CONSTRUCTION OF ENCLOSURE AT 2A RACEWAY AT THE FISH BARRIER LOCATED IN ROMEOVILLE, IL
Solicitation number
W912P621B0014
Issued by

About this file

This solicitation notice is for the construction of an enclosure at the 2A Raceway Fish Barrier located in Romeoville, Illinois. The United States Army Corps of Engineers, Chicago District will be awarding an invitation for bid contract for a small business with a magnitude of cost estimated between $1 million to $5 million. Under the contract, the contractor will be responsible for constructing enclosures over the 2A raceway and rectifiers, including grounding of bus bars, lighting, and heating. The North American Industry Classification System code is 237990 and the small business size standard is $39.5 million. Interested contractors can download the solicitation package from the provided website and must register in the System for Award Management. The response due date will be specified in the invitation for bid document. The contracting office is located at 231 South LaSalle Street, Suite 1500 in Chicago, Illinois.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the bid schedule and provide responses to contractor questions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P621B0014

X 9B. DATED (SEE ITEM 11)

18-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Sep-2021

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P621B0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

A. SOLICITATION CHANGES:

1. By this amendment the bid schedule has been changed as follows:

CLIN 0002

The CLIN description has changed from REPLACE GRAVEL WITH ASPHALT to REPAVING

CONCRETE.

B. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries.

Question 1: Plan sheets S301, S302 note that the foundations are to extend down to rock. Borings were not provided to show the rock elevation depth. Will this extended excavation and backfill be paid at unit price?

USACE Response Q1: The extended excavation and backfill will be paid at the unit price. The Contractor shall see the Boring Information attached to this document for reference. The Rock Elevation Depth obtained from the attached reference documents are listed at 5 – 28 inches.

Question 2: Since there are not any borings available, will any required rock excavation, if needed, be paid at unit price?

USACE Response Q2: Any required rock excavation for pavement installation, as mentioned on plan sheet C- 102 through C-105, will be covered by CLIN 0002 'Replace Gravel with Concrete Pavement'. Note paragraph

1.1.2.1 in Specification 01 22 00.00 10 covers payment for this item and includes 'all incidentals necessary to complete the work. Provided for Bidder reference are the attached previous site investigations, showing the approximate location of bedrock in this area.

Question 3: Who is providing the chemical testing of existing soil and certification for offsite disposal as CCDD or subtitle D?

USACE Response Q3: Any excess soil generated by construction activity will be wasted on site; no soil material will be taken offsite for disposal. The Contractor shall see the Environmental Protection Spec Section 01 57 20.01 03 Paragraph 3.5.2 entitled 'Excess Soil'. Therefore, no testing of existing soil and certification for offsite disposal as CCDD or subtitle D is required.

Question 4: There isn’t any raw cutting CLIN included in the bid schedule, will this be added or?

USACE Response Q4: See Response to Question 2.

Question 5: Do we need to provide SKIFF during the construction period for safety since the site is close to the

CANAL?

USACE Response Q5: The Contractor shall provide a SKIFF for the work conducted in the 2A Raceway Enclosure Project during the construction period. The contractor shall see Specification 01 35 26 for the Government Safety Requirements.

Question 6: Please confirm that the overhead coiling doors shall be steel in accordance with Specification section 08 33 23 – Overhead Coiling Doors NOT insulated FRP as called out on A1/A-201, E5/A-201 and C5/A-202.

USACE Response Q6: The contractor shall see drawing sheet A-601, the Overhead coiling doors shall be constructed of an insulated non-conductive material. USACE assumed FRP for this.

Question 7: Please confirm the overhead coiling doors will not be required to be non-conductive as shown on the Door Schedule on A601. (Reed) The contractor shall see drawing sheet A-601, the Overhead coiling doors shall be constructed of an insulated non-conductive material. USACE assumed FRP for this.

USACE Response Q7: Please confirm the overhead doors will be “coiling” type and NOT “sectional” as shown on Detail E8 Door Types on A601. (Reed) The contractor shall see drawing sheet A-601, the overhead doors shall be coiling type.

Question 8: Please confirm doors shall be manual operation per Specification section 08 33 23 and NOT motorized. (Reed) Per Specification 08 33 23, the doors shall be manual operation.

USACE Response Q8: Diagram A1 on Sheet A104 includes Keynote 3-9 in two (2) locations; however, 3-9 is not in the Keynote legend. Please advise on Keynote 3-9.

Keynote 3-9 shall read: “EXISTING OVERHEAD RACEWAY SHALL CONTINUE ABOVE NEW ROOF.

COORDINATE FINAL CLEARANCE CLEAR DIMENSION WITH ENGINEERING TEAM AND

CUSTOMER.” Intent of note is to call attention to the overhead raceway as it relates to the respective information on sheet A104.

Question 9: During our site walkthrough on 9/9/2021, we observed an existing grounding ground grid system installed near the 2A Raceway; the demolition, architectural, and electrical drawings do not call out what to do with the existing ground grid – please advise on how to proceed.

USACE Response Q9: The contractor shall utilize the existing grounding grid to ground the enclosure. The contractor shall see grounding plan E-125.

Question 10: Is crane access/setup allowed adjacent to the work limits along Old Romeo Road? Please advise if the USACE will permit a location for crane setup.

USACE Response Q10: Crane setup is allowed either inside the fence of in the road. However, traffic must be maintained in one lane except for short outages. Outages should not exceed 3 hours without allowing traffic to pass.

Question 11: Please advise on the current Clean Agent Suppression vendor that maintains the current buildings at this USACE location?

USACE Response Q11: The current Fire Suppression Vender is OPS. OPS shall provide maintenance information upon request.

Question 12: Please advise on the current Fire Alarm vendor that maintains the current buildings at this USACE location.

USACE Response Q12: The current Fire Alarm Vender is OPS. OPS shall provide maintenance information upon request.

Question 13: With modifications due to the existing metal building’s roofs and walls – please provide the existing roofing and wall panel manufacturer’s warranty as well as subcontractor’s warranty (if still active).

USACE Response Q13: The existing roofing and wall panel was Installed in 2005. It was a design build by Smith Root. Any Documentation would be in Federal Archives.

Question 14: Keynote 1-21 on Sheet A-102 calls out to relocate the existing security camera locations and coordinate with USACE for the new location; please provide how much distance (linear feet) we should factor in moving the existing security cameras.

USACE Response Q14: The contractor shall factor 20 linear feet per device.

Question 15: Keynote 1-5 on Sheet A-102 calls out for a new removable FRP cover over the existing raceway;

however, there is no detail of the new FRP cover. Please provide a detail section of the new FRP cover.

USACE Response Q15: An additional detail will not be required for the removable FRP covers. The contractor shall provide loose FRP panels, which rest on the existing concrete knee walls per drawing sheets A-102, A- 104, A-301 and specification 13 34 19 Metal Building Systems to cover the existing raceway. That contractor shall submit a seaming diagram to illustrate how panels are joined together to make a uniform cover.

Question 16: Keynote 4-8 on Sheet AD-101 calls for the existing gate to remain; while the existing gate is anchored on top of existing concrete barricades, please provide a detail section of the new concrete sidewalks/paving abuts the existing barriers/gates as Sheet C-102 shows the new paving along the existing barriers/gates.

USACE Response Q16: Gates should remain in place, as noted in AD-101. A clarifying note has been added to C-102, stating that the width of the new pavement in this area may be adjusted to avoid impacts to the existing gate and jersey barrier fence.

Question 17: Please advise whether the existing gates shown on Sheet C-102 are to be removed/reinstalled as they are within the new concrete paving area. (Reed/Laura)

USACE Response Q17: Gates should remain in place, as noted in AD-101. A clarifying note has been added to C-102, stating that the width of the new pavement in this area may be adjusted to avoid impacts to the existing gate and jersey barrier fence.

Question 18: Please confirm it is acceptable to use taller fences/barriers to protect against falls along the Chicago Sanitary and Ship Canal in lieu of safety boat rescue.

USACE Response Q18: USACE Response Q15: Per EM 385-1-1, work above or adjacent to water requires fall protection and a safety skiff. The existing railing provide fall protection up to 200 LB at 42 inches. Any work above ground, such that a person falling would potentially fall over the railing requires additional fall protection. That protection must be in accordance with OSHA. It may be lifeline and harness, or it could be a barrier of sufficient height and strength to prevent a worker from falling into the water.

Question 19: Bid Schedule Item No. 0002 states “Replace Gravel with Asphalt” while the plans and specifications call out concrete paving – please confirm concrete paving costs breakout are to be included in Item No. 0002.

USACE Response Q19: The Bid Schedule has been corrected to show ‘Replace Gravel with Concrete Pavement’ to match specification section 01 22 00.00 10. Concrete paving costs shall be included in item No 0002.

Question 20: The Fire alarm Specification Section and the Fire alarm drawings mention a horn/strobe fire alarm system and also a voice speaker/strobe system; please advise which is correct.

USACE Response Q20: The horn/strobe system is correct. The existing Fire alarm systems are strobe and horn only. This is intended to be a normally unoccupied building. The additional features would be excessive.

Question 21: The Fire alarm specs mention a VDU (video display unit) system for fire alarm annunciation, Fire alarm printer, as well a fire alarm graphic annunciator. Is this a misprint or are these truly required for this project? The Fire Alarm drawings do not show these items; however, specification indicate and mention them.

Please advise.

USACE Response Q21: The contractor shall connect to the existing fire alarm panel and utilize the features that the panel currently possess. Video Display Unit (VDU) is not required for the work in this contract.

Question 22: Will the railroad assign flagmen or supervisors to the project? Also, how many trains per day pass the site? These questions have been requested in order to obtain railroad protective insurance.

USACE Response Q22: The contractor shall assume a rough estimate of ten trains a day that pass the site.

Under this contract no flagmen or supervisors will be required.

C. AMENDED DRAWING SHEETS:

-C-102

End Of amendment 0002

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

%PRODUCTION DATA 2%

%PRODUCTION DATA 1%

%PRODUCTION DATA 3% %PRODUCTION DATA 4%

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R

SE

Z =586.9458

Y =1811889.7887

X =1059040.9832

Z=586.8665

Y=1811889.7520

X=1059040.8518

EXISTING:

Z=586.5140

Y=1811892.5780

X=1058996.3440

EXISTING:

Z=586.5160

Y=1811916.4155

X=1058998.1655

EXISTING:

Z=587.2445

Y=1811949.2134

X=1059043.5338

EXISTING:

Z=587.8810

Y=1811928.8150

X=1059035.8610

EXISTING:

NOTES

LEGEND

M A

T C

H L

IN

E

T O

C S

-1

A1

SCALE: 1" = 5'

SITE PLAN SHEET 1 OF 10

2A RACEWAY

2A RACEWAY

POWER QUALITY BUILDING

BE VIF. SEE NOTE 8.

EXISTING GATE, EXACT LOCATION TO

FENCE

BARRIER 2A GENERATOR

AC UNITTRANSFORMER

CONCRETE WALKWAY

CONCRETE WALKWAY

CHICAGO SANITARY AND SHIP CANAL

DOOR STOOP

SITE PAVING

WORKLIMITS

ANY REQUIRED ADJUSTMENTS WITH THE COR.

IMPACTS TO THE EXISTING JERSEY BARRIER FENCE AND GATE. COORDINATE

NEW PAVEMENT WIDTH MAY VARY IN THIS AREA AS REQUIRED TO AVOID ANY 8.

ROADWAY AND EXISTING BUILDINGS ONLY.

THICK CONCRETE PAVEMENT IS PERMITTED FOR SIDEWALK BETWEEN THE

TO AVOID CONFLICTS WITH EXISTING BUILDING SLABS AND ENTRANCES, 5" 7.

6. REFER TO STRUCTURAL SHEETS FOR DETAILS OF STOOP CONSTRUCTION.\

WHERE PAVEMENT WILL ABUT THE NEW STRUCTURE.

REFER TO STRUCTURAL AND ARCHITECTURAL DETAILS FOR LOCATIONS

WEST, FOLLOWING FLOW ARROWS AND PAVEMENT ELEVATIONS SHOWN.

5. IN GENERAL, PAVEMENT IN THIS AREA SHOULD SLOPE AT 1% FROM EAST TO

MEANS NECESSARY TO MEET THE REQUIREMENTS.

REQUIRED DENSITY PRIOR TO PLACING ANY PAVEMENT BY ANY COMPACTION

CONTRACTORS RESPONSIBILITY TO COMPACT THE SUBGRADE TO THE

TO THE STANDARDS DEFINED IN THE SPECIFICATION. IT IS THE

4. IT IS ASSUMED THE EXISTING SUBGRADE IS CAPABLE OF BEING COMPACTED

DRILLING/ROCK EXCAVATION MAY BE NECESSARY. 3.

C-101. COORDINATE WITH COR FOR EXACT LOCATION.

SPOILS TO BE RELOCATED TO ON-SITE STOCKPILE LOCATION AS SHOWN ON

USE EXISTING GRAVEL TO BE REMOVED AS BACKFILL IF REQUIRED. ANY 2.

AND HANDHOLES SHALL BE BROUGHT FLUSH WITH TOP OF PAVEMENT.

ALL EXISTING UNDERGROUND UTILITY OR GROUNDING ACCESS MANHOLES 1.

EXISTING, MATCH EXISTING HAND HOLES

SLOPE UP 1% (MIN.) FROM

EXISTING STORM MANHOLE

KEYMAP

TRUE N

T/P 586.5

T/P 586.5

T/P 586.9

T/P 586.9

TRUE N

T/P 587.2

SLOPE DOWN FROM BUILDING AT 1%

2.5' X 7' CONCRETE STOOP

2.5' X 4.5' CONCRETE STOOP

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R

C-102

A N

S I

D

P R

O J E

C T

I D

F

IL

E N

A M

E

R A

N A

M

IS

H R

A

P .E

L V

A N

D E

N B

E R

G P

.E

W

IL

L C

O U

N T

Y

IL

L

IN

O

IS

A

R A

C E

W A

Y E

N C

L O

S U

R E

F

IS

H D

IS

P

E R

S A

L B

A R

R

IE

R

C H

IC

A

G O

IL

L

IN

O

IS

S

L

A S

A L

L E

S T

S

U

IT

E

C H

IC

A

G O

D

IS

T R

IC

T

H

E E

T

O F

S

IT

E P

L A

N

A D

A M

K A

R R

L V

A N

D E

N B

E R

G P

.E

C

-1 .d g n

-6 K

G J

CERTIFIED FINAL DOCUMENTS - RTA

W

P

-2

-B

-0

J U

L Y

W

P

-2

-C -X

X X

X

A

M E

N D

M E

N T

S E

P T

R O

M E

O V

IL

L

E R

O A

D

File details come from the government source that posted it. Updated .