AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area Project, FY-14-2 Plaquemines Parish, Louisiana (ED 14-043) is hereby amended as follow s:

1. Include Changes to the specif ications and plans as show n on the attached pages;

2. Establish a Pre-Bid Teleconference for Tuesday, 26 July 2016 at 10:30 a.m. CST; Call-in Information is show n on the attached pages. All Pre-Bid Teleconference questions you w ant answ ered at the Pre-Bid Conference shall be submitted in w riting to Veronica Garner at Veronica.Garner@usace.army.mil and Angela Hermanson at Angela.Hermanson@usace.army.mil pior to the teleconference call.

3. Encourage Contractors to review the specif ications and plans as per the posted Solicitation and Amendments.

4. All and f inal questions are due NLT Tuesday, 27 July 2016 at 5:00 p.m. CST.

5. Bid Opening w ill be established by Amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-14-B-0053

X 9B. DATED (SEE ITEM 11)

14-Aug-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2016

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

PRE-BID TELECONFERENCE

A Pre-Bid Teleconference call is scheduled for Tuesday, July 26, 2016 at 10:30 a.m. CST.

Webinar and Conference Call Information is shown below:

Web Conference URL: https://www.webmeeting.att.com Meeting Number: (511) 468-6455 Participant Code: 465481

Conference Call Line: (877) 336-1839 Access Code: 7641901 Contractors are encouraged to review the specifications and plans per the Solicitation and Amendments. Please submit any questions you would like answered in writing prior to the teleconference call on Monday, July 25, 2016, NLT 1:00 p.m. CST to Veronica Garner at Veronica.Garner@usace.army.mil and Angela Hermanson at Angela.Hermanson@usace.army.mil

W912P8-14-B-0053 mailto:Veronica.Garner@usace.army.mil mailto:Angela.Hermanson@usace.army.mil

SECTION 00010

Pages 3 and 4. Delete these pages in their entirety and substitute the attached revised pages 3, 4, 5, and 6 therefore.

SECTION 00700

Page 19 of 22, paragraph 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS, subparagraph (e). Change “C-01 thru C-08” to “C-01 thru C-23”.

SECTION 00800

Page 1, paragraph 1. Delete this paragraph in its entirety and substitute the following therefore:

“1. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) commence dredging under this contract within 30 calendar days after the date the Contractor receives the notice to proceed,

(c) prosecute the work diligently, and

(d) complete the base work ready for use not later than 225 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises, and backfilling of the any floatation access canals.

NOTE 1: The term “work” includes tasks such as submission of submittals, performance of preliminary and/or BD surveys, and does not have to be dredging or pipeline installation.

NOTE 2: The Contractor is advised that the time allowed for completion of the work (Base Work - 225 calendar days, plus Optional Work Item 0004 - 170 calendar days, and Optional Work Items 0006 through 0011 - 270 calendar days) reflects the Government's best estimate of the shortest reasonable performance period. The Contractor shall be obligated to make any and all arrangements necessary (multiple crews, overtime, concurrent operations, etc.) to complete the work within the available time

W912P8-14-B-0053 period. Such arrangements shall not constitute grounds for an equitable adjustment.

NOTE 3: See Bidding Schedule Note 8 for Time Adjustment information in the event of exercising OPTIONAL WORK line items.”

SECTION 01100

1. Page 9, paragraph 7, subparagraph (a). Delete this subparagraph in its entirety and substitute the following therefore:

“(a) The Contractor shall furnish regularly to inspectors on board the dredge or other craft upon which they are employed a suitable separate room approximately 150 square feet in size for a Corps of Engineers field office. The room shall be fully equipped and maintained to the satisfaction of the Contracting Officer; it shall be properly heated, ventilated, air conditioned, and lighted, shall have sufficient electrical outlets with power surge protection to power a laptop computer and printer, shall have a desk which can be locked, and a drafting table measuring at least four (4) feet by six (6) feet, a comfortable chair for each inspector, washing conveniences and daily janitorial services. This will not be a separate cost and will be included in the price of dredging. Should the Contractor have a photocopy machine on the jobsite, the Contractor may allow the use of his own in lieu of providing a separate machine for use by the Government inspector. The entire cost to the Contractor for furnishing, equipping, and maintaining the foregoing accommodations, shall be distributed amongst the existing bid items. If the Contractor fails to meet these requirements, the facilities referred to above will be secured by the Contracting Officer, and the cost thereof will be deducted from payments to the Contractor.”

2. Page 17. Add the following new paragraph immediately after paragraph 23, as:

”24. VIDEO AND PHOTOGRAPHIC DOCUMENTATION – WORK ASSOCIATED

WITH SPANISH PASS

The pre-construction and post-construction conditions of access roads used and all driveways, sidewalks, above-ground utilities, staging area(s), slip mooring area, and existing structures in the immediate vicinity thereof shall be verified and documented by the use of Contractor-furnished photographs and videos. Videos shall be digital format (DVD) with voice over commentary describing all pertinent or unusual conditions. Videos shall have a stamped date. Photographs shall be 35 mm or digital, color, and 4-inch x 6-inch size minimum, and shall have stamped date. The Contractor shall provide two (2) copies of the DVD and two (2) copies of photos with negatives or CDs containing files to the Contracting Officer for the Contract file.

Electronic photos shall be accompanied by a log describing the content of each photo. Two (2) hard copies shall be assembled in a report form with a cover letter attached. In the report, a description of each picture identifying and describing the

W912P8-14-B-0053 location and indicating the date of the photograph shall be typed beneath each picture. On the reverse of each photograph, the Contractor shall affix a self-adhesive label on the reverse of each picture that shall identify the location, describe the photographed object and indicate the date of the photograph and name of the person who documents the information. All the information on the label shall be typewritten in black. Additionally, the name shall also be signed. The Contractor shall coordinate so that representatives of the Contracting Officer are present during the pre- and post-construction documentation. No measurement will be made for video and photographic documentation. Payment will be made at the contract job price for “Video and Photographic Documentation - OW”, if Optional Work is exercised.”

SECTION 02 21 10.00 12

1. Page 3, paragraph 1.2. Delete this paragraph in its entirety and substitute the following therefore:

“1.2 MEASUREMENT AND PAYMENT

No separate measurement and payment will be made for surveys and channel bottom grab sampling. However, a deduction of $500 per channel bottom grab sample will be assessed for samples not provided in accordance with these specifications. The cost of survey work covered under this section shall be included in the applicable contract unit price per cubic yard for "Dredging", "Dredging - OW" (if Optional Work is exercised), "Spanish Pass Disposal - OW" (if Optional Work is exercised), or the contract job price for "Flotation Channels".”

2. Add the following new paragraphs immediately after paragraph 3.1.6.6, as:

“3.1.6.7 Spanish Pass Disposal Area - Cross Section Surveys

The Contractor shall perform approximately 15 before and after cross sections of the Spanish Pass Disposal Area, approximately perpendicular to the disposal area baseline. The cross sections shall be taken at approximate 400' intervals, initiating at the eastern retention dike alignment. The final cross section shall be taken west of the western dike alignment. Spacing shall be adjusted such that the western dike alignment is also captured by this data collection effort. Cross sections shall capture the entire remnant Spanish Pass channel to the south and extend northward an adequate length to encompass the proposed outer borrow area to the north.

Soundings and/or rod readings shall be recorded to the nearest tenth of a foot and the distance between soundings and/or rod readings shall not exceed 50 feet, and adjusted to capture all abrupt changes in grade After construction sections shall be taken on the same range lines as the before construction cross sections. All shots shall be recorded to the nearest tenth of a foot. All survey data shall be promptly plotted and furnished to the Contracting Officer's Representative. All survey data shall also be recorded in electronic format as per the paragraph entitled "Data".

W912P8-14-B-0053

3.1.6.8 Spanish Pass - Profile Surveys

Upon completion of construction in each respective disposal cell, after construction profiles shall be taken of the completed Spanish Pass ridge and marsh platform.

These profiles shall consist of a centerline profile of the newly constructed ridge, as well as two (2) profiles of the newly constructed backside marsh platform which shall be spaced 100’ each side of the centerline of the newly created backside marsh platform. All profiles shall extend a minimum of 100’ beyond the centerlines of the far eastern and western retention dikes. All profiles shall be continuous and encompass both disposal cells, as well as the interior gap to be left where the two (2) Plains All American crude pipelines divide the disposal cells. Shot intervals for all profiles shall not exceed 50' and shall be adjusted to capture significant breaks in grade. (crown points, berm points, toes of dikes, etc.) All survey data shall be promptly plotted and furnished to the Contracting Officer's Representative. All survey data shall also be recorded in electronic format as per the paragraph entitled "Data".”

SECTION 35 20 23.00 12

Delete this section in its entirety and substitute the attached revised Section 35 20

23.00 12 therefore.

DRAWINGS

Add the attached new drawings, SHEET IDENTIFICATION Nos. C-09 thru C-23.

SECTION 00010 – BIDDING SCHEDULE

Mississippi River, Baton Rouge to the Gulf Head of Passes Hopper Dredge Disposal Area Project (#14-2)

Plaquemines Parish, Louisiana

Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount

BASE WORK

0001 Mobilization and Demobilization 1 JOB

0002 Flotation Channels 1 JOB

0003 Dredging 6,000,000 CY

TOTAL BASE WORK: $

OPTIONAL WORK - OW

0004 Dredging - OW 5,000,000 CY

0005 Bird Nesting Prevention and Avoidance Measures - OW 120 DAY

0006* Additional Mobilization and Demobilization for Spanish Pass Disposal - OW

1 JOB

0007* Spanish Pass Disposal - OW

0007AA* First 1,300,000 Cubic Yards 1,300,000 CY

0007AB* All Over 1,300,000 Cubic Yards 400,000 CY

0008* Dike Construction for Spanish Pass Disposal - OW 13,700 LF

0009* Crushed Stone Repairs - Spanish Pass and Haliburton Roads - OW

750 CY

0010* Mechanical Dredging Required for Slip Access - OW 1 JOB

0011* Access Ramps Required Over Dredge Pipeline - OW 1 JOB

0012* Video and Photographic Documentation - OW 1 JOB

TOTAL OPTIONAL WORK: $

TOTAL BASE WORK + OPTIONAL WORK: $

Award will be made as a whole to one bidder.

* Denotes a change from the previous Bidding Schedule.

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

NOTE 1: The Contractor shall note that the area, shown as the borrow area, on the contract drawings is also designated as a disposal area for hopper dredges.

NOTE 2: It is the Government’s intent, under this contract, to dredge approximately 12,700,000 cubic yards of material (if option work is exercised) from the hopper dredge disposal area (HDDA) and place it into the wetland creation areas, as shown on the contract drawings. Circumstances may arise such that the Contractor may be required to coordinate this work with hopper dredges working in Southwest Pass of the Mississippi River. If such coordination is required, the Contractor may be directed to move dredging operations within the borrow area to an area which will cause the least impact to both dredging and disposal operations. In addition, should the Contractor elect to place material within the West Bay area, close coordination will be required with the Corps of Engineers, US Coast Guard, River Pilots and VTS in order to assure safe operations and minimal impacts to navigation.

NOTE 3: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE

UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY

ITEM, ITS BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE

INELIGIBLE FOR AWARD.

NOTE 4: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (See FAR 14.404-2).

NOTE 5: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 142 after Notice of Award. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within 24 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the government to exercise the options. Also, due to unforeseen circumstances, (i.e., Mississippi River stages and hopper dredging requirements for Southwest Pass, as well as uncertainty in the prep work and repairs that might be required to roads and staging areas) the Contractor shall note that the Government may exercise, by written notice, all or part of Item 0004 – 'Dredging - OW ', and/or all or part of Item 0005 – 'Bird Nesting Prevention and Avoidance Measures - OW ', and/or all or part of Item 0009 – 'Crushed Stone Road Repairs - Spanish Pass and Haliburton Roads

- OW '. The exercise of any option in part does not obligate the government to the full extent of the option.

NOTE 7: OPTIONAL WORK ITEMS: The Government may require the delivery of the numbered line item(s), identified in the schedule as Optional Work items, in the quantity (total or part quantity) and price stated in the schedule. The Contracting Officer may exercise all or part of the Optional Work by written notice to the Contractor. Bidders shall bid on all items including the Optional Work item (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid. If the Government activates the Optional Item, the activation will occur while the Contractor’s plant is within the limits of the base dredging work.

NOTE 8: TIME ADJUSTMENT IN THE EVENT OF OPTIONAL WORK. In the event that OPTIONAL WORK, Line Item 0004 is exercised under the terms of this contract, the time required for completion of the contract will be increased by 170 calendar days, and if OPTIONAL WORK, Line Items 0006 through 0011 are exercised under the terms of this contract, the time required for completion of the contract will be increased by 270 calendar days beyond the original duration of 225 calendar days established for the Basic Contract Work set forth in Section 00800, Special Contract Requirements paragraph entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK”. For partial award of OPTIONAL WORK Item 0004, the 170 calendar day allowance will be prorated accordingly.

OPTIONAL WORK Items 0005 and 0012 requires work to be performed concurrent with other construction operations, thus the time required for completion of this contract will not be increased for these items.

NOTE 9: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

NOTE 10: Any VEQ analysis under Option Items 0007AA will be based upon the variation in the line item quantity provided in the Bid Schedule above, and not a variation in any lesser quantity actually awarded under that option line item.

NOTE 11: The quantities shown in Items 0005 and 0009 are for evaluation purposes only; payment for this line item will be based on the actual quantity used and they shall be excluded from the “VARIATIONS IN ESTIMATED QUANTITIES” clause.

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

EVALUATION OF SUBDIVIDED ITEMS.

Item No. 0007 is subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

(End of Clause)

VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS.

The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item No. 0007.

a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

b. Where the actual quantity of work performed for Item No. 0007 is less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity .

c. If the quantity of work performed under Item No. 0007 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.

(End of Clause)

MRBR_Head of Passes Hopper Dredge Disposal Area Project (#14-2) Ed 14-043

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 20 23.00 12

DREDGING

PART 1 GENERAL

1.1 SCOPE

1.2 MEASUREMENT

1.2.1 Quantity Surveys

1.2.2 Quantity Computations

1.2.3 Acceptance Reach

1.2.4 Timely Performance Of Quantity Surveys

1.2.5 Progress Payments

1.2.6 Radio And Telephone Communication Equipment

1.2.7 Mechanical Dredging for Slip Access

1.2.8 Dike Construction for Spanish Pass Disposal

1.2.9 Road Repairs

1.2.10 Access Ramp(s)

1.3 PAYMENT

1.3.1 Mobilization And Demobilization

1.3.2 Dredging and Dredging - OW

1.3.3 Flotation Channels

1.3.4 Additional Mobilization and Demobilization for Spanish Pass

Disposal -OW

1.3.5 Spanish Pass Disposal- OW

1.3.6 Mechanical Dredging for Slip Access - OW

1.3.7 Dike Construction for Spanish Pass - OW

1.3.8 Crushed Stone Repairs - Spanish Pass and Haliburton Roads - OW

1.3.9 Access Ramps Required Over Dredge Pipeline - OW

1.4 SUBMITTALS

1.5 QUALITY CONTROL

1.5.1 Quality Control Reports

1.5.2 Report Of Operations

1.5.3 Construction Schedule

1.5.4 Access Plan

1.6 RADIO AND TELEPHONE COMMUNICATIONS

1.6.1 Maritime Radio Transceiver

1.6.2 Radio Equipment For Additional Dredges

1.6.3 Satellite Telephone

1.7 PLANT

1.7.1 General Requirements

1.7.2 Capacity

1.7.3 Inspectors (Government Agents) Transportation

1.7.4 Miscellaneous Equipment

1.7.5 Automatic Identification System (AIS)

PART 2 PRODUCTS

2.1 SURFACING

SECTION 35 20 23.00 12 Page 1

W912P8-14-B-0053

PART 3 EXECUTION

3.1 DREDGING

3.1.1 General

3.1.2 Hydraulic Cutterhead Dredging

3.1.3 Order Of Work

3.1.3.1 Dredging

3.1.3.2 Disposal in Delta Refuge

3.1.4 Excessive Dredging

3.1.5 Slides

3.1.6 Character Of Materials

3.2 WORKING IN THE VICINITY OF STRUCTURES AND UTILITY CROSSINGS

3.2.1 General

3.2.2 Existing Pipelines, Structures Or Utilities

3.2.3 Unidentified Pipelines, Structures, Or Utilities

3.2.4 Disposal

3.2.5 Utility and Pipeline Marking Requirement

3.3 DISPOSAL OF DREDGED MATERIAL

3.3.1 General

3.3.2 East Side Disposal - Delta Wildlife Refuge

3.3.3 West Bay Marsh Creation Area

3.3.3.1 Plan of Operation

3.3.3.2 Disposal Template

3.3.3.3 Temporary Discharge Line

3.3.3.4 Vessel Traffic Service (VTS)

3.3.4 South Pass Disposal Areas - Pass A Loutre Wildlife Management

Area (PALWMA)

3.3.4.1 Sawdust Bend Disposal Area

3.3.4.2 Freshwater Reservoir (Castille Disposal Area)

3.3.4.3 Retaining Dikes and Closures

3.3.5 Spanish Pass Disposal Area

3.3.5.1 Material Delivery

3.3.5.2 Slip Maintenance

3.3.5.3 Pipeline Access

3.3.5.4 Retention Dikes

3.3.6 Flotation Access Dredging for Accessing Delta Wlidlife Refuge and South Pass Disposal Areas

3.3.7 Ramp and Road Repairs

3.3.8 Prevention Of Damage

3.3.9 Excessive Discharge Pipe Leakage

3.3.10 Deposition In Non-Approved Areas

3.3.11 Protection Of Government Monuments, Markers, Or Towers

3.3.12 Submerged Discharge Lines (Separate from Special Requirements for Dredge Pipeline Crossing of Mississippi River/ Southwest Pass Channel)

3.3.13 Work In The Vicinity Of Other Government Contractors

-- End of Section Table of Contents --

SECTION 35 20 23.00 12 Page 2

W912P8-14-B-0053

SECTION 35 20 23.00 12

DREDGING

PART 1 GENERAL

1.1 SCOPE

(a) The work provided for herein consists of furnishing all plant, labor, materials, and equipment and performing all operations necessary for the removal of all materials to the required dimensions as shown on the contract drawings, satisfactory disposal thereof, and all operations incidental thereto. Under this contract, the Contractor may use either the West Bay marsh creation disposal area, the marsh creation and peninsula sites within the Delta Refuge along the east side of the Mississippi River and north of Pass a Loutre, the marsh creation areas within the Pass A Loutre Wildlife Management Area (PALWMA) along South Pass, or a combination of all three.

(b) If the Contractor elects to dispose of material dredged from the Hopper Dredge Disposal Area (HDDA) site via a temporary pipeline under and across the Mississippi River, then the pipeline must be installed and removed in accordance with the guidelines specified herein and assure that the channel is open at all times for safe navigation. The only exception will be the times that the Contractor will be allowed to work within the navigation channel in order to install and remove the dredge pipeline within the allowable navigation channel limits. This will also require close coordination with the Corps of Engineers, US Coast Guard, River Pilots, and VTS in order to assure safe operations and minimal impacts to navigation.

(c) If the Government elects to exercise the Option Items for Spanish Pass Disposal, the Contractor will be required to mobilize plant and equipment required to haul/ transport material dredged from the HDDA approximately 12 miles upstream to an existing slip, at the end of Haliburton Road and along the right descending bank of Tiger Pass, for use as an offloading/pump out area, from which disposal pipeline shall be established and run to the proposed Spanish Pass ridge location. Maintenance dredging of the slip, along with disposal of material dredged for accessing the slip, shall be performed as deemed necessary and in compliance with these plans and specs. The dredge pipe shall pass under Tide Water Road, immediately east of its junction with Haliburton Road, via a 42" casing to be installed in advance by others. Construction of a crushed stone and/or earthen ramp over the dredge pipeline in order to provide local access, as well as road rehabilitation and staging area preparation via crushed stone surfacing will be required. In addition, significant retention dike construction will be required at the Spanish Pass ridge site prior to placement of dredged material.

1.2 MEASUREMENT

1.2.1 Quantity Surveys

A survey of the sites for dredging shall be made in accordance with the provisions of Section 02 21 10.00 12 SURVEYS AND CHANNEL BOTTOM GRAB SAMPLING and all measurements to determine dredging quantities will be based on the "before and after dredging" cross sections described therein.

SECTION 35 20 23.00 12 Page 3

W912P8-14-B-0053

Determinations of quantities to be paid for in the area specified, after having once been made, will not be reopened.

1.2.2 Quantity Computations

The quantity of dredged material removed and to be paid for will be measured by the cubic yard by computing the volume along the centerline of each dredge cut between the "before-dredging" cross sections and the required dimensions as shown on the contract drawings using the average end area method. No allowance will be made for excessive dredging except as provided in the paragraph entitled "Excessive Dredging". In order for the Government to make dredging volume computations, the Contractor shall furnish the track plotter charts described in Section 02 21 10.00 12 SURVEYS AND CHANNEL BOTTOM GRAB SAMPLING, paragraph "Preliminary Field Surveys", and the "before and after dredging" data described in Section 02 21 10.00 12 SURVEYS AND CHANNEL BOTTOM GRAB SAMPLING, paragraph "Before and After Dredging Cross Sections".

1.2.3 Acceptance Reach

For the purpose of acceptance, the completed work will be accepted in reaches of 1,000 linear feet extending along the length of the HDDA area in a north/south direction, over a bottom width of 250 feet. This bottom reach width, upon approval of the Contracting Officer, may be adjusted to best accommodate the specific dredge mobilized to perform the work. The adjusted dredge cuts shall be reflected on the plan layout sheet. The Contractor shall also submit all survey submittal back-up items for each acceptance reach individually, including but not limited to to following:

Track Plotter, Fathometer scroll, ASCII format file, batch file printout, computation tabulation sheet, plotted cross sections to-scale, calibration back-up, and gage readings, times, and dates.

1.2.4 Timely Performance Of Quantity Surveys

"Before-dredging" quantity surveys shall be made at least 2,000-feet in advance of dredging operations but not more than two (2) weeks prior to commencement of work in the acceptance reach or reach to be covered by the survey unless an exception is granted by the Contracting Officer.

Acceptance profiles shall be made within 1,000-feet behind the dredge but not more than two (2) weeks after completion of work in any acceptance reach or other unit of work. Deviations from this limiting time element may be necessary because of unusual job conditions or adverse weather.

1.2.5 Progress Payments

Monthly progress payments will be made based on quantities determined using "before dredging" surveys and the required dimensions, provided the after dredging cross sections and any additional soundings that may be directed indicate that the Contractor has met the required dimensions and the acceptance reach length.

1.2.6 Radio And Telephone Communication Equipment

No separate measurement will be made for furnishing and maintaining radio and telephone communication equipment.

1.2.7 Mechanical Dredging for Slip Access

Should optional work for Spanish Pass disposal operations be exercised, the

SECTION 35 20 23.00 12 Page 4

W912P8-14-B-0053

Contractor is allowed use of an existing slip facility as noted on the contract drawings for pipeline access or to stage pump out operations.

Current conditions of the slip indicate that access dredging would be required to access the slip off of Tiger Pass and allow for access of an off loader/ pump out station / scow / hopper barge placement at this location. The quantity of access flotation dredged material removed and to be paid for will not be measured for payment. The Contractor, based on proposed plant and methodology of work, shall determine the extent of excavation required to properly place his plant and accomplish the work.

1.2.8 Dike Construction for Spanish Pass Disposal

Should optional work for Spanish Pass disposal operations be exercised, the Contractor is required to construct retention dikes around the perimeter of the receiving area(s) prior to dredge material placement. The anticipated approximate limits of each retention dike cell are shown on the contract drawings. Measurement for retention dike construction will be by the linear foot satisfactorily constructed. Maintenance of each retention dike to the required elevations, once constructed, is the responsibility of the Contractor for the remainder of the contract duration and no measurement for payment will be made for the maintenance of retention dikes.

1.2.9 Road Repairs

Should optional work for Spanish Pass disposal operations be exercised, repairs to the length of Spanish Pass Road between Jump Basin Road and the dredge pipeline corridor is required via placement of crushed stone overlay prior to usage for mobilization of equipment, transporting of supplies, or other necessary road usages. Upon completion of Spanish Pass disposal activities, any required road repairs to the Spanish Pass Road or Haliburton Road resulting from the Contractors use of these roads, as deemed necessary by the Contracting Officers Representative, shall be repaired via placement of crushed stone overlay. The Contractor shall take measurements of lengths, widths, and thicknesses of stone placement as necessary to measure placement by the cubic yard of crushed stone placed.

Measurement for this work shall be by the cubic yard placed. The pipeline crossing ramp, if constructed with crushed stone, may be used for road rehabilitation upon completion of the dredging and disposal operations, but this re-use of stone will not be measured for payment.

1.2.10 Access Ramp(s)

Should optional work for Spanish Pass disposal operations be exercised, the Contractor is required to provide continued access for the local facility to the northeast of Haliburton Road and in the immediate vicinity of the offloading slip along Tiger Pass. This access may be in the form of an earthen fill and/or crushed stone ramp, or burial of the pipeline across their access road location. The pipeline crossing ramp, if constructed with crushed stone, may be used for road rehabilitation upon completion of the dredging and disposal operations, but this re-use of stone will not be measured for payment. No measurement shall be made for the construction of access ramps.

1.3 PAYMENT

1.3.1 Mobilization And Demobilization

An item to cover the cost of initial mobilization and final demobilization of the Contractor's plant and equipment under this contract is included and

SECTION 35 20 23.00 12 Page 5

W912P8-14-B-0053 will be paid for as stipulated in the Contract Clause in Section 00700, entitled "Payment For Mobilization And Demobilization (DFARS 252.236-7004)". This shall also include all costs for mobilization and demobilization of equipment required for the installation and removal of a submerged dredge pipeline under the Mississippi River in the event the Contractor should elect to pump material from the HDDA to the West Bay marsh creation site via a submerged pipeline.

1.3.2 Dredging and Dredging - OW

Payment for dredging will be made at the applicable contract unit price per cubic yard for "Dredging" and "Dredging - OW" (if Optional Work is exercised). Price and payment shall constitute full compensation for furnishing all plant, labor and materials and performing all work for surveying, including any additional soundings that may be directed, excavation, Government directed moving of dredge within limits of the borrow area due to shoaling, re-dredging that may be required within previously dredged and accepted areas, disposal of materials, aluminum skiff fully operated, furnishing an airboat fully operated, furnishing survey vessel(s) as required in Section 02 21 10.00 12, furnishing 4x4 All Terrain Vehicles (ATV's) for disposal area inspection, pollution control, construction and maintenance of retaining dikes that might be necessary to prevent material from entering any adjacent waterways not designated as available for disposal, furnishing and maintaining radio and telephone communications equipment, and all operations incidental thereto.

1.3.3 Flotation Channels

Payment for excavation of the flotation channel will be made at the contract job price for "Flotation Channels". Price and payment shall constitute full compensation for furnishing all plant, labor, and materials for performing all work for excavation,backfilling, and surveying of the flotation channels dredged for flotation access to the peninsula and marsh creation areas as shown on the contract drawings, and all operations incidental thereto. Conditions within Pass A Loutre, based off of a 26 February 2012 survey, are provided on the drawings for informational purposes relative to access within Pass A Loutre. The Contractor shall verify the access conditions within Pass A Loutre prior to opening of bids in order to determine its needs and any access channel dredging that might be required.

1.3.4 Additional Mobilization and Demobilization for Spanish Pass Disposal

-OW

A line item to cover the cost of initial mobilization and final demobilization of the Contractor's plant, equipment, and dredge pipeline as required under this contract to perform optional work covered under CLIN 0007 for "Spanish Pass Disposal - OW", CLIN 0008 for "Dike Construction for Spanish Pass Disposal - OW", CLIN 0009 for "Crushed Stone Repairs - Spanish Pass and Haliburton Roads - OW" , CLIN 0010 for "Mechanical Dredging Required for Slip Access - OW", and CLIN 0011 for "Access Ramps Required Over Dredge Pipeline - OW", is included and will be paid for at the contract job price for "Additional Mobilization and Demobilization for Spanish Pass Disposal - OW". Price and payment shall constitute full compensation for all operations necessary for preparation for and commencement of disposal at the Spanish Pass disposal site, including all plant, equipment, and pipeline delivery and setup as well as removal of these items upon completion of work.

SECTION 35 20 23.00 12 Page 6

W912P8-14-B-0053

1.3.5 Spanish Pass Disposal- OW

Payment for dredging of material with placement into the Spanish Pass Disposal Area will be made at the contract unit price per cubic yard for "Spanish Pass Disposal - OW" (if this Optional Work is exercised). Price and payment shall constitute full compensation for furnishing all plant (including scows/barges, tenders as required, pump out station, additional pipeline, booster(s), etc), transportation and satisfactory placement and shaping/ grading of dredged materials, labor, materials, and performing all work for surveying, including any additional soundings and/or rod readings that may be directed, excavation, Government directed moving of dredge within limits of the borrow area due to shoaling, re-dredging that may be required within previously dredged and accepted areas, aluminum skiff fully operated, furnishing an airboat fully operated, furnishing survey vessel(s) as required in Section 02 21 10.00 12, furnishing government inspector transportation for disposal area inspection, pollution control, and maintaining radio and telephone communications equipment, and all operations incidental thereto.

1.3.6 Mechanical Dredging for Slip Access - OW

Payment will be made at the applicable contract job price for "Mechanical Dredging Required for Slip Access - OW", if Optional Work is exercised.

Price and payment shall constitute full compensation for furnishing all plant, labor and materials and performing all work for dredging and disposal of materials removed from the slip provided for staging of dredge material pipeline access, and offloading (pump out) access and operations.

1.3.7 Dike Construction for Spanish Pass - OW

Payment for Spanish Pass dike construction will be made at the contract unit price per linear foot for "Dike Construction for Spanish Pass Disposal

- OW", if Optional Work is exercised. Price and payment shall constitute full compensation for furnishing all plant, labor, equipment, staking, material, construction, continued maintenance; and all other costs incidental thereto, all as specified herein and as shown on the drawings.

1.3.8 Crushed Stone Repairs - Spanish Pass and Haliburton Roads - OW

Payment for crushed stone placement will be made at the contract unit price per cubic yard for "Crushed Stone Repairs - Spanish Pass and Haliburton Roads - OW", if Optional Work is exercised. Price and payment shall include all costs of furnishing, hauling, handling, placing, removing as required, and maintaining the stone, including any stone delivered and placed for construction of an equipment staging area within the allowable 75' by 75' area located at the west end of Spanish Pass Road. Payment will not be made for stone initially placed within a stone access ramp and previously paid for, and then re-used for road rehabilitation.

1.3.9 Access Ramps Required Over Dredge Pipeline - OW

Payment for access ramps will be made at the contract job price for "Access Ramps Required Over Dredge Pipeline - OW", if Optional Work is exercised.

Price and payment shall include all costs of furnishing, hauling and installation of necessary materials for ramp construction or pipeline burial across access road (i.e. crushed stone, earthen materials, mats, etc), handling, placing, and maintenance of access ramps/ crossings, and removing as required.

SECTION 35 20 23.00 12 Page 7

W912P8-14-B-0053

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Dredge Plant Data

Plant Data Sheets. The Contractor shall complete the plant data sheets attached at the end of this section for the dredge and attendant plant the Contractor intends to use to perform the work under this contract. (See Paragraph General Requirements)

Plan of Operation

Submit a Plan of Operation at each pipeline and utility crossing. (See Paragraph WORKING IN THE VICINITY OF STRUCTURES AND

UTILITY CROSSINGS)

Disposal of Dredged Material; G, ED

Submit a disposal of dredged material plan in Government furnished disposal areas no later than seven (7) days prior to commencement of the work. (See Paragraph DISPOSAL OF DREDGED

MATERIAL)

Plan for Crossing Mississippi River with a Submerged Discharge Line;

G, ED

Submit for review and approval a plan for installation and removal of a submerged pipeline leading from the HDDA to the West Bay marsh creation area in the event the Contractor should elect to use a submerged crossing. (See Paragraph West Bay Marsh Creation Area)

Access Plan; G, ED

See subparagraph "Access Plan" of Paragraph "QUALITY CONTROL", and Section 01100 GENERAL PROVISIONS, entitled ACCESS PLAN.

Construction Schedule; G,C T

See subparagraph "Construction Schedule" of Paragraph "QUALITY CONTROL", and Section 00700 Paragraph SCHEDULES FOR CONSTRUCTION

CONTRACTS (FAR 52.236-15 - APR 1984).

SD-07 Certificates

Certified Letter

Copy of Certified Letters to Pipelines and Utilities Owners. A copy of the certified letter shall be submitted for information to the Contracting Officer concurrent with owner notification.

SD-11 Closeout Submittals

SECTION 35 20 23.00 12 Page 8

W912P8-14-B-0053

Report of Operations; G, ED-L

(See subparagraph "Report Of Operations" of Paragraph "QUALITY

CONTROL")

1.5 QUALITY CONTROL

The Contractor shall establish and maintain quality control for dredging operations to assure compliance with contract requirements and maintain records of his/her quality control for all dredging operations including but not limited to the following:

(1) Dredging. Visual classification of material; limits of dredging as to bottom grades and widths; side slopes; adherence to "Limits of Borrow Area".

(2) Dredged Material Disposal. Location of material placement and alignment of peninsulas, if used. Surveillance of elevation and template of material placed within disposal area.

(3) Effluent. Surveillance and location of the dredge discharge outlet, distance from surrounding waterways, and shoaling or leakage from discharge line.

(4) Retaining Dikes. Location and grade of retaining dikes where constructed, and limits and grade of borrow to be used.

(5) Installation/Removal of Temporary Submerged Dredge Discharge Pipeline Across the Mississippi River (If proposed by Contractor); plan for coordination with USACE, USCG, VTS and mariners.

(6) Road Repairs, Ramps and Staging Area. Locations of material placement, thickness and quantities of stone or other materials placed utilized for both initial construction and any required maintenance during construction and/or following construction of Spanish Pass.

The Contractor's Access Plan shall include all open water routes proposed to deliver plant, equipment, and/or materials, as well as submerged pipeline crossings of all navigable waterways, including all outlets off the river, that will be required in order to prevent impedance to navigation.

1.5.1 Quality Control Reports

The original and two (2) copies of these reports and tests, as well as the records of corrective action taken, shall be furnished the Government daily. Format of this report shall be as prescribed in Section

01 45 04.00 10 CONTRACTOR QUALITY CONTROL.

1.5.2 Report Of Operations

(1) The Contractor shall prepare and submit a Report of Operations (ENG Form 4267) for each dredge working. This report shall be submitted on a daily basis and not in groups, e.g. several daily reports packaged together at one time. A sample of ENG Form 4267 is included at the end of this section.

(2) The Contractor shall prepare a Daily Dredge Location Report. The

SECTION 35 20 23.00 12 Page 9

W912P8-14-B-0053

Contractor shall prepare this report, to be E-Mailed in PDF format to the Venice Sub-office no later than 7:00 a.m. each day. Information in this report will be outlined by the Contracting Officer's Representative at the CQC Coordination meeting held prior to the start of construction.

(3) The Contractor shall also prepare a report of operations for each month or partial month's work on MVN Form 322 (Work Sheet for Preparing Consolidated Form 4267). The monthly report shall be submitted on or before the 7th of each month, consolidating the previous month's work.

MVN Form 322 can be computer generated and shall be approved by the Contracting Officer's Representative on site. A sample of MVN Form 322 is attached at the end of this section.

(4) The Contractor shall submit the leverman's log (cutters), mate's log (hoppers), or similar, or any other documentation as requested by the COR pertaining to dredging activities, both electronically and hard copy on a daily basis.

(5) All required reports shall be made available in electronic format.

The Contractor shall distribute one (1) copy of each report to each of the following:

(a) U.S. Army Engineer District, New Orleans New Orleans Area Office ATTN: Mr. Kenneth Crumholt, P.E.

7400 Leake Ave.

New Orleans, LA 70118

(b) Government Inspector

(6) One (1) copy of each Report of Operations shall be maintained by the Contractor on the dredge(s).

(7) Upon completion of construction, a complete set of all aforementioned electronic reports shall be compiled and furnished on compact disc, read-only memory (CD-ROM)to CEMVN-ED-L, ATTN: Scott Clement.

(8) Further instructions on the preparation of the reports will be furnished at the Preconstruction Conference.

1.5.3 Construction Schedule

The Contractor shall submit a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work. The requirement is specified and further detailed in the Section 00700 FAR Clause 52.236-15 "Schedules for Construction Contracts".

1.5.4 Access Plan

The Contractor shall submit an Access Plan to be reviewed and approved by the Contracting Officer. The requirement is specified and further detailed in the Section 01100 GENERAL PROVISIONS, entitled ACCESS PLAN. The Access Plan shall include all open water routes proposed to deliver plant, equipment, and/or materials. The Access Plan shall include all open water routes proposed to deliver plant, equipment, and/or materials, as well as

SECTION 35 20 23.00 12 Page 10

W912P8-14-B-0053 submerged pipeline crossings of all navigable waterways, including all outlets off the river, that will be required in order to prevent impedance to navigation.

1.6 RADIO AND TELEPHONE COMMUNICATIONS

1.6.1 Maritime Radio Transceiver

The Contractor shall furnish and maintain throughout the contract, one (1) FM ship's radio transceiver with power not in excess of 25 watts, and at least 15 watts output on the maritime frequencies of 156.800 (Channel 16) and 156.375 (Channel 67) MHz 16F3 emission, with a tolerance of plus or minus 5 kHz deviation at 100 percent modulation for communication concerning navigation in the vicinity of the dredge. The radio shall be operated in accordance with FCC rules and regulations.

1.6.2 Radio Equipment For Additional Dredges

In the event that the Contractor has more than one (1) dredge operating simultaneously under this contract, the above-specified radio equipment shall be furnished and maintained on each dredge.