W81G6691695879
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: INVITATION FOR BIDS NO. W912P619B0018, “City of Hobart, 6th Street Sanitary Sew er Improvement, CIty of Hobart, IN, County of Lake (USACE - Chicago District Project)”
THE NEXT PAGES DESCRIBE THE ELEMENTS OF THIS AMENDMENT –
1. CONTRACT ID CODE PAGE OF PAGES
1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0018
X 9B. DATED (SEE ITEM 11)
23-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Sep-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
A. BID OPENING DATE AND TIME The Bid Opening Date is NOT EXTENDED by this Amendment.
Accordingly, all bids are required prior to the bid opening time of 2:00pm Central time on September 23, 2019. – For further details regarding bid submission, please refer to Solicitation Section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”
B. BID SCHEDULE: The government is providing a revised Bid Schedule (Section 00 10 00 – Solicitation Contract Form). Therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule.
--The specific Bid Schedule revisions are:
CLIN 0001AG HMA For Patching revised to 58 SQ YDS CLIN 0002AE HMA For Patching revised to 276 SQ YDS CLIN 0003AE HMA For Patching revised to 113 SQ YDS
C. POINT OF CONTACTs: The Contacts for this Amendment is Annette Lakes at 312-846-5368/ Annette.H.Lakes@usace.army.mil AND Regina G. Blair at 312-846-5371/ regina.g.blair@usace.army.mil.
END OF AMENDMENT NO. 0002
(REVISED BID SCHEDULE FOLLOWS)
REVISED BID SCHEDULE – AMENDMENT NUMBER 0002
Section 00 10 00 - Solicitation
CONTRACTING BID FORM
THE “SOLICITATION CONTRACT FORM” CONTAINED AT THIS SECTION 00 10 00 OF THE
SOLICITATION DOCUMENT SHALL BE USED BY BIDDERS TO SUBMIT THEIR BIDS; SAID FORM IS
CONSIDERED THE “BID SCHEDULE” AS TERMED THROUGHOUT THIS SOLICITATION.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE WORK - WEST 6TH STREET
FFP
This is a Parent Line Item linking Sub-items 0001AA through 0001AT under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number , which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all apply to the quantities delineated at the sub-item level.
PURCHASE REQUEST NUMBER: W81G6691695879
NET AMT
0001AA 1 Job
MOBILIZATION (BASE WORK)
FFP
Under this line item, the contractor is required to perform mobilization activities.
The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AB 1 Job
DEMOBILIZATION (BASE WORK)
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0001AC 1 Job Maintenance of Traffic
0001AD 1 Job Clearing and Grubbing
0001AE 629 Square
Yard
Subgrade Treatment, 16"
0001AF 934 Square
HMA for Mainline
0001AG 58 Square
HMA for Patching
0001AH 19 Square
Aggregate For Drives
0001AJ 186 Square
Mulched Seeding, Type 1
0001AK 1 Each Connection to Existing Manhole
0001AL 16 Each 8"x6" Sanitary Sewer Connection
0001AM 4 Each Sanitary Manhole, Type A
0001AN 16 Each 6" Sanitary Cleanout
0001AP 660 Linear
Foot
8" Sanitary Pipe
0001AQ 407 Linear
6" Service Lateral
0001AR 2 Each Contaminated Soil Sampling & Analysis
0001AS 2 Each Dewatering Groundwater Sampling
& Analysis
0001AT 1 Lot
PERFORMANCE & PAYMENT BONDS (BASE WORK)
FFP
THIS IS A COST REIMBURSABLE LINE ITEM FOR BOND COVERAGE
FOR LINE ITEMS 0001AA THROUGH 0001AS.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract price changes.
OPTION PRIORITY AREA #1 - EAST 6TH STREET
FFP
This is a Parent Item, linking Option Sub-items 0002AA through 0002AT under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number , which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all
0002AA 1 Job
OPTION MOBILIZATION (PRIORITY AREA #1)
mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0002AB 1 Job
OPTION DEMOBILIZATION (PRIORITY AREA #1)
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0002AC 1 Job OPTION Maintenance of Traffic
0002AD 1 Job OPTION Clearing and Grubbing
0002AE 276 Square
OPTION HMA for Patching
0002AF 48 Square
OPTION Concrete Sidewalk, 4"
0002AG 13 Square
OPTION Mulched Seeding, Type 1
0002AH 1 Each OPTION Connection to Existing Manhole Forcemain
0002AJ 22 Each OPTION Sanitary Service Connection, Forcemain
0002AK 22 Each OPTION Forcemain Lateral Assembly
0002AL 719 Linear
OPTION 2" Sanitary Forcemain
0002AM 1,039 Linear
OPTION 3" Sanitary Forcemain
0002AN 547 Linear
OPTION 1-1/4" Forceman Lateral
0002AP 1 Each OPTION Terminal Flusing Connection
0002AQ 1 Each OPTION Air/Vacuum Release Structure
0002AR 2 Each OPTION Contaminated Soil Sampling & Analysis
0002AS 2 Each OPTION Dewatering Groundwater Sampling
& Analysis
0002AT 1 Lot
OPTION PERFORMANCE & PAYMENT BONDS
FFP
(PRIORITY AREA #1) THIS IS A COST REIMBURSABLE LINE ITEM FOR
BOND COVERAGE FOR LINE ITEMS 0002AA THROUGH 0002AS.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the
OPTION PRIORITY AREA #2 - FLEMING STREET
FFP
This is a Parent Item, linking Option Sub-items 0003AA through 0003AR under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number , which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0003AA 1 Job
OPTION MOBILIZATION (PRIORITY AREA #2)
mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0003AB 1 Job
OPTION DEMOBILIZATION (PRIORITY AREA #2)
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0003AC 1 Job OPTION Maintenance of Traffic
0003AD 1 Job OPTION Clearing and Grubbing
0003AE 113 Square
OPTION HMA for Patching
0003AF 13 Square
OPTION Aggregate for Drives
0003AG 26 Square
OPTION Mulched Seeding, Type 1
0003AH 2 Each OPTION Connection to Existing Manhole Forcemain
0003AJ 10 Each OPTION Sanitary Service Connection, Forcemain
0003AK 10 Each OPTION Forcemain Lateral Assembly
0003AL 392 Linear
OPTION 2" Sanitary Forcemain
0003AM 144 Linear
OPTION 1-1/4" Forcemain Lateral
0003AN 2 Each OPTION Terminal Flushing Connection
0003AP 2 Each OPTION Contaminated Soil Sampling & Analysis
0003AQ 2 Each OPTION Dewatering GroundwaterSampling& Analysis
0003AR 1 Lot
OPTION PERFORMANCE & PAYMENT BONDS
FFP
(PRIORITY AREA #2) THIS IS A COST REIMBURSABLE LINE ITEM FOR
BOND COVERAGE FOR LINE ITEMS 0003AA THROUGH 0003AQ.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the
OPTION PRIORITY AREA #3 - WEST 6TH STREET
FFP
This is a Parent Item, linking Option Sub-items 0004AA through 0004AC under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number , which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0004AA 1,085 Square
OPTION Milling, Asphalt, 1.5"
0004AB 1,085 Square
OPTION HMA for Surface
0004AC 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
(PRIORITY AREA #3) THIS IS A COST REIMBURSABLE LINE ITEM FOR
BOND COVERAGE FOR LINE ITEMS 0004AA THROUGH 0004AB.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the
OPTION PRIORITY AREA #4 - EAST 6TH STREET
FFP
This is a Parent Item, linking Option Sub-items 0005AA through 0005AC under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number , which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0005AA 5,179 Square
0005AB 5,179 Square
0005AC 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
(PRIORITY AREA #4) THIS IS A COST REIMBURSABLE LINE ITEM FOR
BOND COVERAGE FOR LINE ITEMS 0005AA THROUGH 0005AB.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the
OPTION PRIORITY AREA #5 - FLEMING STREET
FFP
This is a Parent Item, linking Option Sub-items 0006AA through 0006AC under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number , which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or
0006AA 759 Square
0006AB 747 Square
0006AC 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
(PRIORITY AREA #5) THIS IS A COST REIMBURSABLE LINE ITEM FOR
BOND COVERAGE FOR LINE ITEMS 0006AA THROUGH 0006AB.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the
SUMMATION OF BID PRICES
BASE BID ITEMS, WEST 6TH STREET (“BASE WORK” – ITEMS 0001AA THROUGH
0001AT): $______________________
OPTION ITEMS FOR “PRIORITY AREA #1,” EAST 6TH STREET – (ITEMS 0002AA
THROUGH 0002AT): $_________________________
OPTION ITEMS FOR “PRIORITY AREA #2,” FLEMING STREET – (ITEMS 0003AA
THROUGH 0003AR): $_________________________
OPTION ITEMS FOR “PRIORITY AREA #3,” WEST 6TH STREET – (ITEMS 0004AA
THROUGH 0004AC): $______________________
OPTION ITEMS FOR “PRIORITY AREA #4,” EAST 6TH STREET – (ITEMS 0005AA
THROUGH 0005AC): $______________________
OPTION ITEMS FOR “PRIORITY AREA #5,” FLEMING STREET – (ITEMS 0006AA
THROUGH 0006AC): $______________________
OVERALL TOTAL BID PRICE (ITEMS 0001AA THROUGH 0001AT; OPTION
ITEMS 0002AA THROUGH 0002AT; OPTION ITEMS 0003AA THROUGH 0003AR);
OPTION ITEMS 0004AA THROUGH 0004AC; OPTION ITEMS 0005AA THROUGH
0005AC AND OPTION ITEMS 0006AA THROUGH 0006AC):
END OF REVISED BID SCHEDULE