Amendment 0001 W912P620B0010 Crown Point Sanitary Sewer Improvements.pdf
PDF 1 MB Posted
- Solicitation number
- W912P620B0010
About this file
This is a solicitation notice announcing the issuance of an invitation for bids for sanitary sewer improvement work in Crown Point, Indiana. The work includes the installation of 700 feet of 8-inch cured-in-place pipe liner, 400 feet of 10-inch liner, 6,500 feet of 12-inch liner, rehabilitation of up to 40 manholes, installation of a 36-inch flow meter and a 48-inch sanitary doghouse manhole up to 9 feet complete. The contracting office is the U.S. Army Corps of Engineers Chicago District. Competition is reserved for small business concerns with a size standard of $39.5 million. Bids are due by September 1, 2020. The point of contact is provided for any questions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6600579185
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: INVITATION FOR BIDS NO. W912P620B0010, "CITY OF CROWN OF POINT, LAKE COUNTY, SANITARY SEWER IMPROVEMENTS
- SECTION 219 (USACE ACQUISITION)
-- THIS AMENDMENT CONTINUES ON THE NEXT PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
1 43
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P620B0010
X 9B. DATED (SEE ITEM 11)
30-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2020
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P620B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. BID OPENING DATE AND TIME:
The Bid Opening Date and Time is NOT EXTENDED by this Amendment. Therefore, bids are due by 3:00 p.m. (Central Time) on September 1, 2020. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”
B. REVISION TO SECTION 00 10 00 – SOLICITATION:
BLOCK 10, PAGE 1 OF THE SF1442 (SOLICITATION)
The text should have read as follows:
COMPETITION FOR THIS ACQUISITION IS RESTRICTED TO SMALL BUSINESS CONCERNS
PROJECT TITLE: CITY OF CROWN POINT, LAKE COUNTY, SANITARY SEWER
IMPROVEMENTS - SECTION 219 (USACE ACQUISITION)
PROJECT DESCRIPTION: The contractor will be required to install the following rehabilitation components for the combined sewers: 700 feet of 8-inch Cured-In-Place-Pipe Liner (CIPP), 400 feet of 10-inch CIPP, 6500 feet of 12-inch CIPP, and up to 23 manholes to be rehabilitated as well as installation of a 36” flowmeter. Manholes and sewer segments would be rehabilitated to include cementitious lining amongst other component work, while the sewer segments would receive cured-in-place pipe lining (CIPP), and/or point repairs.
The North American Industry Classification System code (NAICS) is 237110, with a size standard of $39.5M. The estimated price range for this construction project is between $1,000,000.00 and $5,000,000.00. Applicable Wage Rates: Wage Determination Number: IN20200001 08/07/2020.
WHEREIN STATED IN THIS SOLICITATION "OFFER OR OFFEROR", IT MEANS BID OR
BIDDER.
C. AMENDED SPECIFICATION SECTIONS: The following Specification Sections have been revised.
The revised sections are enclosed hereunder and replace the previously furnished sections.
a. Section 33 01 30.16, Subpart 1.2.1 has been revised for disposal.
b. Section 33 01 30.16, Subpart 3.1.1 has been revised for disposal.
c. Section 33 01 31, Subpart 2.1.5 has been revised for disposal.
d. Section 01 50 00, Subpart 3.4 has been revised for haul route.
D. BID SCHEDULE:
The government is providing a revised bid schedule (Section 00 10 00 – Solicitation Contract Form), which changes the unit of measure for line items 0004AA, 0005AA, 0006AA, 0006AB, 0007AA, 0008AA, 0009AA, 0010AA, 0010AB, and 0011AA, to read vertical linear feet and decreases quantity of CLIN 0001AP by 58 sq. yds. from 74
sq. yds. to 16 sq. yds. Therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule.
E. WAGE DETERMINATION: This Amendment encloses the most recent Wage Determination, General Decision IN20200001 08/07/2020.
F. PRE-BID MEETING ATTENDANCE: By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the pre-bid meeting held on August 11, 2020.
G. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846-5378;
email: ericka.d.hillard@usace.army.mil.
END OF AMENDMENT NO. 0001
(The aforementioned Bid Schedule, Specification Sheets, Wage Determination and Pre-bid Meeting Attendance
Sheet follows)
REVISED (VIA AMENDMENT NO. 0001)
Section 00 10 00 - Solicitation
CONTRACT BID FORM BID SCHEDULE
THE BELOW BID FORM SERVES AS THE BID SCHEDULE AND SHALL BE USED BY THE BIDDER TO
ENTER ITS BID PRICING
DISTINCTION OF LINE ITEMS:
The below Bid Schedule contains a combination of Firm Fixed Price (FFP) and cost reimbursable line items.
Although “FFP” is shown in the description of the cost reimbursable line items, it is not to be construed as a Firm Fixed Price line item. In this case, the FFP represents the Contract Type, which is firm fixed price. Therefore, the contractor will be reimbursed as stated within the extended description of the cost reimbursable line items.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE BID ITEMS
FFP
This is a Parent Line Item linking Sub-items 0001AA through 0001AX under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all apply to the quantities delineated at the sub-item level.
PURCHASE REQUEST NUMBER: W81G6600579185
NET AMT
0001AA 1 Job
MOBILIZATION
FFP
Under this line item, the contractor is required to perform mobilization activities.
The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
PSC CD: Y1PZ
0001AB 1 Job
DEMOBILIZATION
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AC 470 Linear
Foot
8" SANITARY SEWER CLEANING AND CCTV
FFP
0001AD 335 Linear
10" SANITARY SEWER CLEANING AND CCTV
0001AE 5,437 Linear
12" SANITARY SEWER CLEANING AND CCTV
0001AF 470 Linear
8" SANITARY SEWER REHABILITATION - CIPP
0001AG 335 Linear
10" SANITARY SEWER REHABILITATION - CIPP
0001AH 5,437 Linear
12" SANITARY SEWER REHABILITATION - CIPP
0001AJ 106 Each
LATERAL REINSTATEMENTS
0001AK 1 Job
SURFACE RESTORATION - FINAL GRADING AND
FFP
SEEDING
0001AL 1 Job
MAINTENANCE OF TRAFFC
0001AM 1 Job
TEMPORARY EROSION AND SEDIMENT CONTROL
0001AN 1 Each
SANITARY LATERAL RECONNECTION TO SEWER,
FFP
6" WYE, COMPLETE
0001AP 16 Square
Yard
CURB-TO-CURB ASPHALT REPLACEMENT
0001AQ 2 Each
POINT REPAIR IN ASPHALT
0001AR 1 Each
SEWER PIPE PATCH
0001AS 1 Each
POINT REPAIR IN CONCRETE
0001AT 13 Each
PROTRUDING TAP
0001AU 1 Job
CONSTRUCT BENCH IN 84" DIAMETER
FFP
SANITARY DOGHOUSE MANHOLE, EQUIPMENT AND INSTALL OF
FLOW METER, CHECK VALVE; COMPLETE
0001AV 1 Each
SEAL PIPE CLOSED
0001AW 1 Lot
PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0001AA through 0001AV
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract price changes. re: FAR 52.232-5(g)
OPTION OPTION #1 BID ITEMS
FFP
(Manhole 247 to Manhole 261) This is a Parent Line Item linking Sub-items 0002AA through 0002AF under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all
0002AA 305 Linear
OPTION 12" SANITARY SEWER CLEANING AND CCTV
0002AB 305 Linear
OPTION 12" SANITARY SEWER REHABILITATION - CIPP
0002AC 6 Each
OPTION LATERAL REINSTATEMENTS
0002AD 1 Job
OPTION MAINTENANCE OF TRAFFIC
0002AE 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0002AF 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0002AA through 0002AE
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #2 BID ITEMS
FFP
(Manhole 261 and Manhole 203) This is a Parent Line Item linking Sub-items 0003AA through 0003AG under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0003AA 305 Linear
OPTION 12" SANITARY SEWER CLEANING AND CCTV
0003AB 305 Linear
OPTION 12" SANITARY SEWER REHABILITATION - CIPP
0003AC 1 Each
OPTION PROTRUDING TAP
0003AD 6 Each
OPTION LATERAL REINSTATEMENTS
0003AE 1 Job
OPTION MAINTENANCE OF TRAFFIC
0003AF 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0003AG 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0003AA through 0003AF
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #3 BID ITEMS
FFP
(Manholes 9 and Manhole 203) This is a Parent Line Item linking Sub-items 0004AA through 0004AG under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0004AA 7.50 Vertical
Linear Feet
OPTION INTERIOR MANHOLE LINING
0004AB 2 Each
OPTION INTERIOR MANHOLE FRAME SEAL AND/OR
FFP
CHIMNEY SEAL
0004AC 2 Each
OPTION RESET FRAME
0004AD 1 Each
OPTION CONSTRUCT CHANNEL AND/OR BENCH
0004AE 1 Job
OPTION MAINTENANCE OF TRAFFIC
0004AF 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0004AG 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0004AA through 0004AF
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #4 BID ITEMS
FFP
(Manholes 243, 248, and 261) This is a Parent Line Item linking Sub-items 0005AA through 0005AF under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0005AA 23.80 Vertical
0005AB 2 Each
OPTION INTERIOR MANHOLE FRAME SEAL AND/OR
FFP
0005AC 1 Each
OPTION NEW MANHOLE COVER
0005AD 1 Job
OPTION MAINTENANCE OF TRAFFIC
0005AE 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0005AF 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0005AA through 0005AE
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #5 BID ITEMS
FFP
(Manholes 8 and 214) This is a Parent Line Item linking Sub-items 0006AA through 0006AG under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0006AA 5 Vertical
0006AB 5 Vertical
OPTION CORROSION BARRIER
0006AC 2 Each
OPTION INTERIOR MANHOLE FRAME SEAL AND/OR
FFP
0006AD 1 Each
OPTION CONSTRUCT CHANNEL AND/OR BENCH
0006AE 1 Job
OPTION MAINTENANCE OF TRAFFIC
0006AF 1 Job
OPTION TEMPORARY EROSION AND SEDMINET CONTROL
0006AG 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0006AA through 0006AF
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #6 BID ITEMS
FFP
(Manholes 215 and 217) This is a Parent Line Item linking Sub-items 0007AA through 0007AG under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0007AA 2.70 Vertical
0007AB 1 Each
OPTION NEW MANHOLE COVER
0007AC 2 Each
OPTION INTERIOR MANHOLE FRAME SEAL AND/OR
FFP
0007AD 1 Each
OPTION CONSTRUCT CHANNEL AND/OR BENCH
0007AE 1 Job
OPTION MAINTENANCE OF TRAFFIC
0007AF 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0007AG 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0007AA through 0007AF
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #7 BID ITEMS
FFP
(Manholes 218 and 219) This is a Parent Line Item linking Sub-items 0008AA through 0008AJ under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0008AA 8.90 Vertical
0008AB 1 Each
OPTION NEW MANHOLE COVER
0008AC 2 Each
OPTION INTERIOR MANHOLE FRAME SEAL AND/OR
FFP
0008AD 1 Each
OPTION NEW MANHOLE CASTING
0008AE 1 Each
OPTION SEAL PIPE CLOSED
0008AF 1 Each
OPTION REPLACE AJUSTMENT RINGS
0008AG 1 Job
OPTION MAINTENANCE OF TRAFFIC
0008AH 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0008AJ 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0008AA through 0008AH
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #8 BID ITEMS
FFP
(Manholes 202 and 222) This is a Parent Line Item linking Sub-items 0009AA through 0009AE under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0009AA 10.90 Vertical
0009AB 2 Each
OPTION INTERIOR MANHOLE FRAME SEAL AND/OR
FFP
0009AC 1 Job
OPTION MAINTENANCE OF TRAFFIC
0009AD 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0009AE 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0009AA through 0009AD
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #9 BID ITEMS
FFP
(Manholes 4, 213, 252, 253 and 262) This is a Parent Line Item linking Sub-items 0010AA through 0010AG under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0010AA 51.70 Vertical
0010AB 13 Vertical
OPTION CORROSION BARRIER
0010AC 5 Each
OPTION INTERIOR MANHOLE FRAME SEAL AND/OR
FFP
0010AD 1 Each
OPTION REHABILITATION CONE BLOCKS
0010AE 1 Job
OPTION MAINTENANCE OF TRAFFIC
0010AF 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0010AG 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
This is a cost reimbursable line item for bond coverage for line items 0010AA through 0010AF
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
OPTION OPTION #10 BID ITEMS
FFP
(Manholes 3, 224, 225, 227 and 236) This is a Parent Line Item linking Sub-items 0011AA through 0011AG under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0011AA 25.10 Vertical
0011AB 5 Each
OPTION INTERIOR MANHOLE FRAME SEAL AND/OR
FFP
0011AC 1 Each
OPTION SEAL PIPE CLOSED
0011AD 3 Each
OPTION RESET FRAME
0011AE 1 Each
OPTION CONSTRUCT CHANNEL AND/OR BENCH
0011AF 1 Job
OPTION MAINTENANCE OF TRAFFIC
0011AG 1 Job
OPTION TEMPORARY EROSION AND SEDIMENT CONTROL
0011AH 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
his is a cost reimbursable line item for bond coverage for line items 0011AA through 0011AG
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
SUMMATION OF BID PRICES
BASE WORK (ITEMS 0001 THROUGH 0001AW): $_____________________
OPTION #1 WORK (ITEMS 0002 THROUGH 0002AF): $____________________
OPTION #2 WORK (ITEMS 0003 THROUGH 0003AG): $____________________
OPTION #3 WORK (ITEMS 0004 THROUGH 0004AG): $____________________
OPTION #4 WORK (ITEMS 0005 THROUGH 0005AF): $____________________
OPTION #5 WORK (ITEMS 0006 THROUGH 0006AG): $____________________
OPTION #6 WORK (ITEMS 0007 THROUGH 0007AG): $____________________
OPTION #7 WORK (ITEMS 0008 THROUGH 0008AJ): $____________________
OPTION #8 WORK (ITEMS 0009 THROUGH 0009AE): $____________________
OPTION #9 WORK (ITEMS 0010 THROUGH 0010AG): $____________________
OPTION #10 WORK (ITEMS 0011 THROUGH 0011AH): $____________________
OVERALL BID PRICE (ITEMS 0001 THROUGH 0011AH (INCLUDES ALL RESPECTIVE):
END OF REVISED BID SCHEDULE
Sanitary Sewer Improvements, City of Crown Point, IN W912P620B0010
3.4.3 Rush Hour Restrictions
Do not interfere with the peak traffic flows preceding and during normal operations without notification to and approval by the Contracting Officer.
3.4.4 Dust Control
Dust control methods and procedures must be approved by the Contracting Officer. Coordinate dust control methods with 01 57 20.02 03
ENVIRONMENTAL PROTECTION FOR INDIANA.
3.4.5 Haul Route
Heavy machinery shall avoid Main Street and proceed from work site to Greenwood Avenue, east to Indiana Avenue, and north to Summit Street or 101st Avenue. Machinery accessing the Wastewater Treatment Plant shall use the south entrance along Merrillville Road, as shown in the plans, sheet MD5.
3.5 CONTRACTOR'S TEMPORARY FACILITIES
Contractor-owned or -leased trailers must be identified by Government assigned numbers. Apply the number to the trailer within 14 calendar days of notification, or sooner, if directed by the Government. Temporary facilities will meet requirements as identified in EM 385-1-1 Section 04.
3.5.1 Storage Area
Storage Area should be coordinated with Contracting Officer.
3.5.2 Maintenance of Storage Area
The Contractor shall keep the premises free from accumulations of waste material, debris, rubbish, scrap, etc. caused by his employees or construction operations. Upon completion of the work, he shall systematically clean and make any needed repairs of the structures; remove all equipment, tools and surplus materials; leave the structures "broom clean", or its equivalent, and the premises in a neat and clean condition.
3.5.3 Appearance of Trailers
Trailers which are rusted, have peeling paint or are otherwise in need of repair will not be allowed on Installation property. Trailers must present a clean and neat exterior appearance and be in a state of good repair.
3.5.4 Security Provisions
Provide adequate outside security lighting at the temporary facilities.
The Contractor will be responsible for the security of its own equipment.
3.5.5 Weather Protection of Temporary Facilities and Stored Materials
Take necessary precautions to ensure that roof openings and other critical openings in the building are monitored carefully. Take immediate actions required to seal off such openings when rain or other detrimental weather is imminent, and at the end of each workday. Ensure that the openings are completely sealed off to protect materials and equipment in the building from damage.
SECTION 01 50 00 Page 9
AMD 0001 - 08/12/20
1.1.9 Pipe Segment
The length of pipe from entry point to exit point along the main or service.
1.1.10 Pipeline Assessment and Certification Program
A CCTV Inspection standardization certification and observation coding system sponsored by NASSCO.
1.1.11 Point Repair
The location of a failure where a repair has occurred.
1.1.12 Post-Installation CCTV (Post-TV)
Post-TV inspection is used to determine the slip lining of sanitary or storm sewers has been completed in accordance with the contract documents.
1.1.13 Pre-Installation CCTV (Pre-TV)
Pre-TV inspection is a video inspection of existing sewer lines to confirm cleaning activities, locations of service connections, and identify defects in the existing sewer system infrastructure prior to any work being performed.
1.1.14 Re-TV Inspection
Upon the completion of repairs made after performing a Post-TV Inspection or Warranty TV inspection, the mains or services are re-inspected by performing a Re-TV inspection. Also, refers to rework for a TV-Inspection that has video interruptions, gaps, or is not continuous.
1.1.15 TV Inspection Log
Information collected and recorded by the CCTV operator for each CCTV inspection effort and includes pertinent information for the respective inspection section; such as, date of inspection, location of site, CCTV technician, direction of CCTV inspection with manhole or structure identifiers, weather conditions, pipe size(s), pipe materials, conditions found, locations where the conditions were found.
1.1.16 Warranty CCTV (Warranty-TV)
Warranty-TV inspection is used to determine the slip lining of sanitary or storm sewers does not have any defects present, remains in compliance with project specifications and Post-TV inspection.
1.2 ADMINISTRATIVE REQUIREMENTS
1.2.1 Disposal Plan
As part of the Environmental Protection Plan being submitted for the project per Section 01 57 20.02 03 ENVIRONMENTAL PROTECTION FOR INDIANA, submit a disposal plan prior to performing any work that might generate waste materials. Include a complete description of the materials that are expected to be encountered and their proposed disposal sites. No changes to the disposal plan will be made without prior written acceptance by the Contracting Officer. See subparagraph 3.1.1 of this specification for
SECTION 33 01 30.16 Page 4 required disposal of liquids and solids resulting from cleaning activities. Liquid and solid waste from cleaning activities shall be disposed of at the City’s wastewater treatment plant.
1.2.2 Sewage Handling Permit
Prior to commencing application of herbicide, if used, obtain and maintain a valid State sewage handling permit and permits required by local jurisdictions. Submit a copy of this permit to the Contracting Officer prior to beginning any cleaning or pump and haul operations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, an "AE" designation following the "G" designation identifies the submittal will be reviewed by the local sponsor's Engineer. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Sewage Handling Permit ; G, AE
Homeowner Notification Flyer ; G, AE
SD-03 Product Data
Cleaning Products ; G, AE
SD-04 Samples
Five Percent Submittal ; G, AE
SD-07 Certificates
List of Equipment G, AE
Qualifications ; G, AE
CCTV Technician's Qualifications ; G, AE
Pre-TV Inspection ; G, AE
Post-TV Inspection ; G, AE
Warranty-TV Inspection ; G, AE
SD-11 Closeout Submittals
Records of Disposals
Final CCTV Inspection Logs ; G, AE
Final CCTV Inspection Database ; G, AE
Final Digital CCTV Inspection Recordings ; G, AE
SECTION 33 01 30.16 Page 5 clear in-focus picture of a minimum of ten lineal feet of the entire periphery of the sewer pipe. The lighting for the camera shall minimize glare. Lighting sensitivity shall be 3 lux or less.
c. Transporters: The camera should be mounted on skids or a tractor suitably sized for the pipe to be televised that will position the camera lens above the liquid flow line, near the center axis of the pipe. Any motorized transporters should have adjustable speed control. The televising may also be accomplished using camera equipment mounted on a raft or floating pontoon, if the required pipe condition information cannot be obtained by tracked camera equipment within the maximum allowable flow depths.
d. Cable and Footage Counter: A minimum 1,500 feet of TV cable on the spool reel shall be provided. The TV cable will be supported by an equal length tag line for removal of the equipment from the pipeline.
e. Computer System: The computer system shall be capable of recording, indexing, and processing inspection data; printing CCTV inspection logs; and recording, storing, and playing video and images of pipe observations as required for the data documentation requirements of these specifications.
f. Software: Inspection software shall be an up-to-date, PACP compliant software, such as versions of CUES Granite XP, WinCam, Flexidata, or equal, as approved by LS/COR.
2.2 MATERIALS
2.2.1 Cleaning Products
Select cleaning products that do not present a health and safety concern, are allowed for use in the sewer system according to Federal and State regulations, will not adversely affect the water quality of the water being conveyed in the sewer system, are suitable for the wastewater treatment plant and the climatic conditions at the project site. Submit manufacturer's label and SDS for the cleaning products proposed for use.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Sewer Line Cleaning
Immediately prior to conducting CCTV activities, thoroughly clean the segment of sewer pipe to be video inspected. Clean the segments using hydraulically propelled, high-velocity jet, or mechanically powered equipment.
Sewer cleaning shall be performed with hydraulically propelled high velocity jet designed for cleaning sewers. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. As a minimum, jetting of lines must be performed by pulling the high velocity spray nozzle in the direction opposite to the force created by the water pressure.
Liquid decanted or separated from the solids shall be returned to the sewer and shall not contain solids having greater than a 1/2-inch .
SECTION 33 01 30.16 Page 11
The intent of sewer line cleaning is to remove all sludge, dirt, sand, rocks, grease, and other solids or semisolid material from the pipe so that the sewer lines are ready for relining.
a. During cleaning and preparation operations, undertake precautions to protect the sewer system and property from damage. Restore property damaged as a result of such cleaning and preparation operations to pre-existing conditions.
b. During the course of normal cleaning operations immediately report pre-existing damage such as broken or missing pipe to the Contracting Officer.
c. When hydraulically propelled cleaning tools or tools which retard the flow in the sewer line are utilized, take precautions to ensure that the water pressure created does not damage or cause flooding on the adjacent site.
d. Maintain access to fire hydrants for the purpose of fire protection at all times.
e. If cleaning of an entire sewer section cannot be successfully performed from one manhole or structure, set up the equipment on the other entry or exit point and attempt cleaning again.
f. If successful cleaning cannot be performed from the opposite end or the equipment fails to traverse the entire pipeline section, cease cleaning those specific sewer sections, notify the Contracting Officer and CCTV inspect both sides of the pipeline section to determine the cause of the blockage.
g. Protruding Lateral Connections: When specified, contractor shall remove protruding lateral connections via the use of internal cutting devices which are capable of providing a smooth lateral cut at its internal connection to the sewer.
h. Liquid and solid waste resulting from sewer cleaning shall be disposed at the Crown Point Wastewater Treatment Plant at 1321 Merrillville Road, Crown Point, Indiana 46307. Contractor must coordinate disposal with City Wastewater Plant Manager, Chris Previs.
3.1.1.1 Blockage
If cleaning of an entire sewer section cannot be successfully performed from one manhole, equipment shall be set up on the other manhole and cleaning again attempted. No additional payment allowance shall be made for reverse set-ups. If on reverse set-up successful cleaning also cannot be performed or equipment fails to traverse entire sewer line section, it shall be assumed that a major blockage or defect exists, and cleaning effort shall be abandoned.
Contractor shall determine the location of major blockage(s) by measuring length of hose or rod inserted from manholes at each end and immediately report location of blockage(s) to COR and CONTRACTOR shall note these conditions in its field log.
Contractor shall recognize that there are some conditions such as broken pipe and major blockages that prevent cleaning from being accomplished or
SECTION 33 01 30.16 Page 12
Color: Light Gray.
2.1.5 Work Included
Lining of manholes shall include bench unless manhole is to receive a new bench/channel as noted in the construction drawings. Cost of work shall be included in bid as there will be no additional VLF calculated for payment of the bench lining.
Remove manhole steps.
Prior to any repair work inside the manhole, all interior wall and invert surfaces shall be cleaned using a minimum of 5,000 pounds per square inch (psi) water to blast to removal all foreign matter, loose mortar, grease, oil residues, and to etch the surfaces. After pressure cleaning, surface is to be cleaned with degreaser or other solvents as needed to remove any film or residue on the surface. Structure shall then be pressure rinsed with water.
a. Material removed from the manhole during cleaning , both liquid and solids, shall be disposed of at the City's Wastewater Treatment Plant located at 1321 Merrillville Road, Crown Point, Indiana 46307.
Contractor must coordinate disposal with City Wastewater Plant Manager, Chris Previs capable of being washed down the sewer without causing any potential obstruction in the sewer may be washed down the sewer unless chemicals are used as part of the cleaning process.
Objects that cannot be washed down the sewer shall be physically removed and disposed of at the Contractor's expense .
b. If the initial water blast cannot be utilized due to structural conditions in the manhole or it does not remove all deposits, then a solution of muriatic acid (hydrochloric acid) at a ratio of one part acid to ten parts water shall be applied by spraying from above the manhole. After the acid solution is applied, it shall be washed off completely, and the manhole shall be allowed to dry. The mixing, application, and removal of the acid solution shall be done in strict accordance with the manufacturer's specifications and safety procedures. All waste materials resulting from the cleaning operation shall be removed from the manhole being cleaned and properly disposed of by the Contractor.
Examine surface to receive restoration mortar. Notify the Owner if surfaces are not acceptable. Do not begin surface preparation or application until unacceptable conditions have been corrected.
Prepare surfaces in accordance with lining manufacturer's instructions.
Provide the Owner with a minimum of three workdays advance notice of completion of surface preparation and start of application.
Inspect cleaned surfaces to identify and mark corroded reinforcing steel, and to locate cracks, leaks, and joints.
Replace or treat corroded reinforcing steel, repair cracks and leaks and treat joints in accordance with manufacturer's instructions and as approved by the COR.
All pipes penetrating manhole wall shall have exposed perimeters sealed.
SECTION 33 01 31 Page 9
"General Decision Number: IN20200001 08/07/2020
Superseded General Decision Number: IN20190001
State: Indiana
Construction Types: Building, Heavy and Highway
Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/07/2020 3 02/14/2020 4 02/21/2020 5 04/03/2020 6 05/01/2020 7 05/29/2020 8 06/05/2020 9 06/12/2020 10 06/26/2020 11 07/03/2020 12 07/10/2020 13 07/24/2020 14 08/07/2020
ASBE0017-002 06/01/2019
LAKE AND PORTER COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 50.50 27.80
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHANICAL SYSTEMS).........$ 37.80 24.54
ASBE0075-001 06/01/2019
REMAINING COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 32.00 24.54
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
BOIL0001-005 05/01/2017
LAKE COUNTY, City of Hammond; North of 114th Street
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BOIL0374-003 03/01/2018
Rates Fringes
BOILERMAKER......................$ 37.22 27.65
BRIN0004-011 06/01/2019
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer; Stone Mason;
Pointer, Cleaner, Caulker...$ 38.12 24.40 Marble Finisher; Tile Finisher....................$ 30.00 15.54 Marble Mason; Terrazzo Worker; Tile Layer..........$ 37.05 21.64 Terrazzo Finisher...........$ 30.00 15.54
BRIN0004-018 06/01/2019
SOUTH BEND: ST. JOSEPH COUNTY
BRICKLAYER
BRICKLAYER; STONE MASON;
POINTER, CAULKER, CLEANER...$ 29.49 16.77
MARBLE AND TILE FINISHER....$ 30.00 15.54
MARBLE AND TILE LAYER.......$ 30.57 18.36
TERRAZZO FINISHER...........$ 30.00 15.54
TERRAZZO WORKER.............$ 31.57 18.36
CARP0413-002 04/01/2020
St. Joseph County
Rates Fringes
CARPENTER........................$ 28.77 22.11
CARP0765-001 06/01/2020
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
CARPENTER........................$ 39.19 29.24
MILLWRIGHT.......................$ 39.88 29.20
CARP1029-001 06/01/2020
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
MILLWRIGHT.......................$ 28.58 25.21
ELEC0153-001 06/03/2019
ST JOSEPH COUNTY
Rates Fringes
Communication Technician.........$ 26.50 18.33
ELECTRICIAN......................$ 34.67 24.27
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
* ELEC0531-001 06/01/2020
LAPORTE and PORTER COUNTIES
ELECTRICIAN......................$ 40.75 27.32
ELEC0697-001 06/01/2020
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 42.75 29.93
ELEC0697-004 08/26/2019
LAKE COUNTY
Rates Fringes
Telecommunication Technician.....$ 34.00 26.70
Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).
Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC1393-003 12/02/2019
LAKE & PORTER COUNTIES
(Calumet Area, North of U.S. Hwy 30)
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR 1:
(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 31.77 29%+6.75
EQUIPMENT OPERATOR 3
(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 39.19 29%+6.75
GROUNDMAN...................$ 25.04 29%+6.75
GROUNDMAN-TRUCK DRIVER......$ 26.14 29%+6.75
LINEMAN.....................$ 41.61 29%+6.75
ELEV0002-005 01/01/2019
ELEVATOR CONSTRUCTION
LAKE AND PORTER COUNTIES
Rates Fringes
ELEVATOR MECHANIC................$ 56.61 33.705+a+b
FOOTNOTES:
a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.
ELEV0044-002 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 51.35 34.765+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0150-001 06/01/2019
BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:
LAKE, LAPORTE, and PORTER COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 41.00 36.13
GROUP 2.....................$ 40.20 36.13
GROUP 3.....................$ 35.90 36.13
GROUP 4.....................$ 33.70 36.13
GROUP 5.....................$ 28.25 36.13
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;
Concrete paver 27E cu. ft. & under; Concrete placing boom;
Concrete pump/grout pump with boom (truck mounted);
Concrete pump with boom (truck mounted); concrete tower;
Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);
Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors,…