Solicitation Amendment W912P726BA0030002 SF 30.pdf
PDF 923 KB Posted
- Solicitation number
- W912P726BA003
About this file
This is Amendment 0002 to Solicitation W912P726BA003 for the Suisun Bay Channel & NY Slough FY26 Maintenance Dredging Project, issued by the U.S. Army Corps of Engineers (USACE) San Francisco District. The amendment was issued on June 12, 2026, with an effective date of June 12, 2026, and does not extend the offer receipt deadline. The amendment revises Specifications Section 01 35 00 Part 1.1 to remove the reference to the USACE Sacramento District Explosive Safety Management Plan (ESMP). Offerors must acknowledge receipt of this amendment prior to the solicitation deadline using one of three methods: completing items 8 and 15 and returning copies of the amendment, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in rejection of the offer. Any changes to previously submitted offers must be made by letter or electronic communication referencing both the solicitation number and amendment number and received prior to the opening deadline.
The underlying project specifications in Section 01 35 00 address Munition Response Site (MRS) requirements for both Water Explosion Area and Terrestrial Explosion Area, which carry "moderate to high" probability risk ratings and have not been completely cleared of Munitions of Explosive Concern (MEC). MEC support work must comply with USACE Explosives Safety and Health Requirements Manual EM 385-1-97, EM 200-1-15, Department of Defense Explosive Safety Board Technical Paper 18, and the MOTCO Explosive Safety Submission (ESS) and applicable amendments. The contractor is responsible for all MEC coordination and communication with USACE and MOTCO, must submit a MEC Plan for government approval, and must notify the government a minimum of 15 calendar days prior to starting MEC support operations with all required submittals accepted beforehand.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 3
0002 12 JUN 2026 0
W912P7
W075 ENDIST SAN FRAN
KO CONTRACTING DIVISION, 450 GOLDEN GATE AVENUE
SAN FRANCISCO, CA 94102-3406
UNITED STATES
LISA IP, EMAIL: LISA.I.IP@USACE.ARMY.MIL TELEPHONE: 415-503-6877
SCD: PAS:
W912P726BA003
19 MAY 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUISUN BAY CHANNEL & NY SOLUGH FY26 MAINTENANCE DREDGING PROJECT
The purpose of this amendment is to revise specifications section 01 35 00 Part 1.1 to remove the reference to the USACE Sacramento District Explosive Safety Management Plan
(ESMP).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGE
This amendment makes changes to the solicitation; these changes represent one of three types, either adding new information, deleting information, or revising existing information. Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the summary of change below:
Specifications:
- Revised Section 01 35 00 Part I.1 to remove the reference to USACE Sacramento District ESMP.
(End of Summary of Change)
FY26 Suisun Channel Dredging Project Solicitation
SECTION 01 35 00
MUNITION RESPONSE SITE
12/20
PART 1 GENERAL
1.1 PROJECT REQUIREMENTS
Both the Water Explosion Area MRS and the Terrestrial Explosion Area MRS have a "moderate to high" probability risk rating and have not been completely cleared of Munitions of Explosive Concern (MEC). The area in both MRS's where no MEC clearance operation have taken place, remain at a "moderate to high" probability risk rating, and unless stated otherwise, the contractor must assume the moderate to high probability rating
Select areas have had MEC clearance operations completed in advance of construction projects or portions of a construction project. These portions, if cleared to the full depth of construction work, can proceed with a "low" probability risk rating.
All MEC Support will be in accordance with the requirements of the U.S.
Army Corps of Engineers (USACE)Explosives Safety and Health Requirements Manual EM 385-1-97, and EM 200-1-15, Department of Defense Explosive Safety Board (DDESB) Technical Paper (TP) 18, USACE Sacramento District Explosive Safety Management Plan (ESMP), and the MOTCO Explosive Safety Submission (ESS) and applicable amendments. The USACE Sacramento District ESMP is available upon request and the MOTCO ESS and applicable amendments are attached at the end of the specifications package. The contractor shall be responsible for providing all necessary MEC coordination and communication with USACE and MOTCO.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Munition Of Explosive Concern (MEC) Plan; G
SD-04 Samples
Uparmored Equipment Inspection; G
1.3 PROJECT MANAGEMENT
The Contractor shall provide project oversight and coordination to ensure that the project schedule, submittals, and field work are maintained and completed in accordance with all project requirements.
1.3.1 MEC Support Notification
The Contractor shall notify the Government a minimum of 15 calendar days prior to the start of MEC support operations. All related and required submittals need to be accepted before any MEC support work begins and
SECTION 01 35 00 Page 2 l3spnep9 Cross-Out