W912P7-08-B-0003-0006.pdf

PDF 22 MB Posted

Attached to
Oakland Outer Harbor Channel Maintenance Dredging, Alameda County, California
Solicitation number
W912P7-08-B-0003
Issued by

About this file

Amendment 0006

View the file

Other files

File Type Posted
BID RESULTS.pdf PDF
Questions and Answers_Oak_OM_31_Jul_08 —
W912P7-08-B-0003-0005.pdf PDF
outer harbor POWER CABLE.dwg DWG drawing
Oakland Outer Harbor Channel Maintenance Dredging W912P7-08-B-0003 Amendment 2.pdf PDF
W912P7-08-B-0003-0002.pdf PDF
W912P7-08-B-0003-0001.pdf PDF
Oakland 08-amendment1.cal —
Oak_FY08_27Jun08_FINAL.pdf PDF
Oakland Outer 08-2.cal —
maxview500.exe EXE file
Oakland Outer 08-1-Coversheet.cal —
Readme_Oakland_O M_FY2008.txt TXT text file
Oakland Outer 08-5.cal —
Oakland Outer 08-3.cal —
Oakland Outer 08-4.cal —
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNRESTRICTED IFB

OAKLAND OUTER HARBOR CHANNEL MAINTENANCE DREDGING, ALAMEDA COUNTY, CALIFORNIA.

PROJECT DESCRIPTION:The work consists of maintenance dredging of Oakland Outer Harbor Channel to provide a project authorized depth -50 feet plus 1 foot allowable paid over-depth plus 1 foot allowable nonpaid over-depth, and disposing of the dredged material in the designated upland disposal site at Hamilton wetland.

ESTIMATED COST RANGE OF PROJECT: $1,000,000 - $5,000,000

X

JAMES E GARROR 415-503-6988

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

30-Jun-2008

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______3 calendar days and complete it within ________105 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the work required are due at the place specified in Item 8 by __1:00 P.M.__ local time _6 August 2008__ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

PAGE OF PAGES

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: TEL: FAX:

W912P7-08-B-0003

CONTRACT AWARD

Contract Notes:

*QUANTITY IS AN ESTIMATED AMOUNT, SEE SECTION 00700, FAR 52.211-18, EFARS

52.211-5000, AND 52.211-5001, FOR VARIATION IN ESTIMATED QUANTITIES

CONTRACT CLAUSE.

1. Prices must be submitted on all individual items of this Pricing Schedule - Government Furnished Site (GFS). Failure to do so may be cause for rejection of bids.

2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.

3. The lump sum, "LS", line items above are not “estimated quantity” line items and therefore are not subject to the Variation in Quantity contract clause.

4. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES

(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Pricing Schedule as submitted by the bidder:

1) Obviously misplaced decimal points will be corrected;

2) Discrepancy between unit price and extended price, the unit price will govern;

3) Apparent errors in extension of unit prices will be corrected;

4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

5. Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms P.1 and P.2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract. If a bidder elects to submit a bid on an alternative site, the Dredge Plant and Equipment schedule shall also include a list of all equipment required to offload at the alternative site.

6. At this time the Government is unable to predict whether the off loader will be continuously operable during the performance of this contract. In the event the offloader becomes unavailable during the pendency of this work the Government may negotiate for the delivery of the O&M

L3CT9JEG

Text Box

L3CT9JEG

Text Box

FAX: (415) 503-6694

For bid results go to the FedBizOpps.gov website https://www.FedBizOpps.gov. If this site has no bid information, call the Contract Specialist above.

(3) All technical questions on the specifications or drawings must be submitted in writing using one of the following:

MAILING ADDRESS:

Department of the Army U.S. Army Engineer District, San Francisco Contracting Division (Attn: James E. Garror Sr.)

1455 Market Street, 17th Floor, Room 1741 San Francisco, CA 94103-1398

FAX: (415) 503-6694, Attn: James E. Garror Sr.

E-MAIL: ***use the appropriate Contract Specialist's name, AND Team Leader and delete the rest: James.E.Garror@usace.army.mil , Shirley.Turnbo@usace.army.mil

(4) Please include the solicitation number, the project title, the location of the project, the full name of your company and your telephone and FAX numbers in your correspondence. Written inquiries should be received by this office not later than 14 calendar days prior to the date set for bid opening.

(5) Oral explanations or instructions are not binding. Changes to the solicitation can only be made by an amendment to the solicitation.

52.0214-4582 DIRECTIONS FOR SUBMITTING BIDS (MAR 2003)

Envelopes containing bids must be sealed, marked and addressed as follows:

MARK ENVELOPES:

Solicitation No. W912P7-08-B-00003 Bid Opening Date: 30 July 2008 Bid Opening Time: 1:00 PM Local Time

ADDRESS ENVELOPES TO:

Department of the Army U.S. Army Engineer District, San Francisco ATTN: Contracting Division 1455 Market Street, 17th Floor San Francisco, CA 94103-1398

SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED BIDS:

Hand-carried bids must be delivered to: The Building Lobby at

00100 - 3 mailto:James.E.Garror@usace.army.mil mailto:Shirley.Turnbo@usace.army.mil

L3CT9JEG

Text Box ------------- 6 August 2008

L3CT9JEG

Line

Line

00700 - 15

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $4,400 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS

Item Nos. 0002 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

52.211-5001 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (MAR 1995)--EFARS

This variation in estimated quantities clause is applicable only to Items Nos. 0002.

a. Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

b. Where the actual quantity of work performed for Items Nos. 0002 is less than 85% of the quantity of the first sub-item listed under such item (0002AA), the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.

c. If the quantity of work performed under Items Nos. 0002, exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item (0002AA) and/or if the quantity of work performed under the second sub-item or any subsequent sub-item (0002AB) under Item Nos. 0002 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.

L3CT9JEG

Line

L3CT9JEG

Line

L3CT9JEG

Line

L3CT9JEG

Line

L3CT9JEG

Line

L3CT9JEG

Line

L3CT9JEG

Line

L3CT9JEG

Line

File details come from the government source that posted it. Updated .