This document contains correspondence regarding an invitation for bid for the Redwood City Channel Maintenance Dredging Project in San Mateo County, California. The project involves maintenance dredging of the Redwood City Channel to a depth of 30 feet plus 2 feet of overdepth, and transporting dredged material to a government site and a contractor-furnished beneficial reuse upland site. Material disposed at the upland site is suitable as cover material. The bid opening date was delayed from April 19th to April 26th at the request of contractors to allow sufficient time following the bidding period for the Oakland Inner and Outer Harbor FY21 Maintenance Dredging Project. Herring observers are not required as dredging is scheduled to end before November 30th. Scow decanting will be allowed during dredging operations as determined necessary by the contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Request for Information Goverments Response
23-Mar-21
SECTION 01 57 19.99 43, HERRING SPAWNING OBSERVERS, requires herring observers for dredging that occurs beyond November 30.
Since the dredge window is June 1 – November 30, please clarify if herring observers must be included in the bid and what CLIN item they should be associated with.
There is no CLIN associated with herring observers. They shouldn't be needed since the dredging is expected to end before November 30.
23-Mar-21
Note 7 within SECTION 00 10 00 PRICING SCHEDULE indicates the following:
The material from reaches 3 and 5 has been found to be suitable as placement at a beneficial reuse upland site that does not decant process water on site.
Please indicate if the material to be placed at the beneficial reuse upland site is considered “cover” material or “non-cover” material.
The material to placed at the beneficial reuse upland site is considered "cover" material.
5-Apr-21
I’m requesting that USACE postpone the bid date on the Redwood City Cannel Dredging project at least one week due to the Oakland Inner and outer harbor Fy21 Maintenance dredging project now being bid the prior Thursday 4-15-21. As you know the Redwood project is a Total Small Business Set-Aside and in the past the most competitive set-aside bids came from small businesses teaming with large businesses to assist in completing the project. With only two business days between bids it will be difficult to obtain proper pricing from the large businesses that are focused on Oakland project. Neither of the large businesses are willing to provide pricing until after Oakland has bid, because neither Manson or Dutra will be interested in Redwood if they succeed on Oakland. This short time line will not enable us to provide the most competitive pricing possible.
The bid opening date for the Redwood City Harbor Maintenance Dredging Project was delayed from 04/19/21 to 04/26/21.
12-Apr-21
3.2.6.1 Overflow/Decant, Spillage and Leakage in Section 35 20 23 states, “Spillage and leakage are prohibited during transportation to the disposal site.” Aside from this restriction during transportation, will scow decanting be allowed as determined necessary by the Contractor during dredging
Yes, scow decanting will be allowed as determined necessary by the Contractor during dredging.
12-Apr-21 For dredge sediments requiring disposal at an upland site, is all material suitable as cover material
Yes, the material to be disposed at the upland site is suitable as cover material.