AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
BROADVIEW GENERATOR UPGRADE, ATS, BUILDING AUTOMATION SYSTEM EQUIPMENT AND CONTROLS UPGRADE, IN CHICAGO, COOK
COUNTY, IL
THIS AMENDMENT MAKES THE CHANGES AS DELINEATED BELOW.
1. THE AGENCY PROVIDES ANSWERS TO CONTRACTOR’S QUESTIONS RECEIVED ON FEBURARY 21 THROUGH 26, 2018.
2. INCORPORATES THE MOST CURRENT US DEPARTMENT OF LABOR, DAVIS BACON WAGE DETERMINATION NUMBER: IL180009
2/16/2018 IL9.
3. FAR CLAUSE 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS, LISTS THE INCLUSION OF ADDITIONAL DRAWINGS, PHOTOS
AND MANUALS.
4. THE ATTENDANCE SHEET FROM THE PRE-BID MEETING/SITE VISIT, WHICH TOOK PLACE ON 2/20/2018 IS ATTACHED HERETO
5. THE BID OPENING DATE REMAINS UNCHANGED. ALL BIDS ARE DUE BY MARCH 5, 2018, BY 2:00P.M. CST.
6. POINT OF CONTACT FOR THIS AMENDMENT IS ANITA R. SIMPKINS AT (312)846-5372 OR AT ANITA.R.SIMPKINS@USACE.ARMY.MIL.
1. CONTRACT ID CODE PAGE OF PAGES
1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P618B0004
X 9B. DATED (SEE ITEM 11)
05-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Feb-2018
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P618B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SUMMARY OF CHANGES
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified to add attachments, photos and manuals.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the scope of work and the atttachments provided herein.
List of Attachments
1. Equipment Data BSSA HVAC Operation and Maintenance Data BSSA Kohler Power System Model KSS-KSP ATS.
CL Installation, Operation and Maintenance Manual 150727 Distech Controls EC Display 05DI-DSDISPL-21
2. Facility Reference Drawings:
Fire Protection Remodeling Plan
H-01 First Floor Piping Plan V-01 First Floor Vent Plan C-01 Plat of Survey G-101 Site Plan and Access RE-101 Electrical Demolition Plan E0.0 Night Lighting Plan E1.1 Lighting Plan E2.1 Power Plan E3.1 Communication Plan E4.1 Security Plan E5.1 Access Control/CCTV System E6.1 Fire Alarm Plan E7.1 Electrial One-Line Diagram
3. Security and Clearance Requirements
4. Existing Site photos
5. Abbreviations
(End of clause)
SOLICITATION W912P6‐18‐B‐0004
BROADVIEW GENERATOR UPGRADE, ATS, BUILDING AUTOMATION SYSTEM EQUIPMENT AND CONTROLS
UPGRADE, IN CHICAGO, COOK COUNTY, IL
Contractor Questions and USACE Responses
Question #1 – “Can the customer please provide in writing or on a drawing where to install the new PC/ BAS monitoring station.”
USACE Response to Question #1 ‐ A new attachment, #116 is added by way of this Amendment 0001, showing the floor plan with the run from the mechanical room to the PC station in office.
A straight run is 108'‐4" A true run is approx. 140'‐5"
Question #2 – “Can the customer provide additional above ceiling drawings of the electrical/data cable trays and conduit raceways. This will be needed for the monitoring station installation.”
USACE Response to Question #2 – Overhead cabling drawings are not available. Bidders can request a site visit to take photos in the main administration area. The ceiling in R&D is tamper proof and the plenum space cannot be accessed. For reference, the following attachments are added by way of this Amendment 0001: the overhead fire protection plan, with the lighting overlay, the first floor piping and vent plans.
Question #3 – “Does the customer have a diagram of the current monitoring equipment? and will they be able to provide us with any info on which equipment they would like the new additional controllers installed? and how many additional controllers are needed? Or do we need to schedule a site visit???”
USACE Response to Question #3 ‐ The SOW requires that all site equipment be supported by the stand‐by generator power, in the event of a power outage. At a minimum, the two Liebert units, the rooftop units and the Aaon unit are not supported by the generator. See Section 01 11 00 Summary of Work, paragraph 2.0 Generator scope.
The Distech display is currently located in the COMM Center and does not allow for user control. The main controller in the mechanical room does not allow for overrides or modifications of the original programming.
For this work as stated in the SOW, the PC operator station shall be located in office, see attachment, #116 which is added by way of this Amendment 0001. The station must allow the operator to communicate with the main control panel for real time modifications and control.
Question #4 – “Specifications tell us to run conduit from exterior tap box [above door] to new transfer switch. Are existing feeders from Com Ed CT cabinet to be spliced inside tap/junction box or replaced?”
USACE Response to Question #4 ‐ This will have to be determined on site. Bidders may assume worst case scenario and include in bid cost for replacing entire feeder. Should the entire feeder need to be replaced, the contractor’s bid price will be eligible for payment; however if the entire feeder isn’t required, the will obtain a credit. ”
Question #5 – “Can temporary 500 amp feed be ran in PVC?”
USACE Response to Question #5 – The temporary 500 amp feed be ran in PVC is acceptable for temporary work.
Nothing in NEC 'Article 590 Temporary Installations' prohibits the use of PVC for temporary work.
Question #6 – “Are old transfer switches to be left on site or removed?”
USACE Response to Question #6 ‐ Old transfer switches may be left onsite ONLY IF THEY PROVIDE REDUNDANT
BACKUP CONTROL OF THE EQUIPMENT, IN THE EVENT OF FAILURE OF THE NEW SWITCHES.
Question #7 – “Please advise as to the current BAS provider/contractor for this building?”
USACE Response to Question #7 ‐ Advance Mechanical was the original HVAC installer of the current BAS. WMI Technologies programmed the panel. ICE does not have a support contract in place to provide software updates or modifications to the current system.
Question #8 – “Please advise if we are obliged to utilize the current BAS provider / contractor for the new Controls System associated with this project?”
USACE Response to Question #8 ‐ There are no restrictions regarding a new control system provider.
Question #9 – “Can you please clarify if we should plan for (or if there will be room for) a project office trailer, or should we anticipate that space will be provided within the ICE building for the field staff?”
USACE Response to Question #9 - There will not be space available for an on-site project office trailer.
Contractor staff will have access to the work areas required, and some space is available for an on-site storage box for tools, etc in the work area shown on attachment G-101 Site Plan and Access.
Question #10 – “Additionally, I do not see any requirements for office space for USACE.”
USACE Response to Question #10 -No office space is required for USACE under this contract.
General Decision Number: IL180009 02/16/2018 IL9
Superseded General Decision Number: IL20170009
State: Illinois
Construction Types: Building, Heavy, Highway and Residential
County: Cook County in Illinois.
BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/16/2018
ASBE0017-001 06/01/2017
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 50.50 25.80 Fire Stop Technician.............$ 40.40 24.54
HAZARDOUS MATERIAL HANDLER
includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 37.80 24.54
BOIL0001-001 05/01/2017
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BRIL0021-001 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
BRIL0021-004 06/01/2017
Rates Fringes
Marble Mason.....................$ 44.63 26.83
BRIL0021-006 06/01/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 44.38 25.84
TILE FINISHER....................$ 38.56 22.10
TILE SETTER......................$ 45.49 25.72
BRIL0021-009 06/01/2017
Rates Fringes
MARBLE FINISHER..................$ 33.95 26.03
BRIL0021-012 06/01/2017
Rates Fringes
Pointer, cleaner and caulker.....$ 45.42 24.06
CARP0555-001 06/01/2017
BUILDING, HEAVY, AND HIGHWAY
Rates Fringes
CARPENTER
Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer Building...................$ 46.35 31.29 Heavy & Highway............$ 46.35 31.31
CARP0555-002 10/01/2017
RESIDENTIAL CONSTRUCTION
Rates Fringes
CARPENTER........................$ 37.11 31.29
ELEC0009-003 06/04/2017
Line Construction
Groundman...................$ 39.39 61.37% Lineman and Equipment Operator....................$ 50.50 61.37%
ELEC0134-001 06/05/2017
Rates Fringes
ELECTRICIAN......................$ 47.40 32.21
ELEC0134-003 06/05/2017
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 43.10 23.95
The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.
ELEV0002-001 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 54.85 32.645+a+b
FOOTNOTES:
a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.
b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service
* ENGI0150-006 06/01/2017
Building and Residential Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 50.10 36.45
GROUP 2....................$ 48.80 36.45
GROUP 3....................$ 46.25 36.45
GROUP 4....................$ 44.50 36.45
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;
Autograde*; Backhoes with Caisson attachment*:Batch Plant*;
Benoto(Requires two Engineers); Boiler and Throttle Valve;
Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted)*; Concrete Conveyor;
Concrete Conveyor, Truck Mounted; Concrete Paver over 27E
cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;
Cranes, (GCI and similar type Requires two operators only);
Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;
Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36" and Over)*; Roto Mill Grinder (Less Than 36")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.
GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over);
Conveyor, Portable; Forklift Trucks; Greaser Engineer;
Highlift Shovels or Front End loaders under 2 1/4 cu yd;
Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;
Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;
Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour);
Winch Trucks with "A" Frame.
GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;
Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;
Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)
GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers
*-Requires Oiler
* ENGI0150-025 06/01/2017
Heavy and Highway Construction
OPERATOR: Power Equipment
GROUP 1.....................$ 48.30 36.45
GROUP 2.....................$ 47.75 36.45
GROUP 3.....................$ 45.70 36.45
GROUP 4.....................$ 44.30 36.45
GROUP 5.....................$ 43.10 36.45
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring Machine; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring
*Requires Oiler
IRON0001-026 06/01/2017
Rates Fringes
IRONWORKER
Sheeter.....................$ 47.58 37.34 Structural and Reinforcing..$ 47.33 37.34
IRON0063-001 06/01/2017
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 46.75 34.44
IRON0063-002 06/01/2017
Rates Fringes
IRONWORKER
Fence Erector...............$ 39.58 27.70
IRON0136-001 07/01/2017
IRONWORKER
Machinery Movers; Riggers;
Macinery Erectors...........$ 40.17 33.04 Master Riggers..............$ 42.67 33.04
LABO0002-006 06/01/2017
Rates Fringes
LABORER (BUILDING &
RESIDENTIAL)
GROUP 1....................$ 41.20 27.47
GROUP 2....................$ 41.20 27.47
GROUP 3....................$ 41.28 27.47
GROUP 4....................$ 41.30 27.47
GROUP 5....................$ 41.40 27.47
GROUP 6....................$ 41.40 27.47
GROUP 7....................$ 41.43 27.47
GROUP 8....................$ 41.53 27.47
GROUP 9....................$ 41.55 27.47
GROUP 10....................$ 41.75 27.47
GROUP 11....................$ 41.78 27.47
GROUP 12....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1: Building Laborers; Plasterer Tenders; Pumps for Dewatering; and other unclassified laborers.
GROUP 2: Fireproofing and Fire Shop laborers.
GROUP 3: Cement Gun.
GROUP 4: Chimney over 40 ft.; Scaffold Laborers.
GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.
GROUP 6: Stone Derrickmen & Handlers.
GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.
GROUP 8: Firebrick & Boiler Laborers.
GROUP 9: Chimney on fire brick; Caisson diggers; & Well Point System men.
GROUP 10: Boiler Setter Plastic Laborers.
GROUP 11: Jackhammermen on fire brick work only.
GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous Waste Removal Laborers.
LABO0002-007 06/01/2017
LABORER (HEAVY & HIGHWAY)
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.28 27.47
GROUP 3.....................$ 41.40 27.47
GROUP 4.....................$ 41.43 27.47
GROUP 5.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1: Common laborer; Tenders; Material expeditor (asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned
GROUP 2: Ashpalt tampers & smoothers; Cement gun laborers
GROUP 3: Cement Gun Nozzle (laborers), Gunite
GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;
Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;
Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);
Power drive concrete saws; other power tools.
GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure
LABO0002-008 06/01/2017
Rates Fringes
LABORER (Compressed Air)
0 - 15 POUNDS...............$ 42.20 27.47
16 - 20 POUNDS..............$ 42.70 27.47
21 - 26 POUNDS..............$ 43.20 27.47
27 - 33 POUNDS..............$ 44.20 27.47
34 - AND OVER...............$ 45.20 27.47
LABORER (Tunnel and Sewer)
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.33 27.47
GROUP 3.....................$ 41.43 27.47
GROUP 4.....................$ 41.55 27.47
GROUP 5.....................$ 41.20 27.47
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0225-001 06/01/2017
Rates Fringes
LABORER (DEMOLITION/WRECKING)
GROUP 1.....................$ 36.00 27.47
GROUP 2.....................$ 41.40 27.47
GROUP 3.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1 - Complete Demolition
GROUP 2 - Interior Wrecking and Strip Out Work
GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or Strip Out Work
PAIN0014-001 06/01/2017
Rates Fringes
PAINTER (including taper)........$ 44.55 26.49
PAIN0027-001 06/01/2017
Rates Fringes
GLAZIER..........................$ 42.45 34.18
PLAS0005-002 07/01/2015
PLASTERER........................$ 42.25 26.65
PLAS0502-001 06/01/2017
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.25 32.18
PLUM0130-001 06/01/2017
Rates Fringes
PLUMBER..........................$ 49.25 28.97
PLUM0597-002 06/01/2017
Rates Fringes
PIPEFITTER.......................$ 47.50 30.02
ROOF0011-001 12/01/2017
Rates Fringes
ROOFER...........................$ 42.30 22.75
* SFIL0281-001 01/01/2018
Rates Fringes
SPRINKLER FITTER.................$ 48.10 27.05
SHEE0073-001 07/01/2017
Rates Fringes
Sheet Metal Worker...............$ 43.50 35.42
SHEE0073-002 07/01/2017
Rates Fringes
Sheet Metal Worker
ALUMINUM GUTTER WORK........$ 30.57 35.42
TEAM0731-001 06/01/2017
COOK COUNTY - HEAVY AND HIGHWAY
Rates Fringes
TRUCK DRIVER
2 or 3 Axles................$ 35.60 22.10 4 Axles.....................$ 35.85 22.10 5 Axles.....................$ 36.05 22.10 6 Axles.....................$ 36.25 22.10
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and
Christmas Day.
B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
TEAM0731-002 03/01/2012
Rates Fringes
Traffic Control Device Monitor
TRAFFIC SAFETY WORKER:
Primary duties include but are not limited to the delivery, maintenance and pick-up of traffic control devices, the set-up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow boards, message signs, barricade and sign fabrication equipment.......$ 28.25 9.08
TEAM0786-001 06/01/2017
COOK COUNTY - BUILDING AND RESIDENTIAL
Rates Fringes
TRUCK DRIVER
2 & 3 Axles.................$ 39.942 0.25+a 4 Axles.....................$ 39.75 0.25+a 5 Axles.....................$ 39.967 0.25+a 6 Axles.....................$ 40.184 0.25+a
FOOTNOTES:
a. $719.00 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
BSSA BAS Controller Location Plan
425 EAST ALGONQUIN ROAD • ARLINGTO~ HEIGHTS, lleotio5
~ 647/593-2510 • FAX: 847/593-2536
Heating • Air Conditioning • Plumbing • Piping • Ventilation • Service Engineers • Contractors
HVAC Operation And Maintenance Data
For
Immigration And Customs Enforcement Broadview Service Staging Area
1930 Beach Broadview, Illinois
Advance Mechanical Systems, Inc.
425 E. Algonquin Road
Arlington Heights, Illinois 60005
Project Number 11132
Ml::Ma!tl'IS
MECHANICAi.. COI'nim,c""rofls ASSOd!Ai!ON
NA'noNAI_ CEfiTIAEEO ?IPlE WELDING l;ll.JREAU
Table of Contents
EquiTment 1 {' L.r f ' Vt'l V Z::: -rc;._') ~
1. York Air Handling Unit
2. AAON Condenser
3. Carrier Rooftop A/C unit
4. Greenheck Energy Recovery Unit
5. Square D Variable Frequency Drives
6. Liebert Air Conditioning Units
7. Loren Cook Fans
--8. TittJs VAN Terminals
CotVrad k c..Icvs
- sr ,· 11/dtf-vuj
~ vA { +- Co-.J/ Ill)'
Vendor I Supplier
Windy City Representatives 200 Windsor Drive Oak Brook, IL 60523 Phone: (630) 590-6933
Windy City Representatives 200 Windsor Drive Oak Brook, IL 60523 Phone: (630) 590-6933
Temperature Equipment Corp.
17725 Volbrecht Road Lansing, IL 60438 Phone: (708) 418-7948
Brucker Company 1200 Greenleaf Elk Grove, IL 60007 Phone: (847) 437-9690
Windy City Representatives 200 Windsor Drive Oak Brook, IL 60523 Phone: (630) 590-6933
Zonatherm Products 251 Holbrook Drive Wheeling, IL 60090 Phone: (847) 541-1129
Air Products Equipment 1555 Louis Elk Grove, IL 60007 Phone: (847) 437-5952
Air Products Equipment 1555 Louis Elk Grove, IL 60007 Phone: (847) 437-5952 c
9. Temperature Controls WMI Technologies 2019 Corporate Lane - Suite 111 Naperville, IL 60563 Phone: (630) 369-7100
HAMMER Division 23 - Mechanical Systems
Section 230000 -Mechanical Systems
• Air Handling Unit- York XTI 045X066- BAJA057 A
• Product Data
• Installation
• Maintenance
Condensing Unit- AAON CL-045-8-0-BE04-000
• Product Data
• fustallation
• Maintenance
• RoofTop Unit- Carrier- 48TCFDTI2A2A5-0FOAO
• Product Data
• Installation
• Maintenance
• Energy Recovery Unit- Greenheck - ERV -361 S-15-B
• Product Data
• Installation
• Maintenance
• Variable Frequency Drives- SquareD- Class 8839
• Product Data
• Installation
• Liebert Units - Condensing and Evaporating Unit ~ Product Data cner~ Rg~E! GreeJiheck- ERv -3615-15-B
• Maintenance
• Root Top Exhaust- Cook model ACE-D
• Product Data
• Installation
• Maintenance
• Cabinet and Radiant Unit Heaters Product Data
• Installation
• Maintenance
Hot Water Filter- Shelco Model F0-08
• Product Data
• Diffusers and Grills
• Product Data
• Installation
• Single Duct V AV Tenninals
• Product Data
• HVAC Controls
• Product Data
• Schematics
HAMMER LGC, INC. P.O. Box 557 Samson, AL 36477 (334) 898-2700 Fax {334} 898-2583
Vo!urne2
Tab I 1\-~v -1
Tab2 Cv- \
Tab3 ~TV-[
Tab4 fbfLii -I
Tab 5 f\1 0 "-\. £
Tab 6 1',! el-!l-
:::>~3V~
Tab8 ~( /
Tab 9 ~· \" l\J..oJ.!£. i
Tab 10 Nt>~ Tab 11 'N.t>l.l..t
Tab 12 •. \1 P,-" ., Tab 13 '1-l..mE-
l. i~YORK YORK SOLUTION
AIR HANDLING UNITS
BY JOHNSON CONTROLS
INSTALlATION, OPERATION & MAINTENANCE Supersedes 102.20-NOM1 (105) I Form 1 02.20-NOM1 (909)
YORK SOLUTION INDOOR AND OUTDOOR MODELS
27X27 THROUGH 132X138
LD09624
INDOOR UNIT
LD09688
OUTDOOR UNIT
IMPORTANT!
READ BEFORE PROCEEDING!
GENERAL SAFETY GUIDELINES
This equipment is a relatively complicated apparatus.
During installation, operation, maintenance or service, individuals may be exposed to certain components or conditions including, but not limited to: refrigerants, oils, and materials under pressure, rotating components, and both high and low voltage. Each of these items has the potential, if misused or handled improperly, to cause bodily injury or death. It is the obligation and responsibility of operating/service personnel to identifY and recognize these inherent hazards, protect themselves, and proceed safely in completing their tasks. Failure to comply with any of these requirements could result in serious damage to the equipment and the property in which it is situated, as well as severe personal injury or death to themselves and people at the site. .
This document is intended for use by owner-authorized operating/service personnel. It is expected that this individual possesses independent training that will enable them to perform their assigned tasks properly and safely. It is essential that, prior to performing any task on this equipment, this individual shall have read and understood this docmnent and any referenced materials. This individual shall also be familiar with and comply with all applicable govermnental standards and regulations pertaining to the task in question.
SAFETY SYMBOLS
(DANGER )
The following symbols are used in this document to alert the reader to areas of concern: (
DANGER indicates an imminently hazardous situation, which if not avoided, will result in death or seri ous injury.
WARNING indicates a potentially hazardous situation, which if not avoided, could result in death or seri-r-;1\--:---. CAUTION identifies a hazard which
1. could lead to damage to the machine, damage to other equipment and/or
(CAUTION)
environmental pollution. Usually an instruction will be given, together with a brief explanation.
[ l ous injury.
WARNIN~
NOTE is used to highlight additional information that may be helpful to you.
Consider for IAQ compliance per
ASHRAE STANDARD 62-2001 .
;1\ External wiring, unless specified as an optional connection in the manufacturer's product
_line, is NOT to be connected inside the control panel cabinet. Devices such as relays, switches, transducers and controls may NOT be installed inside the control panel. NO external wiring
[ l is allowed to run through the control panel. All wiring must be in accordance with John
WARNING
1::::==:::..1 son Controls published specifications and must be performed ONLY by qualified Johnson Controls personnel. Johnson Controls will not be responsible for damages/problems result ing from improper connections to the controls or application of improper control signals.
Fail'!re to follow this will void the manufacturer's warranty and cause serious damage to pr.,~lfry or injury to persons.
NOTICE TO CUSTOMER/CON
TRACTOR
PROTECT YOUR WARRANTY PRI
OR TO STARTUP.
Read and follow the Installation & Start-up Instructions provided with this equipment.
Storage of this equipment MUST be on a fiat surface and protected from the weather.
Protect this equipment from damage, construction dirt, debris and water.
DO NOT OPERATE DOORS WHEN
UNIT IS NOT ON A FLAT SURFACE.
Isolate this eqnipment from pressure testing of water, steam, gas and air piping.
Do not test, clean and flush piping through coils in this equipment.
Isolate this equipment from temporary building power.
Contact local Johnson Controls Service for purchase of Startup Service with two weeks advance notice. Provide current job site contact.
To perform a careful and thorough startup, verifY the following:
Reliable power will be available for startup.
Ductwork is complete.
FORM 102.20-NOM1 (909)
- Controls are complete.
- Shipping splits completely re-assembled, sealed and wired.
Filters are installed and secured.
- All shipping materials have been removed.
METAL TAB USED TOSECUREDOORIS
ASAFETYDEVICE. DO NOT DISCARD
IT.
Start-up will be performed according to that outlined in Section 3 of the Installation and Start-up Instructions provided.
Temporary use of air handler requires startup performed according to that outlined in Section 3 of the Installation and Start-up Instructions provided.
A qualified startup technician must complete the "AIR HANDLING UNITS START-UP CHECK LIST" Form 100.00-CLI and file a copy at the local YORK Service Office. ~ This form is provided in the information package with each air handler.
Rotate fans every four ( 4) weeks beginning upon arrival.
CHANGEABILITY OF THIS DOCUMENT
In complying with Johnson Controls policy for continuous product improvement, the information contained in this document is subject to change without notice. While Johnson Controls makes no commitment to update or provide current information automatically to the manual owner, that information, if applicable, can be obtained by contacting the nearest Johnson Controls Service office.
It is the responsibility of operating/service personnel to verifY the applicability of these documents to the equipment in question. If there is any question in the mind of operating/service personnel as to the applicability of these documents, then prior to working on the equipment, they should verifY with the owner whether the equipment has been modified and if current literature is available.
JOHNSON CONTROLS 3
FORM 102 .. 20-NOM1 (909)
TABLE OF CONTENTS
GENERAL SAFETY GUIDELINES
CHANGEABILITY OF THIS DOCUMENT
TABLE OF CONTENTS
LIST OF FIGURES
LIST OF TABLES
SERVICE TASK REFERENCE
INTRODUCTION
GENERAL.. ................................................................................................................................................•. 29
TYPICAL YORK SOLUTION OPERATION IN "HVAC" SYSTEM
VENTILATION SYSTEM
ECONOMIZER SYSTEM· TYPICAL
HEATING OPERATION
COOLING OPERATION
HAND IDENTIFICATION
SEGMENT IDENTIFICATION
UNIT IDENTIFICATION ...................................................................................•
UNIT ID LABEL .......................................................................... :
SKID ID LABEL
SEGMENT IDENTIFICATION BOX .................................................................................................... 33.
FILTER ID LABEL
LOOSE COMPONENT ID LABEL
DIRECTION OF AIRFLOW
1.0 PRE-INSTALLATION .................................................................................................................................. 1·1 RECEIVING ................................................................................................................................................ 1-1
RIGGING OF INDOOR AND OUTDOOR UNITS ....................................................................................... 1-1
OFF-LOADING ....................................................................................................................................... 1·2
CRANE AND SPREADER BARS .....................................................................................•..................... 1-2
FORK LIFT ............................................................................................................................................. 1-2
COME-A-LONGS OR POWER PULL ............................................................................. : ...................... 1-2
SHACKLES ............................................................................................................................................ 1-3
INSPECTION .............................................................................................................................................. 1-4
CHECK FOR DAMAGE .................................................. ; ....................................................................... 1-4
RECEIVER RESPONSIBILITY .......................................................................................................... l-4
INDOOR UNITS ................................................................................................................................. l-4
OUTDOOR UNITS ............................................................................................................................. l-4
CHECKING FOR NON MOUNTED PARTS ........................................................................................... 1-4
STORAGE .................................................................................................................................................. 1-4
SHORT-TERM STORAGE ...................................................................................................................... l-4
LONG-TERM STORAGE .................................. ~ ..................................................................................... l-5
PREVENTIVE MAINTENANCE PRIOR TO LONG TERM STORAGE ............................................. l-5
PERIODIC FAN CHECK .................................................................................................................... l-5
4 JOHNSON CONTROLS
FORM 102.20-NOM1 (909)
TABLE OF CONTENTS (CONT.)
2.0 INSTALLATION ........................................................................................................................................... 2-1 SITE PREPARATION ................................................................................................................................. 2-1
OUTDOOR UNITS (SITE PREP) ............................................................................................................ 2-1
MOUNTING ···············································································'····----·········································-2-2 CURB .........
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.