Amendment_0004_W912P619B0006_Village_of_Glenview_-_Glen_Oak_Acres_Storm_Sewer_Improvement_Section_219.pdf

PDF 315 KB Posted

Attached to
Village of Glenview - Glen Oak Acres Storm Sewer Improvements - Section 219, Village of Glenview, Cook County, Illinois
Solicitation number
W912P619B0006
Issued by

About this file

This file contains Amendment 0004

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6690724940

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REFERENCE INVITATION FOR BIDS NO. W912P619B0006, "VILLAGE OF GLENVIEW, GLEN OAK ACRES STORM SEWER IMPROVEMENTS -

SECTION 219, COOK COUNTY, IL (USACE-CHICAGO DISTRICT ACQUISITION)"

-- THE DESCRIPTION OF THIS AMENDMENT FOLLOWS ON THE NEXT PAGES --

1. CONTRACT ID CODE PAGE OF PAGES

1 48

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P619B0006

X 9B. DATED (SEE ITEM 11)

15-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Aug-2019

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P619B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

A. BID OPENING DATE AND TIME:

The Bid Opening Date is EXTENDED to August 16, 2019; the bid opening time is not changed.

Therefore, bids shall be delivered to the Chicago District prior to 2:00 p.m. (Central Time) on August 16, 2019. Detailed information regarding the submission of bids is located at section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”

B. Bidders may email an acknowledged copy of this particular Amendment No. 0004 to Ericka Hillard at ericka.d.hillard@usace.army.mil with a copy furnished to Regina Blair at regina.g.blair@usace.army.mil. All bids must be mailed to hand‐carried per the provisions set forth in the Solicitation document.

C. BID SCHEDULE:

The government is providing a revised bid schedule (Section 00 10 00 – Solicitation Contract Form). Therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule. THE FOLLOWING REVISIONS WERE MADE TO THE BID SCHEDULE:

(1) SUBCLIN 0001BD

The pricing detail quantity has increased by 63.00 from 436.00 to 499.00.

(2) SUBCLIN 0001BE

The CLIN extended description has changed from:

SEWER PIPE INSTALLATION, JACKED & BORED, STORM, 48" DIP

To:

SEWER PIPE INSTALLATION, JACKED & BORED, STORM, 48" RCP

The pricing detail quantity has decreased by 63.00 from 144.00 to 81.00.

D. AMENDED SPECIFICATION SECTION: SECTION 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES under sub‐paragraph 1.2.18 OF THE SPECIFICATION SECTION HAS BEEN AMENDED AS FOLLOWS:

The section of ST‐P‐300‐1‐1 between the Jacking Pit and Receiving Pit, crossing under Wagner Road, has changed to read: “SEWER PIPE INSTALLED, JACKED & BORED, STORM, 48” RCP” and the remainder of ST‐P‐300‐1‐1 through the jacking pit and on to ST‐MH‐300‐2‐1 has changed to read: “SEWER PIPE INSTALLED, STORM, 48” RCP”.

--BY THIS AMENDMENT, BIDDERS ARE NOTIFIED THAT THE USACE WILL BE REFLECTING

THE AFORMENTIONED CHANGE VIA THE CONFORMED COPY OF THE CONTRACT. THUS,

THIS AMENDMENT WILL NOT CONTAIN A REVISED SPECIFICATION SHEET; THE REVISED

PAGE WILL BE INCLUDED IN THE CONFORMED CONTRACT. NONETHELESS, THIS

PARTICULAR REVISION/CHANGE IS HEREBY FORMALIZED VIA THIS AMENDMENT AND

THE BIDDER SHALL INCORPORATE THIS CHANGE BY WAY OF ITS BID.

E. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries (SEE THE FOLLOWING).

Q1. According to the new Bid Schedule issue as a part of Amendment 1, CLIN 0001BE's description is "SEWER PIPE INSTALLATION, JACKED & BORED, STORM, 48" DIP". However both Amendment 2 and Amendment 3 indicate there is no 48" DIP on this project. Please clarify or change the description of CLIN 0001BE to reflect the proper description.

USACE Response Q1: The contractor shall refer to the above Paragraph D, wherein the USACE has made the applicable revision to its Specifications.

Q2. Drawing C‐300 shows pipe ST‐P‐300‐1‐1 to be 48" RCP and a total of 144 lf long between structures ST‐MH‐300‐1‐1 and ST‐MH‐300‐2‐1. CLIN 0001BE shows "SEWER PIPE INSTALLATION, JACKED & BORED, STORM, 48" DIP" to be 144 lf long. Drawing C‐300 also shows a 15' x 40' jacking pit clearly BETWEEN the 2 structures just referenced. This would indicate that the jacked pipe is substantially less length than 144', probably more like 80'. This is would mean that the balance would likely be paid as part of CLIN 0001BD.

With the method of installation described by Amendment 2 and reinforced by Amendment 3, and that this item is a very significant cost item, we recommend revising the bid schedule with more accurate quantities.

USACE Response Q2: The contractor shall refer to the above Paragraph D, wherein the USACE has made the applicable revision to its BID SCHEDULE.

F. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846‐5378; email: ericka.d.hillard@usace.army.mil.

(The aforementioned Revised Bid Schedule follows)

REVISED BID SCHEDULE

AMENDMENT 0004

THE BELOW BID FORM SERVES AS THE BID SCHEDULE AND SHALL BE USED BY THE BIDDER

TO ENTER ITS BID PRICING

IMPORTANT NOTE - DISTINCTION OF LINE ITEMS:

The below Bid Schedule contains a combination of Firm Fixed Price (FFP) and cost reimbursable line items. Although “FFP” is shown in the description of the cost reimbursable line items, it is not to be construed as a Firm Fixed Price line item. In this case, the FFP represents the Contract Type, which is firm fixed price. Therefore, the contractor will be reimbursed as stated within the extended description of the cost reimbursable line items.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

DRAINAGE IMPROVEMENTS - BASE WORK

FFP

Bidders shall provide their pricing at sub-items 0001AA through 0001CL, as this Item 0001 identifies the information that relates directly to sub-items 0001AA through 0001CL. Therefore, this Item 0001 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0001 is not to be separately priced for payment purposes.

PURCHASE REQUEST NUMBER: W81G6690724940

NET AMT

0001AA 1 Job

MOBILIZATION

FFP

Under this line item, the contractor is required to perform mobilization activities.

The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.

Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

0001AB 1 Job

DEMOBILIZATION

FFP

Under this line item, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.

Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

0001AC 149 Square

Yard

CLASS D PATCHING, 12" W/AGGREGATE BASE

FFP

CLASS D PATCHING, 12" W/AGGREGATE BASE COURSE, TYPE B, 12"

0001AD 74 Square

AGGREGATE SHOULDERS, 6"

0001AE 628 Linear

Foot

TRENCH PAVING, 4"

0001AF 153 Net Ton

(2,000

LB).

HOT-MIX ASPHALT SURFACE COURSE, MIX "D"

HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 - 2 INCH

0001AG 19 Square

HOT-MIX ASPHALT DRIVEWAY REMOVAL

HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT

0001AH 100 Linear

CONCRETE CURB AND GUTTER REMOVAL

CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT, M-3.12

0001AJ 17 Square

CONCRETE DRIVEWAY REMOVAL & REPLACEMENT

0001AK 1,469 Square

CONCRETE SIDEWALK REMOVAL & REPLACEMENT

0001AL 2,237 Square

HMA SURFACE REMOVAL, 2"

0001AM 1 Job

TRAFFIC CONTROL AND PROTECTION

0001AN 79 Linear

THERMOPLASTIC PAVEMENT MARKING - LINE 4"

0001AP 160 Linear

THERMOPLASTIC PAVEMENT MARKING - LINE 6"

0001AQ 44 Linear

THERMOPLASTIC PAVEMENT MARKING- LINE 24"

0001AR 6 Each

EXISTING SIGN REMOVAL AND REINSTALLATION

0001AS 2 Each

EXISTING MAILBOX REMOVAL& REINSTALLATION

0001AT 12 Each

EXPLORATORY EXCAVATION (STORM,SAN,WATER)

0001AU 6 Each

STRUCTURE REMOVAL, STORM

0001AV 24 Linear

STORM SEWER PIPE REMOVAL, 6"

0001AW 77 Linear

STORM SEWER PIPE REMOVAL, 10"

0001AX 212 Linear

STORM SEWER PIPE REMOVAL, 12"

0001AY 24 Linear

SEWER PIPE INSTALLATION, STORM, 6" PVC

0001AZ 2 Linear

SEWER PIPE INSTALLATION, STORM, 10" PVC

0001BA 271 Linear

SEWER PIPE INSTALLATION, STORM, 12" RCP

0001BB 66 Linear

SEWER PIPE INSTALLATION, STORM, 24" RCP

0001BC 437 Linear

SEWER PIPE INSTALLATION, STORM, 36" RCP

0001BD 499 Linear

SEWER PIPE INSTALLATION, STORM, 48" RCP

0001BE 81 Linear

SEWER PIPE INSTALLATION, JACKED & BORED

SEWER PIPE INSTALLATION, JACKED & BORED, STORM, 48" RCP

0001BF 3 Each

STORM SEWER INLET CONSTRUCTION, TYPE A

0001BG 1 Each

STORM CATCH BASINS CONSTRUCTION, TYPE A

STORM CATCH BASINS CONSTRUCTION, TYPE A, 4' DIAMETER

0001BH 7 Each

STORM CATCH BASINS CONSTRUCTION, TYPE C

STORM CATCH BASINS CONSTRUCTION, TYPE C, 2' DIAMETER

0001BJ 1 Each

STORM MANHOLE, TYPE A, 4' DIAMETER

0001BK 3 Each

STORM MANHOLE, TYPE A, 6' DIAMETER

0001BL 1 Each

STORM MANHOLE, TYPE A, 7' DIAMETER

0001BM 2 Each

STORM CONFLICT MANHOLE, TYPE A

STORM CONFLICT MANHOLE, TYPE A, 6' DIAMETER

0001BN 2 Each

SPECIAL RESTRICTOR STORM STRUCTURE, 6'

SPECIAL RESTRICTOR STORM STRUCTURE, 6' DIAMETER

0001BP 1 Each

SPECIAL RESTRICTOR STORM STRUCTURE, 7'

SPECIAL RESTRICTOR STORM STRUCTURE, 7' DIAMETER

0001BQ 1 Each

SPECIAL RESTRICTOR STORM STRUCTURE, 8'

SPECIAL RESTRICTOR STORM STRUCTURE, 8' DIAMETER

0001BR 6 Each

LOWERING OF SANITARY SEWER SERVICE

0001BS 4 Each

SANITARY SERVICE PROTECTION

0001BT 6 Each

WATER SERVICE REPLACEMENT, 1.5"

0001BU 1 Each

WATER MAIN RELOCATION, 6"

0001BV 1 Each

WATER MAIN RELOCATION, 8"

0001BW 145 Linear

SILT FENCE

0001BX 230 Linear

GRADING AND SHAPING OF DITCHES

0001BY 3 Each

INLET PROTECTION FILTER

0001BZ 9 Each

ABOVE GRADE INLET FILTER

0001CA 1,076 Linear

SEWER CONDITION EVALUATION, STORM, PRIOR

SEWER CONDITION EVALUATION, STORM, PRIOR TO CONSTRUCTION

0001CB 1,076 Linear

SEWER CONDITION EVALUATION, STORM, POST

SEWER CONDITION EVALUATION, STORM, POST CONSTRUCTION

0001CC 1,031 Linear

SEWER CONDITION EVALUATION,SANITARY,PRIO

SEWER CONDITION EVALUATION, SANITARY, PRIOR TO

CONSTRUCTION

0001CD 1,031 Linear

SEWER CONDITION EVALUATION,SANITARY,POST

SEWER CONDITION EVALUATION, SANITARY, POST CONSTRUCTION

0001CE 12 Each

TREE ROOT PRUNING

0001CF 12 Each

TREE TRUNK PROTECTION

0001CG 24 Each

TREE REMOVAL (6" TO 15" IN DIAMETER)

0001CH 22 Each

TREE REMOVAL (OVER 15" IN DIAMETER)

0001CJ 48 Square

DETECTABLE WARNING

0001CK 127 Square

PARKWAY RESTORATION

0001CL 1 Lot

PERFORMANCE AND PAYMENT BONDS

FFP

THIS IS A REIMBURSABLE LINE ITEM FOR BOND COVERAGE FOR LINE

ITEMS 0001AA THROUGH 0001CK.

The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract price changes.

OPTION DRAINAGE IMPROVEMENTS - OPTION 1 ITEMS

FFP

Bidders shall provide their pricing at sub-items 0002AA through 0002BF, as this Item 0002 identifies the information that relates directly to sub-items 0002AA through 0002BF. Therefore, this Item 0002 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0002 is not to be separately priced for payment purposes.

0002AA 260 Linear

OPTION TRENCH PAVING, 4"

0002AB 28 Net Ton

(2,000

LB).

OPTION HOT-MIX ASPHALT SURFACE COURSE, MIX "D"

HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 - 2 INCH

0002AC 19 Square

OPTION HOT-MIX ASPHALT SURFACE DRIVEWAY REMOVAL

HOT-MIX ASPHALT SURFACE DRIVEWAY REMOVAL AND

REPLACEMENT

0002AD 505 Square

OPTION HMA SURFACE REMOVAL, 2"

0002AE 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

0002AF 3 Each

OPTION EXPLORATORY EXCAVATION (STORM,SAN,WATER)

0002AG 3 Each

OPTION STRUCTURE REMOVAL, STORM

0002AH 35 Linear

OPTION STORM SEWER PIPE REMOVAL, 8"

0002AJ 10 Linear

OPTION STORM SEWER PIPE REMOVAL, 12"

0002AK 50 Linear

OPTION ABANDON EXISTING STORM SEWER, 12"

0002AL 83 Linear

OPTION SEWER PIPE INSTALLATION, STORM, 12" RCP

0002AM 249 Linear

OPTION SEWER PIPE INSTALLATION , STORM, 48" RCP

0002AN 2 Each

OPTION STORM SEWER INLET CONSTRUCTION, TYPE A

0002AP 2 Each

OPTION STORM CATCH BASINS CONSTRUCTION, TYPE A

0002AQ 2 Each

OPTION STORM CATCH BASINS CONSTRUCTION, TYPE C

0002AR 2 Each

OPTION STORM MANHOLE, TYPE A, 6' DIAMETER

0002AS 2 Each

OPTION LOWERING OF SANITARY SEWER SERVICE

0002AT 2 Each

OPTION WATER SERVICE REPLACEMENT, 1.5"

0002AU 2 Each

OPTION WATER MAIN RELOCATION, 6"

0002AV 135 Linear

OPTION SILT FENCE

0002AW 105 Linear

OPTION GRADING AND SHAPING OF DITCHES

0002AX 6 Each

OPTION ABOVE GRADE INLET FILTER

0002AY 185 Linear

OPTION SEWER CONDITION EVALUATION, STORM, PRIOR

0002AZ 185 Linear

OPTION SEWER CONDITION EVALUATION, STORM, POST

0002BA 185 Linear

OPTION SEWER CONDITION EVALUATION, SANITARY

0002BB 185 Linear

OPTION SEWER CONDITION EVALUATION,SANITARY,POST

0002BC 3 Each

OPTION TREE ROOT PRUNING

0002BD 3 Each

OPTION TREE TRUNK PROTECTION

0002BE 103 Square

OPTION PARKWAY RESTORATION

0002BF 1 Lot

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

THIS IS A REIMBURSABLE LINE ITEM FOR BOND COVERAGE FOR LINE

ITEMS 0002AA THROUGH 0002BE.

The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the

OPTION DRAINAGE IMPROVEMENTS - OPTION 2 ITEMS

FFP

Bidders shall provide their pricing at sub-items 0003AA through 0003BK, as this Item 0003 identifies the information that relates directly to sub-items 0003AA through 0003BK. Therefore, this Item 0002 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0003 is not to be separately priced for payment purposes.

0003AA 64 Square

OPTION CLASS D PATCHING, 12" W/AGGREGATE BASE

CLASS D PATCHING, 12" W/AGGREGATE BASE COURSE, TYPE B, 12"

0003AB 86 Square

OPTION AGGREGATE SHOULDERS, 6"

0003AC 19 Square

OPTION HOT-MIX ASPHALT DRIVEWAY REMOVAL

HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT

0003AD 1,398 Square

OPTION CONCRETE SIDEWALK REMOVAL & REPLACEMENT

CONCRETE SIDEWALK REMOVAL AND REPLACEMENT

0003AE 64 Square

OPTION HMA SURFACE REMOVAL, 2"

0003AF 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

0003AG 40 Linear

OPTION THERMOPLASTIC PAVEMENT MARKING - LINE 4"

0003AH 109 Linear

OPTION THERMOPLASTIC PAVEMENT MARKING - LINE 6"

0003AJ 18 Linear

OPTION THERMOPLASTIC PAVEMENT MARKING- LINE 24"

0003AK 2 Each

OPTION EXISTING SIGN REMOVAL AND REINSTALLATION

0003AL 2 Each

OPTION EXISTING MAILBOX REMOVAL AND REINSTALL

EXISTING MAILBOX REMOVAL AND REINSTALLATION

0003AM 5 Each

OPTION EXPLORATORY EXCAVATION (STORM,SAN,WATER)

0003AN 4 Each

OPTION STRUCTURE REMOVAL, STORM

0003AP 192 Linear

OPTION STORM SEWER PIPE REMOVAL, 12"

0003AQ 192 Linear

OPTION SEWER PIPE INSTALLATION, STORM, 12" RCP

0003AR 340 Linear

OPTION SEWER PIPE INSTALLATION, STORM, 30" RCP

0003AS 1 Each

OPTION STORM SEWER INLET CONSTRUCTION, TYPE A

0003AT 1 Each

OPTION STORM CATCH BASINS CONSTRUCTION,TYPE A,4

0003AU 1 Each

OPTION STORM CATCH BASINS CONSTRUCTION,TYPE C,2

0003AV 1 Each

OPTION STORM MANHOLE, TYPE A, 4' DIAMETER

0003AW 1 Each

OPTION STORM MANHOLE, TYPE A, 6' DIAMETER

0003AX 1 Each

OPTION SPECIAL RESTRICTOR STORM STRUCTURE, 5'

SPECIAL RESTRICTOR STORM STRUCTURE, 5' DIAMETER

0003AY 1 Each

OPTION WATER SERVICE REPLACEMENT, 1.5"

0003AZ 245 Linear

OPTION GRADING AND SHAPING OF DITCHES

0003BA 3 Each

OPTION ABOVE GRADE INLET FILTER

0003BB 330 Linear

OPTION SEWER CONDITION EVALUATION, STORM, PRIOR

0003BC 330 Linear

OPTION SEWER CONDITION EVALUATION, STORM, POST

0003BD 330 Linear

OPTION SEWER CONDITION EVALUATION, SANITARY

0003BE 330 Linear

OPTION SEWER CONDITION EVALUATION,SANITARY,POST

0003BF 5 Each

OPTION TREE ROOT PRUNING

0003BG 5 Each

OPTION TREE TRUNK PROTECTION

0003BH 8 Square

OPTION DETECTABLE WARNING

0003BJ 137 Square

OPTION PARKWAY RESTORATION

0003BK 1 Lot

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

THIS IS A REIMBURSABLE LINE ITEM FOR BOND COVERAGE FOR LINE

ITEMS 0003AA THROUGH 0003BJ.

The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the

SUMMATION OF BID PRICES

BASE WORK (ITEMS 0001 THROUGH 0001CL): $_____________________

OPTION 1 ITEMS (ITEMS 0002 THROUGH 0002BF): $____________________

OPTION 2 ITEMS (ITEMS 0003 THROUGH 0003BK): $____________________

OVERALL BID PRICE (ITEMS 0001 THROUGH 0003BK (INCLUDES ALL RESPECTIVE SUBITEMS):

END OF REVISED BID SCHEDULE