This notice solicits bids for a construction project to replace 1,500 feet of 10-inch diameter sanitary sewer lines in Matteson, Illinois. The United States Army Corps of Engineers - Chicago District will replace deteriorating sewer lines from Lincoln Highway to Homeland Road as part of a redevelopment of the former Lincoln Mall Shopping Center into commercial and retail use. Interested small businesses with average annual revenue under $39.5 million are invited to bid. The project cost is estimated between $500,000 and $1 million. Bids are due by the date specified in the IFB document and must be registered in the System for Award Management to comply with annual certification requirements. Questions should be directed to the Point of Contact, Kyle Smith, at the Chicago District office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO: W912P620B0024

CHICAGO DISTRICT

LEADERS IN CUSTOMER CARE

ROSE LANE WATER MAIN

REPLACEMENT AND SANITARY

SEWER MANHOLE

REHABILITATION PROJECT,

VILLAGE OF MATTESON, IL

CONSTRUCTION SOLICITATION

AND SPECIFICATIONS

Certified Final Documents – Ready to Advertise W912P620B0024 August 25, 2020

Water Main and Sanitary Sewer Manhole Rehab,Village Matteson,IL W912P620B0024

PROJECT TABLE OF CONTENTS

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

00 10 00 SOLICITATION

00 21 00 INSTRUCTIONS

00 22 13 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 73 00 SUPPLEMENTARY CONDITIONS

WAGE RATES

DIVISION 00 SUBSURFACE IMFORMATION

00 31 32.13 SUBSURFACE DRILLING AND SAMPLING INFORMATION

DIVISION 01 GENERAL REQUIREMENTS

01 10 00 GENERAL PROVISIONS

01 11 00 SUMMARY OF WORK

01 22 00.00 10 PRICE AND PAYMENT PROCEDURES

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 55 26.00 03 TEMPORARY TRAFFIC CONTROL

01 57 20.01 03 ENVIRONMENTAL PROTECTION FOR ILLINOIS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 03 CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 31 EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 EXTERIOR IMPROVEMENTS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 19 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKINGS

32 92 23 SODDING

DIVISION 33 UTILITIES

33 01 30.16 MANHOLE REHABILITATION

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 40 00 STORM DRAINAGE UTILITIES

-- End of Project Table of Contents –

Project Title: Village of Matteson Sanitary Sew er Improvements, Matteson, IL

Project Description: The project is at the site of the former Lincoln Mall Shopping Center w hich w ill be re-developed for commercial and retail use. The overall project includes replacing approximately 1,500 feet of 10-inch diameter sanitary sew er to replace existing deteriorating sew er from Lincoln Highw ay to Homeland Road.

COMPETITION FOR THIS ACQUISITION IS 100% SET-ASIDE FOR SMALL BUSINESS CONCERNS

Applicable North American Industry Classif ication System Code: 237110 w ith a small business size standard of $39.5M

Est. Magnitude of Construction Cost: Betw een $500K and $1M

Applicable Construction Wage Rates: General Decision Number IL20200009, dated 08/21/2020

For the purposes of bidding this acquisition, w herein stated "RFP," it means IFB and w herein stated "offer," it means Bid. ---------EMAILED BIDS ARE ACCEPTABLE - SEE Solicitation Section 00 22 13

X

KYLE D SMITH 312.846.5370

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-Aug-2020

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________360 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 70 00

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________24 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

04:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 312.846.5371 TEL: FAX:

W912P620B0024 76

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Work

FFP

This is a parent Contract Line Item, linking its Sub-Items 0001AA through 0001CC. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0001AA through 0001CC, wherein the sub-line items themselves identify the quantities required to perform said work.

NET AMT

0001AA 1 Job Mobilization

FFP

Under this CLIN, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

0001AB 1 Job Demobilization

FFP

Under this CLIN, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment

0001AC 1 Job Traffic Control

FFP

0001AD 8 Each Inlet Filter

0001AE 1 Each Tree Protection

0001AF 1 Each Tree Root Pruning

0001AG 300 Linear

Foot

Perimeter Erosion Barrier

0001AH 25 Linear

Steel Casings, 20 Inch

FOB: Destination

0001AJ 2 Each Removing and Resetting Street Signs

0001AK 750 Square

Yard

Pavement Removal

0001AL 200 Linear

Combination Curb And Gutter Removal

0001AM 40 Square

Driveway Pavement Removal

0001AN 950 Square

Sidewalk Removal

0001AP 2 Each Fire Hydrants To Be Removed

0001AQ 1 Each Water Valve Boxes to Be Abandoned

0001AR 1 Each Water Main To Be Abandoned, 6" and 8"

0001AS 6 Each Sanitary Sewer Service Adjustment

0001AT 4 Each 6 " Cut And Cap

0001AU 6 Each 8 " Cut And Cap

0001AV 44 Linear

Storm Sewer Removal, 10 "

0001AW 22 Linear

Storm Sewer Removal, 12 "

0001AX 22 Linear

Sanitary Sewer Removal, 8 "

0001AY 44 Linear

Storm Sewer, Water Main Quality Pipe,10 "

0001AZ 22 Linear

Storm Sewer, Water Main Quality Pipe,12 "

0001BA 22 Linear

Sanitary Sewer, Water Main Quality Pipe, 8 "

0001BB 8 Each Drainage & Utility Structures

Drainage & Utility Structures to be Adjusted

0001BC 120 Linear

Ductile Iron Water Main

Ductile Iron Water Main, Class 52 With Polyethylene Encasement, 6"

0001BD 100 Linear

Ductile Iron Water Main, Class 52 With Polyethylene Encasement, 8"

0001BE 800 Linear

Ductile Iron Water Main, Class 52 With Polyethylene Encasement, 8" Directionally Drilled

0001BF 2 Each Fire Hydrant Assembly Complete

0001BG 1 Each 6" X 6" Tapping Sleeve

6" X 6" Tapping Sleeve And Valve In Valve Box

0001BH 2 Each 6" X 6" Tapping Sleeve

FFP

6" X 6" Tapping Sleeve And Valve In Valve Vault, Type A, 4' Diameter, Type 1 Frame, Closed Lid

0001BJ 2 Each 8" X 8" Tapping Sleeve

FFP

8" X 8" Tapping Sleeve And Valve In Valve Vault, Type A, 5' Diameter, Type 1 Frame, Closed Lid

0001BK 1 Each Gate Valve 8" In 5 Ft Diameter Valve

Gate Valve 8" In 5 Ft Diameter Valve Vault, Type 1 Frame, Closed Lid

0001BL 1 Each Gate Valve in Valve Box

0001BM 6 Each 1" Water Service (Short)

0001BN 11 Each 1" Water Service (Long)

0001BP 3 Each Line Stop, 6"

0001BQ 2 Each Line Stop, 8"

0001BR 750 Square

Class D Patches, Type IV, 6 Inch

0001BS 20 Square

Hot-Mix Asphalt Driveway Pavement, 4"

0001BT 20 Square

PCC Driveway Pavement, 7"

0001BU 800 Square

Portland Cement Concrete Sidewalk 5 Inch

0001BV 250 Square

Detectable Warnings

0001BW 200 Linear

Combination Curb And Gutter Replacement

0001BX 890 Square

Hot-Mix Asphalt Surface Removal, 2"

0001BY 200 Pound Bituminous Materials (Tack Coat)

0001BZ 40 Net Ton

(2,000

LB).

Leveling Binder (Machine Method), N50

0001CA 75 Net Ton

(2,000

LB).

Hot-Mix Asphalt Surface Course

Hot-Mix Asphalt Surface Course, Mix "D", N50

0001CB 310 Linear

Thermoplastic Pavement Markings, 6"

0001CC 200 Square

Sodding, Salt Tolerant (Special)

0001CD 1 Each

8" X 8" Tapping Sleeve And Valve In Valve Box FOB: Destination

0001CE 1 Lot Performance & Payment Bond

FFP

Performance & Payment Bond

BOND COVERAGE FOR LINE ITEMS 0001AA THROUGH 0001CB

THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDS. The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes See FAR 52.232-5(g).

OPTION OPTION WORK

FFP

This is a parent Contract Line Item, linking its Sub-Items 0002AA through 0002AN. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0002AA through 0002AN, wherein the sub-line items themselves identify the quantities required to perform said work.

0002AA 1 Job OPTION Mobilization

FFP

Under this CLIN, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment

0002AB 1 Job OPTION Demobilization

FFP

Under this CLIN, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment

0002AC 1 Job OPTION Traffic Control

0002AD 5 Each OPTION Install Gasket Seal Cover

0002AE 12 Each OPTION Manhole to be Heavy Cleaned

0002AF 2 Each OPTION Adjust and Seal Manhole Frame

0002AG 11 Each OPTION Internal Frame Adjustment Sealant

0002AH 13 Each OPTION Install Frame and Gasket Seal Cover

0002AJ 4 Each OPTION Grout Manhole

0002AK 6 Each OPTION Curtain Grout Manhole

0002AL 7 Each OPTION Replace Bench/Invert

0002AM 200 Linear

OPTION Sanitary Manhole to be Internally Sealed

Sanitary Manhole to be Internally Sealed - Epoxy

0002AN 1 Lot OPTION Performance & Payment Bond

FFP

Performance & Payment Bond

BOND COVERAGE FOR LINE ITEMS 0002AA THROUGH 0002AN

THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDSThe Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes See FAR 52.232-5(g).

SUMMATION OF BID PRICES

TOTAL AMOUNT FOR BASE BID ITEMS (ITEMS 0001AA THROUGH 0001CC):

TOTAL AMOUNT FOR OPTION ITEMS (ITEMS 0002AA THROUGH 0002AN):

OVERALL TOTAL BID PRICE (ALL OF THE AFOREMENTIONED LINE ITEMS):

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

CLAUSES INCORPORATED BY FULL TEXT

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 2016)

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(b) (1) Bidders shall acknowledge receipt of any amendment to this solicitation--

(i) By signing and returning the amendment;

(ii) By identifying the amendment number and date in space provided for this purpose on the form for submitting a bid;

(iii) By letter;

(iv) By facsimile, if facsimile bids are authorized in the solicitation; or

(v) By email, if email bids are authorized in the solicitation.

(2) The Government must receive the acknowledgement by the time and at the place specified for receipt of bids.

(End of provision)

52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)

(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.

(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--

(1) Lump sum bidding;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of subparagraphs (1) through (3) above.

(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.

(d) Alternate bids will not be considered unless this solicitation authorizes their submission.

52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)

(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.

(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.

(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.

(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.

(End of provison)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a FIRM-FIXED PRICE CONSTRUCTION CONTRACT contract resulting from this solicitation.

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Regina G. Blair Contracting Chief, Chicago District Directorate of Contracting USACE - Chicago District 231 South LaSalle Street, Suite 1500 Chicago, Illinois 60604

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Imad Samara

Address: 231 S. LaSalle St, Suite 1500, Chicago, IL 60604 Telephone: (312)-846-5560:

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

www.acquisition.gov https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)

(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for --

(1) Furnishing all plant, labor, equipment, appliances, and materials; and

(2) Performing all operations required to complete the work in conformity with the drawings and specifications.

(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.

Section 00 22 13 - Supplementary Instructions to Bidders

IMPORTANT BID NOTES

(THE ABOVE SOLICITATION SECTION 00 10 00 IS TO BE USED BY BIDDERS

TO SUBMIT THEIR BIDS; IT IS ALSO CONSIDERED THE “BID SCHEDULE” AS

TERMED THROUGHOUT THE SOLICITATION.)

1. BID CONDITIONS:

a. The Contractor shall bid ALL items that are contained in the Bid Schedule

INCLUDING ALL OPTION ITEMS, with no exceptions. Should a Contractor fail to fully complete the bid schedule, its bid will not be considered responsive to the solicitation and eligible for the resultant contract award. Therefore, the bidder’s total price for the work shall be based on the TOTAL of all BASE AND OPTION items included in the Bid Schedule. The Contractor shall enter both its unit price and extended price for each Bid Item.

b. From this Solicitation, the government intends to award one firm-fixed price contract to the responsive, responsible bidder submitting the lowest overall aggregate price for all Base and Option Items. The intent is to immediately award the base bid items at the time of award.

c. Split or multiple awards will not result from this Solicitation.

d. Bidders are required to acknowledge the receipt of all amendments to the

Solicitation on the Standard Form 1442, OR by completing the Standard Form 30 itself.

e. SF 1442 BACK (Page 2 of the Solicitation): Bidders shall fully complete all the required areas located under the section designated as “BID” (refer to Items 14 through 20C).

f. Section 00 45 00 (Representations and Certifications): The bidder must complete the applicable boxes found at Section 00 45 00 of this Solicitation and submit the completed Section along with all other documents required by this Solicitation. In order to place a bid in response to this Solicitation, the bidder must be registered in an “active status” at the System for Award Management (SAM) (registration can be completed on line for free at www.sam.gov). Accordingly, any bid furnished from contractor without an active registration at SAM may be considered non-responsive to the material requirements of this Solicitation and ineligible for award.

2. OPTION PROVISIONS: SEE SECTION 00 70 00 CLAUSE NO. 52.217-7.

3. BID SUBMISSION:

a. This Solicitation (Invitation for Bids) stipulates email as an additional method of bid submission. As an option to Bidders, BIDS may submitted by EMAIL to Kyle Smith at kyle.d.smith@usace.army.mil, with copies furnished to Michael Jones at michael.t.Jones@usace.army.mil and Regina Blair at regina.g.blair@usace.army.mil.

b. In consideration of the provisions of Subpart 14.301 of the Federal Acquisition Regulation, wherein the “responsiveness of bids” is provisioned, bidders must comply with all material respects of this Solicitation (Invitation for Bids) to be considered for the resulting award.

Accordingly, bids submitted by EMAIL (and other methods authorized by this Solicitation) must be in compliance with the submission requirements discussed below. (also see Clause No. 52.214-5 at Section 00 21 00 of this Solicitation)

c. METHOD OF BID SUBMISSION: ALL BIDS IN RESPONSE TO THIS SOLICITATION

SHALL BE SUBMITTED BY REGULAR OR EXPRESS MAIL OR BY ELECTRONIC

MAIL (EMAIL). IMPORTANT NOTE: --DUE TO COVID 19, HAND-CARRIED BIDS

WILL NOT BE PERMITTED.

(1) Mailed/Express/Overnighted Bids: Under this type of submission, Bids and all other documents required by this Solicitation (see Section 00 21 13) shall be enclosed and sealed in an envelope that is clearly marked “Bid” and shall include the assigned Solicitation Number, and the Bid Opening Date and Time. It is the responsibility of each bidder to ensure that its Sealed Bid is received by the Chicago District’s – USACE Contracting Branch, located at 231 South LaSalle Street, Suite 1500, Chicago, IL 60604 prior to the date and time set for the opening of the bids.

(2) Electronic Mail (Email) Bids: Emailed Bids shall be transmitted and accompanied by all other required documents (re: “Important Bid Notes,” Solicitation Section 00 21 13). The Bidder’s bid and all required documents shall be attached therein the Email. The subject line of the Email shall contain the Solicitation Number and Project title. The Bidder shall verify all contents of its attachments to ensure they are readable and in full compliance with the Solicitation requirements. Therefore, prior to submitting the bid, the Bidder shall ensure all bid documents are in conformance and enclosed for bidding purposes. The date and time stamp provided via the government’s email will constitute the time of receipt of a bid package. The government will acknowledge receipt of the Bidder’s email. The government will not review the Bid or any of the attachments provided via the Bidder’s email until the Bid Opening. All electronically submitted files by Email CANNOT EXCEED this Agency's size limit of 20MB (includes email and its attachment); files exceeding this size will be denied access to the aforementioned email inboxes. It is the responsibility of the contractor to determine the size of its electronic file. Should the Bidder need to break up its submittal, it may provide its attachment under separate emails to avoid exceeding the size limit. The last email received will constitute the full submission of the Bid, e.g. the time received by the government.

d. TIME OF SUBMISSION: Bids are required prior to 4:00 p.m. CDT on 24 September 2020. (Re: FAR Subpart 14.302 Bid submission. “Bids shall be submitted so that they will be received in the office designated in the invitation for bids not later than the exact time set for opening of bids.”)

e. VIRTUAL BID OPENING: For this procurement, Contracting will conduct a virtual Bid Opening in accordance with the below provisions. These procedures are being used because of the current public health concerns affiliated with COVID-19.

f. VIRTUAL BID OPENING PROVISIONS/ PARTICIPATION:

THE VIRTUAL BID OPENING WILL BEGIN AT 4:00 P.M. CDT ON 24 September 2020.

Individuals interested in participating in the virtual bid opening can participate by following these instructions:

Interested individuals will navigate to a WEBEX link and enter their email address and name.

Please provide your full name and information. This information will be utilized to obtain the list of attendees at the virtual bid opening.

The WEBEX Conference and Audio Meeting Information (call in number, access code) will be provided via an update to the Solicitation Notice maintained at the BETA.SAM.GOV Website.

This information will be provided at least 24-48 hours prior to the Bid Opening date and time.

The bids will be read aloud and individuals will be able to view the information on the WEBEX screen as the bids are entered into a bid tabulation sheet. Should technological issues ensue from the visual viewing at the WEBEX, the audio access will take precedence and satisfy the conditions of bids being communicated publicly/read aloud.

g. BID GUARANTEE:

Bidders are required to submit a Bid Guarantee for this project in accordance with the Federal Acquisition Regulation Clause 52.228-1, “Bid Guarantee” – Refer to Solicitation Section 00 21 00 for the full text of this Clause.

A bid guarantee shall be submitted at 20% of the bid price or $3M whichever is the lesser.

Any Bidders bidder failing to submit a Bid Guarantee will be considered non- responsive to the Solicitation and ineligible for award.

Emailed Bids: If submitting your Bid by email, the bid guarantee must be included in your emailed attachment(s).

h. ATTACHMENT A – PREAWARD SURVEY FORM – The bidder shall complete the enclosed Attachment A and submit it along with its bid submission. The preaward survey form is to aid in expediting the award of this project. Only the winning bidder’s information will be surveyed.

i. QUESTIONS SHALL BE SUBMITTED IN SUFFICIENT TIME TO BE

ANSWERED VIA AN AMENDMENT PRIOR TO THE BID OPENING DAY

AND TIME (Re: 52.214-6 Explanation to Prospective Bidders)

VIRTUAL PRE- BID MEETING

A virtual pre- bid meeting will be held for this project on September 9, 2020 at 11:00 a.m. (CDT) by use of Webex.

The Webex particulars FOLLOW:

When it’s time to join the meeting on the aforementioned date and time, please use the following weblink:

https://usace.webex.com/usace/j.php?MTID=m7d17e6b1970a2e11c579b7d3e48b71b8

FOR AUDIO – JOIN BY PHONE:

Call-in number (ATT Audio Conference): 1-816-423-4282 (US/Canada) Call-in toll-free number (ATT Audio Conference): 1-866-590-5055 (US/Canada)

Access Code: 268 944 3 Securtity Code: 268 944 3 Conf ID No.: Enter the # sign

Following the prebid meeting, Contractors are urged to visit the project site.

At the pre- bid meeting, Government representatives will highlight specific contract requirements. The objective is to provide an information exchange between potential bidders and the Government to avoid the possibility of misinterpretation of the contract requirements. The Corps of Engineers strongly encourages all potential bidders to attend the pre- bid meeting and, in the interest of making the meeting more meaningful, prospective bidders are urged to present any written questions concerning the project bid documents, bidding, and construction requirements or other related matters prior to the pre- bid meeting. Please send written questions to Kyle Smith at kyle.d.smith@usace.army.mil – BE SURE TO INCLUDE THE SOLICIATION NUMBER W912P620B0024 AND

PROJECT TITLE ON THE SUBJECT LINE OF YOUR EMAIL.

With respect to questions, written questions may be submitted at the beginning of the pre-bid meeting and oral questions may be submitted from the floor, will only be addressed if they are clarifications of information provided in the solicitation and in subsequent amendments issued before the scheduled prebid meeting and site visit. Answers, interpretations, and decisions made at the meeting will not become official unless and until verified by an amendment to the solicitation issued prior to the receipt of bids. Following the meeting, prospective bidders will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the contract to the extent such information is reasonably obtained.

Meeting number: 146 311 5238 Meeting password: 7ZKeiesjM73

ATTACHMENT A

PREAWARD SURVEY INFORMATION

(RE: Subparts 9.104-1 and 9.105-1 of the Federal Acquisition Regulation)

CONTRACTOR: _______________________________________

SOLICITATION W912P620B0024, “Village of Matteson Sanitary Sewer Improvements- (Matteson, IL) Chicago District Project”

Please complete the below form to assist in the completion of a Pre-award Survey:

1. Month and Year started in business:

2. Year and State Incorporated:

3. Key Personnel:

President/Owner:

Vice President/Partner:

Secretary/Treasurer:

4. Number of Full-Time Employees:

5. Surety -

Agency:

Agent:

Address, City & State:

Telephone#:

6. Insurance Company -

Agency:

Agent:

7. Financial Institution Information -

Name of Bank:

Contact Person:

8. References: Provide the names and contact information of three references. Information obtained from references will be used to determine if you have been diligent in the following areas: a) Quality of Work; b)

Timely Performance; c) Effectiveness of Management; d) Compliance with Safety Standards; and e) Compliance with Labor Standards.

9. Does your company have any ongoing projects that may cause a problem with completing or beginning performance of the subject project?

END OF FORM

Section 00 45 00 - Representations and Certifications

252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

CLAUSES INCORPORATED BY FULL TEXT

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237110.

(2) The small business size standard is $39,500,000.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $83,099, the provision with its Alternate II applies.

(D) If the acquisition value is $83,099 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

X (i) 52.204-17, Ownership or Control of Offeror.

X (ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .