Sacramento RFI Q-A_21 May 2025.pdf
PDF 81 KB Posted
- Attached to
- Sacramento River DWSC Dredging FY25
- Solicitation number
- W912P725BA011
About this file
This document is a Questions and Responses (Q&A) file for the Sacramento Deepwater Ship Channel (DWSC) Dredging project, Solicitation Number W912P725BA011. The document contains five key questions and corresponding responses from potential contractors, addressing critical project details such as anticipated award date (2 June 2025), notice to proceed timing (5-7 days after award), water quality management requirements (must be performed by a third party), and environmental compliance specifics related to Delta Smelt interactions. The document clarifies procedural expectations, including stopping work and notifying the Contracting Officer and environmental manager if more than 5 Delta Smelt are encountered during the project, and provides guidance on updating project documentation from a previous related dredging project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sacramento Deepwater Ship Channel (DWSC) Dredging
FY25 AS OF: May 21 2025
QUESTIONS & RESPONSES
SOLICITATION NUMBER W912P725BA011
The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.
Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment
(SF30) to the solicitation changes the solicitation.
Changes to any previous responses in this document will be struck-through and new, updated responses will be provided appropriate
RFI # SPEC SECTION/DRAWING RFI QUESTION RESPONSES
1 Topic:
N/A
Would the government be able to specify the anticipated date of award?
The award is anticipated to be executed 2 June 2025
2 Topic:
N/A
Would the government be able to specify the anticipated date of notice to proceed?
NTP is usually 5-7 days after award
(Pending Bond receipt and validation or other unforeseen issues)
3 Topic: Can the government specify if the water quality management is required to be done by a 3rd party?
See specs section 1.11 Operations and Water Quality Monitoring Plan
SECTION 01 57 19. IT IS required to be done by a 3rd party.
4 Topic: Can the government specify the consequences of taking more than 5 Delta Smelt during the duration of the contract?
Stop work, notify KO and environmental manager immediately. USACE will contact
FWS on path forward.
5 Topic:
6 Topic:
Section:
Can a Dredging Plant & Equipment Schedule be updated from Richmond Inner Harbor Dredging Project Sacramento DWSC Dredging
Strike though the Richmond Inner Harbor Dredging Project-replace with Sacramento DWSC Dredging l3ct9jn9 Highlight