This document is a Bid Schedule for the Indiana Harbor Dredging project, solicitation number W912P625BA008, dated Thursday, September 25, 2025. The contract involves mechanical dredging services with multiple line items for dredging mobilization/demobilization, material transportation, off-loading, and distribution. The base bid includes dredging 45,000 cubic yards (CY) initially, with an additional 20,000 CY possible, along with two CDF bathymetry surveys and placement of 1,000 tons of debris and unpumpable material in a Confined Disposal Facility (CDF). The bid schedule also includes seven optional line items for additional mechanical dredging (ranging from 5,000 to 10,000 CY) and corresponding optional debris placement in CDF (ranging from 2,000 to 10,000 tons), providing flexibility for potential expanded project scope. The document appears to be a U.S. Army Corps of Engineers contract opportunity, with space provided for bidders to fill in unit prices and extended cost calculations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indiana Harbor Dredging Bid Schedule

W912P625BA008

Thursday, September 25, 2025

Contract Estimated

Line Item Quantity

0001 Dredging Mobilization/Demobilization JOB 1

Mechanical Dredging, Transportation, Off-Loading and Distribution of

Dredged Material

0002AA First 45,000 CY CY 45,000

0002AB Over 45,000 CY CY 20,000

0003 CDF Bathymetry Survey EA 2

0004 Placement of Debris and Unpumpable Material in CDF TON 1000

BASE BID ITEMS TOTAL:

Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material - Option 1

CY 10,000

Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material - Option 2

CY 5,000

Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material - Option 3

CY 5,000

Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material - Option 4

CY 5,000

Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material - Option 5

CY 5,000

Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material - Option 6

CY 5,000

Mechanical Dredging, Transportation, Off-Loading and Distribution of Dredged Material - Option 7

CY 5,000

0012 CDF Bathymetry Survey - Option 1 EA 2

0013 Placement of Debris and Unpumpable Material in CDF - Option 1 TON 10,000

0014 Placement of Debris and Unpumpable Material in CDF - Option 2 TON 5,000

0015 Placement of Debris and Unpumpable Material in CDF - Option 3 TON 5,000

0016 Placement of Debris and Unpumpable Material in CDF - Option 4 TON 5,000

0017 Placement of Debris and Unpumpable Material in CDF - Option 5 TON 2,000

0018 Placement of Debris and Unpumpable Material in CDF - Option 6 TON 2,000

0019 Placement of Debris and Unpumpable Material in CDF - Option 7 TON 2,000

0020 Placement of Debris and Unpumpable Material in CDF - Option 8 TON 2,000

0021 Placement of Debris and Unpumpable Material in CDF - Option 9 TON 2,000

OPTION BID ITEMS TOTAL: TOTAL BID: BASE + OPTION