This document is an amendment to an invitation for bid for maintenance dredging of the Redwood City Channel in San Mateo County, California. The amendment makes changes to the solicitation including revising bid quantities, periods of performance, specifications for allowable overdepth, and disposal site limits due to a March 2021 survey. Offerors must acknowledge this amendment and submit a signed copy with their bid by 26 April 2021 to be considered responsive. The work includes contour dredging the channel to 30 feet below mean lower low water plus 1.5 feet of paid overdepth, and transporting dredged material to a government disposal site and a contractor beneficial reuse site. The estimated quantity is 456,100 to 598,400 cubic yards. The North American Industry Classification System code is 237990. The solicitation will result in a firm fixed price contract awarded by the Army Corps of Engineers, San Francisco District to the responsive, responsible bidder offering the lowest price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes on page 2 of this amendment for all changes to the solicitation documents.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P721B0003

X 9B. DATED (SEE ITEM 11)

19-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Apr-2021

CODE

CONTRACTING DIVISION

450 GOLDEN GATE AVE, 4TH FL

SAN FRANCISCO CA 94102

W912P7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X 1

This amendment makes changes to the solicitation; these changes represent one of three types, either adding new information, deleting information, or revising existing information. Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the below summary of changes:

ADVERTISEMENT FRONT-END (DIVISION 00):

1. Revised SF1442, page 1, blocks 11& 13

2. Revised Section 00 10 00, Price Schedule- Paid Over-depth changed from 2ft to 1.5ft and bid quantities were increased due to the March 2021 survey

3. Period of performance revised due to increased bid quantities

a. Estimated Period of Performance – changed to 149 days

b. Description of Work – changed 2 ft paid overdepth to 1.5 ft overdepth in the first sentence

4. SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 1 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 149 calendar days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

TECHNICAL SPECIFICATIONS (DIVISION 01-49):

1. Section 35 20 23 – see attached

a. Paragraph 1.4.1.4 – Allowable (Paid) Overdepth Prism – First sentence changed 2ft to 1.5ft and last sentence removed.

b. Paragraph 1.4.1.5 - Allowable (Unpaid) Overdepth Prism – description added.

2. Section 35 20 24 – see attached

a. Paragraph 3.4.3 – Alcatraz Island Disposal Site (SF-11) – limits changed to 200,000 CY from September to November and 250,000 CY from June to August

DRAWINGS:

1. Plan sheet G-02 – channel profile adjusted to reflect the change in the allowable paid and unpaid over-depth (see attached Sheet G-02)

REQUEST FOR INFORMATION (RFI)- QUESTIONS AND ANSWERS

Be advised the bid opening for this project has been changed from 19-Apr-2021 01:00 PM to 26-Apr-2021 01:00 PM. see updated SF 1442.

All offerors are required to acknowledge this amendment and provide a signed copy of this amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non- responsive.

Invitation for Bid (IFB) - Redw ood City Channel Maintenance Dredging Project, San Mateo County, California.

Project Description: The w ork includes maintenance dredging (using contour dredging) of the Redw ood City Channel to -30-ft (MLLW) plus 1.5-ft of paid overdepth and transporting of the dredged material to the Government-furnished site SF-11 and to the Contractor furnished beneficial reuse upland site.

This requirement is a Small Business set aside. It w ill be issued as an Invitation for Bid (IFB) w hich w ill result in the aw ard of a single Firm Fixed Price (FFP) Contract.

The North American Industry Classif ication System (NAICS) Code applicable to this acquisition is 237990.

Estimated Cost Range is betw een $10,000,000 and $25,000,000.

Bidder Questions - Questions relating to this soliciation and technical inquiries w ill be submitted via email to the assigned contract specialist.

Inquiries must be recieved no later than 14 calendar days prior to the date set for bid opening.

X

ERICA MILLER 415-503-6990

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

19-Mar-2021

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______1 calendar days and complete it w ithin ________149 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 Apr 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, SAN FRANCISCO DISTRICT

450 GOLDEN GATE

SAN FRANCISCO CA 94102

W912P7

PAGE OF PAGES

CODE W912P7

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

CONTRACTING DIVISION

450 GOLDEN GATE AVE, 4TH FL

SAN FRANCISCO CA 94102

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: (415) 503-6995 TEL: FAX:

W912P721B0003 1 OF 145

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912P7-21-B-0003

Contract Line Item No.(CLIN)

Description of Supplies and Services

*Estimate d

Quantity Unit

Unit Price

Amount

0001 Mobilization and Demobilization 1 Job

0002 Dredging Reach 1 to -30-ft MLLW including 2 1.5 feet of paid Over-depth with Disposal at SF-11

63,700

91,100 CY $ $

0003 Dredging Reach 2 to -30-ft MLLW including 2 1.5 feet of paid Over-depth with Disposal at SF-11

90,100

120,700 CY $ $

0004 Dredging Reaches 3 and 5 to -30-ft MLLW including 2 1.5 feet of paid Over-depth with Disposal at Contractor Furnished Beneficial Reuse Site

71,500

107,600 CY $ $

0005 Dredging Reach 4 to -30-ft MLLW including 2 1.5 feet of paid Over-depth with Disposal at SF-11

153,100

203,400 CY $ $

0006 Dredging Reaches 6 to -30-ft MLLW including 2 1.5 feet of paid Over-depth with Disposal at SF-11

77,700

75,600 CY $ $

Total (Item 0001 through 0006) 456,100

598,400 CY $

* - ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL

CONDITION) OF THE CONTRACT.

SECTION 00 10 00

PRICING SCHEDULE

THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC.,

NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND

CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

REDWOOD CITY CHANNEL BID ITEMS - REDWOOD CITY CHANNEL FY21 MAINTENANCE DREDGING

WITH DISPOSAL AT GOVERNMENT FURNISHED DISPOSAL SITE (SF-11) AND CONTRACTOR

FURNISHED BENEFICIAL REUSE UPLAND SITE.

SECTION 00 10 00 Page 1 of 2

W912P7-21-B-0003

Notes:

1 .

2 .

3 .

4 .

5 .

6 .

7 .

End of Document

The material from reaches 3 and 5 has been found to be suitable for placement as cover material at a beneficial reuse upland site that does not decant process water on site.

This contract is subject to the FAR Clause 52.232-18 Availability of Funds in Section 72.

To be considered responsive, prices must be submitted on all individual items within Pricing Schedule. Failure to do so may be cause for rejection of bids.

Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

The term "Job", which appears on the Pricing Schedule (Section 00 10 00) under “Unit” for Bid Item No. 0001 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No. 0001.

BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214- 19 Contract Award – Sealed Bidding – Construction.

The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.

SECTION 00 10 00 Page 2 of 2