3, West Pointe A La Hache, Gulf South Pipeline and Siphon T-Walls, Plaquemines Parish, Louisiana
TO OPEN:
I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL OPPORTUNITY
CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION.
Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.
III. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) D-U-N-S number. If you do not already have a D&B D-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.
BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS
SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS
IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)
DESCRIPTION AND MAGNITUDE OF WORK: The work consists of the constructing new floodwall to include:
reinforced concrete walls, driving steel sheet piling, driving steel pipe piling, compacted embankment fill, clearing and grubbing, grouted riprap, structural excavation and backfill, painting, turf establishment, culverts, demolition, temporary flood protection, utility modifications, silt fencing, and other incidental work.
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH
THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS
MANUAL", DATED NOVEMBER 2014.
ATTENTION:
Contractors must complete, and submit with their offer, the provisions located in section 00600. An offeror may also submit, in lieu of the completed section 00600, a complete hard copy of their Online Representations and Certifications Applications (ORCA) registration. See FAR Clauses 52.204-7 and 52.204-8 for requirement information. The website for ORCA is www.sam.gov.
SOLICITATION NUMBER: W912P8-16-B-0038
TECHNICAL INQUIRIES AND QUESTIONS
ALL QUESTIONS MUST BE SUBMITTED VIA PROJNET.
TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THIS
SOLICITATION ARE TO BE SUBMITTED VIA BIDDER INQUIRY IN PROJNET
AT (HTTPS://WWW.PROJNET.ORG) . BIDDERS ARE ENCOURAGED TO
SUBMIT QUESTIONS NO LATER THAN 17 JUNE 2016 IN ORDER TO
ENSURE ADEQUATE TIME IS ALLOTTED TO FORM AN APPROPRIATE
RESPONSE AND AMEND THE SOLICITATION, IF NECESSARY. TO SUBMIT
AND REVIEW INQUIRY ITEMS, PROSPECTIVE VENDORS WILL NEED TO
USE THE BIDDER INQUIRY KEY PRESENTED BELOW AND FOLLOW THE
INSTRUCTIONS LISTED BELOW THE KEY FOR ACCESS. A PROSPECTIVE
VENDOR WHO SUBMITS A COMMENT /QUESTION WILL RECEIVE AN
ACKNOWLEDGEMENT OF THEIR COMMENT/QUESTION VIA EMAIL, FOLLOWED
BY AN ANSWER TO THE COMMENT/QUESTION AFTER IT HAS BEEN
PROCESSED BY OUR TECHNICAL TEAM.
ALL TIMELY QUESTIONS AND APPROVED ANSWERS WILL BE MADE
AVAILABLE THROUGH PROJNET. APPROVED ANSWERS TO ALL TIMELY
QUESTIONS WILL ALSO BE POSTED ON THE FEDBIZOPS IN THE FORM OF
A REPORT GENERATED FROM PROJNET AS SOON AS THE
COMMENT/QUESTION ENTERING PERIOD IS OVER AND ALL ANSWERS ARE
ALL FINALIZED.
THE SOLICITATION NUMBER IS: W912P8-16-B-0038
THE BIDDER INQUIRY KEY IS: 3BR4RD-MUYFSG
SPECIFIC INSTRUCTIONS FOR PROJNET BID INQUIRY ACCESS:
1. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK
ADD ON THE UPPER RIGHT SIDE OF THE SCREEN.
2. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
3. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
4. EMAIL. ENTER THE EMAIL ADDRESS YOU WOULD LIKE TO USE FOR
COMMUNICATION.
5. CLICK CONTINUE. A PAGE WILL THEN OPEN SAYING THAT A USER
ACCOUNT WAS NOT FOUND AND WILL ASK YOU TO CREATE ONE USING
THE PROVIDED FORM.
6. ENTER YOUR FIRST NAME, LAST NAME, COMPANY, CITY, STATE,
PHONE, EMAIL, SECRET QUESTION, SECRET ANSWER, AND TIME
ZONE. MAKE SURE TO REMEMBER YOUR SECRET QUESTION AND
ANSWER AS THEY WILL BE USED FROM THIS POINT ON TO ACCESS
THE PROJNET SYSTEM.
7. CLICK ADD USER. ONCE THIS IS COMPLETED YOU ARE NOW
REGISTERED WITHIN PROJNET AND ARE CURRENTLY LOGGED INTO
THE SYSTEM.
SPECIFIC INSTRUCTIONS FOR FUTURE PROJNET BID INQUIRY ACCESS:
1. FOR FUTURE ACCESS TO PROJNET, YOU WILL NOT BE EMAILED ANY
TYPE OF PASSWORD. YOU WILL UTILIZE YOUR SECRET QUESTION
AND SECRET ANSWER TO LOG IN.
2. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK
ADD ON THE UPPER RIGHT SIDE OF THE SCREEN.
3. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
4. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
5. EMAIL. ENTER THE EMAIL ADDRESS YOU USED TO REGISTER
PREVIOUSLY IN PROJNET.
6. CLICK CONTINUE. A PAGE WILL THEN OPEN ASKING YOU TO ENTER
THE ANSWER TO YOUR SECRET QUESTION.
7. ENTER YOUR SECRET ANSWER AND CLICK LOGIN. ONCE THIS IS
COMPLETED YOU ARE NOW LOGGED INTO THE SYSTEM.
PTC-i ED 14-031
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00010 Solicitation, Offer and Award (SF-1442) Bidding Schedule
00100 Instructions to Bidders 00700 Contract Clauses
DIVISION 01 - GENERAL REQUIREMENTS
01100 General Provisions 01 32 17.00 20 Network Analysis Schedule (NAS) 01 33 00 Submittal Procedures 01 42 00 Sources for Reference Publications 01 45 02.00 10 Quality Control System (QCS) 01 45 04.00 10 Contractor Quality Control 01 53 00.01 12 Temporary Flood Protection 01 53 00.02 12 Temporary Retaining Structures 01 57 20.00 12 Environmental Protection 01 57 23.00 12 Storm Water Pollution Prevention Plan 01 57 23.01 12 Truck Wash-Down Racks 1 78 02.00 10 Closeout Submittals
DIVISION 02 – EXISTING CONDITIONS
2 22 30 Pump Station Performance Assessment 2 41 00 Demolition
DIVISION 03 – CONCRETE
3 11 14.00 12 Formwork for Concrete 03 15 13.00 12 Expansion Joints and Waterstops in Concrete 03 21 00.00 12 Reinforcing Steel 03 31 00.00 12 Cast-in-Place Structural Concrete
DIVISION 05 - METALS
05 50 03.00 12 Metalwork Fabrication, Machine Work, And Miscellaneous Provisions
05 50 04.01 12 Miscellaneous, Standard Articles, Shop Fabricated Items
PTC-2 ED 14-031
DIVISION 09 - FINISHES
09 97 02.01 12 Painting: Coal Tar Epoxy System
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems
DIVISION 22 - PLUMBING
22 14 13.13 Fronting Protection Discharge Piping 22 14 20 72" Dia. Siphon Discharge Pipe 23 20 00.00 12 Flexible Couplings
DIVISION 26 - ELECTRICAL
26 05 00.00 40 Electrical Work
DIVISION 31 – EARTHWORK
31 05 19.04 12 Separator Geotextile 31 05 19.05 12 Reinforcement Geotextile 31 11 00.00 12 Clearing and Grubbing 31 23 00.00 12 Excavation 31 23 16.16 12 Structural Excavation and Backfill 31 23 19.00 12 Dewatering 31 24 00.00 12 Embankment 31 37 00.01 12 Grouted Riprap 31 41 16.00 12 Steel Sheet Piling 31 62 14.00 12 Pile Load Tests 31 62 17.00 12 Steel Pipe Piles
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 16.00 12 Asphaltic Pavement 32 15 00.00 12 Surfacing 32 92 19.04 12 Turf Establishment and Maintenance
PTC-3 ED 14-031
DIVISION 33 – UTILITIES
33 05 00.00 12 Modifications to Existing Utilities 33 40 01.00 12 Corrugated Metal Pipe 33 52 10 Service Piping, Fuel Systems 33 56 10 Factory-Fabricated Fuel Storage Tanks 35 31 19.04 12 Riprap
BID BOND
( See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date) OMB Number: 9000-0045
Expiration Date: 6/30/2016 Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, DC 20405.
SURETY(IES) (Name and business address)
PENAL SUM OF BOND BID IDENTIFICATION
PERCENT
OF BID
PRICE
AMOUNT NOT TO EXCEED BID DATE INVITATION NO.
MILLION (S) THOUSAND(S) HUNDRED(S) CENTS
FOR (Construction, supplies, or Services)
OBLIGATION
We, the Principal and Surety (ies) are firmly bound to the United States of America (hereinafter call the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit or liability is the full amount of the penal sum.
CONDITIONS:
The principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10 days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to executes such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each surety executing this instrument agrees that its obligations is not impaired by any extension(s) of the time for acceptance of the bid that the principal may grand to the Government. Notice to the surety (ies) of extensions (s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the periods originally allowed for acceptance of the bid.
WITNESS
The principal and Surety (ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
1.
(Seal)
2.
(Seal)
3.
(Seal) Corporate Seal NAME(S) &
TITLE(S)
(Typed)
1. 2. 3.
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
1.
(Seal) 2.
(Seal)
NAME(S)
(Typed)
1. 2.
CORPORATE SURETY(IES)
SU
R
ET
Y
A
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT ($)
Corporate Seal
SIGNATURE(S) 1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
AUTHORIZED FOR LOCAL REPRODUCTION
Pervious edition is usable
STANDARD FORM 24 (REV. 10/1998)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
INDIVIDUAL PARTNERSHIP
JOINT VENTURE CORPORATION
STATE OF INCORPORATION
SU
R
ET
B
STATE OF INC. LIABILITY LIMIT ($)
Corporate Seal SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
C
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT ($)
Corporate Seal SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
D
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT ($)
Corporate Seal SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
E
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT ($)
Corporate Seal
SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
F
NAME &
ADDRESS
STATE OF INC. LIABILITY LIMIT ($)
Corporate Seal
SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
G
STATE OF INC. LIABILITY LIMIT ($)
Corporate Seal
SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. any deviation from this form will require the written approval of the Administrator of General Services.
2, Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., ab attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporation executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and address shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY (IES)." In the space designed "SURETY (IES)" on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), or each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word " Corporate Seal";
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "Offeror."
STANDARD FORM 24 (REV. 10/1998) BACK
W42HEM61200377
NEW ORLEANS TO VENICE, HURRICANE PROTECTION SYSTEM, NOV-NF-W-06B.3, WEST POINTE A LA
HACHE, GULF SOUTH PIPELINE AND SIPHON T-WALLS, PLAQUEMINES PARISH, LOUISIANA
DESCRIPTION OF WORK: The work consists of the constructing new floodwall to include: reinforced concrete walls, driving steel sheet piling, driving steel pipe piling, compacted embankment fill, clearing and grubbing, grouted riprap, structural excavation and backfill, painting, turf establishment, culverts, demolition, temporary flood protection, utility modifications, silt fencing, and other incidental work.
The estimated value of the proposed work is between $10,000,000 and $25,000,000.
X
DUSTIN G. CANNADA (601)631-7546
NOTE: In this request for proposal, "bid" and "bidder" mean "offer" and "offeror".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26 May 2016
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
SEE SPECIAL NOTICES TO BIDDERS
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by
GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within 10 calendar days and complete it within (580 calendar days after receiving award, X Notice to proceed. This performance period is X mandatory, negotiable. ( See Section 0700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original to perform the work required are due at the place specified in Item 8 BY 1400, 28 JUNE 2016.
If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
VICKSBURG CONTRACTING OFC
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE
PAGE
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(601)631-7261 FAX: TEL: TEL: FAX:
W912P8-16-B-0038
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) Page 2 (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
96NA X 3125.000 B2 X 08 2412 NA 961262 3230 29F027
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 964145
US ARMY CORPS OF ENGRS FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
26. ADMINISTERED BY
U.S. ARMY CORPS OF ENGINEERS
NEW ORLEANS AREA OFFICE
7400 LEAKE AVENUE,
RM 186 NEW ORLEANS, LA 70118
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
SECTION 00010 – BIDDING SCHEDULE
New Orleans to Venice, Hurricane Protection System, NOV-NF-W-06B.3, West Pointe A La Hache, Gulf South Pipeline and Siphon T-Walls, Plaquemines Parish, Louisiana
Item Description Estimated Quantity Unit Unit Price Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB FOR
0002 Video and Photographic Documentation 1 JOB FOR
0003 Web Camera System 1 JOB FOR
0004 Removal of Existing 72” Dia.
Siphon Discharge Pipe 1 JOB FOR
0005 Testing and Delivery of Existing 72” Dia. Siphon Discharge Pipe 1 JOB FOR
0006 Floating Plant 1 JOB FOR
0007 Temporary Retaining Structures (Gulf South Pipeline) 1 JOB FOR
0008 Temporary Retaining Structures (72" Dia. Siphons) 1 JOB FOR
0009 Silt Fences
0009AA First 1,000 LF 1,000 LF
0009AB All Over 500 LF 500 LF
0010 Truck Wash-Down Rack (Gulf South Area) 1 JOB FOR
0011 Truck Wash-Down Rack (Siphon Area) 1 JOB FOR
0012 Drainage Pumping Assessment 1 JOB FOR
0013 Demolition Work 1 JOB FOR
0014 Reinforced Concrete Floodwall 1 JOB FOR
0015 Miscellaneous Metalwork 1 JOB FOR
0016 Walkway Ramps 1 EA
0017 Pump House Construction 1 JOB FOR
0018 Discharge Pipe, Fittings, Valves, and Pipe Supports 1 JOB FOR
0019 Installation of 72" Dia. Siphon Discharge Pipes 496 LF
W912P8-16-B-0038 00010-3 ED-14-031
0020 Electrical Work 1 JOB FOR
0021 Separator Geotextile 286 SY
0022 Reinforcement Geotextile 825 SY
0023 Clearing and Grubbing 1 JOB FOR
0024 Construction Dewatering 1 JOB FOR
0025 Embankment, Compacted Fill
0025AA First 15,000 CY 15,000 CY
0025AB All Over 15,000 CY 3,000 CY
0026 Sand Fill 4,000 CY
0027 Grouted Riprap 1,630 CY
0028 Piling, Steel Sheet, Type PZ-22 14,773 SF
0029 Piling, Steel Sheet, Type PZ-35 2,533 SF
0030 Compression Pile Test
0030AA First Compression Test 3 EA
0030AB All Over 3 Compression Test 3 EA
0031 Tension Pile Test
0031AA First Compression Test 3 EA
0031AB All Over 3 Compression Test 3 EA
0032 Load Frame and Test Piles 1 JOB FOR
0033 Furnish Steel Pipe Piles 33,144 LF
0034 Drive Steel Pipe Piles 33,144 LF
0035 Asphaltic Paving 245 SY
0036 Surfacing 50 CY
0037 Turf Establishment and Maintenance 3 ACRE
0038 Utility Modifications 1 JOB FOR
0039 Corrugated Metal Arch Pipe 60 LF
0040 Fuel Storage Tank and Supply System 1 JOB FOR
0041 Riprap (T-Wall M-8 and M-9) 477 TON
W912P8-16-B-0038 00010-4 ED-14-031
0042 Riprap (T-Wall M-6) 56 TON
TOTAL BASE WORK: $
OPTIONAL WORK AREA (OW)
0043 Furnishing New 72" Dia. Siphon Discharge Pipes - (OW) 496 LF
TOTAL OPTIONAL WORK: $
TOTAL BASE WORK + OPTIONAL WORK: $
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPaym ent.aspx
W912P8-16-B-0038 00010-5 ED-14-031
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NOTE 5: OPTIONAL WORK ITEM. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Item, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTION WORK Item by written notice to the Contractor. Bidders shall bid on all items including optional item (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that the OPTIONAL WORK item is exercised under the terms of the contract, but not later than 200 calendar days from contract required completion, the time required for completion of the contract will not be adjusted. The work shall be performed concurrent with original contract duration of 580 calendar days established for the BASE WORK items specified in the Contract Clause entitled
“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(FAR 52-211-10 – APR 1984)”.
Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
W912P8-16-B-0038 00010-6 ED-14-031
http://www.fedshirevets.gov/index.aspx http://www.dol.gov/vets/ http://benefits.va.gov/vow/ http://wtc.army.mil/modules/employers/index.html http://www.hiringourheroes.org/ http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-
Section 00100 - Bidding Schedule/Instructions to Bidders
SPECIAL NOTICES
1. INVITATION FOR BIDS (IFB) NO. W912P8-16-B-0038
FOR: NEW ORLEANS TO VENICE, HURRICANE PROTECTION SYSTEM, NOV-NF-
W-06B.3, WEST POINTE A LA HACHE, GULF SOUTH PIPELINE AND SIPHON
T-WALLS, PLAQUEMINES PARISH, LOUISIANA
BID OPENING MAY BE ATTENDED IN PERSON OR VIEWED ONLINE AT
http://155.76.244.230/bids/bids.htm
2. SEALED BIDS FOR THE WORK DESCRIBED HEREIN WILL BE
RECEIVED UNTIL DATE AND TIME OF BID OPENING.
3. THIS PROCUREMENT IS WOMAN OWNED SMALL BUINESS SET-ASIDE.
4. YOUR ATTENTION IS DIRECTED TO SECTION 00100-BID
SCHEDULE/INSTRUCTIONS TO BIDDERS CLAUSE ENTITLED “SUBMISSION
OF BIDS”. IT IS THE BIDDER’S RESPONSIBILITY TO ENSURE THAT
BIDS SENT BY COMMERCIAL CARRIER ARE CLEARLY IDENTIFIED AS
CONTAINING A SEALED BID ON THE OUTERMOST ENVELOPE. THIS
INCLUDES, BUT IS NOT LIMITED TO, BIDS SENT VIA: FEDERAL
EXPRESS, AIRBORNE EXPRESS, EXPRESS COURIER SERVICES, INC.,
EXPRESS MAIL - U.S. POSTAL SERVICE, UNITED PARCEL SERVICE AND
PUROLATOR.
5. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL
OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
6. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE CONTRACT
CLAUSE ENTITLED, “AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS
FOR CONSTRUCTION”, WHICH WILL APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
7. SEE SECTION 01 00 00.00 09, GENERAL CONTRACT REQUIREMENTS
CLAUSE, ENTITLED, “PAYMENT INVOICES” WHICH WILL APPLY TO THE
CONTRACT RESULTING FROM THIS SOLICITATION.THE FEDERAL
ACQUISITION REGULATION REQUIRES THAT THE “REMIT TO” ADDRESS OF
THE INVOICE MATCH THE “REMIT TO” ADDRESS ON THE CONTRACT OR A
PROPER NOTICE OF ASSIGNMENT.
8. MAIL BIDS TO THE VICKSBURG DISTRICT HEADQUARTERS
BUILDING, PLANS AND SPECIFICATIONS ROOM, ROOM 120, 4155 CLAY
STREET, VICKSBURG, MISSISSIPPI 39183-3435. BIDS SENT BY
W912P8-16-B-0038 00100-1 ED-14-031
http://155.76.244.230/bids/bids.htm
COMMERCIAL CARRIER SHALL BE CLEARLY MARKED ON THE OUTER
ENVELOPE AS CONTAINING A “SEALED BID”. BIDS MUST BE RECEIVED
PRIOR TO THE EXACT TIME SET FOR BID OPENING.
9. HAND CARRIED BIDS MUST BE DELIVERED TO THE PLANS AND
SPECIFICATIONS ROOM, ROOM 120, IN THE VICKSBURG DISTRICT
HEADQUARTERS BUILDING, 4155 CLAY STREET, VICKSBURG,
MISSISSIPPI 39183-3435. ALL BIDS MUST BE RECEIVED PRIOR TO
THE EXACT TIME SET FOR BID OPENING. NOTE: BIDS DELIVERED
LATER THAN 15 MINUTES PRIOR TO THE TIME SET FOR THE BID
OPENING SHALL BE DELIVERED DIRECTLY TO ROOM 103, BID OPENING
ROOM, RATHER THAN ROOM 120, THE PLANS AND SPECIFICATIONS ROOM.
10. BIDS WILL NOT BE ACCEPTED NOR SHALL BIDS BE WITHDRAWN
TELEGRAPHICALLY OR BY ELECTRONIC COMMERCE.
11. VENDORS CAN BE FOUND ON THE WEB SITE:
http://www.cpars.navy.mil/. IF THE CONTRACTOR WISHES TO
PARTICIPATE IN THE PERFORMANCE EVALUATION PROCESS, ACCESS TO
CCASS AND PKI CERTIFICATION IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
12. P RIOR TO BID OPENING, IN ACCORDANCE WITH FEDERAL
ACQUISITION REGULATION PART 14.303 (b) MODIFICATION OR
WITHDRAWAL OF BIDS, “A BID MAY BE WITHDRAWN IN PERSON BY A
BIDDER OR ITS AUTHORIZED REPRESENTATIVE IF, BEFORE THE EXACT
TIME SET FOR OPENING OF BIDS, THE IDENTITY OF THE PERSONS
REQUESTING WITHDRAWAL IS ESTABLISHED AND THAT PERSON SIGNS A
RECEIPT FOR THE BID."
THE FOLLOWING STEPS WILL BE REQUIRED BY THE VICKSBURG
CONTRACTING OFFICE:
1) CONTRACTOR MUST PRESENT A LETTER VERIFYING THEY ARE A
REPRESENTATIVE OF THE COMPANY.
2) CONTRACTOR MUST SHOW VALID PICTURE ID.
3) VICKSBURG DISTRICT CONTRACTING OFFICE WILL HAVE THE
REPRESENTATIVE SIGN A RECEIPT FOR BID.
W912P8-16-B-0038 00100-2 ED-14-031
http://www.cpars.navy.mil/
GENERAL NOTICES
1. AUTHORITY & APPROPRIATION INFORMATION PROGRAM DATA
AUTHORITY:
(a) Original Authorization: Section 203 of the Flood Control Act of 1962, Public Law 87-874 (76 Stat. 1173)
(b) Supplemental Authorization: New Orleans to Venice, LA— Under the Flood Control and Coastal Emergencies (FC&CE) heading, Chapter 3, Title I, Division B of Public Law 109 148 (119 Stat.
2762 – 2763) (3rd FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title II of Public Law 109-234 (120 Stat. 454-455) (4th FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title III of Public Law 110-252 (122 Stat. 2349-2350) (6th FC&CE Supplemental); and under the FC&CE heading, Chapter 3, Title I, Division B of Public Law 110-329 (122 Stat. 3590) (7th FC&CE Supplemental)
APPROPRIATION:
4th and 6th Supplemental appropriations for the Non-Federal Levees. 3rd, 4th, and 6th Supplemental appropriations for New Orleans to Venice, LA
FUNDING CITATION: 96x3125
2. NEGOTIATIONS AFTER SEALED BIDDING.
The Government has the option to reject all bids received in response to the sealed bid advertisement and initiate negotiation. Negotiations will include soliciting offers from each responsible bidder that submits a bid in response to the Invitation for Bids. If, after bid opening, the Contracting Officer determines that negotiations are in the best interest of the Government, the following steps will be followed:
(a) An amendment to the sealed bid advertisement will be issued to each responsible bidder changing the Invitation for Bids Number to Request for Proposals Number. The amendment will also make any necessary changes to the scope of the work.
(b) A cover letter signed by the negotiator will accompany the amendment explaining the procedures to be followed during negotiations.
W912P8-16-B-0038 00100-3 ED-14-031
3. BID, PERFORMANCE AND PAYMENT BONDS.
A bid bond is required with the bid package and is to be executed on Standard Form SF24. Performance and payment bonds with be required after award. See Section 00700, Contract Clauses 52.228-1, BID GUARANTEE and 52.228-15, PERFORMANCE AND
PAYMENT BONDS -- CONSTRUCTION
4. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS.
The right is reserved, as the interest of the Government may require, to revise or amend the specifications and/or drawings prior to the date set for opening bids. Such revisions or amendments, if any, will be announced by amendment or amendments to this Invitation for Bids. Copies of such amendments as may be issued will be furnished to all prospective bidders. If the revision or amendments are of a nature which require material changes in quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the District Engineer will enable bidders to revise their bids. In such case, the amendments will include an announcement of the new date for opening bids.
5. BUSINESS INTEGRITY.
The apparent successful bidder as a condition for award of any contract resulting from this solicitation may be required to execute a certificate related to Business Integrity.
6. CONDITIONS AFFECTING THE WORK.
Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Invitation for Bids, the specifications, or related documents.
W912P8-16-B-0038 00100-4 ED-14-031
7. BIDDER'S QUALIFICATIONS.
Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and the plant available to be used in performing the work.
8. SITE OF THE WORK.
Bidders are advised that for purpose of applicability of the Davis-Bacon Act and other contract labor standard provisions, "the site of the work" under the contract to be awarded pursuant to this Invitation may not be limited to the physical place(s) where the construction called for in the contract will remain when work on it has been completed. The "site of the work" may include other adjacent or nearby property used by the Contractor or Subcontractors during such construction. For example, fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., will be considered part of the site of the work provided they are dedicated exclusively or nearly so to performance on the contract and are so located in proximity to the actual construction location that it would be reasonable to include them.
9. INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE,
AND BONDS.
a. Specifications, Invitation No. W912P8-16-B-0038, Bidding Schedule, Pre-award Information/Description of Work/Bid Evaluation, Equipment Schedule, Construction Contract Clauses, and Wage Determination Decisions No. LA160007 03/04/2016 LA7 of the Secretary of Labor, are parts of this Invitation.
b. (1) An offeror (bidder) electing to use individual sureties for either bid guarantees or performance and payment bonds must submit, concurrently with the bonds and required affidavits, a statement of both the business and personal names of the persons and/or brokerages firms through whom the bonds or the guarantees were obtained, together with the address and telephone number of the persons and/or brokerage firms.
(2) Offerors or bidders should note that some individual sureties and brokers of individual sureties have been debarred or suspended from offering themselves or others as sureties to the Government. Offerors or bidders are responsible for
W912P8-16-B-0038 00100-5 ED-14-031
ascertaining the current status of their sureties and brokers.
(3) Failure to provide the required information or the submission of bid guarantees obtained from debarred or suspended sureties or brokers may cause rejection of the offer (bid).
10. DEFINITIONS
(a) The term "head of the agency" or "Secretary" as used herein means the Secretary of the Army; and the term "his duly authorized representative" means the Chief of Engineers, Department of the Army, or an individual or board designated by him.
(b) "Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
(c) The agency board of contract appeals having jurisdiction over all appeals from final decisions of the Contracting Officer under the Contract Disputes Act of l978 is the Armed Services Board of Contract Appeals, addressed as follows: Recorder, Armed Services Board of Contract Appeals, Skyline 6, 7th Floor, 5109 Leesburg Pike, Falls Church, Virginia 22041-3208.
(d) "Small business concern" means a concern including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria and size standards in 13 CFR 121.
(1) Size Standards for Construction and Special Trades.
(a) Construction. A concern is small if its average annual receipts for its preceding 3 fiscal years did not exceed $36.5 million.
(b) Dredging. A concern is small if (1) its average annual receipts for its preceding 3 fiscal years did not exceed $27.5 million, and (2) at least 40 percent of the yardage in the contract's plans and specifications is dredged with equipment owned by the concern or obtained from another small business dredging concern.
W912P8-16-B-0038 00100-6 ED-14-031
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management JUL 2013 52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
CLAUSES INCORPORATED BY FULL TEXT
52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)
Item Nos. 0009, 0025, 0030, and 0031 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subitems.
(End of provision)
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
(End of provision)
52.219-2 EQUAL LOW BIDS (OCT 1995)
(a) This provision applies to small business concerns only.
(b) The bidder’s status as a labor surplus area (LSA) concern may affect entitlement to award in case of tie bids. If the bidder wishes to be considered for this priority, the bidder must identify, in the following space, the LSA in which the costs to be incurred on account of manufacturing or production (by the bidder or the first-tier subcontractors) amount to more than 50 percent of the contract price.
W912P8-16-B-0038 00100-7 ED-14-031
(c) Failure to identify the labor surplus areas as specified in paragraph (b) of this provision will preclude the bidder from receiving priority consideration. If the bidder is awarded a contract as a result of receiving priority consideration under this provision and would not have otherwise received award, the bidder shall perform the contract or cause the contract to be performed in accordance with the obligations of an LSA concern.
(End of Provision)
CLAUSES INCORPORATED BY FULL TEXT
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
See Attached See Attached
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
W912P8-16-B-0038 00100-8 ED-14-031
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Economic Area 113 New Orleans, LA as follows:
Bayou Sauvage, Turtle Bayou, Orleans Parish, Louisiana
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S Army Corps of Engineers Ellis Screws
CEMVK-CT-C
4155 Clay Street Vicksburg, MS 39183
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Randy Persica New Orleans Area Office Email: Randy.J.Persica@usace.army.mil Telephone: 504-862-1873 or 504-631-7261
(End of provision)
W912P8-16-B-0038 00100-9 ED-14-031
CLAUSES INCORPORATED BY FULL TEXT
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
(End of provision)
CLAUSES INCORPORATED BY FULL TEXT
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any (48 CFR Chapter) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
W912P8-16-B-0038 00100-10 ED-14-031
NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY (APRIL 1984)
(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation Goals for Female Participation for Each Trade for Each Trade
SMSA Counties MS 19.2% 6.9% SMSA Counties LA 31.0% 6.9% Non-SMSA Counties 27.7% 6.9%
These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in the geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed.
Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Program office.
(c) The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance Requirements for Construction,” and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.
The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract. Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Director, Office of Federal Contract Compliance Programs, within 10 working days following award of a construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notifications shall list the –
W912P8-16-B-0038 00100-11 ED-14-031
(1) Name, address, and telephone number of the subcontractor;
(i) Employer identification number of the subcontractor;
(2) Estimated dollar amount of the subcontract;
(3) Estimated starting and completion dates of the subcontract;
and
(4) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is (FAR 52.222-23) Economic Area 113, New Orleans, LA as follows:
Standard Metropolitan Statistical Area
(SMSA) Counties:
0920 Biloxi – Gulfport, MS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 19.2% MS Hancock; MS Harrison; MS Stone
5560 New Orleans, LA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 31.0% LA Jefferson; LA Orleans; LA St. Bernard; LA St. Tammany
Non-Standard Metropolitan Statistical Area
(Non-SMSA) Counties - - - - - - - - - - - - - - - - - - - - - - - - - - - -…