This amendment modifies an invitation for bid for construction services. The modification provides responses to contractor questions, revises specifications and drawings, and clarifies requirements. The services required include constructing enclosures over a raceway and rectifiers at a fish barrier in Romeoville, Illinois, as well as associated grounding, lighting, and heating work. The estimated cost of construction is between $1-5 million. The solicitation is restricted to small businesses with average annual receipts less than $39.5 million. The response due date is not specified. The Department of the Army Corps of Engineers Chicago District is the contracting office for this opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is make changes to the specifications, plans and to address contractor questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Sep-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P621B0014
X 9B. DATED (SEE ITEM 11)
18-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2021
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P621B0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. SOLICITATION CHANGES:
1. By this amendment the below clause has been updated:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Richard Hurt Telephone: 312-600-0083
Name: Nikolay Dundarov Telephone: 312-823-2220
(End of provision)
2. By this amendment the ability to enter technical inquiries and questions relating to bid procedures or bonds will not be accepted after 10 calendar days prior to the bid submittal deadline. Government responses will be provided on or before 5 calendar days prior to the bid submittal deadline
B. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries.
Question 1: Specification section 21 22 00 identifies a NOVEC 1230 clean agent fire suppression system, however the drawings make no reference to a Clean Agent system. Please provide drawings of the clean agent system.
USACE Response Q1: The Contractor shall refer to drawing note number one on sheet M-101. This note provides guidance that the contractor shall provide a Qualified fire protection engineer (QFPE) that shall be responsible for the design of the clean agent system. The Drawings have also been revised to provide additional details for the actions that the contractor shall take in order to implement the desired new Fire Alarm and Clean Agent systems into the existing clean agent and fire alarm system. See Drawing Sheets FA-02, FA-02,FA-03. See Specifications 28 31 70, and 21 22 00.0 40.
Question 2: The bid documents titled “Enclosure at 2A Raceway” make no reference to a clean agent system in the Rectifier Building. It was our understanding the Rectifier Building is what required the Clean Agent System. Please clarify.
USACE Response to Q2: The contractor shall see drawing sheets X-100, FA-01 for the information that states that the rectifier building shall be the only building that requires a clean agent system. The contractor shall see FA-002 for guidance on evaluating and implementing the new desired Clean Agent System with the existing Clean Agent System located in the 2A Building
Question 3: Specification sections 28 31 13.00 40 and 28 31 70 both Identify addressable fire alarm systems with potentially conflicting requirements. Which specification takes precedent? Please provide direction, as we are unable to provide a comprehensive bid based on the current information.
USACE Response Q3: The Contractor shall see specification section 28 31 70 this specification shall take precedents. The Specifications have been revised to remove specification 28 31 13.00 40.
Question 4: On Drawing E101 there is a type S fixture shown but not listed on the fixture schedule. Please clarify what this fixture is.
USACE Response Q4: USACE Response to Q4: Drawing sheet E-101 has been revised to show fixture S. This fixture shall be a wall mounted fixture and must be field adjusted to accommodate the existing pipes that are in the rectifier building.
Question 5: On drawing E110 on the right-hand side there are some notes and circuit numbers that are cut off on Detail D1. Please clarify what this says in its entirety.
USACE Response Q5: USACE Response to Q5: Drawing sheet E-110 has been revised so that the circuit number and notes are shown clearly.
Question 6: Please provide a spec and/or manufacturer for the electrode disconnect switch to give us an idea of what the design is based off.
USACE Response Q6: USACE Response to Q6: The contractor shall see Specification 26 05 00.00 40 Section 2.1.6 for the electrode disconnect switch information.
Question 7: The bid documents titled “Enclosure at 2A Raceway” make no reference to a clean agent system in the Rectifier Building. It was our understanding the Rectifier Building is what required the Clean Agent System. Please clarify.
USACE Response to Q7: The contractor shall see drawing sheets X-100, FA-01 for the information that states that the rectifier building shall be the only building that requires a clean agent system. The contractor shall see FA-002 for guidance on evaluating and implementing the new desired Clean Agent System with the existing Clean Agent System located in the 2A Building.
Question 8: Specification sections 28 31 13.00 40 and 28 31 70 both Identify addressable fire alarm systems with potentially conflicting requirements. Which specification takes precedent? Please provide direction, as we are unable to provide a comprehensive bid based on the current information.
USACE Response to Q8: The Contractor shall see specification section 28 31 70 this specification shall take precedents. The Specifications have been revised to remove specification 28 31 13.00 40.
Question 9: On Drawing E101 there is a type S fixture shown but not listed on the fixture schedule. Please clarify what this fixture is.
USACE Response to Q9: Drawing sheet E-101 has been revised to show fixture S. This fixture shall be a wall mounted fixture and must be field adjusted to accommodate the existing pipes that are in the rectifier building.
Question 10: On drawing E110 on the right-hand side there are some notes and circuit numbers that are cut off on Detail D1. Please clarify what this says in its entirety.
USACE Response to Q10: Drawing sheet E-110 has been revised so that the circuit number and notes are shown clearly and not cut off.
Question 11: Please provide a spec and/or manufacturer for the electrode disconnect switch to give us an idea of what the design is based off of.
USACE Response to Q11: The contractor shall see Specification 26 05 00.00 40 Section 2.1.6 for the electrode disconnect switch information.
Question12: I am unable to get a delivery time line from the manufacturers for this solicitation until they actually take a detailed look at the drawings and work up a delivery estimate. If I had to guess I would say best to worst delivery schedule of these buildings will probably be about 12 - 15 months. That is merely speculation at this time.
Also, please remember that these timelines are current day and I don't believe anyone can predict what the future holds. Additionally, since these are special buildings the manufacturer will not produce the anchor bolt plans until the final design is approved and signed off. Without the anchor bolt plans the concrete work cannot commence, so startup for the entire project is delayed due to the steel delivery timeline. I'm hesitant to request an actual POP extension because of the factors I mentioned above. If the Corp of Engineers can devise some method of extension with a potential review of the current conditions at time of award that would be helpful for us. With something along this line of working together we would plan on bidding the project.
USACE Response to Q12: The contactor shall see specification 01 11 00 Summary of Work for guidelines on the Period of Performance.
C. AMENDED DRAWING SHEETS: The following Drawing Sheets have been revised and are hereunder enclosed replacing the previously furnished respective sheets.
- FA-02
- FA-03
- X-100
- A-601
- M-101
- M-601
D. AMENDED SPECIFICATIONS: The following Drawing Sheets have been revised and are hereunder enclosed replacing the previously furnished respective sheets.
- 01 11 00
- 28 31 70
- 28 31 13.00 40
- 21 22 00.00 40
- 26 05 00.00 40
End Of amendment 0001