W81G6690354395
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: INVITATION FOR BIDS NO. W912P619B0017, "CRESTWOOD WATER MAIN IMPROVEMENTS, CRESTWOOD, IL"
CONTINUES ON THE FOLLOWING PAGES -
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0017
X 9B. DATED (SEE ITEM 11)
07-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
A. The Bid Opening Date for this Solicitation is extended to September 13, 2019. The bid opening time remains 4p.m. Central time. Accordingly, all bids shall be furnished to the USACE-Chicago District prior to 4p.m. Central time on September 13, 2019.
B. ACKNOWLEDGMENT OF THIS AMENDMENT and any others MAY BE EXECUTED VIA EMAIL by transmitting the signed Amendment(s) to Annette Lakes at annette.h.lakes@usace.army.mil with a copy to Regina Blair at regina.g.blair@usace.army.mil. HOWEVER, ANY AND ALL BIDS MUST BE FURNISHED BY MAIL OR HANDCARRIED as described in the Solicitation – See Section 00 22 13 Supplementary Instructions to Bidders.
C. PROVIDED BELOW ARE THE USACE’S RESPONSES TO CONTRACTOR’S
INQUIRIES:
Q= QUESTION
UR = USACE RESPONSE
Q1: -can you provide a list of all questions and answers that were received for this job?
UR1: All questions have been addressed in the previously issued Amendments to include this Amendment No. 0004.
Q2: -some of the plan sheets show the water service crossing the existing water main to make the connection to the existing service, while others show stopping short of crossing the water main. Is the intent to make the connection to the existing water service without crossing the existing water main?
UR2: The intent is to connect the water service to the new main either by crossing the existing water main or connecting to the new main.
Q3: -can we install the water services at 4.5-5' deep to avoid the existing water main.
UR3: The "Typical Tap Service Piping (Copper)" detail on Sheet C-502 of the drawings show how connection is to be made at the depth of bury of the new main. NOTE: THIS SAME QUESTION WAS RESPONDED
TO VIA AMENDMENT 0004. THE SPECIFIC RESPONSE WAS PROVIDED FOR QUESTION 10.
HOWEVER, THE RESPONSE SHOULD HAVE READ AS GIVEN HEREIN THIS UR3 IN LIEU OF THE
RESPONSE PROVIDED AT AMENDMENT 0004, Q 10.
Q4: -how will lead water services be handled?
UR4: The Village of Crestwood has no records of lead water service in the project area and we do not anticipate any. However, inventory of each service material shall be documented by our field personnel during construction. In the event lead service is found, the Village would be notified and Village protocol to address issue shall be followed.
Q5: -will they need to be replaced in its entirety?
UR5: Refer to response to question 4 above.
Q6: -Can we use precast thrust blocks?
UR6: Yes
Q7: -can we use field lok gaskets as the restrained joints?
UR7: Refer to section 33 14 00 under Mechanical Joint Restraint.
Q8 (This is a 2 PART QUESTION): -Addendum 3, Section 01 22 00.00 10 Page 7
Part 1 of the question: paragraph 1.20 "UNIT PRICE PAY ITEMS" indicates "CONTRACTOR MAY NOT BE
PAID FOR EXCEEDING CONTRACT QUANTITIES"
Part 2 of the question: -is this correct? the Addendum also talked about this not being a FFP project. PLEASE
CLARIFY
UR8:
To address Part 1 of the question, contractors will be paid at their unit prices for the contract quantities shown in the bid schedule (Re: Solicitation Section00 21 13 (Instructions to Bidders), Clause No. 252.236- 7008 Contract prices - bidding schedules). Therefore, any overruns must be addressed via a remedy contract clause.
With respect to Part 2 of the question, the resulting Contract from this Solicitation is definitely a Firm Fixed Price Construction Contract as set forth in the Solicitation Section 00 21 13 (Instructions to Bidders), Clause Number 52.216-1, Page 41 of 83 of the Solicitation document.
Q9: -Addendum 3, Section 01 22 00.00 10 Page 10 -curb boxes within 3' of proposed main shall have bbox removal and replacement but is not paid for. What if the water main needs a new alignment due to utility conflicts and pushes the water main closer to the existing boxes now within the 3'.
UR9: Alignment changes due to conflicts shall first be discussed with our field personnel during construction. If warranted, it may be paid under “complete removal and replacement of curb stop and curb box”.
Q10: -can we add a pay item for these installations?
UR10: No. There is a pay item for “ Complete Removal and Replacement of Curb Stop and Curb Box”. Refer to Specification Section 01 22 00.00 10 (Pages 9 and 10) for a full description of what it entails.
Q11: -why are we not replacing the entire water services including the roundway?
UR11: Per discussions with Village staff, some of the b-boxes are in good working condition and there is no need for them to be replaced. Please note there is a set amount of budget for the construction and project was designed taking that into account.
Q12: -is a field office required for this project?
UR12: No.
Q13: -can materials be stored long the parkways/streets if barricaded? Common practice.
UR13: Yes
Q14: -will restoration at the storage area be paid for?
UR14: No. We don’t anticipate any restoration in the storage area.
Q15: -does everyone on the project have to be OSHA 40?
UR15: OSHA 40-Hour HAZWOPER training is only required if specified in the solicitation. This is typically required for those who work on a job site where hazardous materials are present, and in this project no HTRW materials are known to exist. However, key personnel must have the minimum training and experience as specified in SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and
SECTION 01 45 00.00 10 QUALITY CONTROL.
D. The Point of Contacts for this Amendment are Regina G. Blair at 312-846-5371 and Annette Lakes at 312-846-5368.
END OF AMENDMENT