AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

BROADVIEW GENERATOR UPGRADE, ATS, BUILDING AUTOMATION SYSTEM EQUIPMENT AND CONTROLS UPGRADE, IN CHICAGO, COOK

COUNTY, IL

THIS AMENDMENT MAKES THE CHANGES AS DELINEATED BELOW.

1. PROVIDES CLARIFICATION THAT THE BID OPENING DATE REMAINS UNCHANGED. ALL BIDS ARE DUE BY MARCH 8, 2018, BY 2:00P.M.

CST., AS NOTED IN BLOCK #13 ON THE STANDARD FORM 1442.

2. THE AGENCY PROVIDES ANSWERS TO CONTRACTOR’S QUESTIONS RECEIVED ON FEBURARY 28, 2018.

3. PROVIDES REVISED PAGES FOR SCOPE OF WORK SECTION 01 11 00.

4. ADDS ATTACHMENT 6 “BAS EQUIPMENT INVENTORY LIST”

5. FAR CLAUSE 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS, LISTS THE INCLUSION OF ADDITIONAL ATTACHMENTS.

6. POINT OF CONTACT FOR THIS AMENDMENT IS ANITA R. SIMPKINS AT (312)846-5372 OR AT ANITA.R.SIMPKINS@USACE.ARMY.MIL.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P618B0004

X 9B. DATED (SEE ITEM 11)

05-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Mar-2018

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P618B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

BROADVIEW GENERATOR UPGRADE, ATS, BUILDING AUTOMATION SYSTEM EQUIPMENT AND

CONTROLS UPGRADE, IN CHICAGO, COOK COUNTY, IL

Contractor Questions and USACE Responses - Question #1: “The statement of work requires that we Overhaul the existing Generator. Can you please specify the extent of the overhaul? Will the engine require a major overhaul (Replacing/repairing inner components of the engine) or basic maintenance and tune up? Please advise? “

USACE Response to Question #1 - Refer to Section 01 11 00 Paragraph 2.1 text, "Provide all labor and materials required to inspect the existing Cummins generator, replace spark plugs, plug wires, belts, hoses, antifreeze, coolant, clamps, gaskets, caps and other parts as needed to optimize performance and ensure continued operation.". Exact details of the overhaul cannot be determined until the required inspection is completed to determine the specific needs. Electrical work on the generator is spelled out in detail in Section 01 11 00 Paragraph 2.2.

Question #2 – “The statement of work states to overhaul existing generator and Refit FFP - (This would mean to reinstall the required feeds and breakers on to the exist. generator no relocation of the unit is needed) Please advise?”

USACE Response to Question #2 – The Scope of Work does not require relocation of the generator unit.

Question #3 – “In the scope of work, 01-22-00, Measure & Pay, #2, It is shown as 400 amp ATS. Should it be 800 amp or Should it be both 800 amp and 400 amp?”

USACE Response to Question #3 – By way of this Amendment 0002, Attachment 6 has been added, which is a list of the equipment that must be supported by the ATS(s), the generator and interfaced with the BAS for control and monitoring. It is up to the bidder to determine the required electrical loads based on the equipment. Scope of Work Section 01 11 00 2.2 has been changed by way of this Amendment 0002 to add the following text: “Refer to Attachment ‘BAS Equipment Inventory’ for a list of all equipment that must be supported by the ATS(s), the generator and interfaced with the BAS for control and monitoring. It is up to the Contractor to determine the required electrical loads based on the equipment.”

Question #4 – “On the tap box, do you want cam locks installed? It is much safer.”

USACE Response to Question #4 - Section 01 11 00 paragraph 2.2 bullet 31 has been changed by way of Amendment 0002 to read as follows: “Furnish and install tap box with 500amp feed to GDP (Generator Distribution Panel). Tap box to be located on right hand side of outside door and include cam locks.”

Question #5 – “Should the tap box be rated for 600 amp?”

USACE Response to Question #3 – By way of this Amendment 0002, Attachment 6 has been added, which is a list of the equipment that must be supported by the ATS(s), the generator and interfaced with the BAS for control and monitoring. It is up to the bidder to determine the required electrical loads based on the equipment. Scope of Work Section 01 11 00 2.2 has been changed by way of this Amendment 0002 to add the following text: “Refer to Attachment ‘BAS Equipment Inventory’ for a list of all equipment that must be supported by the ATS(s), the

W912P618B0004 generator and interfaced with the BAS for control and monitoring. It is up to the Contractor to determine the required electrical loads based on the equipment.”

Question #6 – “Are we supposed to dig below grade 32 inches for the incoming conduits from ComEd?”

USACE Response to Question #6 - The trenching mentioned in the Scope of Work Section 01 11 00 paragraph

2.2 is within the mechanical room per the facility drawings provided, which has a space heater. Bidder is to determine the required trenching depth per the existing equipment and any applicable requirements from section 31 00 00.

Question #7 - “Would you please remind me what hours the ICE building is open for contractors to do their work?

Also, it is my understanding that your building is not open on weekends (Sat & Sun) but could be with special permission if certain work needed to be completed without interruption. If this is incorrect, please let me know.

Would you also confirm what days ICE is closed for holidays. I am assuming Federal holidays (which I have the list) but are there others?”

USACE Response to Question #7 - Per Scope of Work Section 01 10 00 General Provisions:

“Installation, unless otherwise noted, shall occur during regular business hours, Monday through Friday. All work must be pre�scheduled to allow for Program notification and personnel to escort. Requests for evening or weekend work must be submitted seven (7) days in advance, and are depending on and special afterhours operations and the availability of escort staff.”

(The Government’s response to Question #4 from AMD 0001 has been changed to read as follows.)

Question #4 – “Specifications tell us to run conduit from exterior tap box [above door] to new transfer switch. Are existing feeders from Com Ed CT cabinet to be spliced inside tap/junction box or replaced?”

USACE Response to Question #4 � Bidders are to price the work as described in the Scope of Work. The conformed awarded contract will contain FAR Clauses 52.243-4 CHANGES and 252.243-7002 Requests for Equitable Adjustment, which provides remedies should the contractor encounter work exceeding the Scope of Work requirements.

Fire Damage Legal Liability $ 50,000

Comprehensive Automobile Liability (Including Hired Automobile Liability and Non‐Owned Automobile Liability) Combined Single Limit $1,000,000

Employers' Liability Each Occurrence $ 500,000 Policy Limit $ 500,000 Each Employee $ 500,000

Workers Compensation (As required by state law or Federal law) Umbrella Liability (Occurrence policy form only) Each Occurrence and Aggregate $5,000,000

Prior to commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which contract is to be performed and in no event less than thirty (30) calendar days after written notice thereof to the Contracting Officer.

01 11 00 Summary of Work

The contractor shall provide all necessary equipment, personnel, and materials to perform all work defined in the Scope Section. The contractor shall reference site drawings and ICE personnel for all equipment information and locations. Facility drawings are provided in the attachments to this SOW. Additional facility information can be provided upon request.

1.0 BAS Scope

1.1 General

The installed BAS shall be a Direct Digital Control (DDC) system capable of controlling the HVAC systems via a GUI accessible from an operator workstation. The BAS shall be BACnet compatible with distributed sensors for “plug‐in” readout at any system point. The BAS system shall be accessible, at a minimum, from a dedicated operator workstation located at the facility manager’s discretion. The BAS shall not allow to control or communicate with facility equipment from outside Broadview IRP. The BAS shall include, at minimum, the following capabilities:

a. Control and monitor HVAC equipment performance and status. This includes, but is not limited to, boilers, air handlers, fans, AC units, heaters, automated dampers, and lighting;

b. Temperature setbacks corresponding to occupancy and utilization patterns;

c. Control of temperature setpoints;

d. Filter pressure drop monitoring;

e. Indoor air quality monitoring;

f. Metering the building utility meters including natural gas, electricity, and water; and

g. Monitor generator use.

h. Control and monitor: Air handling unit AHU‐1, exhaust/return fan EF‐2, hot water boiler, and hot water pumps #1 and #2, VAV boxes 1 through 11, Exhaust fan EF‐1, rooftop unit RTU‐1, Energy Recovery ventilator ERV‐1, two Liebert units and condensers.

The contractor shall specify any licenses or proprietary software needed to be installed for operation of the BAS. A non‐proprietary system is the preferred BAS option. The contractor shall utilize existing BAS wiring to the furthest extent possible. Where additional wiring is needed, the contractor shall provide and install additional wiring to complete the requirements of the BAS scope. Any new BAS wiring must be installed under the direct supervision of the facility manager and reflected in the final drawings submitted.

All electrical work shall be performed by a licensed electrician. Submit proof of license prior to beginning any electrical work on site.

BAS O&M Manual: Submit an Operations and Maintenance Manual and provide a minimum four

(4) hour, in‐person, recorded BAS training session for ICE Facility O&M staff (Maximum 20 persons). Coordination for training session must be conducted at least fifteen days in advance.

1.2 BAS Electrical Scope

Remove existing LON systems controllers from control cabinet.

Tag all wiring for re‐use.

Existing control cabinet to be re‐used Provide, install and program a web based BACnet BAS system to control all systems, equipment and metered utilities Replace existing three‐conductor space sensor wiring with six‐conductor, to accommodate new full‐feature space temperature sensors

Provide and install new network communication cabling to tie new BACnet communicating thermostats back to BACnet JACE.

Add new BACnet controllers for all equipment not currently tied to LON controllers

Provide and install all new communication and electrical wiring/cabling for new BACnet controllers

Provide, at minimum, the following efficiency control measures (ECMs) as standard features:

a. Demand Controlled Ventilation

b. Reset Control of DAT Setpoint

c. Reset Control of HWS Setpoint

d. Economizer Optimization

e. Schedule Optimization

f. Night Setback

g. Optimized Start

h. VFD Control Optimization

i. Metering & Trend Logging

1.3 BAS Deliverables

1) New web‐based supervisory controller (JACE with BACnet driver)

2) PC operator workstation for connection to the JACE

3) Provide Floor plan graphics

4) Provide Systems graphics

5) CO2 transmitter

6) Determine which sensors will be resused

7) Provide and install new actuators

8) Provide and install new sensors

9) Provide and install new thermostats

10) New network communication cabling‐integrate all controllers(on all equipment) and back to the new BACnet JACE

The COR shall conduct an initial review and final acceptance of the punchlist specified the BAS requirements. All corrective actions shall be approved by the COR prior to implementation at the facility. The contractor shall provide documentation (e.g. photos, system reports, measurements) of corrective actions in the equipment control and/or operation to save energy.

The documentation shall be provided to the COR in both electronic and hardcopy formats.

Electrical Equipment Product Data: Submit manufacturer's catalog data and descriptive literature for all new equipment and products to be incorporated in the work. This data shall include specifications and assembly drawings showing sizes, performance ratings and operational characteristics, parts and material lists, overall dimensions, and mounting dimensions.

2.0 Generator Scope

2.1 Generator Overhaul and Refit

Provide all labor and materials required to inspect the existing Cummins generator, replace spark plugs, plug wires, belts, hoses, anti‐freeze, coolant, clamps, gaskets, caps and other parts as needed to optimize performance and ensure continued operation. Provide and install a new

ATS for emergency operations and scheduled testing and exercising. Connect to the new BAS system and support any equipment and systems not currently interfaced with backup generator operations. Provide all labor, materials, permits and drawings to support the installation of the new ATS and BAS, including but not limited to concrete work, electrical wiring, communications cabling, cabinets, components and training.

2.2 Generator Electrical Requirements

Refer to Attachment ‘BAS Equipment Inventory’ for a list of all equipment that must be supported by the ATS(s), the generator and interfaced with the BAS for control and monitoring.

It is up to the Contractor to determine the required electrical loads based on the equipment.

Disconnect all existing wiring at existing controller, next to existing generator.

Furnish and install one (1) Deep Sea DSE7310 Microprocessor Gen‐Set Controller (or equal) with mounting box to be mounted next to existing decommissioned controller.

Furnish and install new senders to match new controller.

Furnish and install new wiring from new controller to existing generator.

Furnish and install new CT’s to new controller.

Furnish and install wiring, from controller to buss bar, for voltage sensing.

Furnish and install new e‐stop button on new controller panel.

Furnish and install new mag pick‐up for timing sensing and wire to new controller.

Furnish and install Deep Sea DSE2510 Remote Display Module (or equal), to be located in

24‐hour location.

Furnish and install wiring, from new controller to new annunciator location.

Furnish and install Deep Sea DSE890 Remote Accessory (or equal) for Ethernet connection.

Furnish and install wiring, from new controller to modem on site.

Included software for access by phone, computer or tablet, via the internet.

Furnish and install one (1) 500amp breaker, in NEMA‐1 enclosure, on existing generator.

Furnish and install 500amp feed from existing generator to new breaker, on existing generator.

Furnish and install temporary 500amp feed from new breaker on existing generator, to existing Generator Distribution Panel (GDP).

Remove existing generator controller/distribution panel.

Remove existing concrete pad for existing generator controller/distribution panel.

Saw cut floor from outside wall, straight back, approximately 12 feet and remove concrete for new pipes to be installed. Core two (2) holes in foundation, next to the door, for conduits outside.

Furnish and install 800amp feed, from existing junction box outside on wall, to new ATS location, next to existing generator (normal power).

Furnish and install one (1) reinforced concrete pad for Automatic Transfer Switch (ATS).

Furnish and install reinforc ed concrete for floor patch.

Furnish and install one (1) ASCO Series 300, 800amp, 3‐pole, 4‐wire, 120/208v ATS service entrance rated, in NEMA‐1 enclosure, located on new concrete pad, next to existing generator.

Furnish and install one (1) service rated separately derived ground from new ATS to cold water pipe and bond to ATS neutral. Remove existing separately derived ground from existing 800amp Main Distribution Panel (MDP)

Remove existing 500 amp temporary feed from new breaker on existing generator, to existing GDP.

Furnish and install one (1) 500amp, 3‐phase, 4‐wire, 120/208v feed, with ground, from existing generator to ATS (emergency power).

Furnish and install one (1) 800amp, 3‐phase, 4‐wire, 120/208v feed, with ground, from ATS to existing MDP (load).

Furnish and install low voltage time delays on air conditioning units

Remove existing Kohler 400amp ATS and install new 400amp ASCO ATS

Furnish and install tap box with 500amp feed to GDP (Generator Distribution Panel).

Tap box to be located on right hand side of outside door and include cam locks.

Furnish and install one (1) surge suppressor on MDP

Provide all trenching and backfill

Provide training of ICE Staff

Provide testing of equipment

This work shall include the required trenching and backfill, Training of ICE Staff, and testing of equipment. Submit acceptance checks and tests per manufacturer’s instructions.

Electrical Equipment Product Data: Submit manufacturer's catalog data and descriptive literature for all new equipment and products to be incorporated in the work. This data shall include specifications and assembly drawings showing sizes, performance ratings and operational characteristics, parts and material lists, overall dimensions, and mounting dimensions.

Warranty All equipment must be guaranteed for a period of 2 years from the date of acceptance.

Guarantee replacement parts for 2 years from date of replacement. Provide Warranty against defective materials, design, and workmanship. In cases where the equipment manufacturer's advertised minimum guarantee is in excess of 2 years, it remains in force for its full period. Upon receipt of notice from the Government of failure of any of the parts during the warranty period, provide new replacement parts promptly at no additional cost to the Government.

01 22 00 Measurement and Payment

The project deliverables are:

1)All labor, materials, parts, components to overhaul and refit the existing Cummins generator (CLIN 0003AA)

2) Provide and install a new Transfer Switch‐Electronic Control, 400 Amp 1 (CLIN 0003AB) o Poles‐3 o Listing‐UL 1008/CSA Certification o Frequency‐60 Hertz o System‐3 Phase,3 Wire Or 4 Wire o Voltage‐208 Vac o Cabinet‐Type 1 o Auxiliary Relay‐Switch In Emergency Position‐12VDC o Auxiliary Relay‐Switch In Normal Position‐12VDC o Genset Starting Battery‐12VDC o Clock‐Exercise, External o Relay‐Elevator Signal o Transfer Switch Warranty ‐ 1 Yr Comprehensive

3) A new BACnet BAS system that controls all of the building’s systems and mechanical equipment via a graphical user interface (GUI), accessible from an operator workstation, (CLIN

0004AA)

4) Complete all electrical work as described in Section 01 11 00, including all work in support of electrical upgrades. (CLIN 0003AD)

5) Complete all site work described in Section 01 11 00 (CLIN 0003AC)

6) A punchlist that identifies corrective actions in the equipment control and/or operation to save energy; Documentation (e.g. photos, system reports, measurements) of corrective actions in hard copy and electronically (CLIN 0004AB)

BROADVIEW SPC INVENTORY

WEEKLY BI‐MONTHLY MONTHLY QUARTERLY SEMI‐ANNUAL ANNUAL BI‐ANNUAL 3‐YEAR 4‐YEAR 5‐YEAR

TOTAL

ANNUAL

0.00 0.00 3.50 0.00 0.00 80.35 0.00 13.00 0.00 0.50 147.16

BSSA‐ACC‐1 AIR‐COOLED CONDENSER, OVER 20 TONS (240,000 BTU) HVAC‐ACR‐05‐XXX OUTSIDE PARKING LOT AAON CL‐045‐8‐0‐BE04‐000 1.00 TONNAGE TBD 0.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 5.00

BSSA‐PACAHU‐1

PACKAGE AHU, OVER 10 TONS, 120,000 BTU (INCLUDES DX, HEAT

PUMPS, GAS HEAT)

HVAC‐AHU‐04‐XXX ROOM 149 MECHANICAL ROOM YORK XT1‐045X066‐BAJA017A AKXM XT0264 1.00 AHU‐1FINAL 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 6.00

BSSA‐SPLT‐1

AIR CONDITIONING UNIT OR HEAT PUMP, SPLIT SYSTEM (10 TONS AND

UNDER), CONDENSER

HVAC‐ACR‐03‐XXX OUTSIDE LIEBERT PFH037A‐YL7 Y11JG12751 1.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 3.00

BSSA‐SPLT‐2

AIR CONDITIONING UNIT OR HEAT PUMP, SPLIT SYSTEM (10 TONS AND

UNDER), CONDENSER

HVAC‐ACR‐03‐XXX OUTSIDE LIEBERT PFH037A‐YL7 Y11JG12722 1.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 3.00

BSSA‐SPLT‐3

AIR CONDITIONING UNIT OR HEAT PUMP, SPLIT SYSTEM (10 TONS AND

UNDER), EVAPORATOR

HVAC‐ACR‐03‐XXX ROOM 136A LIEBERT 1.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 3.00

BSSA‐SPLT‐4

AIR CONDITIONING UNIT OR HEAT PUMP, SPLIT SYSTEM (10 TONS AND

UNDER), EVAPORATOR

HVAC‐ACR‐03‐XXX ROOM 136B LIEBERT 1.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 3.00

BSSA‐ATS‐1 AUTOMATIC TRANSFER SWITCH ELEC‐ATS‐01‐XXX ROOM 149 MECHANICAL KOHLER POWER SYSTEMS 1.00 0.00 0.00 0.25 0.00 0.00 1.50 0.00 0.00 0.00 0.00 4.50

BSSA‐ATS‐2 AUTOMATIC TRANSFER SWITCH ELEC‐ATS‐01‐XXX ROOM 149 MECHANICAL ZENITH 1.00 0.00 0.00 0.25 0.00 0.00 1.50 0.00 0.00 0.00 0.00 4.50

BSSA‐BFP‐1 BACKFLOW PREVENTER (OVER 4‐6 INCHES) PLMB‐VLV‐05‐XXX ROOM 110 SPRINKLER CONTROL VALVE 1.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00

BSSA‐ELECBOIL‐1 BOILER, ELECTRIC HVAC‐BLR‐02‐XXX ROOM 149 MECHANICAL ROOM BRYAN BOILER CLM120‐W‐G1 1.00 120 MBH 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 2.00

BSSA‐DCSCHRG‐1 DIRECT CURRENT SYSTEM, CHARGER ELEC‐DCS‐04‐XXX ROOM 149 MECHANICAL ROOM LA MARCHE A46‐6‐24V‐A1 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.99

BSSA‐DCSCHRG‐2 DIRECT CURRENT SYSTEM, CHARGER ELEC‐DCS‐04‐XXX ROOM 149 MECHANICAL LAMARCHE A46‐6‐24V‐A1 E1097‐4 1.00

FOR BIG

DURACELL

BATTERIES

0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.99

BSSA‐VAV‐1 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT ROOM 126 1.00 VAV‐1 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐2 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT ROOM 125 1.00 VAV‐2 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐3 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT ROOM 125 1.00 VAV‐3 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐4 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT ROOM 125 1.00 VAV‐4 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐5 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT ROOM 119 1.00 VAV‐5 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐6 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT ROOM 115 1.00 VAV‐6 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐7 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT ROOM 102 1.00 VAV‐7 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐8 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT ROOM 103 1.00 VAV‐8 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐9 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT OPEN AREA 2ND FLOOR 1.00 VAV‐9 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐10 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT OPEN AREA 2ND FLOOR 1.00 VAV‐10 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐VAV‐11 FAN COIL UNIT, CEILING HUNG, VAV BOX NO EQUIVALENT OPEN AREA 2ND FLOOR 1.00 VAV‐11 0.00 0.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 0.00 1.25

BSSA‐EXFAN‐1 FAN, PROPELLER OR AXIAL (EXHAUST) HVAC‐FAN‐02‐XXX ROOM 149 MECHANICAL 1.00 0.00 0.00 0.50 0.00 0.00 0.75 0.00 0.00 0.00 0.00 6.75

BSSA‐EXFAN‐2 FAN, PROPELLER OR AXIAL (EXHAUST) HVAC‐FAN‐02‐XXX ROOM 135 COMMAND CENTER 1.00 0.00 0.00 0.50 0.00 0.00 0.75 0.00 0.00 0.00 0.00 6.75

BSSA‐EXFAN‐3 FAN, PROPELLER OR AXIAL (EXHAUST) HVAC‐FAN‐02‐XXX ROOF COOK 180ACE180C7B 006SD81267‐00/0000701 1.00 0.00 0.00 0.50 0.00 0.00 0.75 0.00 0.00 0.00 0.00 6.75

BSSA‐EXFAN‐4 FAN, PROPELLER OR AXIAL (EXHAUST) HVAC‐FAN‐02‐XXX ROOF CHELSEA CUBA245KA KM 1.00 0.00 0.00 0.50 0.00 0.00 0.75 0.00 0.00 0.00 0.00 6.75

BSSA‐EXFAN‐5 FAN, PROPELLER OR AXIAL (EXHAUST) HVAC‐FAN‐02‐XXX OUTSIDE SALLYPORT 1.00 0.00 0.00 0.50 0.00 0.00 0.75 0.00 0.00 0.00 0.00 6.75

SERIAL QTY NOTES

ITEM PM FREQUENCY (EFFORT HOURS)

ICE STANDARD NO. DESCRIPTION GSA STANDARD NO. LOCATION SUB‐LOCATION MANUFACTURER MODEL

PAGE 1 OF 3 PRINTED 3/1/2018 8:47 AM

TOTAL

ANNUAL

0.00 0.00 3.50 0.00 0.00 80.35 0.00 13.00 0.00 0.50 147.16

SERIAL QTY NOTES

ITEM PM FREQUENCY (EFFORT HOURS)

ICE STANDARD NO. DESCRIPTION GSA STANDARD NO. LOCATION SUB‐LOCATION MANUFACTURER MODEL

BSSA‐MAFAN‐1 FAN, SUPPLY (MAKE‐UP AIR) NO EQUIVALENT ROOF GREENHECK ERV‐361S15‐BES 12547101 1.00 ERV‐2 0.00 0.00 0.50 0.00 0.00 1.00 0.00 0.00 0.00 0.00 7.00

BSSA‐ELECHTR‐1 HEATER, UNIT (ELECTRIC) HVAC‐UHT‐03‐XXX ROOM 149 MECHANICAL ROOM DAYTON 24V69 1.00 7.5‐10KW 0.00 0.00 0.00 0.00 0.00 0.75 0.00 0.00 0.00 0.00 0.75

BSSA‐GASHTR‐1 HEATER, UNIT (GAS AND OIL FIRED) HVAC‐UHT‐02‐XXX SALLY PORT REZNOR 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐1 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 146 1.00 CABINET HEATER 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐2 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 149 MECHANICAL STERLING 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐3 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 148 1.00 CABINET HEATER 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐4 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 152 1.00 CABINET HEATER 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐5 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 101 1.00 CABINET HEATER 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐6 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 127 1.00 CABINET HEATER 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐7 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX STAIR 113 1.00 CABINET HEATER 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐8 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 202 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐9 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐10 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 203 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐11 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 111 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐12 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 108 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐13 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 102 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐14 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 103 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐15 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 104 1.00

BASEBOARD

HEATER

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐16 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX CONFERENCE 205 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐STEAMHTR‐17 HEATER, UNIT (STEAM AND HOT WATER) HVAC‐UHT‐01‐XXX ROOM 204 KITCHEN 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

BSSA‐GASHTR‐1 HOT WATER HEATER, GAS PLMB‐DWS‐01‐XXX ROOM 148 STATE SBF100260NETASME D00329002 1.00 100 GALLON 0.00 0.00 0.00 0.00 0.00 0.60 0.00 0.00 0.00 0.00 0.60

BSSA‐LIGHT‐FW

LIGHTING, OUTSIDE INCANDESCENT FLUORESCENT, MERCURY VAPOR

OR HIGH PRESSURE SODIUM, METAL HALIDE (EXTERIOR, AREA

LIGHTING)

ELEC‐LTG‐04‐XXX FACILITY‐WIDE 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 1.60

BSSA‐MTRSTR‐1 MOTOR STARTERS, 5‐99 HP ELEC‐MCC‐03‐XXX ROOM 149 MECHANICAL TECO WESTINGHOUSE AEGHUW001 DWS2114345006 1.00 1.5 HP 0.00 0.00 0.00 0.00 0.00 1.00 0.00 2.00 0.00 0.00 1.66

BSSA‐PACAHU‐1

PACKAGE AHU, 10 TONS AND UNDER, 120,000 BTU (INCLUDES DX,

HEAT PUMPS, GAS HEAT)

HVAC‐AHU‐04‐XXX ROOF CARRIER 48TCFD12A2A5A0F0A0 3111G30352 1.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 3.00

BSSA‐CENTPMP‐1 PUMP, CENTRIFUGAL (1‐24HP) HVAC‐PMP‐01‐XXX 1.00 0.00 0.00 0.00 0.00 0.00 1.50 0.00 0.00 0.00 0.00 1.50

BSSA‐CENTPMP‐2 PUMP, CENTRIFUGAL (1‐24HP) HVAC‐PMP‐01‐XXX ROOM 149 MECHANICAL BELL & GOSSETT MVF56T17D5597DP 1.00 0.00 0.00 0.00 0.00 0.00 1.50 0.00 0.00 0.00 0.00 1.50

BSSA‐CENTPMP‐3 PUMP, CENTRIFUGAL (1‐24HP) HVAC‐PMP‐01‐XXX ROOM 149 MECHANICAL BELL & GOSSETT MVF56T17D5597DP 1.00 0.00 0.00 0.00 0.00 0.00 1.50 0.00 0.00 0.00 0.00 1.50

BSSA‐SWB‐FW SWITCHGEAR AND SWITCHBOARD ASSEMBLIES ELEC‐SWB‐01‐XXX FACILITY‐WIDE 10.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 2.00 0.00 0.00 16.60

PAGE 2 OF 3 PRINTED 3/1/2018 8:47 AM

TOTAL

ANNUAL

0.00 0.00 3.50 0.00 0.00 80.35 0.00 13.00 0.00 0.50 147.16

SERIAL QTY NOTES

ITEM PM FREQUENCY (EFFORT HOURS)

ICE STANDARD NO. DESCRIPTION GSA STANDARD NO. LOCATION SUB‐LOCATION MANUFACTURER MODEL

BSSA‐VFD‐1 VARIABLE SPEED FREQUENCY DRIVE ELEC‐VFD‐01‐XXX ROOM 149 MECHANICAL SQUARE D 3.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 3.00 0.00 0.00 5.97

PAGE 3 OF 3 PRINTED 3/1/2018 8:47 AM