W81G6691695879
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: INVITATION FOR BIDS NO. W912P619B0018, “City of Hobart, 6th Street Sanitary Sew er Improvement, CIty of Hobart, IN, County of Lake (USACE - Chicago District Project)”
THE NEXT PAGES DESCRIBE THE ELEMENTS OF THIS AMENDMENT --
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0018
X 9B. DATED (SEE ITEM 11)
23-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Sep-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
A. BID OPENING DATE: The BID OPENING DATE AND TIME IS UNCHANGED by this Amendment, therefore, BIDS are due prior to 2:00p.m. Central Time on September 23, 2019. –For further details regarding bid submission, please refer to Solicitation Section 00 22 13 - Supplementary Instructions to Bidders.
B. REVISED DRAWING SHEETS: The following Drawing Sheets have been revised and are hereunder enclosed replacing the previously furnished respective sheets.
Sheet G-001, TITLE SHEET has been revised to reflect an amendment notation in border block
“UPDATED PATCHING QUANTITIES ON SHEET CU-502.”
Sheet CU-502, SUMMARY OF QUANTITIES AND APPROACH TABLE has been revised to update quantities in the table shown.
C. AMENDED SPECIFICATION SECTIONS: The following items and revised Specification Section are hereunder provided:
(1) ENG FORM 4025-R
(2) SUBMITTAL REGISTER
(3) SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS paragraph 1.6.1.1.1 has been revised to state, “The SSHO may serve as the Quality Control Manager or as the Superintendent but not both.” See revised paragraph from specification 01 35 26 that is enclosed herewith this Amendment.
D. USACE RESPONSE TO A CONTRACTOR’S INQUIRY: By this Amendment, the Chicago District, USACE responds to the following question.
QUESTION: The plans have location of soil borings but I cannot find the actual borings in the specs or on the plans. Are there borings available for review to see the needs for dewatering?
USACE Response: The following two geotechnical reports are located immediately following Specification 00 31 32.13 SUBSURFACE DRILLING AND SAMPLING INFORMATION which contain information with respect to groundwater and soils.
a. GEOTECHNICAL EVALUATION SEWER IMPROVEMENTS HOBART, INDIANA
b. SUBSURFACE INVESTIGATION & GEOTECHNICAL REPORT PROPOSED SANITARY
SEWER HOBART, INDIANA
E. WAGE RATES: This Amendment provides the most current wage rates for this project - SEE General
Decision Number: IN20190001 08/30/2019, which is attached hereto.
F. POINT OF CONTACT: The point of contact for this Amendment is Annette Lakes at 312-846-5368 OR Email: Annette.H.Lakes@usace.army.mil
END OF AMENDMENT
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
6th Street Sanitary Sewer Improvements, City of Hobart, IN
01 10 00 SD-01 Preconstruction Submittals
1.7 G CS AEConstruction Schedule
1.9 G CSCondition of Existing Structures
1.14 G CS AECoordination with Others
1.5Drug Free Workplace
1.23.1 G GSEList of E-Verified/Eligible
Candidates
SD-06 Test Reports
1.20 G CS AEProgress Meeting Minutes
01 33 00 SD-01 Preconstruction Submittals
1.8 G CSSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 G CS SOAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G CS SOAccident Reports
1.12.3 G CS SOLHE Inspection Reports
SD-07 Certificates
1.6.1.5Crane Operators/Riggers
1.7.2.2 G CSStandard Lift Plan
1.7.2.3 G CSCritical Lift Plan
1.7.2.4 G CSNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
6th Street Sanitary Sewer Improvements, City of Hobart, IN
01 35 26 1.14License Certificates
1.14.1Radiography Operation Planning
Work Sheet
1.14.1Portable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G CSContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.2 G CSConstruction Site Plan
01 55 26.00 03 SD-01 Preconstruction Submittals
3.2 G CS AETraffic Control Plan
01 57 20.02 03 SD-01 Preconstruction Submittals
1.6 G DHEnvironmental Protection Plan
01 58 00 SD-02 Shop Drawings
1.4 G CSSign Legend Orders
01 78 00 SD-11 Closeout Submittals
1.6Intermediate Working CAD
Drawing Submittal
1.7.1Final CAD Drawing Submittal
1.7.2 G CS DCFinal CAD Drawing Backcheck
Submittal
1.9Final Cleaning
03 48 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
6th Street Sanitary Sewer Improvements, City of Hobart, IN
03 48 00 1.6 G CS AEStandard Precast Units
1.6 G CS AECustom-Made Precast Units
31 11 00 SD-03 Product Data
2.1.1Tree Wound Paint
31 23 00.00 20 SD-01 Preconstruction Submittals
1.7.1 G AEShoring and Sheeting Plan
1.7.2 G AEDewatering Work Plan
SD-06 Test Reports
1.6 G AEBorrow Site Testing
3.14.2.1 G AEFill and Backfill
3.14.2.2 G AEDensity Tests
SD-07 Certificates
3.6.1UST Contractor
32 11 23 SD-06 Test Reports
3.1.5 G CS AEMoisture Content
3.1.5 G CS AECompaction
32 11 30.10 SD-05 Design Data
3.1.1 G CS AEMix Design
SD-06 Test Reports
3.1.1 G CS AEFly Ash
3.1.1 G CS AELime
3.1.7 G CS AECompaction
3.1.7 G CS AEMoisture
32 12 16 SD-03 Product Data
3.1.2 G CS AEEquipment
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
6th Street Sanitary Sewer Improvements, City of Hobart, IN
32 12 16 3.1.1 G CS AEDesign Mix Formula
32 13 13.06 SD-03 Product Data
2.1.6 G AECuring materials
2.1.4 G AEAdmixtures
2.1.5.1 G AEDowel
SD-05 Design Data
1.6.2 G AEConcrete Mix Design
SD-06 Test Reports
2.1.3 G AEAggregate
3.7.2 G AEConcrete Slump Tests
3.7.4 G AEAir Content Tests
3.7.3 G AEFlexural Strength Tests
SD-07 Certificates
1.6.1Ready-mixed Concrete Plant
1.6.3Batch Tickets
2.1.1Cementitious Materials
33 05 23.13 SD-01 Preconstruction Submittals
1.7.1 G AEStatement of Qualifications and
Records
1.7.2.5 G AESchedule
1.7.2.6 G AECalculations
SD-02 Shop Drawings
3.7 G AEAs-Builts
SD-03 Product Data
1.7.2.2 G AEDrilling Equipment and Methods
1.7.2.3 G AEPiping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
6th Street Sanitary Sewer Improvements, City of Hobart, IN
33 05 23.13 SD-05 Design Data
1.7.2.2 G AESafety Data Sheets
1.7.2.4 G AEProposed Alignment
SD-06 Test Reports
1.7.2.1 G AESubsurface Information
33 30 00 SD-01 Preconstruction Submittals
1.6Existing Conditions
SD-02 Shop Drawings
3.1.2.1 G CS AEPrecast Concrete Manhole
2.3.4 G CS AEMetal items
2.3.4.1 G CS AEFrames, Covers, and Gratings
SD-03 Product Data
2.1 G CS AEPipeline Materials
SD-06 Test Reports
2.4Reports
SD-07 Certificates
2.2.2Portland Cement
33 31 23.00 10 SD-03 Product Data
2.5.1 G AEAir Release Valves
2.5.1.1 G AEAutomatic Air Release Valve
SD-06 Test Reports
3.2 G AEDisposal of Waste Water
3.2.1 G AEPressure Testing
3.2.2 G AELeakage Test
33 32 16 SD-04 Samples
1.4 G AEWarranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
6th Street Sanitary Sewer Improvements, City of Hobart, IN W912P619B0018 rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.6.1 Personnel Qualifications
1.6.1.1 Site Safety and Health Officer (SSHO)
Provide an SSHO that meets the requirements of EM 385-1-1 Section 1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs.
If the SSHO is off-site for a period longer than 24 hours, an equally-qualified alternate SSHO must be provided and must fulfill the same roles and responsibilities as the primary SSHO. When the SSHO is temporarily (up to 24 hours) off-site, a Designated Representative (DR), as identified in the AHA may be used in lieu of an Alternate SSHO, and must be on the project site at all times when work is being performed.
Note that the DR is a collateral duty safety position, with safety duties in addition to their full time occupation.
1.6.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties
The SSHO may not serve as the Quality Control Manager or . The SSHO may not serve as the Superintendent , but not both .
1.6.1.2 Competent Person Qualifications
Provide Competent Persons in accordance with EM 385-1-1 , Appendix Q and herein. Competent Persons for high risk activities include confined space, cranes and rigging, excavation/trenching, fall protection, and electrical work. The CP for these activities must be designated in writing, and meet the requirements for the specific activity (i.e., competent person, fall protection).
The Competent Person identified in the Contractor's Safety and Health Program and accepted Accident Prevention Plan, must be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the the Contracting Officer for information in consultation with the Safety Office.
1.6.1.2.1 Competent Person for Confined Space Entry
Provide a Confined Space (CP) Competent Person who meets the requirements of EM 385-1-1 , Appendix Q, and herein. The CP for Confined Space Entry must supervise the entry into each confined space in accordance with
SECTION 01 35 26 Page 11
AMD #0001 - 09/11/19
Design and Construction
Supervised by:
4'-0"
4"X4" POST
4"X4" POST
4.5"
2.25"
1" 2"21"
3"3"
2"
4.5"
6.25"
10.5"
3"
4'-0"
4'-0"
6'-0" of Engineers
CHICAGO DISTRICT
7.75"
21"3"
6"
1"x6"x4'
Information
Contractor:
U.S. Army Corps
NOT TO SCALE
1.25"
1.875"
1.875"
1.875"
1.875"
42"(max.)19"(max.) 2"
4.5"
9.5"
6"
LINE 3
LINE 2
LINE 1
GENERIC PROJECT IDENTIFICATION SIGN
PLATE 01 58 00-1
FOR SIDE VIEW, SEE PLATE 01 58 00-2
NOTE:
Identification Label for Project
Section 01 58 00
Refer to
3"
(312) 846-5339
WWW.LRC.USACE.ARMY.MIL
(312) 846-5330
This project started
Total lost time injuries lost time accident
Date since last
4'-0"
2x4 BRACE BETWEEN P0STS
2x4 BRACE BETWEEN P0STS
2X4 STAKES
14'-0" LONG 2X4
BRACE FOR EACH POST
4'-0"
4'-0"
8'-0"
Requirement
Safety is a Job ƒ" PLYWOOD
4.875"
4.875"
3"
24"3"
4"x4" POST4"x4" POST
6"
4.5"
2.25"
2.25"
4.875"
6.75"
3" 3" 8" 3"31"
21"
4.5"
4.875"
1"x6"x4'
1.25"
2.5"2.5" 2.5"2.5" 2.5"2.5"
1.25"
NOT TO SCALE
4.5"
4.5"
42"(max.)
2.25"
5.25"
INFORMATION
CONTRACTOR:
LINE 3
LINE 2
LINE 1
GENERIC SAFETY PERFORMANCE SIGN
P L
A T
E for Project Identification Label
Refer to Section 01 58 00
PROJECT LOCATION SHOWN BY
6TH STREET
LAT.: N 41°31'47"
LONG.: W 87°14'51"
FLEMING STREET
LAT.: N 41°31'21"
LONG.: W87°15'24"
HOBART, INDIANA
CITY OF HOBART
2019 WATER QUALITY PROJECTS
G-001 TITLE SHEET
GI-002 GENERAL INFORMATION AND TYPICAL CROSS SECTIONS
GC-003 REAL ESTATE PLAN
GC-004 MAINTENANCE OF TRAFFIC
CU-101 FLEMING STREET LOW PRESSURE FORCE MAIN PLAN AND PROFILE
CU-102 THUR CU-104 6TH STREET - EAST LOW PRESSURE FORCE MAIN PLAN AND PROFILE
CU-105 6TH STREET - WEST SANITARY SEWER PLAN AND PROFILE
CU-106 EROSION CONTROL PLAN
CU-107 BID OPTIONS
CU-501 CONSTRUCTION DETAILS
CU-502
SUMMARY OF QUANTITIES AND APPROACH TABLE
CU-503 CONSTRUCTION DETAILS AND STRUCTURE DATA TABLE
VICINITY MAP
LAKE COUNTY
NOTE:
Contractor Will Be Required To Coordinate The Re-Location Of Any Existing Utilities Encountered
To Accomplish The Work. No Additional Payment Shall Be Made For Coordinating The
Re-Location Of Existing Utilities. Not All Water And Gas Service Lines Are Shown On The Plan. It
Shall Be The Contractor's Responsibility To Have Utilities Accurately Located Prior To The
Commencement Of Construction. Contractor To Coordinate Service Line Reconstruction With
The Gas Utility.
CAUTION:
LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE
BASED UPON ABOVE GROUND EVIDENCE (including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others) AND ARE SPECULATIVE IN NATURE.
THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS
NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS
OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES
SHOULD BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION.
R
R
CABLE TV
COMCAST NORTH
16 WEST 84th DRIVE
MERRILLVILLE, IN 46405
(574) 320-8203
ATTN. LARRY SMITH
ELECTRIC
NIPSCO
ENGINEERING DEPARTMENT
801 E. 86TH AVENUE
MERRILLVILLE, IN 46410
(219) 647-5634
ATTN. JOSE LUIS RINCONENO
STORM AND SANITARY SEWER
CITY OF HOBART
414 MAIN STREET
HOBART, IN 46342
(219) 942-8271
ATTN. PHILLIP GRALIK
TELEPHONE
FRONTIER
2401 CHICAGO STREET
VALPARAISO, IN 46383
(219) 531-9237
ATTN. ALISON BUCHANAN
WATER
INDIANA AMERICAN WATER
650 MADISON STREET
GARY, IN 46401
(219) 880-2326
ATTN. ED NICKELS
GAS DISTRIBUTION AND
GAS 16" HIGH PRESSURE LINE
NIPSCO
ENGINEERING DEPARTMENT
806 EAST 86TH AVENUE
MERRILLVILLE, IN 46410
(219) 647-5143
ATTN. DAN PHILLIPS
6TH STREET
THERE ARE NO KNOWN DRINKING WATER
WELLS LOCATED WITHIN 50 FEET OF THE
PROPOSED SANITARY IMPROVEMENTS.
FLEMING STREET
S O L I C I T A T I O N
N O
F I L E
N A M E
D W N
B Y
C K D
B Y
D E S I G N E D
B Y
D E S C R I P T I O N
D
2 3
C
4 5
A
B
M A R K
A P P R
D A T E
F I L E
N U M B E R
S I Z E
S U B M I T T E D
B Y
P L O T
S C A L E I S S U E
D A T E
D A T E
C O N T R A C T
N O
SHEET
IDENTIFICATION
SHEET OF
US Army Corps of Engineers
U S
A R M Y
C O R P S
O F
E N G I N E E R S
C I T Y
O F
H O B A R T
W A T E R
Q U A L I T Y
P R O J E C T S
H O B A R T
I N D I A N A
T I T L E
S H E E
G-001
S
M i k o s
G
N u l l i n e r
S
M i k o s
N O N E
A N S I
D
G d w g
M
C h m e l i w s k y j
W
P B
I C A G O
D I S T R I C T
C H I C A G O
I L L I N O I S
B U T L E R
F A I R M A N
S E U F E R T
W E S T F I E L D
B L V D
S U I T E
I N D I A N A P O L I S
I N D I A N A
100% PLANS 8/22/19
SOLICITATION NO.:
CERTIFIED FINAL DOCUMENTS:
AS-AWARDED CERTIFIED FINAL:
ISSUE DATE:
W912P619B0018
RTA W912P619B0018
W912P6-##-C-####
22 AUGUST 2019
U P D
A T
D
P
T C H
I N
G
Q
U A N
T I T I E S
O
N
S H
E E T
C U
AutoCAD SHX Text No.
AutoCAD SHX Text
PE11400271
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
INDEX
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
DESIGNATION
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text N
AutoCAD SHX Text Know what's
AutoCAD SHX Text Call
AutoCAD SHX Text below.
AutoCAD SHX Text before you dig.
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
C O
N T
R A
SHEET
IDENTIFICATION
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
F
E
N G
I N
E E
R S
C I T
Y
O
F
H
O B
A R
T
T
R
Q
U A
L I T
Y
P
R O
J E
C T
S
H O
B A
R T
I N
D I A
N A
S U
M M
A R
Y
O
F
Q
U A
N T
I T
I E
S
A N
D
A
P P
R O
A C
H
T
A B
CU-502
S
M i k o s
G
N u l l i n e r
S
M i k o s
T
E D
A N
S I
D
C U d w g
M
C h m e l i w s k y j
P
B
I C
A G
O
D
I S
T R
I C
T
C H
I C
A G
O
I L L I N
O I S
B U
T L E
R
F
A I R
M A
U
F E
R T
W
E S
T F
I E
B
V
D
S
U I T
E
I N
D I A
N A
P O
L I S
I N
D I A
100% PLANS 8/22/19
TERMINAL FLUSHING CONNECTION
NOT TO SCALE
FORCE MAIN LATERAL ASSEMBLY
NOT TO SCALE
IN-LINE FLUSHING CONNECTION
NOT TO SCALE
1.
U P D
A T
T C H
I N
G
Q
U A N
T I T I E S
AutoCAD SHX Text No.
AutoCAD SHX Text
PE11400271
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
"General Decision Number: IN20190001 08/30/2019
Superseded General Decision Number: IN20180001
State: Indiana
Construction Types: Building, Heavy and Highway
Counties: La Porte, Lake, Porter and St Joseph Counties in
Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to
Page 1 of 42beta.SAM.gov
9/15/2019https://beta.sam.gov/wage-determination/IN20190001/13/document the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 01/18/2019
2 01/25/2019
3 02/08/2019
4 03/08/2019
5 04/12/2019
6 05/17/2019
7 06/07/2019
8 06/21/2019
9 07/05/2019
10 07/12/2019
11 08/09/2019
12 08/16/2019
13 08/30/2019
ASBE0017-002 06/01/2019
LAKE AND PORTER COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 50.50 27.80
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
Page 2 of 42beta.SAM.gov
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHANICAL SYSTEMS).........$ 37.80 24.54
ASBE0075-001 06/01/2017
REMAINING COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.50 20.79
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
BOIL0001-005 05/01/2017
LAKE COUNTY, City of Hammond; North of 114th Street
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BOIL0374-003 03/01/2018
Rates Fringes
BOILERMAKER......................$ 37.22 27.65
BRIN0004-011 06/01/2018
Page 3 of 42beta.SAM.gov
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer; Stone Mason;
Pointer, Cleaner, Caulker...$ 37.80 23.42
Marble Finisher; Tile
Finisher....................$ 29.00 15.54
Marble Mason; Terrazzo
Worker; Tile Layer..........$ 37.05 21.64
Terrazzo Finisher...........$ 30.00 15.54
BRIN0004-018 06/01/2018
SOUTH BEND: ST. JOSEPH COUNTY
Rates Fringes
BRICKLAYER
BRICKLAYER; STONE MASON;
POINTER, CAULKER, CLEANER...$ 29.00 15.96
MARBLE AND TILE FINISHER....$ 29.00 15.54
MARBLE AND TILE LAYER.......$ 30.57 18.36
TERRAZZO FINISHER...........$ 30.00 15.54
TERRAZZO WORKER.............$ 31.57 18.36
CARP0413-002 06/01/2019
St. Joseph County
Rates Fringes
CARPENTER........................$ 27.72 20.27
CARP0765-001 06/01/2019
Page 4 of 42beta.SAM.gov
LAKE, LAPORTE AND PORTER COUNTIES
CARPENTER........................$ 37.93 27.30
MILLWRIGHT.......................$ 38.03 27.30
CARP1029-001 06/01/2019
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 27.70 24.34
ELEC0153-001 06/03/2019
ST JOSEPH COUNTY
Rates Fringes
Communication Technician.........$ 26.50 18.33
ELECTRICIAN......................$ 34.67 24.27
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such
Page 5 of 42beta.SAM.gov installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
ELEC0531-001 05/28/2018
LAPORTE and PORTER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 39.60 25.73
ELEC0697-001 05/27/2019
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 41.50 37.66
ELEC0697-004 08/28/2017
LAKE COUNTY
Rates Fringes
Telecommunication Technician.....$ 31.00 24.95
Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).
Page 6 of 42beta.SAM.gov
Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC1393-003 01/01/2019
LAKE & PORTER COUNTIES
(Calumet Area, North of U.S. Hwy 30)
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR 1:
(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 34.69 16.21
EQUIPMENT OPERATOR 3
(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 43.00 18.62
GROUNDMAN...................$ 25.44 13.53
GROUNDMAN-TRUCK DRIVER......$ 30.79 15.08
LINEMAN.....................$ 44.40 19.03
ELEV0002-005 01/01/2019
ELEVATOR CONSTRUCTION
LAKE AND PORTER COUNTIES
Rates Fringes
Page 7 of 42beta.SAM.gov
ELEVATOR MECHANIC................$ 56.61 33.705+a+b
FOOTNOTES:
a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving
Day; Friday after Thanksgiving and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.
ELEV0044-002 01/01/2019
Rates Fringes
ELEVATOR MECHANIC................$ 49.72 33.705+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0150-001 06/01/2019
BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:
LAKE, LAPORTE, and PORTER COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
Page 8 of 42beta.SAM.gov
GROUP 1.....................$ 41.00 36.13
GROUP 2.....................$ 40.20 36.13
GROUP 3.....................$ 35.90 36.13
GROUP 4.....................$ 33.70 36.13
GROUP 5.....................$ 28.25 36.13
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto
(requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete
Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;
Concrete paver 27E cu. ft. & under; Concrete placing boom;
Concrete pump/grout pump with boom (truck mounted);
Concrete pump with boom (truck mounted); concrete tower;
Cranes and Backhoes (All Attachments); Cranes, Hammerhead
Tower; Creter Crane; Derricks (all); Derricks (traveling);
Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist
1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock
Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);
Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;
Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post
Page 9 of 42beta.SAM.gov hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks
GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over
210; Air compressor (2) feeding a common receiver;
Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;
Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm
& similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches
GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen
GROUP 5: Fork lifts (Housing and commercial only)
ENGI0150-012 06/01/2019
BUILDING CONSTRUCTION
ST. JOSEPH COUNTY
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 29.85 29.60
GROUP 2.....................$ 28.50 29.60
GROUP 3.....................$ 27.70 29.60
GROUP 4.....................$ 26.90 29.60
GROUP 5.....................$ 24.30 29.60
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto
Page 10 of 42beta.SAM.gov
Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete
Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck
Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front
End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar
Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form
Paver, Tournapull, Tractor with Boom & Side Boom, Trenching
Machine (12 or more inches in width), Combination Backhoe
Front End Loader Machine with backhoe 1/2 yd bucket or attachments.
GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat
(over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker
(truck mounted), Concrete Mixer (of moore than 21 cu. ft.
capacity), Forklift (with fixed or tilt mast), Greaser
Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole
Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks
(with ""a"" frame.
GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators
(material and personnel), Hydraulic Power Units, Grouting
Page 11 of 42beta.SAM.gov and Pile Driving, Stud Welder, Trenching Machines less than
12 inches in width, Welding Machines (8 through 15).
GROUP 4: Bobcat (up to and including 3/4 cu. yd.).
Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist
(tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4
cu. yd. and under), Tractors (farm type) Welding Machines
(2 through 8).
GROUP 5: Bobcats and forklifts (commercial or residential).
ENGI0150-014 05/01/2019
POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY
LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 41.20 34.65
GROUP 2.....................$ 40.75 34.65
GROUP 3.....................$ 40.30 34.65
GROUP 4.....................$ 39.10 34.65
GROUP 5.....................$ 38.05 34.65
POWER EQUITMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plants (construction), Asphalt plant
(permanent), Auto Patrol (Maintainer), Automatic Dry
Batch Plant, Automated Concrete Placer, Automated
Sub-Grader, Automated Slip Form Paver, Automated Finish
Machine, Combination Backhoe Front, End Loader Machine
Page 12 of 42beta.SAM.gov
(1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader
(stationary), Boring Machine (road), Bulldozer, Concrete
Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core
Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge
Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post
Driver (truck mounted), Lead Greaser, Helicopter, Highlift
Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver
(Hetherington), Pile Driver (Skid or Crawler), Road Paving
Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck
Mounted), Ross Carrier, Roto Mill Grinder (36"" and over), Roto mill grinder (less than 36""), Throttle Valve and
Compressor or Clever Brooks Type Combination, Throttle
Valve and Fireman Combination or Horizontal or Upright
Boiler, Tournapull or similar type equipment, Tractor
(boom), Tractor Drawn Belt Loader with attached Pusher
(requires two engineers), Trench Machine, Tug Boat
Operator, Wheel Excavator, Winch Tractor with ""a"" frame, Scoops, Turnapull or similar types machine used in Tandem
(add $1.00 to class l hourly rate for each machine attached there to).
GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Page 13 of 42beta.SAM.gov
Highlift Shovels (under 3 cu. yds.), Jersey Spreader or
Base Paver, Pavement Bump Grinder (self-propelled), Roller
(Asphalt, waterbound, Macadam, Bituminous Macadam, Brick
Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.
GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt
Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing
Machine, Concrete Spreader (power driven), Digger, Post
Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot
(self-propelled), Sub-grader, Tamper, Mutipile Vibrating
(earth and subbase material), Tractaire with Drill, Tractor
(with all drawn attachements except backhoe and including
Highlift, Endloader of 1 cu. yd. capacity and less.
GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine
(self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine
(paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.
GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater
(1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw
(Concrete Power Driven), Water Pump, Grasscutter.
IRON0292-001 06/01/2018
Page 14 of 42beta.SAM.gov
ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES
IRONWORKER.......................$ 29.75 22.01
IRON0395-001 06/01/2018
LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50
MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE
ON W. TO 3 MILES E. OF IN. COUNTIES
Rates Fringes
IRONWORKER
SHEETER.....................$ 40.25 31.22
STRUCTURAL & ORNAMENTAL.....$ 40.00 31.22
LABO0041-001 06/01/2019
BUILDING CONSTRUCTION
LAKE COUNTY (Western Half)
Rates Fringes
Laborers:
CAISSON AND TUNNEL WORK
(Compressed & Free Air).....$ 37.53 22.50
GROUP 1.....................$ 36.03 22.50
GROUP 2.....................$ 36.78 22.50
GROUP 3.....................$ 37.03 22.50
LABORER CLASSIFICATIONS:
GROUP 1: Building and Construction Laborers; Scaffold
Page 15 of 42beta.SAM.gov
Builders (other than for Mason or Plasterers); Railroad
Workers, Masonry Wall Workers, (interior & exterior);
Portable Water, Pumps with discharge up to 3 indches;
Handling of Creosote Lumber or Like Treated Material
(excluding railroad material); Asphalt Rakers and Lutemen;
Earth compactors; Jackmen and Sheetmen Working Ditches
Deeper than Six (6) Feet in Depth; Laborers Working Ditches
Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;
Tile Layers (sewer or field) and Sewer Pipe Layers
(metallic or non-metallic); Motor Driven Wheelbarrows and
Concrete Buggies; Hyster Operators; Pump Crete Assemblers;
Core Drill Operators; Cement, Lime or Silica Clay Handler
(bulk or bag); Handling of Toxic Materail Damaging to
Clothing; Pneumatic Spikers; Deck Engine and Winch
Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt
Paver; Chain Saw and Demolition Saw Operators; Concrete
Saw; Concrete Conveyor Assemblers; Applying of Curing
Compound; Sinking of Wellpoints; Dewatering Header Systems
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle Laborers; Cement Gun Operators; Scaffold
Builders for Plasterers; Scaffold Builders for Masons;
Water Blast Machine Operators; Air Tool Operators and all
Pneumatic Tool Operators, Air and Electric Vibrators and
Chpping Hammer Operators; Asbestos Removal; Hazardous Waste
Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.
CAISSON AND TUNNEL WORK (Compressed & Free Air)
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top
Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Page 16 of 42beta.SAM.gov
Grout Machine, Track Layers, Air Hoist, Key Board, Agitator
Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl
Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance
Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining
Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.
Premium for all employees working in compressed air shall be as follows:
0 - 15 lbs. $1.00 per hour
16 - 20 lbs. 1.50 per hour
21 - 26 lbs. 2.00 per hour
27 - 33 lbs. 3.00 per hour
34 & over 4.00 per hour
LABO0041-004 04/01/2018
UTILITY CONSTRUCTION
LAKE COUNTY
Rates Fringes
LABORERS
Group 1.....................$ 31.32 17.23
Group 2.....................$ 31.62 17.23
Group 3.....................$ 32.32 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer, Carpenter Tender, Fence
Erector, Grade Checker, Guard Rail Erector, Continuous
Page 17 of 42beta.SAM.gov
Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man
(Mortar, Mastic, and all other types), Lighting Installer
(Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road
Marking and Delineation Laborer, Setting and Placing of all
Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing
Compound, or Like Material, Flagperson, Air Tool, Power
Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete
Saw Operator, Core Drill Operator, Eye Level, Hand Blade
Operator Hydro Seeder Man, Motor Driven Georgia Buggy
Operator, Power Driven Compactor or Taper Operator, Power
Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw
Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side
Rail Setters (for Sidewalk, Side Ditches, Radii, and
Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and
Sheetman, Pipe Greade Man, Winch and Windless Operator
Conduit Installer, Sod Layer
GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole
Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)
GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder
Man, Concrete Barrier Rail Form Setter, Concrete Saw Joint
Control Cutting
LABO0081-001 04/01/2019
Page 18 of 42beta.SAM.gov
HEAVY and HIGHWAY CONSTRUCTION:
LAKE, LA PORTE, and PORTER COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 30.79 18.78
GROUP 2.....................$ 31.09 18.78
GROUP 3.....................$ 31.79 18.78
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer; Carpenter Tender; Fence
Erector; Grade Checker; Guard Rail Erector; Continuous
Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man
(Mortar, Mastic, and all other types); Lighting Installer
(Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;
Rip-rap Installer (all Products and Materials); Road
Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including
Supporting Structure; Spraying of all Epoxy, Curing
Compound, or Like Material; Flagperson; Air Tool, Power
Tool Operator; Asphalt Raker Man; Batch Truck Dumper;
Bridge Hand Rail Erector; Handler (bulk or bag cement);
Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete
Saw Operator; Core Drill Operator, Eye Level; Hand Blade
Operator Hydro Seeder Man; Motor Driven Georgia Buggy
Operator; Power Driven Compactor or Tamper Operator; Power
Saw Operator; Pump Crete Assembly Man; Screed Man or Screw
Man on Asphalt Paver; Rebar Installer; Sandblaster Man;
Sealer Applicator for Asphalt (toxic); Setting and Placeing
Prestressed on Precast Concrete Structural Members; Side
Rail Setters (for Sidewalk, Side Ditches, Radii, and
Pavement); Spreader Box Tender (manual or power driven);
Straw Blower Man; Subsurface Drain and Culvert Pipe Layer;
Page 19 of 42beta.SAM.gov
Concrete Conveyor; Horizonial Boring and Jackman and
Sheetman; Pipe Grade Man; Winch and Windlass Operator
Conduit Installer, Sod Layer.
GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole
Erector; Sewer Pipe Layer; Water Line Installer, Temporary or Permanent; Welders (electric or Oxy-Acetylene).
GROUP 3: Air Track and Wagon Drillman; Dynamite and Powder
Man; Concrete Barrier Rail Form Setter; General Laborer;
concrete saw, joint control cutting
LABO0081-002 04/01/2019
UTILITY CONSTRUCTION
LA PORTE & PORTER COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 31.09 18.78
GROUP 2.....................$ 31.39 18.78
GROUP 3.....................$ 32.09 18.78
LABORERS CLASSIFICATIONS (UTILITY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man
(mortar, mastic and all other types); Lighting installer
(permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plate erector;
Rip-rap installer (all products and materials); Road marking and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing
Page 20 of 42beta.SAM.gov compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man;
Asphalt raker man; Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man;
concrete puddler; concrete rubber; Concrete saw operator;
Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator;
Power-driven compactor or tamper operator; Power saw operator; Pumpcrete assembly man; Screed man or screw man on asphalt paver; Rebar installer; Sandblaster man; Sealer applicator for asphalt (toxic); Setting and placing prestressed or precast concrete structural memebers; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven);
Straw blower man; Subsurface drain and culvert pipe layer;
Transverse and longitudinal hand bull float man; Concrete conveyor assembly man; Horizontal boring and jacking man;
Jackman and sheetman; Pipe grade man; Winch and windlass operator
GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier
(tending bricklayers); TVing and associated grouting of utility lines
GROUP 3: Air track and wagon drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;
Concrete Saw Joint Control cutting
LABO0081-004 06/01/2019
LAKE (Eastern Half), LA PORTE, and PORTER COUNTIES
Rates Fringes
Page 21 of 42beta.SAM.gov
Laborers
GROUP 1.....................$ 36.03 22.50
GROUP 2.....................$ 36.78 22.50
GROUP 3.....................$ 37.03 22.50
LABORER CLASSIFICATIONS (Building Construction)
GROUP 1: Building and Construction Laborers; Scaffold
Builders (other than for Mason or Plasterers); Mechanic
Tenders; Rodmen and Chainmen, Railroad Workers, Masonry
Wall Workers, (interior & exterior); Roofer Tenders, Cement
Finisher Tenders, Carpenter Tenders, Portable Water, Pumps with discharge up to 3 inches; Waterproofing; Hauling of
Creosote Lumber or Lutemen; Asphalt Rakers; Kettlem, Earth
Compactors; Jackman and Sheetmen in Ditches more than 6 ft.
deep; Laborers in ditches 6' deep or deeper; Assembly of
Uncrete Pump; Tile Layers (sewer or field); Sewer Pipe