Scope of Work CVD Bld 2 Renov - ARRA 23.pdf

PDF 158 KB Posted

Attached to
RECOVERY: Renovation of Building #2 at Coyote Valley Dam, Lake Mendocino, CA Project No 4230
Solicitation number
W912P7-10-B-0007
Issued by

About this file

Scope of Work

View the file

Other files

File Type Posted
Bid Results Mar 31 2010.pdf PDF
Amendment 1 to Solicitation.pdf PDF
Questions and Answers.pdf PDF
Bid Bond form.pdf PDF
Questions and Answers.doc DOC document
WalkThruAttend.pdf PDF
61-43-17 Sheet 10D.PDF PDF
61-43-17 Sheet 11B.PDF PDF
ARRA2-Renovation of Building 2 Drawings.pdf PDF
W912P7-10-B-0007.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. ARMY CORPS OF ENGINEERS

SAN FRANCISCO DISTRICT

SCOPE OF WORK

AMERICAN RECOVERY & REINVESTMENT ACT

BUILDING # 2 RENOVATION

ARRA WORK ITEM # 23

COYOTE VALLEY DAM / LAKE MENDOCINO PROJECT

UKIAH, MENDOCINO COUNTY, CALIFORNIA

14 December 2009

ARRA Item # 2

TABLE OF CONTENTS

SECTION_____________________TITLE_________________________PAGE NO._

PART 1 GENERAL

1.1 LOCATION…………………………………………………………………

1.2 BACKGROUND & PURPOSE……………………………………….……………………….1

1.3 GENERAL DESCRIPTION OF WORK……………………….……………………………...2

1.4 GENERAL CONTRACT REQUIREMENTS…………………….…………………………...2

1.5 COMMENCEMENT, PROCECUTION, AND COMPLETION OF WORK…………………2

1.6 ATTACHMENTS / REFERENCES……………………………………………………………3

1.7 SUBMITTALS………………………………………………………………………………….3

1.8 HEALTH AND SAFETY REQUIREMENTS………………………………………………….4

1.9 ACCIDENT RECORDS…………………………………………………………………………4

1.10 REPORTING REQUIREMENTS………………………………………………………………5

1.11 SITE VISIT………………………………………………………………………………………5

1.12 GENERAL CONSTRUCTION………………………………………………………………….5

1.13 CALL-OUT NUMBER………………………………………………………………………….5

1.14 PRE-WORK MEETING………………………………………………………………………….5

1.15 PROTECTION OF GOVERNMENT FACILITIES………………………………………………6

PART 2 SPECIFICATIONS

2.1 GENERAL………………………………………………………………………………………….6

2.2 PRODUCTS………………………………………………………………………………………...6-9

2.3 SITE PREPARATION……………………………………………………………………………..9-10

2.4 EXECUTION……………………………………………………………………………………..10-14

PART 3 CONTRACTOR QUALITY CONTROL

3.1 PAYMENT………………………………………………………………………………………….14

3.2 EXECUTION………………………………………………………………………………………..14

3.3 QUALITY CONTROL PLAN………………………………………………………………....…14-16

3.4 SUBMITTALS………………………………………………………………………………………16

3.5 CONTROL…………………………………………………………………………………………..16

3.6 TESTS……………………………………………………………………………………………17-18

3.7 COMPLETION INSPECTION…………………………………………………………………..18-20

3.8 NOTIFICATION OF NON-COMPLIANCE …………………………………………………

PART 4 GOVERNMENT ACTION AND INSPECTION

4.1 DEFINITIONS……………………………………………………………………………………….20

4.2 RIGHTS………………………………………………………………………………………………20

4.3 INSPECTION………………………………………………………………………...………………21

4.4 NON-COMPLIANCE………………………………………………………………………………...21

4.5 REPEATED NON-COMPLIANCE………………………………………………………………….21

ARRA Item # 2

TABLE OF CONTENTS

SECTION_____________________TITLE_________________________PAGE NO._

PART 5: SUBMITTAL PROCEDURES

5.1 GENERAL……………………………………………………………………………...............21-22

5.2 SUBMITTAL CLASSIFICATION…………………………………………………………….23

5.3 EXECUTION…………………………………………………………………………………..23-25

PART 6 ADDITIONAL POINTS OF CONTACT…………………………………….25-26

PART 7 ATTACHEMENTS

14 December 2009

SCOPE OF WORK: ARRA Work Item # 23

SUBJECT: Coyote Valley Dam / Lake Mendocino Project, Building # 2 Renovation

USACE TECHNICAL POC: Carlos Hernandez, Facility Engineer 707 431- 4550 office 707 293-5429 cell Carlos.R.Hernandez@usace.army.mil

Greg Cox, CE Technician 707 431-4552 office Greg.S.Cox@usace.army.mil

CONTRACT NUMBER: TBD

PART 1: GENERAL___________________________________________

1.1 LOCATION

The job site is located at the U.S. Army Corps of Engineers' Coyote Valley Dam / Lake Mendocino Project Headquarters, approximately 5 miles north of the city of Ukiah (1160 Lake Mendocino Drive, Ukiah, California, 95482) and 3 miles from State Highway 101. See attached plans, for a site and vicinity map.

1.2 BACKGROUND AND PURPOSE

Building # 2 was originally constructed to serve as a concrete and soils testing laboratory, as well as a survey office, during the construction of Coyote Valley Dam (CVD) and appurtenances. Following completion of the dam in the late 1950’s, the building was converted into a wood shop and storage facility. The wood-framed single-story structure has a total floor area of approximately 2,850 feet. Floors are concrete slab type, ceilings are vaulted, and interior walls are generally covered with sheetrock or plywood, if not exposed to studs. The roof is covered with composition type rolled roofing overlaying plywood sheeting, purlins and insulating fiberboard. Currently, Building # 2 is used as an alternate make-shift conference area, as well as exercise and storage facility. The Project’s main building (Building 1) houses the main conference room (also serves as lunch room) which is extremely undersized. Building #2 contains women’s and men’s restrooms which are in various stages of renovation. In 2009, project staff remodeled approximately 368 feet of floor space to construct a new exercise room. Hence, this area shall not be included in new proposed work.

mailto:Carlos.R.Hernandez@usace.army.mil mailto:Greg.S.Cox@usace.army.mil

The purpose of renovation work is to upgrade the facility to replace the shop-type setting, and construct a much needed new conference / lunch area along with appurtenances that provide more suitable working / meeting conditions for staff, as well as visitors.

1.3 GENERAL DESCRIPTION OF WORK

Proposed work includes, furnishing all labor, materials, equipment, transportation, and logistics necessary to renovate Building # 2 as described in the attached plans and the specifications set forth herein. The Government has already purchased some necessary materials for the project’s completion. The Contractor shall verify the government supplies and supply the remaining necessary materials. The Contractor is responsible for all costs related to performing this contract and its successful completion. All work, materials, and equipment will be subject to the control and approval of the Contacting Officer's Representative.

1.4 GENERAL CONTRACT REQUIREMENTS

The Contractor shall take no direction from any government employee or any other person than the Contracting Officer (CO) that changes the terms and conditions of this contract action, the scope, or any change that impacts the price or schedule. Changes authorized by the Contracting Officer will be in the form of a written official signed modification to the contract action received by the Contractor before the Contractor shall act upon the changes. Contracting Officer Representatives (CORs) are limited to the authorities stated in COR appointment letters. The Contractor is responsible for all costs related to performing this contract and its successful completion unless otherwise stated in writing. All work, materials, and equipment will be subject to the control and approval of the COR.

The Contractor shall coordinate with the COR on where they may store equipment, the use of government facilities, property control, and security requirements.

All work personnel shall be skilled and qualified for the work which they perform. All materials used, unless otherwise specified, shall be new and of the types and grades specified. The Contractor shall, if requested, furnish evidence satisfactory to the COR that such is the case.

1.5 COMMENCEMENT, PROCECUTION, AND COMPLETION OF WORK

The Contractor shall commence work within 7 days after notice to proceed and shall complete work within 60 calendar days after notice to proceed. The Contractor shall notify the COR 72 hours prior when work will commence. Work shall be performed between the hours of 7:30 a.m. and 5 p.m., Monday through Friday, unless requested and approved in writing by the COR.

1.6 ATTACHMENTS / REFERENCES

1) Coyote Valley Dam Project, Building # 2 Renovation Plans, dated December 2009 (Attachment 1)

2) Russian River Reservoir (Coyote Valley) Project Office Drawings (No. 61-43- 17, 14 sheets), dated Apr. 27, 1956 (available upon request)

3) Government Provided Materials Inventory List – (Attachment 2)

4) International Building Code IBC (2009)

5) National Electrical Code NEC (2008)

6) Uniform Plumbing Code (2009)

7) Uniform Mechanical Code (2009)

1.7 SUBMITTALS

The Contractor shall provide submittals to the Contracting Officer and/or the COR for approval. The Contractor will not be permitted to start work until all submittals labeled (GA) have been submitted and approved by the Contracting Officer and/or the COR. Items labeled (FIO) are for information purposes only. The Contracting Officer will issue the Contractor a written order to proceed with the work after all submittals are accepted and approved. The Contractor shall submit the following items:

a. Documented proof in insurance and bonds (GA)

b. Contractor Quality Control Plan (GA)

c. Environmental Protection Plan (GA)

d. Health and Safety Plan (GA). This plan shall be in accordance with the Corps’ Safety and Health Requirements Manual – EM 385-1-1, September 2008 edition. The EM is available at the following website. http://www.usace.army.mil/usace-docs/eng-manuals/em385-1-1/toc.htm. The Safety plan shall include the following (appropriate forms can be found at the web-site):

1) Accident Prevention Plan

2) Activity Hazard analysis

3) Safety Exposure Reports

4) Accident Reports

5) Sub-contractor list

5) Manufacturer’s Data and/or Warranty

e. HVAC system heat-pump manufacturers specifications (GA prior to purchase) http://www.constructionbook.com/2009-uniform-mechanical-code-umc-paperback-12-091/hvac-mechanical-codes/ http://www.usace.army.mil/usace-docs/eng-manuals/em385-1-1/toc.htm

1.8 HEALTH AND SAFETY REQUIREMENTS

1.8.1 Work Safety. All work must be done in a safe manner, meeting all current OSHA regulations, and requirements contained in EM 385-1-1, Safety and Health Requirements Manual. The EM is available at http://www.usace.army.mil/usace-docs/eng-manuals/em385-1-1/toc.htm. The Contractor should also be aware that work tasks which are deemed potentially hazardous, require the completion of activity hazard analysis (AHA) forms. Examples of AHA are available in EM 385-1-1. Work will also comply with any other applicable Federal, State, and local codes. If conflicts arise between standards then the most stringent will apply. Work cannot begin until the Contractor’s Safety Plan and AHA(s) have been reviewed and approved by the Corps’ District Safety Officer.

1.8.2 Personnel. The Contractor will furnish competent, safety conscious personnel. If employees prove to be incompetent, the Contractor will remove them and provide satisfactory employees at no additional cost to the government.

1.8.3 Equipment.

a. The equipment used by the Contractor for the specified service will be in satisfactory operating condition and will be maintained in this condition. The Government reserves the right to require the Contractor to discontinue the use of unsatisfactory equipment and to require that all such equipment be replaced. The decision of the Contracting Officer's Representative as to serviceability of the equipment will be final.

b. Equipment must meet current Federal, State, and local safety requirements and all applicable requirements of EM 385-1-1, Safety and Health Requirements Manual.

c. The Contractor shall conduct a pre-work safety inspection of all equipment daily and submit all equipment safety sheets.

d. The Government inspector shall inspect contractor's equipment before it is placed into service.

1.9 ACCIDENT RECORDS

The Contractor shall maintain an accurate record of, and will report to the Contracting Officer's Representative in the manner and on the forms prescribed by the Contracting Officer's Representative, all accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies, and equipment incidental to work performed under this contract.

1.10 REPORTING REQUIREMENTS

1.10.1 Certification. The Contractor must hold any licenses or certifications required by the State of California and be registered with the local county as needed, and provide proof of any certification before the start of work. The Contractor is responsible for any permits required to perform services.

1.10.2 Safety Exposure Data. The Contractor shall submit a Safety Exposure Report, SPD Form 94, to the Contracting Officer's Representative at the end of the job.

1.11 SITE VISIT

Site visits may be arranged during normal working hours by contacting the Facility Engineer, Carlos Hernandez at (707) 433-4550, during the hours of 8:00 a.m. to 4:30p.m. and/or Project Manager Kevin Heape at (707) 462-4222. It is strongly recommended that the contractor conduct a site visit prior to submitting a bid proposal.

1.12 GENERAL CONSTRUCTION

1.12.1 On-Site Storage. The Contractor 'shall coordinate with the Contracting Officer's Representative on where they may store their equipment & materials.

1.12.2 Scheduling of Work. The Contractor shall coordinate scheduling of work with the Contracting Officer's Representative.

1.13 CALL-OUT NUMBER

The Contractor shall maintain a telephone number and means of contact during normal business hours, Monday through Friday. The contact may be a person or answering service or machine. Once the Corps has notified this contact, the Contractor will be considered officially notified when called for problems or other work related items.

1.14 PRE-WORK MEETING

Following the notice to proceed, the Contractor shall attend a pre-work meeting with the Contracting Officer's Representative prior to commencement of work to discuss contract requirements. The Contractor will contact the Facilities Engineer at least 5 days prior to the start of the contract to arrange this meeting.

1.15 PROTECTION OF GOVERNMENT FACILITIES

The Contractor shall be responsible for restoring any Government facilities or property damaged as a result of Contractor's operations. Reasonable care will be used to avoid damage to existing structures, equipment, facilities, and vegetation in the areas serviced. Any damage will be repaired or the items replaced, as directed by the COR, at no cost to the Government. If the Contractor does not make such repair or replacement, the cost thereof will be deducted from normal contract payments.

PART 2: SPECIFICATIONS_____________________________________________

2.1 GENERAL

All performed work shall be in accordance with the 2009 IBC, 2009 UPC, 2009 UMC, and the 2008 NEC building codes. In cases where the design drawings conflict with the referenced code(s), the Contractor shall notify the COR prior to performing the indicated job task. The COR, in this case the facility engineer, shall determine the next course of action prior to commencement of work. The Contractor shall furnish all labor, additional materials, equipment, and transportation to renovate Building # 2 as indicated in the attached plans, references, and in accordance with the following specifications.

2.2 PRODUCTS

The Government has previously purchased some of the materials suitable for the renovation of Building # 2. See Attachment 2 for inventory list. The Contractor shall supply the additional materials necessary to achieve the results indicated in the attached plans and the specifications herein, following approval by the COR.

2.2.1 Flooring. Laminate flooring to match Government supplied Presto-Salem Oak Pergo flooring. Laminate flooring shall have 2-millimeter cushion underlayment along with 6 mil polyethylene vapor barrier. If concrete slab floor base requires leveling, a polymer modified and shrinkage compensated hydraulic cement based product shall be used. For ceramic flooring use 10” to 12” size floor tiles with 3/16 inch spacing.

Contractor shall provide COR tile and grout samples for approval prior to purchase and installation.

2.2.2 Wall Framing. Unless specified otherwise, use No. 2 grade or better, surfaced four sides (S4S) Douglas Fir. Use 2”x 4” size members, 16” on center, for typical wall construction. Use 2”x 6” size for plumbing walls. For wall sill plates, use pressure treated Douglas Fir. Top plates shall be doubled-up. Use minimum 4” x 6” size headers. For door and window openings use double stud/cripples.

Moisture content of framing lumber shall not exceed 19%. Framing lumber shall be stamped “S-Dry” or “MC15”. MSR 1650 E1.6 may be substituted for No. 2 grade if it meets the structural requirements for floor and roof members. Lumber grades and machine stress-rated (MSR) lumber requirements are defined in the latest edition of “Standard Grading Rules for Western Lumber.”

2.2.3 Wall Covering. Cover interior walls with 5/8” thick sheetrock / gypsum wallboard. Tape joints / seams per industry standard and apply standard “orange peel” type texture. If wooden sheeting specified, use ½” APA Rated Struc-1® Sheeting, Grade OSB. Use Tyvek brand, or similar, house wrap (moisture barrier) for exterior walls.

2.2.4 Roof Rafters / Joists. Use double 2”x 8” S4S Douglas Fir, No. 2 Grade, or better. Install between existing 4”x 8” rafters along west portion of building. Existing rafters, which are 4’ on-center and span approximately 20 feet, are undersized under current loading conditions. Secure with Simpson type (or equal) face mount hangers – HU28-2. Install 4”x 8” blocking at 4 feet on-center.

2.2.5 Ceiling. Use vitreous fiber suspending ceiling panels (2’x 4’size) and pertinent components. Install in all remodeled rooms per manufacturer’s specifications.

2.2.6 Windows. Use white vinyl sash sliders with dual panes in sizes specified.

2.2.7 Exterior Doors. Use pre-hung, out-swinging steel doors, 1-1/2” thick x 36” wide x 80” high, with polyurethane insulated core and white exterior latex- flat finish enamel paint. All exterior doors shall contain UL listed Fire Exit Hardware to satisfy pertinent fire safety codes. The exterior door for lunch room area (east side of building) shall include a dual-paned safety glass rated window (approx. 2’ x 3’) with mini-blind between panes.

2.2.8 Interior Doors. Use pre-hung hollow core type with raised panels, 28” – 36” wide, 1-3/8” thick x 80” high, with white latex enamel flat finish. Door knobs shall be metal with brass finish.

2.2.9 Interior/Exterior Trim. Use 2 ¼” colonial CSG, MDF primed fiberboard casing for interior window and door trim. Use 1”x 6” S1S2E pine for exterior doors 1”x 4” S1S2E pine for exterior windows. Use 5 ¼” MDF primed fiberboard OG for interior wall baseboard.

2.2.10 Insulation. Use rolled fiberglass type with minimum R-14 rating for 2”x 4” walls, and R-26 minimum rating for ceilings and 2” x 6” exterior walls.

2.2.11 Lighting. Use Government purchased “FRESCENT” brand fluorescent fixtures and install per lighting plan. Fixtures are typically recessed (4-bulb x 4-foot) type with double ballast.

2.2.12 Electrical. Install new, appropriately sized, circuit breakers and connect new circuits to existing 200-amp alternating current / 240-volt / main service panel. As a minimum, use 2-wire (hot and neutral) / 12 gauge / conductors for circuits. Hardwire all smoke alarms. Use “CAT 7” Cable for voice over internet protocol (VOIP) communication lines. Provide proper grounding throughout according to code.

2.2.13 Plumbing. Use copper (Type L / Blue / Hard Temper) and/or brass for new water supply piping and fittings. Use acrylonitrile butadiene styrene (ABS) type piping and fittings for wastewater/drain lines. All faucets shall have single level control.

2.2.14 Kitchen Appliances/Fixtures. Equip kitchen with following new

(Government pre-approved) electrical appliances/fixtures:

1) automatic dishwasher

2) minimum 8 cubic-foot, frost-free refrigerator/freezer

3) 30” wide stove with range hood, light and two-speed exhaust fan.

4) stainless steel double sink

5) chrome finish faucet with spray attachment

6) wooden overhead and base cabinets throughout with oak or white paint finish

7) cabinet doors with raised panels

8) formica-type counter tops

2.2.15 Bathroom Fixtures. Equip men’s and ladies’ bathrooms with following fixtures:

1.) Toilets- American Standard of brand which meets the following: Vitreous china, White in Color, Low-consumption (6.0 Lpf/1.6 gpf), 3" flush valve with chlorine resistant flapper, Elongated dual water-jet feed™ bowl, 16-1/8" rim height for accessible applications

2.) Sinks- Kohler or brand which meets the following: Vitreous china, White in color, Ledge-back, With hanger, 8” Centers, 20″ (50.8 cm) x 18-1/4″ (46.4 cm) , With Polished faucets, and Accessories.

3.) Showers- American Standard or brand which meets the following. Shower Kit with walls, Includes the following components:

Shower Base Features:

• High-gloss acrylic-capped ABS with fiberglass reinforcement

• Single threshold with tiling flange Nominal Dimensions:

35-7/8" x 35-7/8" x 5-1/8" (911 x 911 x 130mm) Door Features:

• Pivot Bath Door

• Tempered safety glass

• Silver Shine frame finish

• Rain privacy glass Nominal Dimensions:

31-5/8" to 34-3/8" x 64-3/4"(803 to 873 x 1645mm) Wall Set Features:

•SW Bath Wall Set

• High-gloss acrylic-capped ABS with fiberglass reinforcement

• Mounts directly to studs

• Caulk-less installation Nominal Dimensions:

36" x 36" x 70" tall (914 x 914 x 1778mm)

4.) Shower Components- “Shower Only” Trim Kit, complete with metal lever handle, “easy clean” showerhead, shower arm, & flange all with polished chrome finish.

5.) Partitions- Solid Plastic Polyethylene 240 Overhead Braced, Between 2 walls, Color to be determined. (The Contactor shall present the government with color options)

2.2.16 Heating Ventilation & Air Conditioning (HVAC) System. Equip building with new split system heat pump and pertinent duct work. Provide a Carrier “Gemini” Split heat pump system, 6 ton, model 38QQ007 (outdoor unit), 40RMQ008 (indoor unit), Cooling 75000 (Btuh), Heating 71000 (Btuh)-high temp, 39,500 (Btuh)-low temp, unit or an equivalent type unit which meets the said criteria. Use 6” fiberglass “Flex pipe” ducts throughout.

2.2.17 Paint. Paint quality shall match, or exceed, high quality offered by name brands such as Behr and Kelly Moore. Apply at least one coat of 100% acrylic latex water based primer over new and old construction. Apply at least one finish coast of 100% acrylic latex interior satin enamel – ultra pure white. For new exterior construction, apply exterior rated acrylic latex paint in colors to match exterior walls and trim. In bathrooms use semi-gloss moisture / mildew resistant paint. Use semi-gloss finish on all trim work.

2.3 SITE PREPARATION

The Contractor shall remove any necessary structures, fixtures, and materials in order to achieve the results indicated in attached plan sets. Disposal, typically off-site, shall be the responsibility of the Contractor and shall be conducted in accordance with all applicable laws and regulations. In such cases which require utilities to be taken off-line, the Contractor shall notify the COR at least 24 hours in advance.

2.4 EXECUTION

2.4.1 General. The Contractor shall renovate Building # 2 in accordance with the attached plans and according to the specifications referenced in sections 1.5 and 2.2.

As indicated in the attached plans, Building # 2 shall be renovated from its’ present state to include, a Conference Room, Kitchen, Dining Area, File Storage Room, and Men’s & Women’s Restrooms. The existing exercise facility shall remain in its’ present state.

2.4.2 Conference Room. As indicated in the attached plans, the conference room shall be 655 square feet in area. Part of this area’s original footprint shall be used to construct a hallway for access to restrooms, and to provide a good buffer between restrooms and the conference area.

a. Floors. The Contractor shall level the existing concrete slab floor with a concrete self leveling compound. The Contractor shall level the floor according to the product manufacturer’s specifications and to industry standards. Deviations to floor level shall be no greater than 1/8” per 10’ of linear distance. After proper leveling, the Contractor shall install a vapor barrier, underlayment, and then Government provided laminate flooring. Install flooring according to manufacturer specifications and/or industry standard.

b. Walls. In general, construct with 2”x 4” studs, 16” on-center. Insulate all exterior walls, as well as interior walls to also provide sound-proofing. Hang sheetrock, tape, and texture walls in accordance with industry standard. Provide at least one coat each of primer and finish coat.

c. Ceiling. As shown in the attached plans, add double 2”x 8” rafters between existing 4”x 8” rafters, which are at 4’ on-center. Attach rafters to ridge beam with hangers identified in Section 2.2.4. Add blocking between rafters at 4’ on-center. Construct a suspended style “drop ceiling” according to manufacturer’s specifications.

d.. Electrical/Lighting. Run all necessary wiring to achieve the results indicated in the attached plans. Install the indicated switches, outlets, and fixtures. Unless otherwise indicated, switches shall be toggle, 15-amp, 110-volt types. Receptacles shall be grounded, 15amp / 120 volt type. Typically mount receptacles 12 inches above floor and no more than 6 feet apart along walls.

Provide two hard wired smoke alarms at both ends of room. Recess ceiling mount a total of 9 fluorescent light fixtures. All rough and finish type electrical work shall be conducted by a licensed electrician.

e. Communication. Incorporate existing communication lines into the new renovation work at their existing locations. Mount new jacks 12 inches above floor. As indicated in the attached plans construct a 2”x 4” stud wall to encompass the existing server. Install Government-provided vented door.

f. Openings / Finish work. Install interior-grade and exterior-grade doors where indicated in the plans. Install trim around all openings. Install baseboards throughout room. Properly weatherproof all exterior openings to manufacturer recommendations and to applicable code regulations. Apply at least one coat of primer and one coat of interior paint as indicated in section 2.2 to trim and baseboards.

g. Wood Burning Stove. The government has previously purchased a wood burning stove for use in the conference room. The Contractor shall provide the additional components to properly install the stove as indicated in the attached plans. The Contractor shall install a ceramic tile hearth and protective wall section to protect the floor and wall(s) from the stove’s heat. The hearth shall be 4’-4” x 4’-4” and wall sections shall be 5’ in height. See attached plans. Protective material shall be rated for usage in fireplace application. Installation shall be in accordance with the manufacturer’s specifications and to applicable code.

2.4.3 Lunch Room. This new room shall be have approximately 295 square feet of floor area. The Contractor shall construct a new 2”x 4” stud partition wall to separate the new lunch room from a new file room. Contractor shall install a new exterior-type access door along the northeast perimeter of the room and replace an existing window along same wall, as shown on plans.

a. Floors. Renovate floors as indicated in Section 2.4.2a. and plans.

b. Walls. Renovate walls as indicated in Section 2.4.2b. and plans.

c. Ceiling. Renovate as indicated in Section 2.4.2c. and plans.

d. Electrical/ Lighting. Install as indicated in Section 2.4.2d., and install one hardwired smoke alarm .

e. Openings / Finish Work. Install as indicated in Section 2.2. Install new 36-inch wide entrance door, new window (40/30). Install new trim around all openings. Install baseboards throughout room. Properly weatherproof all exterior openings to manufacturer recommendations and to applicable code regulations. Apply at least one coat of primer and one coat of interior paint to trim and baseboards.

2.4.4 File Room. The File Room Shall be 186 sq. ft. Provide a new a wall to separate the File Room from the Conference Room. Remove the existing rolling door.

Install an exterior door and new window as indicated in the attached plans.

a. Floors. Renovate floors as indicated in section 2.4.2a and plans.

b. Walls. Construct the walls as indicated in section 2.4.2b and plans. For exterior wall construction, enclose wall with O.S.B. sheathing and provide 1 layer of house wrap moisture barrier. In areas where exterior walls are exposed the contractor shall propose a siding solution which shall closely match the existing siding and properly weather proof all areas exposed to the elements.

c. Ceiling. Construct as indicated in section 2.4.2c and plans

d. Electrical/ Lighting. Install as indicated in section 2.4.2d and plans.

Install 1 hardwired smoke alarm only. Provide 4 florescent fixtures

e. Openings/Finish Work. Where indicated in the attached plans, the Contractor shall provide interior doors in accordance with 2.2. Also the Contractor shall install a new window (size 60/30) next to the entrance door. Provide exterior door where indicated in the plans and in accordance with 2.2. Install trim around all openings. Install baseboards throughout room. Properly weatherproof all exterior openings to manufacturer recommendations and to applicable code regulations. Apply 1 coat of primer and one coat of interior paint as indicated in section 2.2 to trim and baseboards.

2.4.5 Kitchen. The Kitchen shall be 86 sq. ft. Provide all kitchen components indicated in section 2.2. Prior to installation, provide the COR with sample brochures, color schemes, manufacturer specifications, and/or product samples of the said kitchen components for Government approval. Refer to the attached plans for the general layout.

a. Floors. Level the floor as indicated in 2.4.2a and plans. Provide Ceramic tile flooring indicated in 2.2. Install to manufacture specifications and to the applicable code regulation.

b. Walls. Remove existing wall covering. Provide insulation, sheetrock, tape, texture and paint in accordance with section 2.2. Provide 1 coat of primer and 1 coat of paint.

c. Ceiling. Construct as indicated in section 2.4.2c and in accordance with the attached plans.

d. Electrical/Lighting. Install as indicated in 2.4.2d. Use G.F.I. plugs where indicated. Provide all necessary electrical components, systems, and wiring to achieve the results in the attached plans. Provide 2 florescent fixtures. Conduct all work according to the applicable NEC code regulation. Install one hardwired smoke alarm as indicated in the attached plans.

e. Plumbing. Install all necessary plumbing, venting in accordance with the attached plans and section 2.2. Plumb for hot and cold water at the sink and dishwasher site. Install dishwasher, sink, and provide a connection valve for an ice maker at the refrigerator site. Provide drainage plumbing as indicated in the attached plans.

Conduct all work in strict accordance with UPC code regulation.

f. Opening/Finish Work. Remove existing door, door jamb, to form an open archway between the lunchroom and kitchen. Provide necessary, trim and baseboards, as indicated in 2.2. Apply 1 coat of primer and 1 coat of paint as indicated in 2.2.

2.4.6 Bathrooms. The new Men’s restroom shall be 130 sq. ft. and the new Women’s restroom shall be 130 sq. ft. The existing men’s and women’s shall be switched. The existing entrance to the new women’s restroom shall be reconfigured according to the attached plans. Provide the restroom components as indicated in section

2.2 and where indicated in the attached plans. Prior to installation, provide the COR with sample brochures, color schemes, manufacturer specifications, and/or product samples of the said Bathroom components for Government approval. Existing plumbing may need to be reconfigured to achieve the results indicated in the attached plans.

a. Floors. Level the floor as indicated in 2.4.2a. Provide Ceramic tile flooring indicated in 2.2. Install to manufacture specifications and to the applicable code regulation.

b. Walls. Remove existing wall covering. Enclose existing doorway to the new women’s restroom. Provide insulation, sheetrock, tape, texture and paint in accordance with section 2.2. Provide 1 coat of primer and 1 coat of paint.

c. Ceiling. Construct as indicated in section 2.4.2c and in accordance with the attached plans.

d. Electrical/Lighting. Install as indicated in 2.4.2d. Use G.F.I. plugs where indicated. Provide all necessary electrical components, systems, and wiring to achieve the results in the attached plans. Provide 4 florescent fixtures in each room.

Conduct all work according to the applicable NEC code regulation. Install one hardwired smoke alarm in each restroom as indicated in the attached plans.

e. Plumbing. Install all necessary plumbing and venting in accordance with the attached plans and section 2.2. Plumb for hot and cold water at the sinks and showers. Install sinks, showers, toilets, and urinals, where indicated in the attached plans.

Provide drainage plumbing as indicated in the attached plans. Conduct all work in strict accordance with UPC code regulation.

f. Openings/Finish Work. Provide new entrance to the New Women’s Restroom as indicated in the attached plans. Install interior grade doors. Install trim around all openings. Install baseboards throughout room. Apply one coat of primer and one coat of interior paint as indicated in section 2.2 to trim and baseboards.

2.4.7 Heating and Cooling. Remove the old furnace and ductwork. Install a new HVAC system, with all its necessary components as indicated in 2.2. Provide all necessary venting and ductwork according to the attached plans. All work shall be conducted by a licensed HVAC specialist, according to the 2009 UMC, and to industry standard.

2.4.8 Sewer Main. Due to multiple root intrusions in the existing 6” clay pipe drain laterals exiting building #2 and building #1, the contractor shall re-habilitate the existing laterals (approximately 235 ft) using the “CIPP” process. Cured in place pipe.

The Contractor shall excavate 2’x4’x3’ pits near building #2 for this process. Any damage caused by this process shall be repaired by the contractor. After completing this process the contractor shall test the said sewer main for functionality. The contractor shall contact the project’s maintenance supervisor for locations. Contact Maintenance supervisor David Serafini at (707)467-4254 for locations and specific information M-F 7:45 a.m to 4:30 p.m.

PART 3: CONTRACTOR QUALITY CONTROL__________________ ___

3.1 PAYMENT

Separate payment will not be made for providing and maintaining an effective Quality Control program, and all costs associated therewith shall be included in the applicable unit prices or lump-sum prices contained in the Bidding Schedule.

3.2 EXECUTION

3.2.1 General. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product, which complies with the contract requirements. The system shall cover all construction operations, both onsite and offsite, and shall be keyed to the proposed construction sequence. The project superintendent will be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with quality requirements specified in the contract. The project superintendent in this context shall mean the individual with the responsibility for the overall management of the project including quality and production.

3.3 QUALITY CONTROL PLAN

3.3.1 General. The QC Plan shall include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:

a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the QC staff shall implement the three phase control system for all aspects of the work specified.

b. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures shall be in accordance with Section 5

SUBMITTAL PROCEDURES.

c. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test.

d. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

e. Procedures for tracking construction deficiencies from identification through acceptable corrective action. These procedures will establish verification that identified deficiencies have been corrected.

f. Reporting procedures, including proposed reporting formats.

g. A list of the definable features of work; a definable feature of work is a task which is separate and distinct from other tasks and has separate control requirements. Different trades or disciplines could identify it, or it could be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there is frequently more than one definable feature under a particular section. This list will be agreed upon during the coordination meeting.

3.3.2 Acceptance of Plan. Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his QC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

3.3.3 Notification of Changes. After acceptance of the QC Plan, the Contractor shall notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.

3.3.4 Coordination Meeting. After the Pre-construction Conference, before start of construction, and prior to acceptance by the Government of the QC Plan, the Contractor shall meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. The QC Plan shall be submitted for review a minimum of seven calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the QC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting shall be prepared by the Government and signed by both the Contractor and the Contracting Officer. The minutes shall become a part of the contract file. There may be occasions when either party to reconfirm mutual understandings and/or address deficiencies in the QC system will call subsequent conferences or procedures which may require corrective action by the Contractor.

3.4 SUBMITTALS

Submittals shall be made as specified in Part 5 Submittal Procedures. The QC organization shall be responsible for certifying that all submittals are in compliance with the contract requirements.

3.5 CONTROL

Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. The QC System Manager for each, definable feature of work shall conduct at least three phases of control as follows:

3.5.1 Preparatory Phase. This phase shall be performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase shall include:

a. A review of each paragraph of applicable specifications.

b. A review of the contract drawings.

c. A check to assure that all materials and/or equipment have been tested, submitted, and approved.

d. Review of provisions that have been made to provide required control inspection and testing.

e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.

f. A physical examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.

g. A review of the appropriate activity hazard analysis to assure safety requirements are met.

h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.

i. A check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.

j. Discussion of the initial control phase.

3.5.2 Initial Phase. This phase shall be accomplished at the beginning of a definable feature of work. The following shall be accomplished:

a. A check of work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.

b. Verify adequacy of controls to ensure full contract compliance. Verify required control inspection and testing.

c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.

d. Resolve all differences.

e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.

f. The initial phase should be repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.

3.5.3 Follow-up Phase. Daily checks shall be performed to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. The checks shall be made a matter of record in the QC documentation. Final follow-up checks shall be conducted and all deficiencies corrected prior to the start of additional features of work, which may be affected by the deficient work. The Contractor shall not build upon or conceal nonconforming work.

3.6 TESTS

3.6.1 Testing Procedure. The Contractor shall perform specified or required tests to verify that control measures are adequate to provide a product, which conforms to contract requirements. Upon request, the Contractor shall furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and/or acceptance tests when specified. The Contractor shall perform the following activities and record and provide the following data:

a. Verify that testing procedures comply with contract requirements.

b. Verify that facilities and testing equipment are available and comply with testing standards.

c. Check test instrument calibration data against certified standards.

d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.

e. Results of all tests taken, both passing and failing tests, will be recorded on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test will be given. If approved by the Contracting Officer, actual test reports may be submitted later with a reference to the test number and date taken. An information copy of tests performed by an offsite or commercial test facility will be provided directly to the Contracting Officer. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this contract.

f. The Contractor shall provide a weekly summary of all tests taken and their results.

3.7 COMPLETION OF INSPECTION

3.7.1 Punch-Out Inspection. Near the completion of all work or any increment thereof the QC System Manager shall conduct an inspection of the work and develop a "punch list" of items which do not conform to the approved drawings and specifications.

Such a list of deficiencies shall be included in the QC documentation, and shall include the estimated date by which the deficiencies will be corrected. The QC System Manager or staff shall make a second inspection to ascertain that all deficiencies have been corrected. Once this is accomplished, the Contractor shall notify the Government that the facility is ready for the Government "Pre-Final" inspection.

3.7.2 Pre-Final Inspection. The Government will perform this inspection to verify that the work is complete and ready for use. A Government "Pre-Final Punch List" may be developed as a result of this inspection. The Contractor's QC System Manager shall ensure that all items on this list have been connected and so notify the Government so that a "Final" inspection with the customer can be scheduled. Any items noted on the "Pre-Final" inspection shall be corrected in a timely manner. These inspections and any deficiency corrections required by this paragraph will be accomplished within the time slated for completion of the entire work or any particular increment thereof if the project is divided into increments by separate completion dates.

3.7.3 Final Acceptance Inspection. The Contractor's Quality Control Inspection personnel, his superintendent or other primary management person and the contracting Officer's representative will be in attendance at this inspection as well as additional Government personnel including, but not limited to, those from the Project Office. The Contracting Officer based upon results of the Pre-Final inspection will formally schedule the final acceptance inspection. Notice will be given to the Contracting Officer at least 5 days prior to the final acceptance inspection and must include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government's additional inspection cost.

3.7.4 Documentation. The Contractor shall maintain current records providing factual evidence that required quality control activities and/or tests have been performed.

These records shall include the work of subcontractors and suppliers and shall be on an acceptable form that includes, as a minimum, the following information:

a. Contractor/subcontractor and their area of responsibility.

b. Operating plant/equipment with hours worked, idle, or down for repair.

c. Work performed each day, giving location, description, and by whom.

When Network Analysis (NAS) is used; identify each phase of work performed each day by NAS activity number.

d. Test and/or control activities performed with results and references to specifications/drawings requirements. The control phase should be identified (Preparatory, Initial, and Follow-up). List deficiencies noted along with corrective action.

e. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings requirements.

f. Submittals reviewed, with contract reference, by whom, and action taken.

g. Off-site surveillance activities, including actions taken.

h. Job safety evaluations stating what was checked, results, and instructions or corrective actions.

i. Instructions given/received and conflicts in plans and/or specifications.

j. Contractor's verification statement. These records shall indicate a description of trades working on the project; the number of personnel working;

weather conditions encountered; and any delays encountered. These records shall cover both conforming and deficient features and shall include a statement that equipment and materials incorporated in the work and workmanship comply with the contract. The original and one copy of these records in report form shall be furnished to the Government daily within five days after the date(s) covered by the report, except that reports need not be submitted for days on which no work is performed. As a minimum, one report shall be prepared and submitted for every seven days of no work and on the last day of a no work period. All calendar days shall be accounted for throughout the life of the contract. The first report following a day of no work shall be for that day only. Daily reports shall be signed and dated by the QC System Manager and submitted to the Government inspector by no later than Noon of the following day. The report from the QC System Manager shall include copies of test reports and copies of reports prepared by all subordinate quality control personnel.

3.8 NOTIFICATION OF NON-COMPLIANCE

The Contracting Officer will notify the Contractor of any detected noncompliance with the foregoing requirements. The Contractor shall take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the worksite, shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory collective action has been taken.

No part of the time lost due to such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.

PART 4: GOVERNMENT ACTION AND INSPECTION_____________________

4.1 DEFINITIONS

"Services" as used in this clause, includes work or services performed, workmanship, and materials furnished or utilized in the performance of services.

4.2 RIGHTS

The Government has the right to inspect and test all services called for by the contract, to the extent possible at all times and places during the term of the contract. The Government will perform inspections in a manner that will not unduly delay the work.

4.3 INSPECTION

The Contractor must be present during the final inspection of the work by Federal, State, or local inspectors. Any deficiencies noted during the inspection will be corrected by the Contractor before final payment will be authorized.

4.4 NON-COMPLIANCE

If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract specifications, at no increase in contract amount.

This is the start of the file's text. The full file is on GovTribe.