Amendment_0001_W912P619B0006_Village_of_Glenview-Glen_Oak_Acres_Storm_Sewer_Improvements_Section_219.pdf

PDF 693 KB Posted

Attached to
Village of Glenview - Glen Oak Acres Storm Sewer Improvements - Section 219, Village of Glenview, Cook County, Illinois
Solicitation number
W912P619B0006
Issued by

About this file

This file contains Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6690724940

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REFERENCE INVITATION FOR BIDS NO. W912P619B0006, "VILLAGE OF GLENVIEW, GLEN OAK ACRES STORM SEWER IMPROVEMENTS -

SECTION 219, COOK COUNTY, IL (USACE-CHICAGO DISTRICT ACQUISITION)"

-- THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES --

1. CONTRACT ID CODE PAGE OF PAGES

1 47

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P619B0006

X 9B. DATED (SEE ITEM 11)

15-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Aug-2019

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P619B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

A. BID OPENING DATE AND TIME:

The Bid Opening Date and Time is NOT EXTENDED by this Amendment. Therefore, bids are due by 2:00 p.m.

(Central Time) on August 15, 2019. Detailed information regarding the submision of bids is located at Section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”

B. BID OPENING ROOM:

The following sections has been modified:

SECTION 00 22 13 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

Paragraph 3. e., BID GUARANTEE: The bidder is required to submit a Bid Guarantee for this procurement. Any bidder failing to submit an authentic Bid Guarantee will be considered non-responsive to the Solicitation and ineligible for award. The Bid Guarantee shall be in the amount of 20% of the bidder’s price or $3,000,000.00, whichever is less.

Paragraph 4. a., The designated Bid Opening Room is the Executive Conference Room, located on the 15th floor at 231 South LaSalle Street, Suite 1500, Chicago, Illinois 60604.

C. REVISIONS TO SOLICITATION

(1) BLOCK 11, PAGE 1 OF THE SF1442 (SOLICITATION)

Whereas stated “See Page 70 of 91,” the text should have read as Sect. 00 10 00.

(2) REVISIONS TO SECTION 00 10 00

The Bid Schedule numbers 0002 through 0002BF and 0003 through 0003BK are hereby designated as option items. Therefore, the bid schedule has been revised. Bidders shall remove and replace the previously issued Schedule with the Revised Bid Schedule enclosed herein, which shall be used to enter its Bid prices.

(3) REVISIONS TO SECTION 00 70 00

The following clause has been edited to correct language at subparagraphs (a) and (c). Changed areas are denoted by underlined text.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor acknowledges the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after the date the Contractor acknowledges the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

D. WAGE DETERMINATION:

This Amendment encloses the most recent Wage Determination, General Decision IL20190009, dated 07/26/2019.

E. PRE-BID MEETING ATTENDANCE:

By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the pre-bid meeting held on July 25, 2019.

F. PRE-AWARD SURVEY:

By way of this Amendment, the government is adding a new submittal to be provided by the Bidder. Accordingly, the Bidder shall fully complete the enclosed Pre-Award Survey form and furnish it along with all other items called out in the Solicitation (Refer Solicitation Section 00 22 13 – Supplementary Instructions to Bidders, as specifically described at Paragraph 3. “SUBMISSION OF BIDS.”

G. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846‐5378;

email: ericka.d.hillard@uasce.army.mil.

(The aforementioned Revised Bid Schedule, Pre-Bid Meeting Attendance Sheet and Pre-Award Survey Questionnaire Form follows)

END OF AMENDMENT NO. 0001

REVISED BID SCHEDULE

AMENDMENT 0001

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

DRAINAGE IMPROVEMENTS - BASE WORK

FFP

Bidders shall provide their pricing at sub-items 0001AA through 0001CL, as this Item 0001 identifies the information that relates directly to sub-items 0001AA through 0001CL. Therefore, this Item 0001 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0001 is not to be separately priced for payment purposes.

PURCHASE REQUEST NUMBER: W81G6690724940

NET AMT

0001AA 1 Job

MOBILIZATION

FFP

Under this line item, the contractor is required to perform mobilization activities.

The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.

Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

0001AB 1 Job

DEMOBILIZATION

FFP

Under this line item, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.

Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

0001AC 149 Square

Yard

CLASS D PATCHING, 12" W/AGGREGATE BASE

FFP

CLASS D PATCHING, 12" W/AGGREGATE BASE COURSE, TYPE B, 12"

0001AD 74 Square

AGGREGATE SHOULDERS, 6"

0001AE 628 Linear

Foot

TRENCH PAVING, 4"

0001AF 153 Net Ton

(2,000

LB).

HOT-MIX ASPHALT SURFACE COURSE, MIX "D"

HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 - 2 INCH

0001AG 19 Square

HOT-MIX ASPHALT DRIVEWAY REMOVAL

HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT

0001AH 100 Linear

CONCRETE CURB AND GUTTER REMOVAL

CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT, M-3.12

0001AJ 17 Square

CONCRETE DRIVEWAY REMOVAL & REPLACEMENT

0001AK 1,469 Square

CONCRETE SIDEWALK REMOVAL & REPLACEMENT

0001AL 2,237 Square

HMA SURFACE REMOVAL, 2"

0001AM 1 Job

TRAFFIC CONTROL AND PROTECTION

0001AN 79 Linear

THERMOPLASTIC PAVEMENT MARKING - LINE 4"

0001AP 160 Linear

THERMOPLASTIC PAVEMENT MARKING - LINE 6"

0001AQ 44 Linear

THERMOPLASTIC PAVEMENT MARKING- LINE 24"

0001AR 6 Each

EXISTING SIGN REMOVAL AND REINSTALLATION

0001AS 2 Each

EXISTING MAILBOX REMOVAL& REINSTALLATION

0001AT 12 Each

EXPLORATORY EXCAVATION (STORM,SAN,WATER)

0001AU 6 Each

STRUCTURE REMOVAL, STORM

0001AV 24 Linear

STORM SEWER PIPE REMOVAL, 6"

0001AW 77 Linear

STORM SEWER PIPE REMOVAL, 10"

0001AX 212 Linear

STORM SEWER PIPE REMOVAL, 12"

0001AY 24 Linear

SEWER PIPE INSTALLATION, STORM, 6" PVC

0001AZ 2 Linear

SEWER PIPE INSTALLATION, STORM, 10" PVC

0001BA 271 Linear

SEWER PIPE INSTALLATION, STORM, 12" RCP

0001BB 66 Linear

SEWER PIPE INSTALLATION, STORM, 24" RCP

0001BC 437 Linear

SEWER PIPE INSTALLATION, STORM, 36" RCP

0001BD 436 Linear

SEWER PIPE INSTALLATION, STORM, 48" RCP

0001BE 144 Linear

SEWER PIPE INSTALLATION, JACKED & BORED

SEWER PIPE INSTALLATION, JACKED & BORED, STORM, 48" DIP

0001BF 3 Each

STORM SEWER INLET CONSTRUCTION, TYPE A

0001BG 1 Each

STORM CATCH BASINS CONSTRUCTION, TYPE A

STORM CATCH BASINS CONSTRUCTION, TYPE A, 4' DIAMETER

0001BH 7 Each

STORM CATCH BASINS CONSTRUCTION, TYPE C

STORM CATCH BASINS CONSTRUCTION, TYPE C, 2' DIAMETER

0001BJ 1 Each

STORM MANHOLE, TYPE A, 4' DIAMETER

0001BK 3 Each

STORM MANHOLE, TYPE A, 6' DIAMETER

0001BL 1 Each

STORM MANHOLE, TYPE A, 7' DIAMETER

0001BM 2 Each

STORM CONFLICT MANHOLE, TYPE A

STORM CONFLICT MANHOLE, TYPE A, 6' DIAMETER

0001BN 2 Each

SPECIAL RESTRICTOR STORM STRUCTURE, 6'

SPECIAL RESTRICTOR STORM STRUCTURE, 6' DIAMETER

0001BP 1 Each

SPECIAL RESTRICTOR STORM STRUCTURE, 7'

SPECIAL RESTRICTOR STORM STRUCTURE, 7' DIAMETER

0001BQ 1 Each

SPECIAL RESTRICTOR STORM STRUCTURE, 8'

SPECIAL RESTRICTOR STORM STRUCTURE, 8' DIAMETER

0001BR 6 Each

LOWERING OF SANITARY SEWER SERVICE

0001BS 4 Each

SANITARY SERVICE PROTECTION

0001BT 6 Each

WATER SERVICE REPLACEMENT, 1.5"

0001BU 1 Each

WATER MAIN RELOCATION, 6"

0001BV 1 Each

WATER MAIN RELOCATION, 8"

0001BW 145 Linear

SILT FENCE

0001BX 230 Linear

GRADING AND SHAPING OF DITCHES

0001BY 3 Each

INLET PROTECTION FILTER

0001BZ 9 Each

ABOVE GRADE INLET FILTER

0001CA 1,076 Linear

SEWER CONDITION EVALUATION, STORM, PRIOR

SEWER CONDITION EVALUATION, STORM, PRIOR TO CONSTRUCTION

0001CB 1,076 Linear

SEWER CONDITION EVALUATION, STORM, POST

SEWER CONDITION EVALUATION, STORM, POST CONSTRUCTION

0001CC 1,031 Linear

SEWER CONDITION EVALUATION,SANITARY,PRIO

SEWER CONDITION EVALUATION, SANITARY, PRIOR TO

CONSTRUCTION

0001CD 1,031 Linear

SEWER CONDITION EVALUATION,SANITARY,POST

SEWER CONDITION EVALUATION, SANITARY, POST CONSTRUCTION

0001CE 12 Each

TREE ROOT PRUNING

0001CF 12 Each

TREE TRUNK PROTECTION

0001CG 24 Each

TREE REMOVAL (6" TO 15" IN DIAMETER)

0001CH 22 Each

TREE REMOVAL (OVER 15" IN DIAMETER)

0001CJ 48 Square

DETECTABLE WARNING

0001CK 127 Square

PARKWAY RESTORATION

0001CL 1 Lot

PERFORMANCE AND PAYMENT BONDS

FFP

THIS IS A REIMBURSABLE LINE ITEM FOR BOND COVERAGE FOR LINE

ITEMS 0001AA THROUGH 0001CK.

The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract price changes.

OPTION DRAINAGE IMPROVEMENTS - OPTION 1 ITEMS

FFP

Bidders shall provide their pricing at sub-items 0002AA through 0002BF, as this Item 0002 identifies the information that relates directly to sub-items 0002AA through 0002BF. Therefore, this Item 0002 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0002 is not to be separately priced for payment purposes.

0002AA 260 Linear

OPTION TRENCH PAVING, 4"

0002AB 28 Net Ton

(2,000

LB).

OPTION HOT-MIX ASPHALT SURFACE COURSE, MIX "D"

HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 - 2 INCH

0002AC 19 Square

OPTION HOT-MIX ASPHALT SURFACE DRIVEWAY REMOVAL

HOT-MIX ASPHALT SURFACE DRIVEWAY REMOVAL AND

REPLACEMENT

0002AD 505 Square

OPTION HMA SURFACE REMOVAL, 2"

0002AE 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

0002AF 3 Each

OPTION EXPLORATORY EXCAVATION (STORM,SAN,WATER)

0002AG 3 Each

OPTION STRUCTURE REMOVAL, STORM

0002AH 35 Linear

OPTION STORM SEWER PIPE REMOVAL, 8"

0002AJ 10 Linear

OPTION STORM SEWER PIPE REMOVAL, 12"

0002AK 50 Linear

OPTION ABANDON EXISTING STORM SEWER, 12"

0002AL 83 Linear

OPTION SEWER PIPE INSTALLATION, STORM, 12" RCP

0002AM 249 Linear

OPTION SEWER PIPE INSTALLATION , STORM, 48" RCP

0002AN 2 Each

OPTION STORM SEWER INLET CONSTRUCTION, TYPE A

0002AP 2 Each

OPTION STORM CATCH BASINS CONSTRUCTION, TYPE A

0002AQ 2 Each

OPTION STORM CATCH BASINS CONSTRUCTION, TYPE C

0002AR 2 Each

OPTION STORM MANHOLE, TYPE A, 6' DIAMETER

0002AS 2 Each

OPTION LOWERING OF SANITARY SEWER SERVICE

0002AT 2 Each

OPTION WATER SERVICE REPLACEMENT, 1.5"

0002AU 2 Each

OPTION WATER MAIN RELOCATION, 6"

0002AV 135 Linear

OPTION SILT FENCE

0002AW 105 Linear

OPTION GRADING AND SHAPING OF DITCHES

0002AX 6 Each

OPTION ABOVE GRADE INLET FILTER

0002AY 185 Linear

OPTION SEWER CONDITION EVALUATION, STORM, PRIOR

0002AZ 185 Linear

OPTION SEWER CONDITION EVALUATION, STORM, POST

0002BA 185 Linear

OPTION SEWER CONDITION EVALUATION, SANITARY

0002BB 185 Linear

OPTION SEWER CONDITION EVALUATION,SANITARY,POST

0002BC 3 Each

OPTION TREE ROOT PRUNING

0002BD 3 Each

OPTION TREE TRUNK PROTECTION

0002BE 103 Square

OPTION PARKWAY RESTORATION

0002BF 1 Lot

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

THIS IS A REIMBURSABLE LINE ITEM FOR BOND COVERAGE FOR LINE

ITEMS 0002AA THROUGH 0002BE.

The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the

OPTION DRAINAGE IMPROVEMENTS - OPTION 2 ITEMS

FFP

Bidders shall provide their pricing at sub-items 0003AA through 0003BK, as this Item 0003 identifies the information that relates directly to sub-items 0003AA through 0003BK. Therefore, this Item 0002 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0003 is not to be separately priced for payment purposes.

0003AA 64 Square

OPTION CLASS D PATCHING, 12" W/AGGREGATE BASE

CLASS D PATCHING, 12" W/AGGREGATE BASE COURSE, TYPE B, 12"

0003AB 86 Square

OPTION AGGREGATE SHOULDERS, 6"

0003AC 19 Square

OPTION HOT-MIX ASPHALT DRIVEWAY REMOVAL

HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT

0003AD 1,398 Square

OPTION CONCRETE SIDEWALK REMOVAL & REPLACEMENT

CONCRETE SIDEWALK REMOVAL AND REPLACEMENT

0003AE 64 Square

OPTION HMA SURFACE REMOVAL, 2"

0003AF 1 Job

OPTION TRAFFIC CONTROL AND PROTECTION

0003AG 40 Linear

OPTION THERMOPLASTIC PAVEMENT MARKING - LINE 4"

0003AH 109 Linear

OPTION THERMOPLASTIC PAVEMENT MARKING - LINE 6"

0003AJ 18 Linear

OPTION THERMOPLASTIC PAVEMENT MARKING- LINE 24"

0003AK 2 Each

OPTION EXISTING SIGN REMOVAL AND REINSTALLATION

0003AL 2 Each

OPTION EXISTING MAILBOX REMOVAL AND REINSTALL

EXISTING MAILBOX REMOVAL AND REINSTALLATION

0003AM 5 Each

OPTION EXPLORATORY EXCAVATION (STORM,SAN,WATER)

0003AN 4 Each

OPTION STRUCTURE REMOVAL, STORM

0003AP 192 Linear

OPTION STORM SEWER PIPE REMOVAL, 12"

0003AQ 192 Linear

OPTION SEWER PIPE INSTALLATION, STORM, 12" RCP

0003AR 340 Linear

OPTION SEWER PIPE INSTALLATION, STORM, 30" RCP

0003AS 1 Each

OPTION STORM SEWER INLET CONSTRUCTION, TYPE A

0003AT 1 Each

OPTION STORM CATCH BASINS CONSTRUCTION,TYPE A,4

0003AU 1 Each

OPTION STORM CATCH BASINS CONSTRUCTION,TYPE C,2

0003AV 1 Each

OPTION STORM MANHOLE, TYPE A, 4' DIAMETER

0003AW 1 Each

OPTION STORM MANHOLE, TYPE A, 6' DIAMETER

0003AX 1 Each

OPTION SPECIAL RESTRICTOR STORM STRUCTURE, 5'

SPECIAL RESTRICTOR STORM STRUCTURE, 5' DIAMETER

0003AY 1 Each

OPTION WATER SERVICE REPLACEMENT, 1.5"

0003AZ 245 Linear

OPTION GRADING AND SHAPING OF DITCHES

0003BA 3 Each

OPTION ABOVE GRADE INLET FILTER

0003BB 330 Linear

OPTION SEWER CONDITION EVALUATION, STORM, PRIOR

0003BC 330 Linear

OPTION SEWER CONDITION EVALUATION, STORM, POST

0003BD 330 Linear

OPTION SEWER CONDITION EVALUATION, SANITARY

0003BE 330 Linear

OPTION SEWER CONDITION EVALUATION,SANITARY,POST

0003BF 5 Each

OPTION TREE ROOT PRUNING

0003BG 5 Each

OPTION TREE TRUNK PROTECTION

0003BH 8 Square

OPTION DETECTABLE WARNING

0003BJ 137 Square

OPTION PARKWAY RESTORATION

0003BK 1 Lot

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

THIS IS A REIMBURSABLE LINE ITEM FOR BOND COVERAGE FOR LINE

ITEMS 0003AA THROUGH 0003BJ.

The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the

SUMMATION OF BID PRICES

BASE WORK (ITEMS 0001 THROUGH 0001CL): $_____________________

OPTION 1 ITEMS (ITEMS 0002 THROUGH 0002BF): $____________________

OPTION 2 ITEMS (ITEMS 0003 THROUGH 0003BK): $____________________

OVERALL BID PRICE (ITEMS 0001 THROUGH 0003BK (INCLUDES ALL RESPECTIVE SUBITEMS):

END OF REVISED BID SCHEDULE

ATTACHMENT A

PREAWARD SURVEY INFORMATION

(RE: Subparts 9.104-1 and 9.105-1 of the Federal Acquisition Regulation)

CONTRACTOR:

SOLICITATION W912P619B0006, VILLAGE OF GLENVIEW, GLEN OAK ACRES STORM

SEWER IMPROVEMENTS – SECTION 219, COOK COUNTY, ILLINOIS (USACE-

CHICAGO DISTRICT ACQUISITION)

Please complete the below form to assist in the completion of a Pre-award Survey:

1. Month and Year started in business:

2. Year and State Incorporated:

3. Key Personnel:

President/Owner:

Vice President/Partner:

Secretary/Treasurer:

4. Number of Full-Time Employees:

5. Surety:

Agency:

Agent:

Address, City & State:

Telephone#:

6. Insurance Company:

Agency:

Agent:

7. Financial Institution Information:

Name of Bank:

Contact Person:

8. References: Provide the names and contact information of three references. Information obtained from references will be used to determine if you have been diligent in the following areas: a) Quality of Work; b) Timely Performance; c) Effectiveness of Management; d) Compliance with Safety Standards; and e) Compliance with Labor Standards.

9. Does your company have any ongoing projects that may cause a problem with completing or beginning performance of the subject project?

END OF FORM

"General Decision Number: IL20190009 07/26/2019

Superseded General Decision Number: IL20180009

State: Illinois

Construction Types: Building, Heavy, Highway and Residential

County: Cook County in Illinois.

BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act

Page 1 of 24beta.SAM.gov

8/1/2019https://beta.sam.gov/wage-determination/IL20190009/7/document itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

1 01/11/2019

2 04/19/2019

3 06/07/2019

4 06/14/2019

5 06/21/2019

6 07/19/2019

7 07/26/2019

ASBE0017-001 06/01/2019

Rates Fringes

ASBESTOS WORKER/INSULATOR

Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 50.50 27.80

Fire Stop Technician.............$ 40.40 24.54

HAZARDOUS MATERIAL HANDLER

includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from

Page 2 of 24beta.SAM.gov mechanical systems..........$ 37.80 24.54

BOIL0001-001 05/01/2017

Rates Fringes

BOILERMAKER......................$ 46.18 29.58

BRIL0021-001 06/01/2016

Rates Fringes

BRICKLAYER.......................$ 44.88 26.62

BRIL0021-004 06/01/2017

Rates Fringes

Marble Mason.....................$ 44.63 26.83

BRIL0021-006 06/01/2017

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 44.38 25.84

TILE FINISHER....................$ 38.56 22.10

TILE SETTER......................$ 45.49 25.72

BRIL0021-009 06/01/2017

Rates Fringes

MARBLE FINISHER..................$ 33.95 26.03

BRIL0021-012 06/01/2017

Rates Fringes

Page 3 of 24beta.SAM.gov

Pointer, cleaner and caulker.....$ 45.42 24.06

CARP0555-001 06/01/2018

BUILDING, HEAVY, AND HIGHWAY

Rates Fringes

CARPENTER

Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer

Building...................$ 47.35 32.83

Heavy & Highway............$ 47.35 32.83

CARP0555-002 10/01/2018

RESIDENTIAL CONSTRUCTION

Rates Fringes

CARPENTER........................$ 38.11 32.83

ELEC0009-003 06/03/2018

Rates Fringes

Line Construction

Groundman...................$ 40.48 61.52%

Lineman and Equipment

Operator....................$ 51.90 61.52%

* ELEC0134-001 06/03/2019

Rates Fringes

Page 4 of 24beta.SAM.gov

ELECTRICIAN......................$ 49.35 3%+34.32

ELEC0134-003 06/03/2019

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN.......$ 44.86 3%+24.72

The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.

ELEV0002-001 01/01/2019

Rates Fringes

ELEVATOR MECHANIC................$ 56.61 33.705+a+b

FOOTNOTES:

a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence

Page 5 of 24beta.SAM.gov

Day; Labor Day; Thanksgiving Day; Day after Thanksgiving

Day; Veterans' Day and Christmas Day.

b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service

* ENGI0150-006 06/01/2019

Building and Residential Construction

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 51.10 41.00

GROUP 2....................$ 49.80 41.00

GROUP 3....................$ 47.25 41.00

GROUP 4....................$ 45.50 41.00

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;

Autograde*; Backhoes with Caisson attachment*:Batch Plant*;

Benoto(Requires two Engineers); Boiler and Throttle Valve;

Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe

Front Endloader Machine; Compressor and Throttle Valve;

Concrete Breaker (Truck Mounted)*; Concrete Conveyor;

Concrete Conveyor, Truck Mounted; Concrete Paver over 27E

cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete

Placer*; Concrete Placing Boom; Concrete Pump (Truck

Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;

Cranes, (GCI and similar type Requires two operators only);

Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front

Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside

Page 6 of 24beta.SAM.gov

Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;

Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac

(and similar equipment);Locomotives; Motor Patrol*; Pile

Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress

Machine; Pump Cretes Dual Ram(Requiring frequent

Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw

Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole

Drill*; Roto Mill Grinder (36"" and Over)*; Roto Mill

Grinder (Less Than 36"")*; Scoops-Tractor Drawn; Slip-Form

Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.

GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power

Propelled; Bulldozers; Concrete Mixer (Two Bag and over);

Conveyor, Portable; Forklift Trucks; Greaser Engineer;

Highlift Shovels or Front End loaders under 2 1/4 cu yd;

Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer

Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;

Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;

Rollers; Steam Generators; Tractors; Tractor Drawn

Vibratory Roller (Receives an additional $.50 per hour);

Winch Trucks with ""A"" Frame.

GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;

Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or

Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3"" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;

Welding Machines (2 through 5); Winches, 4 Small Electric

Drill Winches; Bobcat (up to and including 3/4 cu yd)

GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick

Forklifts; Oilers

Page 7 of 24beta.SAM.gov

*-Requires Oiler

* ENGI0150-025 06/01/2019

Heavy and Highway Construction

Rates Fringes

OPERATOR: Power Equipment

GROUP 1.....................$ 49.30 41.00

GROUP 2.....................$ 48.75 41.00

GROUP 3.....................$ 46.70 41.00

GROUP 4.....................$ 45.30 41.00

GROUP 5.....................$ 44.10 41.00

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;

Autograder/ GOMACO or similar; ABG Paver*, Backhoes with

Caisson attachment*, Ballast Regulator, Belt Loader*;

Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker

(truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All

Derricks; Derrick Boats; Derricks, traveling*; Dowell

Machine with Air Compressor ($1.00 above Class 1);

Dredges*; Field Mechanic Welder; Formless Curb and Gutter

Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic

Page 8 of 24beta.SAM.gov

Backhoes*; Backhoes with Shear attachments*; Mucking

Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;

Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36"" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form

(tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt

Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer

Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* &

Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*

GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle

Valve; Bulldozer; Car Loader Trailing Conveyors;

Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and

Throttle Valve; Compressor, common receiver (3); Concrete

Breaker or Hydro Hammer; Concrete Grinding Machine;

Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap

Machine; Belting Machine and Sealing Machine; Concrete

Wheel Saw; Conveyor Muck Cars (Haglund or similar type);

Drills (all); Finishing Machine-Concrete; Greaser Engineer;

Highlift Shovels or Front End Loader; Hoist- Sewer Dragging

Machine; Hydraulic Boom Trucks, all attachments;

Hydro-Blaster (requires two operators); Laser Screed*;

Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow

Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor

Drawn; Self- propelled Compactor; Spreader-Chip-Stone;

Scraper; Scraper-Prime Mover in Tandem regardless of size

(add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly

Page 9 of 24beta.SAM.gov rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats

GROUP 3: Boilers; Brooms, all power propelled; Cement Supply

Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift

Trucks; Grouting Machines; Hoists, Automatic; Hoists, all

Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low

Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump

Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven

GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;

Combination - Small Equipment Operator; Directional Boring

Machine; Generators - Small 50 kw and under; Generators -

Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants

(1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of

300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;

GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional

Boring

*Requires Oiler

IRON0001-026 06/01/2018

Rates Fringes

IRONWORKER

Sheeter.....................$ 49.08 38.28

Page 10 of 24beta.SAM.gov

Structural and Reinforcing..$ 48.83 38.28

IRON0063-001 06/01/2018

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 48.05 35.93

IRON0063-002 06/01/2018

Rates Fringes

IRONWORKER

Fence Erector...............$ 40.88 28.74

IRON0136-001 07/01/2018

Rates Fringes

IRONWORKER

Machinery Movers; Riggers;

Macinery Erectors...........$ 41.00 33.96

Master Riggers..............$ 43.50 33.96

LABO0002-006 06/01/2018

Rates Fringes

LABORER (BUILDING &

RESIDENTIAL)

GROUP 1....................$ 42.72 28.19

GROUP 2....................$ 42.72 28.19

GROUP 3....................$ 42.80 28.19

GROUP 4....................$ 42.82 28.19

GROUP 5....................$ 42.87 28.19

GROUP 6....................$ 42.92 28.19

GROUP 7....................$ 42.95 28.19

Page 11 of 24beta.SAM.gov

GROUP 8....................$ 43.05 28.19

GROUP 9....................$ 43.07 28.19

GROUP 10....................$ 43.17 28.19

GROUP 11....................$ 43.00 28.19

GROUP 12....................$ 43.72 28.19

LABORER CLASSIFICATIONS

GROUP 1: Building Laborers; Plasterer Tenders; Pumps for

Dewatering; and other unclassified laborers.

GROUP 2: Fireproofing and Fire Shop laborers.

GROUP 3: Cement Gun.

GROUP 4: Chimney over 40 ft.; Scaffold Laborers.

GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.

GROUP 6: Stone Derrickmen & Handlers.

GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.

GROUP 8: Firebrick & Boiler Laborers.

GROUP 9: Chimney on fire brick; Caisson diggers; & Well

Point System men.

GROUP 10: Boiler Setter Plastic Laborers.

GROUP 11: Jackhammermen on fire brick work only.

GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous

Waste Removal Laborers.

Page 12 of 24beta.SAM.gov

LABO0002-007 06/01/2018

Rates Fringes

LABORER (HEAVY & HIGHWAY)

GROUP 1.....................$ 42.72 28.19

GROUP 2.....................$ 42.80 28.19

GROUP 3.....................$ 42.87 28.19

GROUP 4.....................$ 43.00 28.19

GROUP 5.....................$ 42.72 28.19

LABORER CLASSIFICATIONS

GROUP 1: Common laborer; Tenders; Material expeditor

(asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned

GROUP 2: Asphalt tampers & smoothers; Cement gun laborers

GROUP 3: Cement Gun Nozzle (laborers), Gunite

GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;

Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;

Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);

Power drive concrete saws; other power tools.

GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous

Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure

LABO0002-008 06/01/2018

Page 13 of 24beta.SAM.gov

Rates Fringes

LABORER (Compressed Air)

0 - 15 POUNDS...............$ 43.72 28.19

16 - 20 POUNDS..............$ 44.22 28.19

21 - 26 POUNDS..............$ 44.72 28.19

27 - 33 POUNDS..............$ 45.72 28.19

34 - AND OVER...............$ 46.72 28.19

LABORER (Tunnel and Sewer)

GROUP 1.....................$ 42.72 28.19

GROUP 2.....................$ 42.85 28.19

GROUP 3.....................$ 42.95 28.19

GROUP 4.....................$ 43.07 28.19

GROUP 5.....................$ 42.72 28.19

LABORER CLASSIFICATIONS (TUNNEL)

GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers

GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher

GROUP 3: Concrete repairmen; Lock tenders (pressure side);

Mortar men; Muckers; Grout machine operators; Track layers

GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;

Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;

Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;

skinners; Maintenance technician

GROUP 5: Asbestos abatement laborer; Toxic and hazardous

Page 14 of 24beta.SAM.gov waste removal laborer; Dosimeter (any device) monitoring nuclear exposure

LABORER CLASSIFICATIONS (SEWER)

GROUP 1: Signalmen; Top laborers and All other laborers

GROUP 2: Concrete laborers and Steel setters

GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;

Mortar men; Scaffold men; Second Bottom men

GROUP 4: Air trac drill operator; Bottom men;

Bracers-bracing; Bricklayer tenders; Catch basin diggers;

Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;

Pipelayers; Rodders; Welder-burners; Well point systems men

GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure

LABO0225-001 06/01/2018

Rates Fringes

LABORER (DEMOLITION/WRECKING)

GROUP 1.....................$ 37.52 28.19

GROUP 2.....................$ 42.72 28.19

GROUP 3.....................$ 42.72 28.19

LABORER CLASSIFICATIONS

GROUP 1 - Complete Demolition

GROUP 2 - Interior Wrecking and Strip Out Work

Page 15 of 24beta.SAM.gov

GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or

Strip Out Work

PAIN0014-001 06/01/2018

Rates Fringes

PAINTER (including taper)........$ 46.55 27.24

PAIN0027-001 06/01/2019

Rates Fringes

GLAZIER..........................$ 44.85 37.72

PLAS0005-002 07/01/2015

Rates Fringes

PLASTERER........................$ 42.25 26.65

PLAS0502-001 06/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 45.25 33.48

PLUM0130-001 06/01/2019

Rates Fringes

PLUMBER..........................$ 51.00 31.47

PLUM0597-002 06/01/2018

Rates Fringes

Page 16 of 24beta.SAM.gov

PIPEFITTER.......................$ 48.50 31.44

ROOF0011-001 12/01/2018

Rates Fringes

ROOFER...........................$ 43.65 23.45

SFIL0281-001 01/01/2018

Rates Fringes

SPRINKLER FITTER.................$ 48.10 27.05

SHEE0073-001 06/08/2018

Rates Fringes

Sheet Metal Worker...............$ 44.25 37.02

SHEE0073-002 06/08/2018

Rates Fringes

Sheet Metal Worker

ALUMINUM GUTTER WORK........$ 31.32 37.02

TEAM0731-001 06/01/2017

COOK COUNTY - HEAVY AND HIGHWAY

Rates Fringes

TRUCK DRIVER

2 or 3 Axles................$ 35.60 22.10

4 Axles.....................$ 35.85 22.10

Page 17 of 24beta.SAM.gov

5 Axles.....................$ 36.05 22.10

6 Axles.....................$ 36.25 22.10

FOOTNOTES:

A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and

Christmas Day.

B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

TEAM0731-002 03/01/2012

Rates Fringes

Traffic Control Device Monitor

TRAFFIC SAFETY WORKER:

Primary duties include but are not limited to the delivery, maintenance and pick-up of traffic control devices, the set-up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow boards, message signs, Page 18 of 24beta.SAM.gov barricade and sign fabrication equipment.......$ 28.25 9.08

TEAM0786-001 06/01/2017

COOK COUNTY - BUILDING AND RESIDENTIAL

Rates Fringes

TRUCK DRIVER

2 & 3 Axles.................$ 39.942 0.25+a

4 Axles.....................$ 39.75 0.25+a

5 Axles.....................$ 39.967 0.25+a

6 Axles.....................$ 40.184 0.25+a

FOOTNOTES:

a. $719.00 per week.

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

Paid Holidays: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day.

900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years -

2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Page 19 of 24beta.SAM.gov

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

Page 20 of 24beta.SAM.gov

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a

Page 21 of 24beta.SAM.gov new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted

Page 22 of 24beta.SAM.gov because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Page 23 of 24beta.SAM.gov

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

Page 24 of 24beta.SAM.gov

File details come from the government source that posted it.