AMENDMENT_NO._0001_W912P619B0017_VILLAGE_OF_CRESTWOOD_IL_SEC_219_PROJECT.pdf
PDF 856 KB Posted
- Solicitation number
- W912P619B0017
About this file
This file contains Amendment No. 0001, which includes a revised Bid Schedule
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6690354395
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: REVISIONS TO VARIOUS AREAS OF THE SOLICITATION; RE: INVITATION FOR BIDS NO. W912P619B0017, "CRESTWOOD WATER
MAIN IMPROVEMENTS, CRESTWOOD, IL"
SEE THE FOLLOWING PAGES
1. CONTRACT ID CODE PAGE OF PAGES
1 41
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0017
X 9B. DATED (SEE ITEM 11)
07-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
A. BID OPENING DATE AND TIME:
The Bid Opening Date remains the same at September 12, 2019 at 4:00pm Central time contingent upon receipt of the IEPA WATER MAIN CONSTRUCTION Permit. The USACE anticipates receipt of said Permit by August 30, 2019; thus, the contingency statement (Page 1, Block 10 of the Solicitation document) now reads as follows:
IMPORTANT --CONTINGENCY STATEMENT: The Bid Opening is contingent upon the USACE- Chicago District receiving the IEPA water main construction permit for this project. Once received, the Chicago District will issue an Amendment advising bidders that the permit has been furnished. Said permit is anticipated by August 30, 2019. If said permit is not furnished to the Chicago District prior to the date scheduled to open bids, bids cannot be accepted and the bid opening date will be extended via an Amendment.
B. SUBMISSION OF BIDS: Detailed information regarding the submission of bids is located at section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”
C. ACKNOWLEDGMENT OF AMENDMENT: Bidders shall acknowledge a copy of this particular Amendment and provide the acknowledged copy along with their Bid.
D. AMENDED BID SCHEDULE :
The government is providing a revised bid schedule (Section 00 10 00 – Solicitation Contract Form).
Therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule.
THE FOLLOWING REVISIONS WERE MADE TO THE BID SCHEDULE:
(1) SUBCLIN 0001AH
The unit of measure has changed to linear feet (LF)
(2) SUBCLIN 0001AX
The line item title has changed to: HMA Pavement and Removal
E. PREAWARD SURVEY QUESTIONAIRRE FORM:
By way of this Amendment, the government is PROVIDING a Pre-Award Survey form to be completed by the Bidder and submitted along with all other items called out in the Solicitation (Refer to Solicitation Section 00 22 13 – Supplementary Instructions to Bidders, as specifically described at Paragraph 3. “SUBMISSION OF BIDS”). The information will aid in surveying the business in accordance with the responsibility requirements set forth by the Federal Acquisition Regulation, Subpart 9. The preaward survey will not be conducted for each bidder, only the winning bidder.
F. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Annette Lakes at 312-846- 5368; email: annette.h.lakes@usace.army.mil.
(The aforementioned Revised Bid Schedule follows)
REVISED BID SCHEDULE
AMENDMENT 0001
Section 00 10 00 - Solicitation
DISTINCTION OF LINE ITEMS
The below Bid Schedule contains a combination of Firm Fixed Price (FFP) and cost reimbursable line items. Although “FFP” is shown in the description of the cost reimbursable line items, it is not to be construed as a Firm Fixed Price line item. In this case, the FFP represents the Contract Type, which is firm fixed price. Therefore, the contractor will be reimbursed as stated within the extended description of the cost reimbursable line items.
CONTRACT FORM - BID SCHEDULE
THE BELOW BID SCHEDULE SHALL BE USED BY BIDDERS TO SUBMIT
THEIR BID PRICES (TO INCLUDE ENTERING UNIT PRICES, EXTENDED
PRICES AND OVERALL BID PRICE)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE WORK - LOCATION: WEST PLAYFIELD
FFP
WEST PLAYFIELD WATER MAIN REPLACEMENT (Refer to Plan SHEET C- 101 through SHEET C-108)
This is a Parent Line Item linking Sub-items 0001AA through 0001BM under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number , which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all apply to the quantities delineated at the sub-item level.
PURCHASE REQUEST NUMBER: W81G6690354395
NET AMT
0001AA 1 Job
TRAFFIC CONTROL & PROTECTION
FFP
0001AB 1 Job
CONTRACTOR VIDEO DATA OF EXISTING
FFP
CONDITIONS
0001AC 1 Job
MOBILIZATION (BASE WORK)
FFP
Under this line item, the contractor is required to perform mobilization activities.
The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AD 1 Job
DEMOBILIZATION (BASE WORK)
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to
0001AE 1 Job
CONSTRUCTION STAKING AND LAYOUT
0001AF 1 Lot
PERFORMANCE & PAYMENT BOND (BASE WORK)
FFP
THIS IS A COST REIMBURSABLE LINE ITEM FOR BOND COVERAGE
FOR LINE
ITEMS 0001AA THROUGH 0001BK.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract price changes.
0001AG 1,885 Foot
D.I. WATERMAIN, OPEN-CUT, 6"
FFP
W/POLYWRAP & TRACER WIRE W/ TRENCH BACKFILL
0001AH 1,207 Foot
D.I. WATERMAIN, OPEN-CUT, 8-INCH
FFP
0001AJ 6 Each
FIRE HYDRANT ASSEMBLY WITH AUX.
FFP
VALVE & BOX, 6"
0001AK 8 Each
GATE VALUE WITH VALVE BOX, 6 INCH
0001AL 2 Each
GATE VALUE WITH VALVE BOX, 8 INCH
0001AM 83 Each
CONNECT EXISTING WATER SERVICE, 3/4"
0001AN 354 Linear
Foot
WATER SERVICE PIPE, OPEN-CUT, 3/4"
0001AP 640 Foot
WATER SERVICE PIPE, INSTALLED
FFP
VIA HDD, 3/4 INCH
0001AQ 27 Each
COMPLETE REMOVAL &
FFP
REPLACEMENT OF CURB STOP AND CURB BOX
0001AR 7 Each
PRIVATE LIGHT POST REMOVAL
FFP
& REINSTALLATION
0001AS 1,990 Square
CONCRETE SIDEWALK REMOVAL & REPLACEMENT
0001AT 113 Square
Yard
CONCRETE DRIVEWAY REMOVAL & REPLACEMENT
0001AU 210 Square
HMA DRIVEWAY REMOVAL AND REPLACEMENT
0001AV 130 Foot
COMBINATON CURB AND GUTTER
FFP
REMOVAL & REPLACEMENT
0001AW 32 Square
DETECTABLE WARNING
0001AX 83 Square
HMA PAVEMENT REMOVAL & REPLACEMENT
0001AY 10 Unit
TREE REMOVAL (6 TO 15 UNITS DIAMETER)
0001AZ 13 Each
TREE PROTECTION
0001BA 14 Each
INLET FILTER BASKET
0001BB 1 Each
NON-PRESSURE CONNECTION TO EXISTING
FFP
WATER MAIN, 8"X8"
0001BC 2 Each
PRESSURE CONNECTION
FFP
TO EXISTING WATER MAIN, 6"X6"
0001BD 13 Each
VALVE BOX REMOVAL
0001BE 7 Each
FIRE HYDRANT REMOVAL
0001BF 3 Each
CAP ABANDON EXISTING WATER MAIN
0001BG 882 Foot
SANITARY SEWER LATERAL
FFP
PIPE REPLACEMENT TO PVC WAER MAIN QUALITY, 6"
0001BH .57 Acre
PARKWAY RESTORATION - 4" TOP SOIL,
FFP
SEED & BLANKET
0001BJ 42 Foot
STORM SEWER PIPE REPLACEMENT TO PVC
FFP
WATER MAIN QUALITY, 8"
0001BK 42 Foot
WATER MAIN QUALITY CASING PIPE, 12"
OPTION OPTION 1 ITEMS -LOCATION: WEST PLAYFIELD
FFP
OPTION 1 BID ITEMS:
WEST PLAYFIELD WATER MAIN REPLACEMENT (Refer to Plan SHEET C- 111 through SHEET C-113)
This is a Parent Line Item linking Sub-items 0002AA through 0002BD under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all
0002AA 1 Job
OPTION TRAFFIC CONTROL & PROTECTION
0002AB 1 Job
OPTION CONTRACTOR VIDEO DATA OF EXISTING
FFP
CONDITIONS
0002AC 1 Job
OPTION MOBILIZATION (OPTION 1 ITEMS)
FFP
Under this line item, the contractor is required to perform mobilization activities.
The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to
0002AD 1 Job
OPTION DEMOBILIZATION (OPTION 1 ITEMS)
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0002AE 1 Job
OPTION CONSTRUCTION STAKING AND LAYOUT
0002AF 1 Lot
OPTION PERFORMANCE & PAYMENT BOND (OPTION 1)
FFP
THIS IS A COST REIMBURSABLE LINE ITEM FOR BOND COVERAGE
FOR OPTION 1 ITEMS 0002AA THROUGH 0002AE AND 0002AG
THROUGH 0002BD.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
0002AG 927 Foot
OPTION D.I. WATERMAIN, OPEN-CUT, 6"
FFP
0002AH 4 Each
OPTION FIRE HYDRANT ASSEMBLY
FFP
WITH AUX. VALVE & BOX, 6"
0002AJ 2 Each
OPTION GATE VALVE WITH VALVE BOX, 6-INCH
0002AK 28 Each
OPTION CONNECT EXISTING WATER SERVICE, 3/4"
0002AL 265 Foot
OPTION WATER SERVICE PIPE, OPEN-CUT, 3/4 INCH
0002AM 15 Each
OPTION COMPLETE REMOVAL & REPLACEMENT OF
FFP
CURB STOP AND CURB BOX
0002AN 2,000 Square
OPTION CONCRETE SIDEWALK REMOVAL
AND REPLACEMENT
0002AP 6 Square
OPTION HMA DRIVEWAY REMOVAL
AND REPLACEMENT
0002AQ 100 Foot
OPTION COMBINATION CURB & GUTTER
FFP
REMOVAL AND REPLACEMENT
0002AR 32 Square
OPTION DETECTABLE WARNING
0002AS 215 Square
OPTION HMA PAVEMENT REMOVAL & REPLACEMENT
0002AT 20 Unit
OPTION TREE REMOVAL (6 TO 15 UNITS DIAMETER)
0002AU 2 Each
OPTION TREE PROTECTION
0002AV 11 Each
OPTION INLET FILTER BASKET
0002AW 1 Each
OPTION PRESSURE CONNECTION TO EXISTING
FFP
WATER MAIN, 6" X 6"
0002AX 5 Each
OPTION VALVE BOX REMOVAL
0002AY 4 Each
OPTION FIRE HYDRANT REMOVAL
0002AZ 2 Each
OPTION CAP ABANDON EXISTING WATER MAIN
0002BA 294 Foot
OPTION SANITARY SEWER LATERAL PIPE REPLACEMENT
FFP
TO PVC WATER MAIN QUALITY, 6"
0002BB 22 Foot
OPTION STORM SEWER PIPE REPLACEMENT
FFP
TO PVC WATER MAIN QUALITY, 12"
0002BC 150 Foot
OPTION WATER MAIN QUALITY CASING PIPE, 12"
0002BD .17 Acre
OPTION PARKWAY RESTORATION - 4" TOP SOIL, SEED
FFP
& BLANKET
OPTION OPTION 2 ITEMS- LOCATION: WEST PLAYFIELD
FFP
OPTION 2 BID ITEMS:
WEST PLAYFIELD WATER MAIN REPLACEMENT (Refer to Plan SHEET C- 109 through SHEET C-110)
This is a Parent Line Item linking Sub-items 0003AA through 0003AX under this Bid Schedule. This Line Item is integral and sets forth the primary work related directly to the respective Sub-items; therefore, the sub-items shall be separately priced at their individual Sub-item Number, which if awarded, will be executed at the quantities, prices and or amounts established therein to satisfy the contract requirements.
Furthermore, this Parent line item shall not be scheduled separately for delivery or priced for payment purposes. Accordingly, delivery, shipment and pricing, all
0003AA 1 Job
OPTION TRAFFIC CONTROL & PROTECTION
0003AB 1 Job
OPTION CONTRACTOR VIDEO DATA OF
EXISTING CONDITIONS
0003AC 1 Job
OPTION MOBILIZATION (OPTION 2 ITEMS)
FFP
Under this line item, the contractor is required to perform mobilization activities.
The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0003AD 1 Job
OPTION DEMOBILIZATION (OPTION 2 ITEMS)
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment
0003AE 1 Job
OPTION CONSTRUCTION STAKING AND LAYOUT
0003AF 1 Lot
OPTION PERFORMANCE & PAYMENT BOND (OPTION 2 )
FFP
THIS IS A COST REIMBURSABLE LINE ITEM FOR BOND COVERAGE
FOR OPTION 2 ITEMS 0003AA THROUGH 0003AE AND 0003AG
THROUGH 0003AX
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any
0003AG 785 Foot
OPTION D.I. WATERMAIN, OPEN-CUT, 6"
0003AH 3 Each
OPTION FIRE HYDRANT ASSEMBLY WITH AUX
VALVE & BOX 6"
0003AJ 21 Each
OPTION CONNECT EXISTING WATER SERVICE, 3/4"
0003AK 150 Foot
OPTION WATER SERVICE PIPE, OPEN-CUT, 3/4"
0003AL 7 Each
OPTION COMPLETE REMOVAL & REPLACEMENT
OF CURB STOP & CURB BOX
0003AM 1 Each
OPTION PRIVATE LIGHT POST REMOVAL
& REINSTALLATION
0003AN 25 Square
OPTION CONCRETE SIDEWALK REMOVAL
& REPLACEMENT
0003AP 12 Square
OPTION CONCRETE DRIVEWAY REMOVAL
0003AQ 90 Square
OPTION HMA DRIVEWAY REMOVAL
0003AR 5 Each
OPTION TREE PROTECTION
0003AS 2 Each
OPTION INLET FILTER BASKET
0003AT 4 Each
OPTION VALVE BOX REMOVAL
0003AU 3 Each
OPTION FIRE HYDRANT REMOVAL
0003AV 2 Each
OPTION CAP ABANDON EXISTING WATER MAIN
0003AW 231 Foot
OPTION SANITARY SEWER LATERAL PIPE
REPLACEMENT TO PVC WATER MAIN QUALITY, 6"
0003AX .14 Acre
OPTION PARKWAY RESTORATION - 4" TOP SOIL,
SEED & BLANKET
SUMMATION OF PRICES:
BASE WORK (ITEMS 0001AA THROUGH 0001BK): $_____________________
OPTION 1 BID ITEMS (ITEMS 0002AA THROUGH 0002BD): $____________________
OPTION 2 BID ITEMS (ITEMS 0003AA THROUGH 0003AX): $____________________
TOTAL OVERALL BID PRICE (ITEMS 0001AA THROUGH 0001BK; ITEMS 0002AA
THROUGH 0002BD, AND ITEMS AND 0003AA THROUGH 0003AX:
END OF REVISED BID SCHEDULE VIA AMENDMENT NO. 0001
PREAWARD SURVEY QUESTIONAIRRE
(RE: Subparts 9.104-1 and 9.105-1 of the Federal Acquisition Regulation)
CONTRACTOR:
SOLICITATION NUMBER (INVITATION FOR BIDS NO. W912P619B0017, VILLAGE
OF CRESTWOOD, IL WATER MAIN IMPROVEMENTS PROJECT
Please complete the below form to assist in the completion of a Pre-award Survey:
1. Month and Year started in business:
2. Year and State Incorporated:
3. Key Personnel:
President/Owner :
5. Surety:
Agency:
Agent:
Address, City & State:
Telephone#:
6. Insurance Company:
Agency:
Vice President/Partner:
Secretary/Treasurer:
4. Number of Full-Time Employees:
Agent:
7. Financial Institution Information:
Name of Bank:
Contact Person:
8. References: Provide the names and contact information of three references. Information obtained from references will be used to determine if you have been diligent in the following areas: a) Quality of Work; b) Timely Performance; c) Effectiveness of Management; d) Compliance with Safety Standards; and e) Compliance with Labor Standards.
9. Does your company have any ongoing projects that may cause a problem with completing or beginning performance of the subject project?
END OF FORM
END OF AMENDMENT NO. 0001