This solicitation package seeks bids for the Village of Matteson Sanitary Sewer Improvements project located in Matteson, Illinois. The U.S. Army Corps of Engineers Chicago District will replace approximately 1,500 feet of 10-inch diameter sanitary sewer to upgrade deteriorating infrastructure from Lincoln Highway to Homeland Road. Small businesses have until September 24, 2020 to submit bids in response to solicitation number W912P620B0024 for the construction work estimated between $500,000 and $1 million. Bidders must be registered in the System for Award Management at the time of bid submission and include the solicitation number on all correspondence. The acquisition will be set aside for small businesses under NAICS code 237110.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to make changes to the Bid Schedule.
THE SPECIFICS OF THIS AMENMENT FOLLOW ON THE NEXT PAGES -
1. CONTRACT ID CODE PAGE OF PAGES
1 28
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P620B0024
X 9B. DATED (SEE ITEM 11)
25-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Sep-2020
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P620B0024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. AMENDED SECTION 00 10 00 (BID SCHEDULE):
The government is providing a revised bid schedule (Section 00 10 00 – Solicitation Contract Form), which details the following changes:
Unit of issue has changed for the following SUBCLINS 0001BX, and, 0002AM.
Quantities have changed for the following SUBCLINS 0001AV, 0001AY.
Therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule.
B. BID SUBMISSION DATE:
The bid submission date remains unchanged therefore, the bid opening will commence at 4:00 P.M. CST on 24 September 24, 2020. Bidders who intend on emailing their bids should allow themselves sufficient time for emails to flow thru the governments server and be received prior to bid opening deadline.
END OF AMENDMENT
(Revised Bid Schedule follows)
REVISED BID SCHEDULE
REVISED BID SCHEDULE VIA AMENDMENT NO. 0002
- BIDDERS SHALL USE THE BELOW REVISED BID SCHEDULE TO FURNISH THEIR BIDS
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Base Work
FFP
This is a parent Contract Line Item, linking its Sub-Items 0001AA through 0001CE. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0001AA through 0001CE, wherein the sub-line items themselves identify the quantities required to perform said work.
NET AMT
0001AA 1 Job Mobilization
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AB 1 Job Demobilization
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0001AC 1 Job Traffic Control
FFP
0001AD 8 Each Inlet Filter
0001AE 1 Each Tree Protection
0001AF 1 Each Tree Root Pruning
0001AG 300 Linear
Foot
Perimeter Erosion Barrier
0001AH 25 Linear
Steel Casings, 20 Inch
FOB: Destination
0001AJ 2 Each Removing and Resetting Street Signs
0001AK 750 Square
Yard
Pavement Removal
0001AL 200 Linear
Combination Curb And Gutter Removal
0001AM 40 Square
Driveway Pavement Removal
0001AN 950 Square
Sidewalk Removal
0001AP 2 Each Fire Hydrants To Be Removed
0001AQ 1 Each Water Valve Boxes to Be Abandoned
0001AR 1 Each Water Main To Be Abandoned, 6" and 8"
0001AS 6 Each Sanitary Sewer Service Adjustment
0001AT 4 Each 6 " Cut And Cap
0001AU 6 Each 8 " Cut And Cap
0001AV 111 Linear
Storm Sewer Removal, 10 "
0001AW 22 Linear
Storm Sewer Removal, 12 "
0001AX 22 Linear
Sanitary Sewer Removal, 8 "
0001AY 111 Linear
Storm Sewer, Water Main Quality Pipe,10 "
0001AZ 22 Linear
Storm Sewer, Water Main Quality Pipe,12 "
0001BA 22 Linear
Sanitary Sewer, Water Main Quality Pipe, 8 "
0001BB 8 Each Drainage & Utility Structures
Drainage & Utility Structures to be Adjusted
0001BC 120 Linear
Ductile Iron Water Main
Ductile Iron Water Main, Class 52 With Polyethylene Encasement, 6"
0001BD 100 Linear
Ductile Iron Water Main, Class 52 With Polyethylene Encasement, 8"
0001BE 800 Linear
Ductile Iron Water Main, Class 52 With Polyethylene Encasement, 8" Directionally Drilled
0001BF 2 Each Fire Hydrant Assembly Complete
0001BG 1 Each 6" X 6" Tapping Sleeve
6" X 6" Tapping Sleeve And Valve In Valve Box
0001BH 2 Each 6" X 6" Tapping Sleeve
FFP
6" X 6" Tapping Sleeve And Valve In Valve Vault, Type A, 4' Diameter, Type 1 Frame, Closed Lid
0001BJ 2 Each 8" X 8" Tapping Sleeve
FFP
8" X 8" Tapping Sleeve And Valve In Valve Vault, Type A, 5' Diameter, Type 1 Frame, Closed Lid
0001BK 1 Each Gate Valve 8" In 5 Ft Diameter Valve
Gate Valve 8" In 5 Ft Diameter Valve Vault, Type 1 Frame, Closed Lid
0001BL 1 Each Gate Valve in Valve Box
0001BM 6 Each 1" Water Service (Short)
0001BN 11 Each 1" Water Service (Long)
0001BP 3 Each Line Stop, 6"
0001BQ 2 Each Line Stop, 8"
0001BR 750 Square
Class D Patches, Type IV, 6 Inch
0001BS 20 Square
Hot-Mix Asphalt Driveway Pavement, 4"
0001BT 20 Square
PCC Driveway Pavement, 7"
0001BU 800 Square
Portland Cement Concrete Sidewalk 5 Inch
0001BV 250 Square
Detectable Warnings
0001BW 200 Linear
Combination Curb And Gutter Replacement
0001BX 890 Square
Hot-Mix Asphalt Surface Removal, 2"
0001BY 200 Pound Bituminous Materials (Tack Coat)
0001BZ 40 Net Ton
(2,000
LB).
Leveling Binder (Machine Method), N50
0001CA 75 Net Ton
(2,000
LB).
Hot-Mix Asphalt Surface Course
Hot-Mix Asphalt Surface Course, Mix "D", N50
0001CB 310 Linear
Thermoplastic Pavement Markings, 6"
0001CC 200 Square
Sodding, Salt Tolerant (Special)
0001CD 1 Each
8" X 8" Tapping Sleeve And Valve In Valve Box FOB: Destination
0001CE 1 Lot Performance & Payment Bond
FFP
Performance & Payment Bond
BOND COVERAGE FOR LINE ITEMS 0001AA THROUGH 0001CD
THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDS. The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes See FAR 52.232-5(g).
OPTION OPTION WORK
FFP
This is a parent Contract Line Item, linking its Sub-Items 0002AA through 0002AN. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0002AA through 0002AN, wherein the sub-line items themselves identify the quantities required to perform said work.
0002AA 1 Job OPTION Mobilization
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0002AB 1 Job OPTION Demobilization
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0002AC 1 Job OPTION Traffic Control
0002AD 5 Each OPTION Install Gasket Seal Cover
0002AE 12 Each OPTION Manhole to be Heavy Cleaned
0002AF 2 Each OPTION Adjust and Seal Manhole Frame
0002AG 11 Each OPTION Internal Frame Adjustment Sealant
0002AH 13 Each OPTION Install Frame and Gasket Seal Cover
0002AJ 4 Each OPTION Grout Manhole
0002AK 6 Each OPTION Curtain Grout Manhole
0002AL 7 Each OPTION Replace Bench/Invert
0002AM 200 VF
OPTION Sanitary Manhole to be Internally Sealed
Sanitary Manhole to be Internally Sealed - Epoxy
0002AN 1 Lot OPTION Performance & Payment Bond
FFP
Performance & Payment Bond
BOND COVERAGE FOR LINE ITEMS 0002AA THROUGH 0002AM
THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDSThe Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes See FAR 52.232-5(g).
SUMMATION OF BID PRICES
TOTAL AMOUNT FOR BASE BID ITEMS (ITEMS 0001AA THROUGH 0001CC):
TOTAL AMOUNT FOR OPTION ITEMS (ITEMS 0002AA THROUGH 0002AN):
OVERALL TOTAL BID PRICE (ALL OF THE AFOREMENTIONED LINE ITEMS):