10-R-0050 Drawings Pkg 2.pdf
PDF 47 MB Posted
- Solicitation number
- W912P8-10-R-0050
About this file
Drawings Package 2 of 8
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am_0003.pdf | ||
| Am_0002.pdf | ||
| Am_0001.pdf | ||
| Site_Visit_Listing.pdf | ||
| 10-R-0050 Drawings Pkg 4.pdf | ||
| 10-R-0050 Drawings Pkg 5.pdf | ||
| 10-R-0050 Drawings Pkg 7.pdf | ||
| 10-R-0050 Drawings Pkg 3.pdf | ||
| 10-R-0050 Drawings Pkg 6.pdf | ||
| 10-R-0050 Drawings Pkg 1.pdf | ||
| 10-R-0050 Drawings Pkg 8.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AZIMUTH DISTANCENORTHING EASTINGPOINT NUMBER
323498.80 3620102.11
3620229.90
P.I. "B"
P.I. "C"
P.I. "D"
P.I. "E"
PROJECT BASELINE TABLE
209+47.47
USACE B/L STA.USACE B/L OFFSETPROJECT B/L STA.
5+00
8+43.09
13+58.86
13+79.10
14+33.48P.I. "F"
14+50.86
0.00’ 343.09’
212+94.19 323817.20 515.77’
218+06.26 324163.86 3619848.01 20.24’
218+22.71 * SEE BELOW 324177.23 3619832.81 54.38’
218+73.46 324167.62 3619779.29 17.38’ 7.75’ RIGHT
7.79 ’ RIGHT
26.90’ RIGHT
324160.30 3619763.52P.I. "G"
P.I. "H"
43.83’
14+94.69 324152.81 3619720.34
218+90.23
219+33.94
0+00 323137.41 3619756.58NOT APPLICABLE NOT APPLICABLEP.I. "A" 500.00’
3.17 ’ RIGHT
3.19’ RIGHT
AZIMUTH).
P.I. "E" CANNOT BE IDENTIFIED BY USACE BASLINE STATIONING DUE TO PROXIMITY TO P.I. THEREFORE, THE DISTANCE
PROTECTED SIDE
100’0 50’
SCALE:1"=50’
N
SCALE: 1"=50’-0"
GEOMETRIC PLAN - PROJECT BASELINE
P.I.22
P.I . "B
P .I "C
P .I "D
P .I. "E
P .I. "F"
P .I. "H
PROTECTION (TYP.)
REQ’D. SCOUR
LOCATION TABLE THIS DWG.
W/ BRACING (TYP.) SEE
REQ’D. SHEET PILE WALL
4+00
3+00
2+00
1+00
0+00
P.I. "A"
.0
GOVERNMENT TRAILER
225.0’
CONTRACTOR TRAILERS
DWGS. S-08 THRU S-18
REQ’D. BRIDGE; SEE
CONTRACTOR STAGING AREA
208+26
209+00
210+00
+00
+002
9+
0+
5+0
6+0
7+0
8+0
+0
+0
+3
+0
101+
102+
104+00
105+00
106+00
107+00
P.I.1
P.I.2
P.I.3
P.I. 4
P.I.5
P.I.6
P.I.7
P.I.8
P.I.9
P.I.10
P.I.11
P.I.12
P.I.13
P.I.14P.I.15P.I.16
P.I.17
P.I.18
P.I.19
P.I.20
P.I.21
P.I.23
P.I.24
USACE BASELINE
PROJECT BASELINE
PROJECT BASELINE STATIONING
USACE BASELINE STATIONING
P.I. I
P.I. II
P.I. III
P.I. IV
P.I. V
P.I. 1A
Of f
0.
St a
.8
E
3.
N
.3
P .I. "G
5+22.70
5+32.70
5+46.20
5+59.70
5+73.20
5+86.70
6+00.20
6+13.70
6+27.20
6+40.70
6+54.20
6+67.70
6+81.20
6+94.70
7+08.20
7+21.70
7+35.20
7+48.70
7+62.20
7+74.20
7+87.70
8+01.20
8+14.70
8+28.20
8+41.70
8+44.59
8+58.09
8+71.59
8+85.09
8+98.59
9+17.81
9+20.81
9+46.79
9+49.79
9+65.42
9+78.92
9+92.42
10+19.42
10+32.92
10+46.42
10+59.92
10+73.42
10+86.92
11+00.42
11+13.92
11+27.42
11+40.92
11+54.42
11+67.92
11+81.42
11+94.92
12+08.42
12+21.92
12+35.42
12+48.92
12+62.42
12+75.92
12+89.42
13+02.92
13+16.42
13+28.42
13+41.92
13+68.88
13+76.88
13+81.06
13+94.56
14+08.06
14+21.56
14+30.56
14+36.56
14+46.56
B/L STATION
PROJECT
B/L STATION
PROJECT
B/L STATION
PROJECT
10+05.92
9+08.20
13+55.42
LOCATION TABLE
BRACING
SHEET PILE
B/L STA. AZIMUTH DISTANCENORTHING EASTINGPOINT NUMBER
P.I. 1
P.I. 2
P.I. 3
P.I. 4
P.I. 5
P.I. 6
P.I. 7
P.I. 8
P.I. 9
P.I. 10
P.I. 11
P.I. 12
P.I. 13
P.I. 14
P.I. 15
P.I. 16
P.I. 17
P.I. 18
P.I. 19
P.I. 20
P.I. 21
P.I. 22
P.I. 23
P.I. 24
210+06.33 323541.34 3620142.78
210+57.29 323588.55 3620161.98
202°07’53" 50.96’
211+44.38 323669.27 3620194.67
202°02’49" 87.09’
59.65’
212+04.03 323724.64 3620216.85 292°05’14" 0.74’
212+04.77 323724.36 3620217.54 201°40’52" 31.83’
212+36.60 323753.94 3620229.30 111°22’14" 0.74’
212+37.34 323754.21 3620228.61 202°11’02" 3.34’
212+40.68 323757.30 3620229.87 153°20’46" 51.87’
212+92.55 323803.66 3620206.60 153°19’38" 49.92’
213+42.48 323848.27 3620184.19 132°16’19" 22.88’
213+65.36 323863.66 3620167.26 220°30’55" 0.72’
213+66.08 323864.21 3620167.73 132°27’48" 27.64’
213+93.72 323882.87 3620147.34 43°23’38" 0.76’
213+94.48 323882.32 3620146.82 132°11’59" 176.58’
215+71.05 324000.93 3620016.01 132°14’39" 181.48’
217+52.54 324122.94 3619881.66 213°41’24" 0.76’
217+53.29 324123.57 3619882.08 132°10’04" 31.63’
217+84.92 324144.80 3619858.64 46°06’06" 0.74’
217+85.66 324144.29 3619858.11 131°59’24" 29.63"
218+15.28 324164.11 3619836.09 131°23’47" 7.43’
218+22.71 324169.02 3619830.52 78°44’47" 19.98’
218+42.69 324165.12 3619810.92 80°22’23" 86.35’
219+29.04 324150.68 3619725.79 78°15’30" 142.11’
220+71.15 324121.76 3619586.65
USACE BASELINE TABLE
C-02
S
IT
E P
L A
N
B A
S E
L
IN
E
T A
B L E
S
A N
D S
H E
E T P
IL
E
B R
A C
IN
G L
O C
A T
IO
N T
A B
L E
9+57.61
AZIMUTH DISTANCENORTHING EASTINGPOINT NUMBER PROJECT B/L STA.
P.I. "I"
P.I. "II"
P.I. "III"
P.I. "IV"
2+60.15
OFFSET
LEVEE RAMP / BRIDGE TABLE
90.09’ LT.
3+47.51 0.00’ 323388.58 3619996.73
4+40.98 96.39’ RT. 3620130.99
3619871.24
P.I. "V"
5+28.79 180.09’ RT. 323458.44
323389.53
3620279.97
6+52.80 296.98’ RT. 323529.98
323387.70
3620434.63
125.49’
134.27’
164.14’
170.41’
208+26.04 323411.03 3620018.19 223°42’52"P.I. 1A 108.29’
201°49’48"
L.R.A.R.B. STA.
101+00.00
102+25.49
103+59.56
105+23.50
106+93.91
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps
A N
S I
D of Engineers
US Army Corps
:1
F
IL
E d m
C
B a s e li n e
P la n .d g n
D A
T E
T
IM
E
:3
:3
A M
New Orleans District
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
M E
T A
IR
IE
L
A
T
H S
T S
U
IT
E
A N
D A
R C
H
IT
E C
T S
C O
N S
U L T
IN
G E
N G
IN
E E
R S
L
IN
F
IE
L D
H U
N T
E R
J
U N
IU
S
/1
/2
/1
/2
H -4 -4
-7 d -m
C -0
B a s e li n e P la n .d g n
S .M .L
K .L .L
A .D .S
A .F .G
L A
F O
U R
C H
E P
A R
IS
H L
O U
IS
IA
N A
L A
R O
S E T
O G
O L
D E
N M
E A
D O
W
H U
R R
IC
A N
E R
IS
K R
E D
U C
T
IO
N P
R O J E
C T
P H
A S
E R
E P
A
IR
S A
T G
O L
D E
N M
E A
D O
W P
U M
P
IN
G S
T A
T
IO
N
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps
A N
S I
D of Engineers
US Army Corps
:1
F
IL
E d m
C
S it e la n r o f il e .d g n
D A
T E
T
IM
E
:3
:4
A M
New Orleans District
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
M E
T A
IR
IE
L
A
T
H S
T S
U
IT
E
A N
D A
R C
H
IT
E C
T S
C O
N S
U L T
IN
G E
N G
IN
E E
R S
L
IN
F
IE
L D
H U
N T
E R
J
U N
IU
S
/1
/2
/1
/2
H -4 -4
-7 d -m
C -0
S it e P la n P ro fi le .d g n
S .M .L
K .L .L
A .D .S
A .F .G
L A
F O
U R
C H
E P
A R
IS
H L
O U
IS
IA
N A
L A
R O
S E T
O G
O L
D E
N M
E A
D O
W
H U
R R
IC
A N
E R
IS
K R
E D
U C
T
IO
N P
R O J E
C T
P H
A S
E R
E P
A
IR
S A
T G
O L
D E
N M
E A
D O
W P
U M
P
IN
G S
T A
T
IO
N
S T
A .0
M A
T C
H E
X
IS
T
G R
A D
E
.B S
T A .2
G R
A D
E
M A
T C
H E
X
IS
T
S T
A .1
S T A . 1
L.
R .A .R .B
E L .0
S T
A .1
.7
E L .0
S T
A .1
.5
E L .0
S T
A .1
.3
S T
A .1
.2
E L .0
S T
A .1
.2
E L .0
S T
A .1
.2
L .R .A .R .B S
T A .1
P .B S
T A .3
.3
R P .I
L .R .A .R .B S
T A .5
P .B S
T A .9
.3
R P .I
E L .0
.0
L
.1
.B S
T A
S T
A .1
E L .0
S T
A .1
.7
E
L .2
S T
A .1
.4
E
L .0
S T
A .1
.7
L .R .A .R .B S
T A .7
P .B S
T A .5
.1
R E
L .0
L .R .A .R .B S
T A .5
P .B S
T A .7
.0
R E
L .0
L .R .A .R .B S
T A .9
P .B S
T A .8
.9
R E
L .0
L .R .A .R .B S
T A .2
L .R .A .R .B S
T A .2
P .B S
T A .3
.6
R E
L .0
L .R .A .R .B S
T A .2
P .B S
T A .2
.7
R E
L .0
N
.2
E
.7
L .R .A .R .B S
T A .8
E
L .3
.0
S T
A
-5
L .R .A .R .B S
T A .7
P .B S
T A .7
.5
R E
L .0
L.R.A.R.B. STA. 102+18.76
STA. 3+42.82, 4.83’ L, EL. 13.00 =
.0
R
SCALE: 1"=50’-0"
SITE PLAN
PLAN
PROFILE
SCALE: 1"= 10’ VERT.
0 10’ 20’
SCALE:1"=50’ HORIZ.
0 50’ 100’
100’0 50’
SCALE:1"=50’
N
FLOOD SIDE
PROTECTED SIDE
-20
-15
-10
-5
-20
-15
-10
-5
FOR HEAVY LOADS/EQUIPMENT
ALTERNATE CONSTRUCTION ACCESS
.0
.0
.0
R
.3
STONE ROAD
CRUSHED
REQ’D. 7" THICK
.0
R
.0
100+00101+00102+00103+00104+00105+00106+00107+00108+00
PROJECT BASELINE (P.B.)
L .R .A .R .B S
T A .4
P .B S
T A .5
.0
E
L .2
SCALE: 1"=50’-0" (HORIZ.) 1"=10’-0" (VERT.)
PROFILE - LEVEE RAMP & ACCESS ROAD
REQ’D. 7" THICK CRUSHED STONE ROAD
SLAB
REQ’D. APPROACH
SLAB
REQ’D. APPROACH
CONC. BRIDGE
REQ’D. PRECAST
REQ’D. 9" THICK CRUSHED STONE LEVEE RAMP
DITCH INVERT.
MATCH EXIST.
18" CMP
REQ’D.
EXIST. GRADE
POSITIVE DRAINAGE)
INVERT TO PROVIDE
(MATCH EXIST. DITCH
REQ’D. 18" CMPx70’
S = -1.98
PRIOR TO BEGINNING CONSTRUCTION
WILL BE MARKED BY UTILITY OWNER
DURING CONSTRUCTION. LOCATION
EXIST. CABLE NOT TO BE DISTURBED
DWGS. S-08 THRU S-14
REQ’D. BRIDGE; SEE
SLOPE = 10%SLOPE
.0
SAFETY FENCE LIMITS
PHASE ONE TEMPORARY
SAFETY FENCE LIMITS
PHASE TWO TEMPORARY
SAFETY FENCE LIMITS
PHASE TWO TEMPORARY
LEVEE RAMP
CRUSHED STONE
REQ’D. 9" THICK
BASELINE (L.R.A.R.B.)
ACCESS ROAD
LEVEE RAMP &
COMPACTED FILL (TYP.)
REQ’D. CONC. BRIDGE PILES (TYP.)
& LEVEE RAMP AND ACCESS ROAD BASELINE (L.R.A.R.B.) STATIONS.
STATIONS SHOWN ON THIS SHEET ARE PROJECT BASELINE (P.B.) STATIONS2.
SITES).
MEADOW PUMPING STATION AND TEXACO DOCK
FEBRUARY, 1980 (FLOODWALLS AT GOLDEN
AND ARE BASED ON ANOTHER CONTRACT DATED
ALL R/W LINES ARE OFFSETS OF THE BASELINE1.
NOTES:
SAFETY FENCE LIMITS
PHASE ONE TEMPORARY
9+00
1+
2+
3+
.0
R
5 5
C-03
S
IT
E P
L A
N
A N
D P
R O
F
IL
E
(1 O
F
File details come from the government source that posted it. Updated .