W912P621B0007 Amd 0001 Flossmoor Sewer Improvements.pdf

PDF 317 KB Posted

Attached to
Village of Flossmoor Storm Sewer Improvements, Flossmoor, Illinois, USACE-Chicago District Project
Solicitation number
W912P621B0007
Issued by

About this file

This document provides details of an invitation for bid issued by the United States Army Corps of Engineers Chicago District for the Village of Flossmoor Storm Sewer Improvements project. The project involves construction of new storm sewer trunk lines within roadway rights-of-way totaling approximately 735 lineal feet of 48-inch diameter pipe, 1,368 lineal feet of 54-inch diameter pipe, and 588 lineal feet of 60-inch diameter pipe. The work also includes associated pavement, sidewalk, driveway and parkway restoration. Competition for this acquisition is restricted to small business concerns with a NAICS code of 237110 and size standard of $39.5 million. The estimated cost of construction is between $1 million and $5 million. The solicitation is available only via download from the website. Questions are due by the date specified in the IFB. Bids are due at the time and date specified in the IFB.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amenmnent is to make bid schedule changes and address contractor questions.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P621B0007

X 9B. DATED (SEE ITEM 11)

25-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Sep-2021

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P621B0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

A. SOLICITATION CHANGES:

1. By this amendment Wage Rates have been updated to IL20210009 dated 09/03/2021.

2. The Bid schedule has been revised; bidders should utilize the revised bid schedule attached to this amendment.

3. The ability to enter technical inquiries and questions relating to bid procedures or bonds will not be accepted after 10 calendar days prior to the bid submittal deadline. Government responses will be provided on or before 5 calendar days prior to the bid submittal deadline.

B. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries.

Question 1: please clarify the project signage—is it to be a stand up 90 degree sign with posts OR the 45 degree angle signs on posts closer to the ground?

USACE Response Q1: Bidders should refer to sign specification 01 58 00, which includes drawings that indicate how to construct the sign, Paragraph 2.3e which states:

“If the vertical supports system does not rigidly support the sign due to local soil conditions or wind loading, provide additional bracing of the sign supports. Additional bracing must be composed of two inch by four inch bracing bolted to the inside face of each four inch by four inch support post and firmly anchored to the ground behind the sign. Additional bracing is not required to be preservative treated lumber.”

Question 2: The project has (1) base bid and (5) options. If the options are accepted, will there be additional durations for the options?

USACE Response Q2: Bidders should refer to section 00 70 00 Clause 52.217-7, which states:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor via a formal modification to the contract and in the following manners.

a. Group 1 Option Items (0002AA-0002AS): At the discretion of the government, any, all or none of the options within this group may be awarded. Any resulting award may be exercised at the time of contract award or within 180 calendar days following the Contractor’s acknowledgment of the Notice to Proceed. If this option item is awarded, no additional time will be added to the contract. Options awarded via a contract modification will require additional bonding (see provision at Solicitation Section 00 70 00, Federal Acquisition Regulation Clause No.

52.228-15 DEV).

b. Group 2 Option Items (0003AA-0003AU): At the discretion of the government, any, all or none of the options within this group may be awarded. Any resulting award may be exercised at the time of contract award or within 180 calendar days following the Contractor’s acknowledgment of the Notice to Proceed. If this option item is awarded, no additional time will be added to the contract. Options awarded via a contract modification will require additional bonding (see provision at Solicitation Section 00 70 00, Federal Acquisition Regulation Clause No.

52.228-15 DEV).

W912P621B0007

c. Group 3 Option Items (0004AA-0004AS): At the discretion of the government, any, all or none of the options within this group may be awarded. Any resulting award may be exercised at the time of contract award or within 180 calendar days following the Contractor’s acknowledgment of the Notice to Proceed. If this option item is awarded, no additional time will be added to the contract. Options awarded via a contract modification will require additional bonding (see provision at Solicitation Section 00 70 00, Federal Acquisition Regulation Clause No.

52.228-15 DEV).

d. Group 4 Option Items (0005AA-0005BU): At the discretion of the government, any, all or none of the options within this group may be awarded. Any resulting award may be exercised at the time of contract award or within 180 calendar days following the Contractor’s acknowledgment of the Notice to Proceed. If this option item is awarded, no additional time will be added to the contract. Options awarded via a contract modification will require additional bonding (see provision at Solicitation Section 00 70 00, Federal Acquisition Regulation Clause No.

52.228-15 DEV).

e. Group 5 Option Items (0006AA-0006AN): At the discretion of the government, any, all or none of the options within this group may be awarded. Any resulting award may be exercised at the time of contract award or within 180 calendar days following the Contractor’s acknowledgment of the Notice to Proceed. If this option item is awarded, no additional time will be added to the contract. Options awarded via a contract modification will require additional bonding (see provision at Solicitation Section 00 70 00, Federal Acquisition Regulation Clause No.

52.228-15 DEV).

Question 3: Please advise if the pre-bid attendee list will be posted?

USACE Response Q3: The pre-bid attendee list will not be posted; however, all contractor inquires and USACE responses will be published via amendment.

End Of amendment 0001. Revised Bid Schedule and Wage Rates follow amendment.

Revised Bid Schedule for IFB W912P621B0007

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

BASE WORK (ST-MH-305-2 to ST-MH-304-2)

FFP

This is a parent Contract Line Item, linking its Sub-Items 0001AA through 0001AW. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0001AA through 0001AW, wherein the sub-line items themselves identify the quantities required to perform said work.

NET AMT

0001AA 1 Job

TRAFFIC CONTROL AND PROTECTION

FFP

FOB: Destination

PSC CD: Z2ND

0001AB 7 Each

INLET PROTECTION FILTER

FFP

0001AC 2,183 Square

Yard

HMA SURFACE REMOVAL, 2"

FFP

0001AD 724 Square

Foot

CONCRETE SIDEWALK REMOVAL

0001AE 126 Linear

CONCRETE CURB AND GUTTER REMOVAL

0001AF 10 Each

DRAINAGE & UTILITY STRUCTURES TO BE ADJU

FFP

0001AG 1 Each

MANHOLES, TYPE A, 7'-DIAMETER, TYPE 1 FRAME, CLOSED LID

0001AH 3 Each

MANHOLES, TYPE A, 8'-DIAMETER, TYPE 1 FRAME, CLOSED LID

0001AJ 8 Linear

STORM SEWERS, CLASS A, TYPE III 42" (RCP)

0001AK 79 Linear

STORM SEWERS, CLASS A, TYPE III 54" (RCP)

0001AL 500 Linear

STORM SEWERS, CLASS A, TYPE III 60"(RCP)

0001AM 8 Each

SANITARY SERVICE REPLACEMENT

FFP

0001AN 126 Linear

CONCRETE CURB AND GUTTER REPLACEMENT, B-6.12

0001AP 758 Square

CONCRETE SIDEWALK REPLACEMENT

0001AQ 70 Square

DETECTABLE WARNING

0001AR 112 Square

PROTECTIVE COAT

0001AS 1,591 Square

HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 (IL 9.5 mm) - 2-1/4"

0001AT 602 Square

TRENCH PAVING, 4"

0001AU 7 Square

PARKWAY RESTORATION

0001AV 1 Each

RELOCATE SIGN PANEL ASSEMBLY - TYPE A

FFP

0001AW 1 Lot

PERFORMANCE & PAYMENT BONDS

FFP

This item is for bond coverage, which is applicable to line Bond LINE ITEMS

0001AA THROUGH 0001AV.

Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).

Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV) , Performance and Payment Bonds- Construction).

OPTION OPTION #1 BID ITEMS

FFP

OPTION #1 BID ITEMS (ST-MH-304-2 to ST-MH-304-1) This is a parent Contract Line Item, linking its Sub-Items 0002AA through 0002AS. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0002AA through 0002AS, wherein the sub-line

0002AA 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

FFP

0002AB 3 Each

OPTION INLET PROTECTION FILTER

FFP

0002AC 1 Each

OPTION TREE REMOVAL

FFP

0002AD 1,145 Square

OPTION HMA SURFACE REMOVAL, 2"

0002AE 116 Square

OPTION CONCRETE SIDEWALK REMOVAL

0002AF 47 Linear

OPTION CONCRETE CURB AND GUTTER REMOVAL

0002AG 2 Each

OPTION

FFP

DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED

0002AH 1 Each

OPTION

FFP

MANHOLES, TYPE A, 9'-DIAMETER, TYPE 1 FRAME, CLOSED LID

0002AJ 337 Linear

OPTION

STORM SEWERS, CLASS A, TYPE III 54" (RCP)

0002AK 4 Each

OPTION SANITARY SERVICE REPLACEMENT

FFP

0002AL 50 Linear

CONCRETE CURB AND GUTTER REPLACEMENT, B-6.12

0002AM 212 Square

OPTION CONCRETE SIDEWALK REPLACEMENT

0002AN 20 Square

OPTION DETECTABLE WARNING

0002AP 35 Square

OPTION PROTECTIVE COAT

0002AQ 827 Square

HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 (IL 9.5 mm) - 2-1/4"

0002AR 322 Square

OPTION TRENCH PAVING, 4"

0002AS 1 Lot

OPTION PERFORMANCE & PAYMENT BONDS

FFP

This item is for bond coverage, which is applicable to line Bond LINE ITEMS

0002AA THROUGH 0002AR.

Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).

Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV), Performance and Payment Bonds- Construction).

OPTION OPTION #2 BID ITEMS

FFP

OPTION #2 BID ITEMS - (ST-MH-304-1 to ST-MH-303-1) This is a parent Contract Line Item, linking its Sub-Items 0003AA through 0003AU. The actual work to be performed is described under the rementioned Sub- Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0003AA through 0003AU, wherein the sub-line items themselves identify the quantities required to perform said work.

0003AA 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

FFP

0003AB 2 Each

OPTION TREE REMOVAL

FFP

0003AC 825 Square

0003AD 50 Square

OPTION HOT-MIX ASPHALT DRIVEWAY REMOVAL

0003AE 575 Square

0003AF 149 Linear

0003AG 2 Each

OPTION

FFP

DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED

0003AH 1 Each

OPTION

FFP

MANHOLES, TYPE A, 9'-DIAMETER, TYPE 1 FRAME, CLOSED LID

0003AJ 148 Linear

OPTION STORM SEWERS, CLASS A, TYPE III 54" (RCP

0003AK 1 Each

OPTION SANITARY SERVICE REPLACEMENT

FFP

0003AL 149 Linear

CONCRETE CURB AND GUTTER REPLACEMENT, B-6.12

0003AM 616 Square

0003AN 10 Square

0003AP 102 Square

0003AQ 48 Square

OPTION HOT-MIX ASPHALT DRIVEWAY REPLACEMENT

0003AR 777 Square

HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 (IL 9.5 mm) - 2-1/4"

0003AS 54 Square

0003AT 67 Square

OPTION PARKWAY RESTORATION

0003AU 1 Lot

OPTION PERFORMANCE & PAYMENT BONDS

FFP

This item is for bond coverage, which is applicable to line Bond LINE ITEMS

0003AA THROUGH 0003AT.

Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).

Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV) , Performance and Payment Bonds- Construction).

OPTION OPTION #3 BID ITEMS

FFP

OPTION #3 BID ITEMS - (ST-MH-303-1 to ST-MH-300-2) "BOB'O'LINK

ROAD"

This is a parent Contract Line Item, linking its Sub-Items 0004AA through 0004AS. The actual work to be performed is described under the rementioned Sub- Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0004AA through 0004AS, wherein the sub-line items

0004AA 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

FFP

0004AB 2 Each

OPTION INLET PROTECTION FILTER

FFP

0004AC 1,409 Square

0004AD 559 Square

0004AE 93 Linear

0004AF 3 Each

OPTION

FFP

DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED

0004AG 1 Each

OPTION

FFP

MANHOLES, TYPE A, 9'-DIAMETER, TYPE 1 FRAME, CLOSED LID

0004AH 343 Linear

OPTION STORM SEWERS, CLASS A, TYPE III 54" (RCP

0004AJ 4 Each

OPTION SANITARY SERVICE REPLACEMENT

FFP

0004AK 93 Linear

CONCRETE CURB AND GUTTER REPLACEMENT, B-6.12

0004AL 520 Square

0004AM 68 Square

0004AN 79 Square

0004AP 1,074 Square

HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 (IL 9.5 mm) - 2-1/4"

0004AQ 342 Square

0004AR 2 Square

OPTION PARKWAY RESTORATION

0004AS 1 Lot

OPTION PERFORMANCE & PAYMENT BONDS

FFP

This item is for bond coverage, which is applicable to line Bond LINE ITEMS

0004AA THROUGH 0004AR.

Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).

Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV) , Performance and Payment Bonds- Construction).

OPTION OPTION #4 BID ITEMS

FFP

OPTION #4 BID ITEMS - (ST-MH-300-2 to ST-MH-302-1) PERMEABLE

PAVER WORK

This is a parent Contract Line Item, linking its Sub-Items 0005AA through 0005BU. The actual work to be performed is described under the rementioned Sub- Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0005AA through 0005BU, wherein the sub-line items

0005AA 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

0005AB 2,422 Linear

SEWER CONDITION EVALUATION, PRIOR TO CONSTRUCTION

0005AC 17 Each

OPTION INLET PROTECTION FILTER

FFP

0005AD 1,997 Square

OPTION HMA SURFACE REMOVAL, 4"

0005AE 217 Square

OPTION HMA SURFACE REMOVAL, 6-1/2"

0005AF 954 Square

OPTION HMA SURFACE REMOVAL, 7-1/2"

0005AG 223 Square

OPTION HOT-MIX ASPHALT DRIVEWAY REMOVAL

0005AH 297 Square

OPTION CONCRETE DRIVEWAY REMOVAL

0005AJ 2,432 Linear

0005AK 6 Each

OPTION

FFP

DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED

0005AL 788 Square

0005AM 15 Each

OPTION STRUCTURE REMOVAL, STORM

FFP

0005AN 57 Linear

OPTION STORM SEWER PIPE REMOVAL, 8"

0005AP 167 Linear

OPTION STORM SEWER PIPE REMOVAL, 10"

0005AQ 79 Linear

OPTION STORM SEWER PIPE REMOVAL, 12"

0005AR 371 Linear

OPTION STORM SEWER PIPE REMOVAL, 18"

0005AS 4 Each

OPTION

FFP

MANHOLES, TYPE A, 6'-DIAMETER, TYPE 1 FRAME, CLOSED LID

0005AT 1 Each

OPTION

FFP

MANHOLES, TYPE A, 7'-DIAMETER, TYPE 1 FRAME, CLOSED LID

0005AU 9 Each

OPTION

FFP

CATCH BASIN, TYPE A, 4' DIAMETER, HIGH CAPACITY

0005AV 4 Each

OPTION INLET, TYPE A

FFP

0005AW 216 Linear

OPTION STORM SEWERS, CLASS A, TYPE III 12" (RCP

0005AX 902 Linear

STORM SEWERS, CLASS A, TYPE III 48" (RCP)

0005AY 365 Linear

STORM SEWERS, CLASS A, TYPE III 54" (RCP)

0005AZ 9 Each

OPTION SANITARY SERVICE REPLACEMENT

FFP

0005BA 459 Linear

OPTION PIPE UNDERDRAINS, 6" (PVC)

0005BB 11 Each

OPTION UNDERDRAIN CLEANOUT

FFP

0005BC 282 Linear

OPTION SANITARY SEWER SPOT REPAIR

0005BD 2,198 Linear

CONCRETE CURB AND GUTTER REPLACEMENT, B-6.12 (REVERSE

PITCH)

0005BE 184 Linear

CONCRETE CURB AND GUTTER REPLACEMENT, B-6.12

0005BF 912 Square

0005BG 94 Square

0005BH 632 Square

0005BJ 223 Square

OPTION HOT-MIX ASPHALT DRIVEWAY REPLACEMENT

0005BK 297 Square

OPTION CONCRETE DRIVEWAY REPLACEMENT

0005BL 3,862 Square

GEOTECHNICAL FABRIC FOR GROUND STABILIZATION

0005BM 133 Net Ton

(2,000

LB).

OPTION BEDDING COURSE - 1-1/2" (CA-16)

0005BN 666 Net Ton

OPTION AGGREGATE BASE COURSE - 7.5" (CA-7)

0005BP 844 Net Ton

OPTION AGGREGATE SUB-BASE COURSE - 9.5" (CA-1)

0005BQ 28,800 Square

OPTION PERMEABLE INTERLOCKING CONCRETE PAVERS

0005BR 666 Square

0005BS 2 Each

OPTION

FFP

MWRD GREEN INFRASTRUCTURE EDUCATIONAL SIGN

0005BT 2 Each

OPTION SIGNAGE FOR PERMEABLE PAVEMENT AREA

FFP

0005BU 1 Lot

PERFORMANCE & PAYMENT BONDS

FFP

This item is for bond coverage, which is applicable to line Bond LINE ITEMS

0005AA THROUGH 0005BT.

Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).

Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV) , Performance and Payment Bonds- Construction).

OPTION OPTION #5 Bid Items

FFP

OPTION #5 Bid Items - 8" WATER MAIN WORK This is a parent Contract Line Item, linking its Sub-Items 0006AA through 0006AN. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0006AA through 0006AN, wherein the sub-line

0006AA 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

FFP

0006AB 1,483 Linear

OPTION DUCTILE IRON WATER MAIN 8"

0006AC 110 Linear

OPTION CASING PIPE

0006AD 10 Each

OPTION WATER SERVICE RECONNECTION

FFP

0006AE 2 Each

OPTION

FFP

CONNECT TO WATER MAIN (NON-PRESSURE), 6-INCH

0006AF 3 Each

OPTION

FFP

CONNECT TO WATER MAIN (NON-PRESSURE), 8-INCH

0006AG 4 Each

OPTION VALVE AND BOX, 8-INCH

FFP

0006AH 23 Each

OPTION WATER SERVICE B-BOX

FFP

0006AJ 3 Each

OPTION FIRE HYDRANT REMOVAL

FFP

0006AK 2 Each

OPTION REMOVE EXISTING VALVE AND BOX

FFP

0006AL 3 Each

OPTION FIRE HYDRANT

FFP

0006AM 23 Linear

30" STORM SEWER WITH WATER MAIN QUALITY PIPE

0006AN 1 Lot OPTION PERFORMANCE & PAYMENT Bonds

FFP

This item is for bond coverage, which is applicable to line Bond LINE ITEMS

0006AA THROUGH 0006AN.

Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).

Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15 (DEV) , Performance and Payment Bonds- Construction).

BID PRICING

TOTAL AMOUNT FOR BASE BID ITEMS (ITEMS 0001AA THROUGH 0001AW):

TOTAL AMOUNT FOR GROUP 1 OPTION ITEMS (ITEMS 0002AA THROUGH 0002AS):

TOTAL AMOUNT FOR GROUP 2 OPTION ITEMS (ITEMS 0003AA THROUGH 0003AU):

TOTAL AMOUNT FOR GROUP 3 OPTION ITEMS (ITEMS 0004AA THROUGH 0004AS):

TOTAL AMOUNT FOR GROUP 4 OPTION ITEMS (ITEMS 0005AA THROUGH 0005BU):

TOTAL AMOUNT FOR GROUP 4 OPTION ITEMS (ITEMS 0006AA THROUGH 0005AN):

OVERALL TOTAL BID PRICE.

"General Decision Number: IL20210009 09/03/2021

Superseded General Decision Number: IL20200009

State: Illinois

Construction Types: Building, Heavy, Highway and Residential

County: Cook County in Illinois.

BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above‐mentioned types of contracts entered into by the federal government that are subject to the Davis‐Bacon Act itself, but it does not apply to contracts subject only to the Davis‐Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)‐(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 02/19/2021 3 04/23/2021 4 06/04/2021 5 06/11/2021 6 06/25/2021 7 07/02/2021 8 07/30/2021

9 08/13/2021 10 09/03/2021

ASBE0017‐001 06/01/2021

Rates Fringes

ASBESTOS WORKER/INSULATOR

Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 51.80 30.60 Fire Stop Technician.............$ 41.44 27.85

HAZARDOUS MATERIAL HANDLER

includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 38.85 27.85

BOIL0001‐001 05/01/2017

Rates Fringes

BOILERMAKER......................$ 46.18 29.58

BRIL0021‐001 06/01/2016

Rates Fringes

BRICKLAYER.......................$ 44.88 26.62

BRIL0021‐004 06/01/2017

Rates Fringes

Marble Mason.....................$ 44.63 26.83

BRIL0021‐006 06/01/2017

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 44.38 25.84

TILE FINISHER....................$ 38.56 22.10

TILE SETTER......................$ 45.49 25.72

BRIL0021‐009 06/01/2017

Rates Fringes

MARBLE FINISHER..................$ 33.95 26.03

BRIL0021‐012 06/01/2017

Rates Fringes

Pointer, cleaner and caulker.....$ 45.42 24.06

CARP0555‐001 06/01/2021

BUILDING, HEAVY, AND HIGHWAY

Rates Fringes

CARPENTER

Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer Building...................$ 50.86 37.34 Heavy & Highway............$ 50.86 37.34

CARP0555‐002 10/01/2020

RESIDENTIAL CONSTRUCTION

Rates Fringes

CARPENTER........................$ 41.11 32.93

ELEC0009‐003 05/30/2021

Rates Fringes

Line Construction Groundman...................$ 44.11 62.32% Lineman and Equipment Operator....................$ 56.55 62.32%

ELEC0134‐001 06/07/2021

Rates Fringes

ELECTRICIAN......................$ 51.00 37.39

ELEC0134‐003 06/07/2021

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 46.26 28.23

The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.

ELEV0002‐001 01/01/2021

Rates Fringes

ELEVATOR MECHANIC................$ 60.42 35.825+a+b

FOOTNOTES:

a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.

b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service

* ENGI0150‐006 06/01/2020

Building and Residential Construction

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 52.10 42.90

GROUP 2....................$ 50.80 42.90

GROUP 3....................$ 48.25 42.90

GROUP 4....................$ 46.50 42.90

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;

Autograde*; Backhoes with Caisson attachment*:Batch Plant*;

Benoto(Requires two Engineers); Boiler and Throttle Valve;

Caisson Rigs*; Central Redi‐Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;

Concrete Breaker (Truck Mounted)*; Concrete Conveyor;

Concrete Conveyor, Truck Mounted; Concrete Paver over 27E

cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;

Cranes, (GCI and similar type Requires two operators only);

Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;

Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre‐ Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes‐Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36"" and Over)*; Roto Mill Grinder (Less Than 36"")*; Scoops‐Tractor Drawn; Slip‐Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.

GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over);

Conveyor, Portable; Forklift Trucks; Greaser Engineer;

Highlift Shovels or Front End loaders under 2 1/4 cu yd;

Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;

Rock Drill (Self‐Propelled); Rock Drill (Truck Mounted)*;

Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour);

Winch Trucks with ""A"" Frame.

GROUP 3: Air Compressor‐Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor‐Large over 250;

Combination‐Small Equipment Operator; Generator‐ Small 50 kw and under; Generator‐Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or

Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3"" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;

Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)

GROUP 4 ‐ Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers

*‐Requires Oiler

* ENGI0150‐025 06/01/2020

Heavy and Highway Construction

Rates Fringes

OPERATOR: Power Equipment

GROUP 1.....................$ 50.30 42.90

GROUP 2.....................$ 49.75 42.90

GROUP 3.....................$ 47.70 42.90

GROUP 4.....................$ 46.30 42.90

GROUP 5.....................$ 45.10 42.90

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;

Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;

Caisson Rigs*Car Dumper, Central Redi‐Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);

Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre‐Stress Machine;

Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill‐ Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36"" and over)*; Slip‐Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*

GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;

Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine;

Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);

Drills (all); Finishing Machine‐Concrete; Greaser Engineer;

Highlift Shovels or Front End Loader; Hoist‐ Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;

Hydro‐Blaster (requires two operators); Laser Screed*;

Locomotives, Dinky; Off‐Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes‐Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self‐Propelled; Scoops‐Tractor Drawn; Self‐ propelled Compactor; Spreader‐Chip‐Stone;

Scraper; Scraper‐Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats

GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post‐hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A‐Frame; Work Boats; Tamper‐Form motor driven

GROUP 4: Air compressor ‐ Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor ‐ Large over 250;

Combination ‐ Small Equipment Operator; Directional Boring

Machine; Generators ‐ Small 50 kw and under; Generators ‐ Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;

GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring

*Requires Oiler

IRON0001‐026 06/01/2020

Rates Fringes

IRONWORKER

Sheeter.....................$ 52.76 40.48 Structural and Reinforcing..$ 52.51 40.48

IRON0063‐001 06/01/2021

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 52.13 39.47

IRON0063‐002 06/01/2020

Rates Fringes

IRONWORKER

Fence Erector...............$ 44.42 29.73

IRON0136‐001 07/01/2020

Rates Fringes

IRONWORKER

Machinery Movers; Riggers;

Macinery Erectors...........$ 44.00 37.24 Master Riggers..............$ 46.50 37.24

LABO0002‐006 06/01/2018

Rates Fringes

LABORER (BUILDING &

RESIDENTIAL)

GROUP 1....................$ 42.72 28.19

GROUP 2....................$ 42.72 28.19

GROUP 3....................$ 42.80 28.19

GROUP 4....................$ 42.82 28.19

GROUP 5....................$ 42.87 28.19

GROUP 6....................$ 42.92 28.19

GROUP 7....................$ 42.95 28.19

GROUP 8....................$ 43.05 28.19

GROUP 9....................$ 43.07 28.19

GROUP 10....................$ 43.17 28.19

GROUP 11....................$ 43.00 28.19

GROUP 12....................$ 43.72 28.19

LABORER CLASSIFICATIONS

GROUP 1: Building Laborers; Plasterer Tenders; Pumps for Dewatering; and other unclassified laborers.

GROUP 2: Fireproofing and Fire Shop laborers.

GROUP 3: Cement Gun.

GROUP 4: Chimney over 40 ft.; Scaffold Laborers.

GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.

GROUP 6: Stone Derrickmen & Handlers.

GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.

GROUP 8: Firebrick & Boiler Laborers.

GROUP 9: Chimney on fire brick; Caisson diggers; & Well Point System men.

GROUP 10: Boiler Setter Plastic Laborers.

GROUP 11: Jackhammermen on fire brick work only.

GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous Waste Removal Laborers.

LABO0002‐007 06/01/2018

LABORER (HEAVY & HIGHWAY)

GROUP 1.....................$ 42.72 28.19

GROUP 2.....................$ 42.80 28.19

GROUP 3.....................$ 42.87 28.19

GROUP 4.....................$ 43.00 28.19

GROUP 5.....................$ 42.72 28.19

LABORER CLASSIFICATIONS

GROUP 1: Common laborer; Tenders; Material expeditor (asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned

GROUP 2: Asphalt tampers & smoothers; Cement gun laborers

GROUP 3: Cement Gun Nozzle (laborers), Gunite

GROUP 4: Rakers, Lutemen; Machine‐Screwmen; Kettlemen;

Mixermen; Drun‐men; Jackhammermen (asphalt); Paintmen;

Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);

Power drive concrete saws; other power tools.

GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure

LABO0002‐008 06/01/2018

Rates Fringes

LABORER (Compressed Air)

0 ‐ 15 POUNDS...............$ 43.72 28.19

16 ‐ 20 POUNDS..............$ 44.22 28.19

21 ‐ 26 POUNDS..............$ 44.72 28.19

27 ‐ 33 POUNDS..............$ 45.72 28.19

34 ‐ AND OVER...............$ 46.72 28.19

LABORER (Tunnel and Sewer)

GROUP 1.....................$ 42.72 28.19

GROUP 2.....................$ 42.85 28.19

GROUP 3.....................$ 42.95 28.19

GROUP 4.....................$ 43.07 28.19

GROUP 5.....................$ 42.72 28.19

LABORER CLASSIFICATIONS (TUNNEL)

GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers

GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher

GROUP 3: Concrete repairmen; Lock tenders (pressure side);

Mortar men; Muckers; Grout machine operators; Track layers

GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;

Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;

Liner plate and ring setters; Shield drivers; Power knife operator; Welder‐ burners; Pipe jacking machine operator;

skinners; Maintenance technician

GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure

LABORER CLASSIFICATIONS (SEWER)

GROUP 1: Signalmen; Top laborers and All other laborers

GROUP 2: Concrete laborers and Steel setters

GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;

Mortar men; Scaffold men; Second Bottom men

GROUP 4: Air trac drill operator; Bottom men;

Bracers‐bracing; Bricklayer tenders; Catch basin diggers;

Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;

Pipelayers; Rodders; Welder‐burners; Well point systems men

GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure

LABO0225‐001 06/01/2018

Rates Fringes

LABORER (DEMOLITION/WRECKING)

GROUP 1.....................$ 37.52 28.19

GROUP 2.....................$ 42.72 28.19

GROUP 3.....................$ 42.72 28.19

LABORER CLASSIFICATIONS

GROUP 1 ‐ Complete Demolition

GROUP 2 ‐ Interior Wrecking and Strip Out Work

GROUP 3 ‐ Asbestos Work with Complete Demolition/Wrecking or Strip Out Work

PAIN0014‐001 06/01/2020

Rates Fringes

PAINTER (including taper)........$ 48.30 28.72

PAIN0027‐001 06/01/2021

Rates Fringes

GLAZIER..........................$ 47.73 39.84

PLAS0005‐002 07/01/2015

Rates Fringes

PLASTERER........................$ 42.25 26.65

PLAS0502‐001 06/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 45.25 33.48

PLUM0130‐001 06/01/2021

Rates Fringes

PLUMBER..........................$ 52.80 34.67

PLUM0597‐002 06/01/2021

Rates Fringes

PIPEFITTER.......................$ 52.00 36.37

ROOF0011‐001 12/01/2020

Rates Fringes

ROOFER...........................$ 45.75 25.75

SFIL0281‐001 07/01/2021

SPRINKLER FITTER.................$ 51.75 32.65

* SHEE0073‐001 06/01/2021

Rates Fringes

Sheet Metal Worker...............$ 47.50 41.67

SHEE0073‐002 06/08/2018

Rates Fringes

Sheet Metal Worker

ALUMINUM GUTTER WORK........$ 31.32 37.02

TEAM0731‐001 06/01/2017

COOK COUNTY ‐ HEAVY AND HIGHWAY

Rates Fringes

TRUCK DRIVER

2 or 3 Axles................$ 35.60 22.10 4 Axles.....................$ 35.85 22.10 5 Axles.....................$ 36.05 22.10 6 Axles.....................$ 36.25 22.10

FOOTNOTES:

A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years ‐ 2 weeks paid vacation; 10 years ‐ 3 weeks paid vacation; 20 years ‐ 4 weeks paid vacation.

C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

TEAM0731‐002 04/01/2021

Traffic Control Device Monitor

TRAFFIC SAFETY WORKER:

Primary duties include but are not limited to the delivery, maintenance and pick‐up of traffic control devices, the set‐up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow boards, message signs, barricade and sign fabrication equipment.......$ 38.50 18.70

TEAM0786‐001 06/01/2017

COOK COUNTY ‐ BUILDING AND RESIDENTIAL

Rates Fringes

TRUCK DRIVER

2 & 3 Axles.................$ 39.942 0.25+a 4 Axles.....................$ 39.75 0.25+a 5 Axles.....................$ 39.967 0.25+a 6 Axles.....................$ 40.184 0.25+a

FOOTNOTES:

a. $719.00 per week.

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years ‐ 2 weeks paid vacation; 10 years ‐ 3 weeks paid vacation; 20 years ‐ 4 weeks paid vacation.

WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health‐related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health‐related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SULA2012‐007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG‐OH‐0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis‐Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"