W912P618B0013
W81G6681491702
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE INVITATION FOR BIDS NO. W912P618B0013, "WATER MAIN REPLACEMENT SECTION 219 PROJECT, EAST CHICAGO, LAKE
COUNTY, INDIANA"
-- THE DESCRIPTION OF THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
1 69
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P618B0013
X 9B. DATED (SEE ITEM 11)
24-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2018
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. BID OPENING DATE AND TIME:
The Bid Opening Date and Time is NOT EXTENDED by this Amendment, therefore, bids are due by 1:00 p.m.
(Central Time) on 24 September 2018. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”
B. BID SCHEDULE:
The government is providing a revised bid schedule (Section 00 10 00 – Solicitation Contract Form). Therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule.
(1) SUBCLIN 0001AV
The pricing detail quantity has decreased by 1.00 from 2.00 to 1.00.
(2) SUBCLIN 0001AW
The pricing detail quantity has increased by 2.00 from 1.00 to 3.00.
(3) SUBCLIN 0001CB
The pricing detail quantity has increased by 5.00 from 2,812.00 to 2,817.00.
C. WAGE DETERMINATION:
This Amendment encloses the most recent Wage Determination, General Decision IN1, dated 09/07/2018.
D. PRE-BID MEETING ATTENDANCE:
By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the pre-bid meeting held on September 10, 2018.
E. PRE-AWARD SURVEY:
By way of this Amendment, the government is adding a new submittal to be provided by the Bidder. Accordingly, the Bidder shall fully complete the enclosed Pre-Award Survey form and furnish it along with all other items called out in the Solicitation (Refer Solicitation Section 00 22 13 – Supplementary Instructions to Bidders, as specifically described at Paragraph 3. “SUBMISSION OF BIDS.”
F. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846‐5378;
email: ericka.d.hillard@usace.army.mil.
(The aforementioned Wage Determination, Revised Bid Schedule and Pre-Award Survey Questionnaire Form follows)
REVISED BID SCHEDULE
AMENDMENT 0003
THE BELOW BID FORM SERVES AS THE BID SCHEDULE AND SHALL BE USED BY THE BIDDER TO
ENTER ITS BID PRICING
IMPORTANT NOTE - DISTINCTION OF LINE ITEMS:
The below Bid Schedule contains a combination of Firm Fixed Price (FFP) and cost reimbursable line items.
Although “FFP” is shown in the description of the cost reimbursable line items, it is not to be construed as a Firm Fixed Price line item. In this case, the FFP represents the Contract Type, which is firm fixed price.
Therefore, the contractor will be reimbursed as stated within the extended description of the cost reimbursable line items.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
WATER MAIN - BASE WORK
FFP
Bidders shall provide their pricing at sub-items 0001AA through 0001CJ, as this Item 0001 identifies the information that relates directly to sub-items 0001AA through 000CJ. Therefore, this Item 0001 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0001 is not to be separately priced for payment purposes.
PURCHASE REQUEST NUMBER: W81G6681491702
NET AMT
0001AA 1 Job
MOBILIZATION
FFP
Under this line item, the contractor is required to perform mobilization activities.
The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions: The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AB 1 Job
DEMOBILIZATION
FFP
Under this line item, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force from the project site.
Payment Provisions: The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer may require the contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AC 1 Job
MAINTENANCE OF TRAFFIC
FFP
0001AD 1 Job
TEMPORARY EROSION CONTROL
0001AE 10 Linear
Foot
WATER MAIN, 4-INCH DIA.
0001AF 12 Linear
WATER MAIN, 6-INCH DIA.
0001AG 400 Linear
WATER MAIN, 8-INCH DIA.
0001AH 3,381 Linear
WATER MAIN, 12-INCH DIA.
0001AJ 131 Linear
WATER MAIN, 16-INCH DIA.
0001AK 2 Each
FITTING, BEND, 4-INCH DIA.
0001AL 2 Each
FITTING, BEND, 6-INCH DIA.
0001AM 16 Each
FITTING, BEND, 8-INCH DIA.
0001AN 6 Each
FITTING, BEND, 12-INCH DIA.
0001AP 5 Each
FITTING, BEND, 16-INCH DIA.
0001AQ 1 Each
FITTING, TEE, 12-INCH X 4-INCH
0001AR 1 Each
FITTING, TEE, 12-INCH X 6-INCH
0001AS 6 Each
FITTING, TEE, 12-INCH X 8-INCH
0001AT 1 Each
FITTING, TEE, 12-INCH X 12-INCH
0001AU 2 Each
FITTING, TEE, 16-INCH X 16-INCH
0001AV 1 Each
FITTING, CROSS, 12-INCH X 8-INCH
0001AW 3 Each
FITTING, REDUCER, 8-INCH X 4-INCH
0001AX 3 Each
FITTING, REDUCER, 8-INCH X 6-INCH
0001AY 2 Each
FITTING, REDUCER, 16-INCH X 12-INCH
0001AZ 1 Each
FITTING, TEMPORARY CAP, 12-INCH
0001BA 10 Each
FIRE HYDRANT ASSEMBLY, MEDIUM
0001BB 2 Each
TAPPING SLEEVE AND TAPPING VALVE, 12-IN
TAPPING SLEEVE AND TAPPING VALVE, 12-INCH X 12-INCH
0001BC 2 Each
TAPPING SLEEVE AND TAPPING VALVE, 16-IN
TAPPING SLEEVE AND TAPPING VALVE, 16-INCH X 16-INCH
0001BD 1 Each
VALVE, 4-INCH
0001BE 1 Each
VALVE, 6-INCH
0001BF 8 Each
VALVE, 8-INCH
0001BG 4 Each
VALVE, 12-INCH
0001BH 8 Each
WATER SERVICE, 1-INCH,MEDIUM WITH METER
0001BJ 71 Each
WATER SERVICE, 1-INCH, MEDIUM W/O METER
WATER SERVICE, 1-INCH, MEDIUM WITHOUT METER
0001BK 1 Each
WATER SERVICE, 1-INCH,LONG WITHOUT METER
0001BL 5 Each
WATER SERVICE, 2-INCH, MEDIUM W/O/ METER
WATER SERVICE, 2-INCH, MEDIUM WITHOUT METER
0001BM 4 Each
CUT & CAP, 4-INCH WATER MAIN
0001BN 4 Each
CUT & CAP, 6-INCH WATER MAIN
0001BP 3 Each
CUT & CAP, 8-INCH WATER MAIN
0001BQ 1 Each
CUT & CAP, 12-INCH WATER MAIN
0001BR 2 Each
CUT & CAP, 16-INCH WATER MAIN
0001BS 8 Each
RETIRE FIRE HYDRANT
0001BT 16 Each
RETIRE VALVE
0001BU 8 Each
RETIRE WATER SERVICE WITH METER
0001BV 82 Each
RETIRE WATER SERVICE WITHOUT METER
0001BW 2,817 Square
Yard
FULL-DEPTH COMPOSITE PAVEMENT REMOVAL
0001BX 304 Square
CONCRETE SIDEWALK REMOVAL
0001BY 96 Linear
CONCRETE CURB REMOVAL
0001BZ 4 Linear
CONCRETE CURB & GUTTER REMOVAL
0001CA 1 Each
HANDICAP RAMP REPLACEMENT
0001CB 2,817 Square
ASPHALT PAVEMENT REPLACEMENT
0001CC 304 Square
CONCRETE SIDEWALK REPLACEMENT
0001CD 96 Linear
CONCRETE CURB REPLACEMENT
0001CE 4 Linear
CONCRETE CURB AND GUTTER REPLACEMENT
0001CF 10 Each
CONTAMINATED SOIL SAMPLING AND ANALYSIS
0001CG 10 Each
DEWATERING GROUNDWATER SAMPLING
DEWATERING GROUNDWATER SAMPLING AND ANALYSIS
0001CH 1 Lot
GOVERNMENT PRICE ALLOWANCE
FFP
GOVERNMENT PRICE ALLOWANCE FOR HAZARDOUS, TOXIC AND
RADIOACTIVE WASTE (HTRW) SERVICES
THIS IS A GOVERNMENT PRICE ALLOWANCE FOR "HAZARDOUS,
TOXIC AND RADIOACTIVE WASTE (HTRW) SERVICES" NOT
ELSEWHERE REQUIRED BY THIS CONTRACT.
THE CEILING IS NOT TO EXCEED $100,000.00.
Payments will be reimbursed by the government in an amount for work preapproved by the COR at a NOT TO EXCEED PRICE OF $100,000.00. Only costs determined in writing to be reimbursable in accordance with the Contract set shall be reimbursable.
(1) The Contractor shall NOT incur any additional costs or perform any additional services outside of the ceiling price established hereunder. Should the Contractor determine that the allocated amount is insufficient because additional related services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make price adjustments to the Contract
(2) The Contractor shall coordinate all services with the Contracting Officer's Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified.
(3) The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information (labor, travel, per diem, subcontractor costs, etc.) for the verification of the Contractor's expenditures for this line item).
ANY UNUSED BALANCE WILL BE DEOBLIGATED AT THE END OF THE
CONTRACT PERIOD
0001CJ 1 Lot
PERFORMANCE AND PAYMENT BOND
FFP
THIS IS A REIMBURSABLE LINE ITEM FOR BOND COVERAGE FOR LINE
ITEMS 0001AA THROUGH 0001CH.
The Government will reimburse the Contractor for the actual cost of acceptable bonds upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract price changes.
OPTION OPTION AREA #1 - WATER MAIN
FFP
Bidders shall provide their pricing at sub-items 0002AA through 0002AW, as this Item 0002 identifies the information that relates directly to sub-items 0002AA through 0002AW. Therefore, this Item 0002 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0002 is not to be separately priced for payment purposes.
0002AA 1 Job
OPTION MAINTENANCE OF TRAFFIC
0002AB 1 Job
OPTION TEMPORARY EROSION CONTROL
0002AC 131 Linear
OPTION WATER MAIN, 10-INCH DIA.
0002AD 300 Linear
OPTION WATER MAIN, 12-INCH DIA.
0002AE 4 Each
OPTION FITTING, BEND, 10-INCH DIA.
0002AF 2 Each
OPTION FITTING, BEND, 12-INCH DIA.
0002AG 2 Each
OPTION FITTING, TEE, 12-INCH X 10-INCH
0002AH 1 Each
OPTION FIRE HYDRANT ASSEMBLY,REMOVE & REINSTALL
0002AJ 2 Each
OPTION TAPPING SLEEVE & TAPPING VALVE, 10-INCH
TAPPING SLEEVE AND TAPPING VALVE, 10-INCH X 10-INCH
0002AK 1 Each
OPTION VALVE, 12-INCH
0002AL 2 Each
OPTION CUT & CAP, 10-INCH WATER MAIN
0002AM 2 Each
OPTION RETIRE VALVE
0002AN 313 Square
OPTION FULL-DEPTH COMPOSITE PAVEMENT REMOVAL
0002AP 2 Square
OPTION CONCRETE SIDEWALK REMOVAL
0002AQ 4 Linear
OPTION CONCRETE CURB REMOVAL
0002AR 313 Square
OPTION ASPHALT PAVEMENT REPLACEMENT
0002AS 2 Square
OPTION CONCRETE SIDEWALK REPLACEMENT
0002AT 4 Linear
OPTION CONCRETE CURB REPLACEMENT
0002AU 2 Each
OPTION CONTAMINATED SOIL SAMPLING AND ANALYSIS
0002AV 2 Each
OPTION DEWATERING GROUNDWATER SAMPLING
0002AW 1 Lot
OPTION PERFORMANCE&PAYMENT BOND OPTION AREA #1
FFP
BONDS FOR OPTION AREA #1 (LINE ITEMS 0002AA through 0002AV)
THIS IS A COST-REIMBURSABLE LINE ITEM - The government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
OPTION OPTION AREA #2 - WATER MAIN
FFP
This a Parent Line Item identifying the option work that relates directly to its Sub- Line Items 0003AA through 0003AY; the Sub-Line Items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide the pricing at Sub-Line Items 0003AA through 0003AY.
0003AA 1 Job
OPTION MAINTENANCE OF TRAFFIC
0003AB 1 Job
OPTION TEMPORARY EROSION CONTROL
0003AC 600 Linear
Centimeter
OPTION WATER MAIN, 12-INCH DIA.
0003AD 2 Each
OPTION FIRE HYDRANT ASSEMBLY, SHORT
0003AE 1 Each
OPTION VALVE, 12-INCH
0003AF 1 Each
OPTION WATER SERVICE, 1-INCH, SHORT WITH METER
0003AG 8 Each
OPTION WATER SERVICE, 1-INCH, SHORT W/O METER
WATER SERVICE, 1-INCH, SHORT WITHOUT METER
0003AH 1 Each
OPTION WATER SERVICE, 1-INCH,LONG WITHOUT METER
0003AJ 1 Each
OPTION WATER SERVICE, 2-INCH, LONG W/O METER
WATER SERVICE, 2-INCH, LONG WITHOUT METER
0003AK 2 Each
OPTION RETIRE FIRE HYDRANT
0003AL 1 Each
OPTION RETIRE WATER SERVICE WITH METER
0003AM 12 Each
OPTION RETIRE WATER SERVICE W/O METER
RETIRE WATER SERVICE WITHOUT METER
0003AN 409 Square
OPTION FULL-DEPTH COMPOSITE PAVEMENT REMOVAL
0003AP 37 Square
OPTION CONCRETE SIDEWALK REMOVAL
0003AQ 4 Linear
OPTION CONCRETE CURB REMOVAL
0003AR 4 Linear
OPTION CONCRETE CURB & GUTTER REMOVAL
0003AS 409 Square
OPTION ASPHALT PAVEMENT REPLACEMENT
0003AT 37 Square
OPTION CONCRETE SIDEWALK REPLACEMENT
0003AU 4 Linear
OPTION CONCRETE CURB REPLACEMENT
0003AV 4 Linear
OPTION CONCRETE CURB AND GUTTER REPLACEMENT
0003AW 2 Each
OPTION CONTAMINATED SOIL SAMPLING AND ANALYSIS
0003AX 2 Each
OPTION DEWATERING GROUNDWATER SAMPLING
0003AY 1 Lot
OPTION PERFORMANCE&PAYMENT BOND OPTION AREA #2
FFP
BONDS FOR OPTION AREA #2 (LINE ITEMS 0003AA through 0003AX)
THIS IS A COST-REIMBURSABLE LINE ITEM - The government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
SUMMATION OF BID PRICES
BASE WORK (ITEMS 0001 THROUGH 0001CJ): $____________________
OPTION AREA #1 (ITEMS 0002 THROUGH 0002AW): $____________________
OPTION AREA #2 (ITEMS 0003 THROUGH 0003AY): $____________________
OVERALL BID PRICE (ITEMS 0001 THROUGH 0003AY (INCLUDES ALL RESPECTIVE SUBITEMS
AND THE GOVERNMENT PRICE ALLOWANCE): $____________________
END OF REVISED BID SCHEDULE
General Decision Number: IN180001 09/07/2018 IN1
Superseded General Decision Number: IN20170001
State: Indiana
Construction Types: Building, Heavy and Highway
Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/23/2018 3 03/09/2018 4 04/13/2018 5 04/20/2018 6 05/25/2018 7 06/01/2018 8 06/08/2018 9 06/15/2018 10 06/22/2018 11 06/29/2018 12 07/06/2018 13 07/13/2018 14 07/20/2018 15 07/27/2018 16 08/10/2018 17 08/24/2018 18 09/07/2018
ASBE0017-002 06/01/2017
LAKE AND PORTER COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 50.50 25.80
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHANICAL SYSTEMS).........$ 37.80 24.54
ASBE0075-001 06/01/2017
REMAINING COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.50 20.79
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
BOIL0001-005 05/01/2017
LAKE COUNTY, City of Hammond; North of 114th Street
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BOIL0374-003 03/01/2018
Rates Fringes
BOILERMAKER......................$ 37.22 27.65
BRIN0004-011 06/01/2018
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer; Stone Mason;
Pointer, Cleaner, Caulker...$ 37.80 23.42 Marble Finisher; Tile Finisher....................$ 29.00 15.54 Marble Mason; Terrazzo Worker; Tile Layer..........$ 37.05 21.64 Terrazzo Finisher...........$ 30.00 15.54
BRIN0004-018 06/01/2018
SOUTH BEND: ST. JOSEPH COUNTY
Rates Fringes
BRICKLAYER
BRICKLAYER; STONE MASON;
POINTER, CAULKER, CLEANER...$ 29.00 15.96
MARBLE AND TILE FINISHER....$ 29.00 15.54
MARBLE AND TILE LAYER.......$ 30.57 18.36
TERRAZZO FINISHER...........$ 30.00 15.54
TERRAZZO WORKER.............$ 31.57 18.36
CARP0413-002 06/01/2018
St. Joseph County
Rates Fringes
CARPENTER........................$ 26.98 19.81
CARP0765-001 06/01/2018
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
CARPENTER........................$ 37.63 27.05
MILLWRIGHT.......................$ 37.73 26.85
CARP1029-001 06/01/2018
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
MILLWRIGHT.......................$ 26.63 23.76
* ELEC0153-001 06/04/2018
ST JOSEPH COUNTY
Communication Technician.........$ 26.15 17.36
ELECTRICIAN......................$ 34.25 22.96
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
ELEC0531-001 05/28/2018
LAPORTE and PORTER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 39.60 25.73
ELEC0697-001 05/28/2018
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 41.00 63.88%+3.18
ELEC0697-004 08/28/2017
LAKE COUNTY
Rates Fringes
Telecommunication Technician.....$ 31.00 24.95
Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).
Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC1393-003 01/01/2018
LAKE & PORTER COUNTIES
(Calumet Area, North of U.S. Hwy 30)
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR 1:
(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 30.59 29%+$5.65
EQUIPMENT OPERATOR 3
(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 37.88 29%+$5.65
GROUNDMAN...................$ 22.94 29%+$5.65
GROUNDMAN-TRUCK DRIVER......$ 26.55 29%+$5.65
LINEMAN.....................$ 39.95 29%+$5.65
ELEV0002-005 01/01/2018
ELEVATOR CONSTRUCTION
LAKE AND PORTER COUNTIES
Rates Fringes
ELEVATOR MECHANIC................$ 54.85 32.645+a+b
FOOTNOTES:
a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.
ELEV0044-002 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 48.18 32.645+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0150-001 06/01/2018
BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:
LAKE, LAPORTE, and PORTER COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.75 34.48
GROUP 2.....................$ 39.95 34.48
GROUP 3.....................$ 35.65 34.48
GROUP 4.....................$ 33.45 34.48
GROUP 5.....................$ 28.00 34.48
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;
Concrete paver 27E cu. ft. & under; Concrete placing boom;
Concrete pump/grout pump with boom (truck mounted);
Concrete pump with boom (truck mounted); concrete tower;
Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);
Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);
Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;
Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks
GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;
Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;
Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches
GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen
GROUP 5: Fork lifts (Housing and commercial only)
ENGI0150-012 06/01/2018
BUILDING CONSTRUCTION
ST. JOSEPH COUNTY
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 29.45 28.35
GROUP 2.....................$ 28.10 28.35
GROUP 3.....................$ 27.30 28.35
GROUP 4.....................$ 26.50 28.35
GROUP 5.....................$ 23.90 28.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.
GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.
capacity), Forklift (with fixed or tilt mast), Greaser
Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with "a" frame.
GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).
GROUP 4: Bobcat (up to and including 3/4 cu. yd.).
Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4
cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).
GROUP 5: Bobcats and forklifts (commercial or residential).
ENGI0150-014 05/01/2017
POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY
LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.50 32.00
GROUP 2.....................$ 40.05 32.00
GROUP 3.....................$ 39.60 32.00
GROUP 4.....................$ 38.40 32.00
GROUP 5.....................$ 37.35 32.00
POWER EQUITMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine (1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge
Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).
GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.
GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor (with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.
GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine (self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.
GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.
IRON0292-001 06/01/2017
ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES
Rates Fringes
IRONWORKER.......................$ 29.30 21.11
IRON0395-001 06/01/2017
LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50
MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE
ON W. TO 3 MILES E. OF IN. COUNTIES
IRONWORKER
SHEETER.....................$ 39.80 30.32
STRUCTURAL & ORNAMENTAL.....$ 39.55 30.32
LABO0041-001 06/01/2018
BUILDING CONSTRUCTION
LAKE COUNTY (Western Half)
Rates Fringes
Laborers:
CAISSON AND TUNNEL WORK
(Compressed & Free Air).....$ 37.33 21.20
GROUP 1.....................$ 35.83 21.20
GROUP 2.....................$ 36.58 21.20
GROUP 3.....................$ 36.83 21.20
LABORER CLASSIFICATIONS:
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Railroad Workers, Masonry Wall Workers, (interior & exterior);
Portable Water, Pumps with discharge up to 3 indches;
Handling of Creosote Lumber or Like Treated Material (excluding railroad material); Asphalt Rakers and Lutemen;
Earth compactors; Jackmen and Sheetmen Working Ditches Deeper than Six (6) Feet in Depth; Laborers Working Ditches Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;
Tile Layers (sewer or field) and Sewer Pipe Layers (metallic or non-metallic); Motor Driven Wheelbarrows and
Concrete Buggies; Hyster Operators; Pump Crete Assemblers;
Core Drill Operators; Cement, Lime or Silica Clay Handler (bulk or bag); Handling of Toxic Materail Damaging to Clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain Saw and Demolition Saw Operators; Concrete Saw; Concrete Conveyor Assemblers; Applying of Curing Compound; Sinking of Wellpoints; Dewatering Header Systems
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle Laborers; Cement Gun Operators; Scaffold Builders for Plasterers; Scaffold Builders for Masons;
Water Blast Machine Operators; Air Tool Operators and all Pneumatic Tool Operators, Air and Electric Vibrators and Chpping Hammer Operators; Asbestos Removal; Hazardous Waste Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.
CAISSON AND TUNNEL WORK (Compressed & Free Air)
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.
Premium for all employees working in compressed air shall be as follows:
0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour
LABO0041-004 04/01/2018
UTILITY CONSTRUCTION
LAKE COUNTY
LABORERS
Group 1.....................$ 31.32 17.23 Group 2.....................$ 31.62 17.23 Group 3.....................$ 32.32 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer, Carpenter Tender, Fence Erector, Grade Checker, Guard Rail Erector, Continuous Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man (Mortar, Mastic, and all other types), Lighting Installer (Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road Marking and Delineation Laborer, Setting and Placing of all Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing Compound, or Like Material, Flagperson, Air Tool, Power Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete Saw Operator, Core Drill Operator, Eye Level, Hand Blade Operator Hydro Seeder Man, Motor Driven Georgia Buggy Operator, Power Driven Compactor or Taper Operator, Power Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and Sheetman, Pipe Greade Man, Winch and Windless Operator Conduit Installer, Sod Layer
GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)
GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder Man, Concrete Barrier Rail Form Setter, Concrete Saw Joint Control Cutting
LABO0081-001 04/01/2018
HEAVY and HIGHWAY CONSTRUCTION:
LAKE, LA PORTE, and PORTER COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 30.49 17.23
GROUP 2.....................$ 30.79 17.23
GROUP 3.....................$ 31.49 17.23
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer; Carpenter Tender; Fence Erector; Grade Checker; Guard Rail Erector; Continuous Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man (Mortar, Mastic, and all other types); Lighting Installer (Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;
Rip-rap Installer (all Products and Materials); Road Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including Supporting Structure; Spraying of all Epoxy, Curing Compound, or Like Material; Flagperson; Air Tool, Power Tool Operator; Asphalt Raker Man; Batch Truck Dumper;
Bridge Hand Rail Erector; Handler (bulk or bag cement);
Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete Saw Operator; Core Drill Operator, Eye Level; Hand Blade Operator Hydro Seeder Man; Motor Driven Georgia Buggy Operator; Power Driven Compactor or Tamper Operator; Power Saw Operator; Pump Crete Assembly Man; Screed Man or Screw Man on Asphalt Paver; Rebar Installer; Sandblaster Man;
Sealer Applicator for Asphalt (toxic); Setting and Placeing Prestressed on Precast Concrete Structural Members; Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement); Spreader Box Tender (manual or power driven);
Straw Blower Man; Subsurface Drain and Culvert Pipe Layer;
Concrete Conveyor; Horizonial Boring and Jackman and Sheetman; Pipe Grade Man; Winch and Windlass Operator Conduit Installer, Sod Layer.
GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole Erector; Sewer Pipe Layer; Water Line Installer, Temporary or Permanent; Welders (electric or Oxy-Acetylene).
GROUP 3: Air Track and Wagon Drillman; Dynamite and Powder Man; Concrete Barrier Rail Form Setter; General Laborer;
concrete saw, joint control cutting
LABO0081-002 04/01/2018
UTILITY CONSTRUCTION
LA PORTE & PORTER COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 30.97 17.23
GROUP 2.....................$ 31.27 17.23
GROUP 3.....................$ 31.97 17.23
LABORERS CLASSIFICATIONS (UTILITY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man
(mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plate erector;
Rip-rap installer (all products and materials); Road marking and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man;
Asphalt raker man; Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man;
concrete puddler; concrete rubber; Concrete saw operator;
Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator;
Power-driven compactor or tamper operator; Power saw operator; Pumpcrete assembly man; Screed man or screw man on asphalt paver; Rebar installer; Sandblaster man; Sealer applicator for asphalt (toxic); Setting and placing prestressed or precast concrete structural memebers; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven);
Straw blower man; Subsurface drain and culvert pipe layer;
Transverse and longitudinal hand bull float man; Concrete conveyor assembly man; Horizontal boring and jacking man;
Jackman and sheetman; Pipe grade man; Winch and windlass operator
GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines
GROUP 3: Air track and wagon drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;
Concrete Saw Joint Control cutting
LABO0081-004 06/01/2018
LAKE (Eastern Half), LA PORTE, and PORTER COUNTIES
Rates Fringes
Laborers
GROUP 1.....................$ 35.83 21.20
GROUP 2.....................$ 36.58 21.20
GROUP 3.....................$ 36.83 21.20
LABORER CLASSIFICATIONS (Building Construction)
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Mechanic Tenders; Rodmen and Chainmen, Railroad Workers, Masonry Wall Workers, (interior & exterior); Roofer Tenders, Cement
Finisher Tenders, Carpenter Tenders, Portable Water, Pumps with discharge up to 3 inches; Waterproofing; Hauling of Creosote Lumber or Lutemen; Asphalt Rakers; Kettlem, Earth Compactors; Jackman and Sheetmen in Ditches more than 6 ft.
deep; Laborers in ditches 6' deep or deeper; Assembly of Uncrete Pump; Tile Layers (sewer or field); Sewer Pipe Layers; Motor driven Wheelbarrows and Concrete Buggies;
Hyster Operator; Pump Crete Assemblers; Core Drill Operator; Cement, Line or Silica Clay Handers; Handling of Toxic Materials damaging to clothing; Pneumatic Spikers;
Deck Engine and Winch Operator; Water Main and Cable Ducking; Screed Man or Screw Operator on Asphalt Paver;
Chain Saw and Demolition Saw Operator; Concrete Conveyor Assembler
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle; Cement Gun; Scaffold Builders when working for Plasterers, and Mason; Water Blast Machine Operator;
Air Tool Operators and all Pheumatic Tool Operators; Air and Electric Vibrators and Chipping Hammer Operators;
Asbestos Removal; Hazardous Waste Removal
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives; Laborer Specialist
LABO0645-002 04/01/2018
UTILITY CONSTRUCTION
ST JOSEPH COUNTY
Rates Fringes
Laborers:
GROUP 1.....................$ 23.92 15.00
GROUP 2.....................$ 24.22 15.00
GROUP 3.....................$ 24.92 15.00
LABORER CLASSIFICATIONS (UTILITY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;
Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;
Screed man or screw man or asphalt paver; Rebar installer;
Sandblaster man; Sealer applicator for asphalt (toxic);
Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;
Horizontal boring and jacking man; Jackman and sheetman;
Pipe grade man; winch and windlass operator.
GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines.
GROUP 3: Air track and wage drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;
Concrete Saw Joint Cutting.
LABO0645-004 04/01/2018
HEAVY AND HIGHWAY
ST. JOSEPH COUNTY
Rates Fringes
LABORERS
GROUP 1.....................$ 23.72 15.00
GROUP 2.....................$ 24.02 15.00
GROUP 3.....................$ 24.72 15.00
LABORER CLASSIFICATIONS (HEAVY AND HIGHWAY CONSTRUCTION)
GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;
Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;
Screed man or screw man or asphalt paver; Rebar installer;
Sandblaster man; Sealer applicator for asphalt (toxic);
Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;
Horizontal boring and jacking man; Jackman and sheetman;
Pipe grade man; winch and windlass operator
GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines.
GROUP 3: Air track and wage drillman; Concrete barrier rail form setter; Dynamite and powder man;…