About this file

Amendment 05 for HOBART MARSH.

View the file

Other files

File Type Posted
Amend_07.pdf PDF
Amendment_06.pdf PDF
ATTACHMENT_to_AMEND_05.pdf PDF
Amend_04.pdf PDF
AMENDMENT_03.pdf PDF
AMENDMENT_0002_HOBART_MARSH_MITIGATION.pdf PDF
Amendment_01.pdf PDF
W912P6-16-R-0034-113567_HobartMarshMit_Plans.pdf PDF
W912P6-16-R-0034_113567_HobartMarshMit_specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6660843808

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: VARIOUS CHANGES TO THIE SOLICTATION PACKAGE, RE W912P6-16-R-0034, "HOBART MARSH MITIGATION".

CONTINGENCY STATEMENT IS LIFTED: By this Amendment, prospective offerors are hereby informed that the USACE-Chicago District has received the necessary Real Estate and all permits for the project; therefore, proposals w ill be accepted and must be provided no later than 4:30 p.m. CDT on September 19, 2016. Thus, w hereas the contingency statements w ere previously provided, all statements are hereby removed.

SEE THE FOLLOWING PAGES --

1. CONTRACT ID CODE PAGE OF PAGES

J 1 55

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-16-R-0034

X 9B. DATED (SEE ITEM 11)

26-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Sep-2016

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-16-R-0034

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT PARTICULARS

A. The required response date/time remains 19-Sep-2016 04:30PM (CDT).

B. By this amendment, the USACE is responding to contractor’s questions.

C. Attached to this amendment are four (4) updated sections of the Specification. The four updated sections are as follows –

a. SECTION 01 22 00.00 10, PRICE AND PAYMENT PROCEDURES, changed in its entirety.

b. SECTION 32 92 19.10 03, NATIVE SEEDING, the following section has changed -

3.3.1.

c. SECTION 32 92 19.10 03 NATIVE SEEDING, updated seeding Tables have been included.

d. SECTION 32 93 01.00 03 PLANTING OF TREES, SHRUBS, AND

HERBACEOUS PLUG, Tables, have been replaced.

D. This Amendment revises the Section 00010 (Solicitation Contract Form). Therefore, the previously issued section is hereby replaced with the revised section enclosed herein.

Contractors shall provide their pricing on the revised Section 00010.

Revisions are as follows –

CLIN 0006 -

The pricing detail quantity has decreased by 0.49 from 13.00 to 12.51.

SUBCLIN 0008AC

The pricing detail quantity has decreased by 346.00 from 5,474.00 to 5,128.00.

SUBCLIN 0008AE

The pricing detail quantity has decreased by 659.00 from 11,037.00 to 10,378.00.

SUBCLIN 0009AA -

The CLIN description has changed from BROADCAST HERBICIDE to

SELECTIVE CLEARING

SUBCLIN 0010AA -

The CLIN description has changed from BROADCAST HERBICIDE to

SUBCLIN 0012AD

The pricing detail quantity has increased by 19,044.00 from 28,612.00 to 47,656.00.

SUBCLIN 0014AC

The pricing detail quantity has increased by 7,956.00 from 5,356.00 to 13,312.00.

CLIN 0016 -

The CLIN description has changed from PLANT ESTABLISHMENT ACTIVITIES to

SITE PREP, INVASIVE SPECIES &PLANT ESTAB.

The CLIN extended description has changed from Site Preparation, Invasive Species Control, and Plant Establishment Activities; YEAR 1 - 5 to Site Preparation, Invasive Species Control, and Plant Establishment Activities; YEAR 1 - 5. This is a Parent Line Item Identifying the work that relates directly to its Sub-line Items 0016AA through 0016AE; the Sub-line items identify the quantities required to perform said work. Year 1 through Year 5 collectively comprise a complete JOB under this, the Parent CLIN 0016. Therefore, the Contractor shall provide its pricing separately at Sub-items 0016AA through 0016AE. Sub-line items 0016AA through 0016AE were added, each with a price quantity of 1 Job.

CLIN 0022

The CLIN extended description has changed from This is a Parent Line Item identifying the option work that relates directly to its Sub-line Items 0022AA through 0022AC;

the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0022AA through 0022AC. to This is a Parent Line Item identifying the option work that relates directly to its Sub-line Items 0022AA through 0022AD; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0022AA through 0022AD.

CLIN 0022: Sub-CLIN 0022AD is added for bonds.

CLIN 0023

The CLIN extended description has changed from This is a Parent Line Item identifying the option work that relates directly to its Sub-line Items 0023AA through 0023AB;

the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0023AA through 0023AB. to This is a Parent Line Item identifying the option work that relates directly to its Sub-line Items 0023AA through 0023AC; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0023AA through 0023AC

CLIN 0023: Sub-CLIN 0023AC is added for bonds.

E. WAGE DETERMINATION: The updated Wage Determination, General Decision IN1, dated 9 SEPT 2016, is displayed herein.

F. CONTINGENCY STATEMENT IS LIFTED: By this Amendment, prospective offerors are hereby informed that the USACE-Chicago District has received the necessary Real Estate and all permits for the project; therefore, proposals will be accepted and must be provided no later than 4:30 p.m. CDT on September 19, 2016. Thus, whereas the contingency statements were previously provided, all statements are hereby removed.

G. The Point of Contact (POC) for this Amendment is Wesley Dale Dewar at

Wesley.D.Dewar@usace.army.mil or phone 312-846-5370.

H. THE USACE’S RESPONSES TO CONTRACTOR’S QUESTIONS FOLLOW IN THE

TABLE BELOW:

From the information I can gather, the "No.9" Field Fence refers to a straight 9 gauge (ga) field fence. I have never seen this requested but apparently at least one of our competitors does make this, but I can only find it in Class 1 galvanization and your specs require Class 3. I do not see that Deacero makes any all 9 ga field fence, but I am confirming this. The closest I know we have is 9 ga top and bottom wires, 11 ga filler wires. I am not sure if you can check to see if that would work?

"No. 9" (as referred to in the Specification SECTION 32 31 26 Paragraph 2.1.1- Page

4) precedes the ASTM Designation (ASTM A 116, the Standard Specification for Metallic-Coated, Steel-Woven Wire Fence Fabric) and refers to the Design Number for Woven Wire Fence Fabric.

The Design Number describes the standard sizes and constructions of the fabric. Within ASTM's Designation, the Size or Steel Wire Gauge for Intermediate Line and Stay Wires as well as Top and Bottom Wires is listed as 9 gauge. Indiana DOT also specifies coated 9 gage wire for both line wires and vertical stays for Woven Wire Fabric in their Construction Procedures Manual.

The second part of your questions refers to a Class 3 galvanization, though we do not see this in the Plans or Specs. Please refer to ASTM A 116 for the coating Type and Classification.

We have already sent out a lot of the PPQ for the project and I see that you have updated the first page of these forms. Do I need to resend them to our clients to have them sign this revised document or will the original one work? I don't want to have to take any more time up from my clients if I do not need to.

You must use the form provided in Amendment 0002, which is the PPQ-0 form.

I would like to formally ask for a couple more days to get this proposal together. There are a lot of changes in the proposal and we were not able to get started with not knowing what changes were coming in the amendment. A couple more days would help us finalize the costs and provide the best value to the government.

The revised due date for proposals is 19 September 2016 at 4:30P.M. (CDT). See Amendment 0004 to the solicitation on FBO, which changed the due date.

I have a question about some of the changes made for Amendment 2.

Broadcast herbicide was taken out of the line items and looks as if it will be included in Plant Establishment Activities as Site Preparation, although Broadcast herbicide is still included as a Sub-line item for Oak Woods and Oak Ravine, which seems odd because the Sub-line item Selective Clearing were taken out for those as well. Could you please clarify?

This was an oversight. The canopied communities, Oak Woods and Oak Ravine, will receive selective clearing, as well as broadcast and selective herbicide treatments. See the changes in CLIN 0009AA, and in CLIN 0010AA, within this Amendment.

Please provide information on the fire breaks.

The fire breaks are 20 feet wide and essentially follow the mitigation tract perimeters, but also ring the Kim Tract ravines. There will be no woody plantings (trees or shrubs) within the fire breaks, but they will receive the same clearing/seeding treatment as the adjacent communities.

2.1.1 Woven Wire

Size of mesh is not mentioned (size of squares in the fence).

2.1.1 Woven Wire

*Per C-502 scaling Spacing of Stay Wires 6 inch vertical spacing. Horizontal spacing is per ASTM A 116 Fence Fabric Dimensions

2.3.2 Composite Poly Resin Posts

How often are these to be used & can we offer an alternate?

2.3.2 Composite Poly Resin Posts

*Per C-502 for Line Post Spacing 16 FT MAX (Line Panel) *Refer to 2.3.1 Metal Posts for Farm Style Fence metal post acceptable alternatives(ASTM A 702)

2.4 Braces and Rails

"..Group II line posts." Not sure if this applied to this project or not.

2.4 Braces and Rails

*Refer to C-502 for Braces and Rails (Group II Line Posts DO NOT APPLY)

2.6 Padlocks

Are padlocks for "A-Frame" gates only? Or for woven wire gates also?

2.6 padlocks *They are for A-Frame Gates only.

3.4 Barbed Wire

Is there any? If so, last line in this section must not apply.

3.4 Barbed Wire

*No barbed Wire is required for this project.

No gate shown for woven wire fence.

Mentioned in notes on C-502.

*No woven wire fence panel gates (A- Frame Gates only, per C-501)

I have some additional questions for the Little Calumet River, Flood Risk Management Hobart Marsh Wetland Mitigation- W912P6-16-R-0034 project. These questions were brought to my attention by our nursery and are about the native seeding specifications that are in amendment 02. The amended native seeding specifications mention Tables 4A, 4B, 4C, and so but those tables don’t exists unless I am missing something. There are Tables 3A, 3B, 3C and so on in the original specifications. Section 2.1.4 of the amended native seeding specifications also mention Table 4BB, that table does not exist at all. Are these typos or are there new amended seeding tables?

In looking through Amendment 2, my seed supplier noticed that the amendment references species listed in multiple tables from 4A, 4B, 4C all the way to 4BB. However, we don’t see any such tables. Was this a typo and the correct tables are 3A to 3BB? If so, it still seems like there may be an error as the tables only go from Table 3A to Table 3Y.

This is an error. The “Hobart Marsh Native Seed Mixes For Tract (No. Acres)” tables should have been numbered Table 4A: Hobart Marsh native seed mixes for Bailey NW Tract Emergent Wetland Area (1.95 Acres) through Table 4BB: Hobart Marsh native seed mixes for Quail Hollow Tract Oak Woods Area (6.44 Acres). This is corrected in the amendment. See corrected Tables 4A through 4BB in Section 32 92 19.10 03-1 NATIVE

SEEDING.

13 CLIN 0013 for herbaceous plugs quantity changed from 6,852 to 1,308.

Is there a new number/acre for table 3k?

Number/acre for table 3K is No./.23 Acres per table in section 32 93 01.00 03.

14 CLIN 0014AC plugs reduced from 13,312 to 5,356. This seems to correspond to plug table 3O being removed. Is this the case?

This was a mistake. CLIN 0014AC is 13,312 plugs.

15 CLIN 0012 Plugs were reduced from 47,656 to 28,612. This seems to correspond to removing all forbs from the plug mix for this item. Is this correct?

This was a mistake. CLIN 0012AD is 47,656 plugs.

16 CLIN 0012 Shrubs were reduced from 523 to 98. Is there a new number per acre for each species?

This was a mistake. CLIN 0012AC is 523 shrubs.

17 CLIN 0014AB Is 2.67 acres the correct acreage for this? I see swale seed for

1.07 ac in table 3P but I don’t see any other swale seed mix in any table.

Should there be a swale seed mix in the Kim tract?

Tables 3I, 3O, 4Q and 4Y cover the swale areas and the acreage (2.67) is correct. See Section 32 92 19.10 03 of the Project Specifications.

18 CLIN 0006 I don’t see a seed mix table that corresponds with this.

See Table 4J, in Section 32 92 19.10 03 of the Project Specifications.

19 CLIN 0005 I can’t determine which cover crop should be used for this line item.

See Table 4B, in Section 32 92 19.10 03 of the Project Specifications.

20 CLIN 0004AB Do we have a seed mix table for this or should be use table 3C (same as CLIN 0007)?

See Table 4U, in Section 32 92 19.10 03 of the Project Specifications.

21 CLIN 0008AB The amendment states that forbs are added to table 4G (I’m presuming this should actually be 3G).

Do we have the new forbs list? Also, should this CLIN be updated with the acreage of 201.87?

The acreage will be updated. The forb seed list is in table 4G , in Section 32 92

19.10 03 of the Project Specifications.

22 The wage rates identified in the documents (Amendment 2) offer several classifications of labor for Lake County, IN. None of the specified classifications describe planting or landscape maintenance activities.

Which rates will the government expect to see published on the wage labor report (certified payroll) provided by the contractor?

Once the contract is awarded, if the Contractor identifies one or more classifications considered necessary by the Contractor for performance of the work is/are not listed on the applicable wage determination, initiate a request for approval of an additional classification along with the proposed wage and benefit rates for that classification. The complete answer, from the DOL website, is displayed below

Conformances Under the Davis-Bacon Act (Response to Question #22, continued)

Contracting Officers may submit completed SF1444 Requests to the Department of Labor via email. Please scan the completed form and all supporting documents into a 'pdf' file and attach to the email. Include the Contracting Officer's name, address, telephone, and email address.

Submit the email to: WHD-CBACONFORMANCE_INCOMING@dol.gov The U.S. Department of Labor (DOL) issues wage determinations under the Davis-Bacon Act (DBA) using survey data on prevailing construction wages and benefits paid in specific areas. On occasion, the data does not contain sufficient information to issue rates for a particular classification of worker needed in the performance of the contract. Because of this, DBA provisions contain a conformance procedure for the purpose of establishing an enforceable wage and benefit rate for the missing classification.

Contractors are responsible for determining the appropriate staffing necessary to perform the contract work. Contractors are also responsible for complying with the minimum wage and benefits requirements for each classification performing work on the contract. If a classification considered necessary by the contractor for performance of the work is not listed on the applicable wage determination, the contractor must initiate a request for approval of an additional classification along with the proposed wage and benefit rates for that classification.

The awarded Contractor initiates the request by preparing an SF1444, Request for Authorization of Additional Classification and Rate, at the time of employment of the unlisted classification. (Reference FAR 22.406-3 and 52.222-6(b), and Title 29 CFR Part 5, Section 5.5(a)). The contractor completes blocks 2 through 15 on the form. Request may be submitted to DOL without the form, but must contain the required information.

Employees, if present, or their designated representative must sign block 16 noting their concurrence or disagreement with the contractor's proposed wage and benefit rate. If the employee indicates disagreement with the contractor's proposal, he must provide a statement supporting a recommendation for different rates.

(“Designated representative” is generally a union. It cannot be the contractor 's personnel officer or other contractor representative.)

The Contractor submits the request to the Contracting Officer. The Contracting Officer reviews the request for completeness and signs the form designating the contracting agency's concurrence or disagreement with regard to the contractor's proposal. If the Contracting Officer indicates disagreement with the contractor's proposal, a statement must be attached supporting a recommendation for different rates. The Contracting Officer then submits the proposal with all attachments to DOL for approval. The Contractor is obligated to pay the proposed wage and benefit rates pending a response from DOL.

Checklist for DBA Conformances:

a. The classification must be appropriate for the contract work, and must be a classification that is utilized in that locality by the construction industry.

b. The contractor cannot propose a new classification by combining job duties from two or more existing classifications on the wage determination, or propose a new classification that performs only part of the duties of an existing classification.

c. The proposed classification cannot be a "trainee". Generally, a proposed classification of "helper" will not be approved. Under DBA provisions, a "helper" will not be approved by DOL unless the contractor establishes that the criteria in the regulations at 29 C.F.R. Part 5 are met.

d. Conformance requests should not be submitted for exempt classifications (project managers, full-time supervisors, professionals such as engineers), nor for classifications other than "laborers or mechanics" employed on the site of work, as covered by DBA.

e. The proposed rate and fringe benefits should bear a reasonable relationship to the wage rates listed on the wage determination.

f. The contractor must attach a brief job description to each SF1444 request submitted for classifications that are not generally known and utilized in the construction industry in the locality. The contractor should include all pertinent documentation that supports his request for approval of an additional classification.

g. If the contractor has further questions about a conformance process, he/she may contact the nearest Regional Office of the U. S. Department of Labor, Wage and Hour Division (see DOL's website in the WDOL.GOV Library).

END OF QUESTIONS AND RESPONSES

REVISED Section 00010 – Solicitation Contract Form, serving as the OFFEROR’S PRICE

PROPOSAL

Offerors are required to FULLY PRICE all items below, with the exception of those items directing entry of pricing at the Sub-Item Level.

ITEM NO

SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

0001 1 Job

MOBILIZATION

FFP

Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

PURCHASE REQUEST NUMBER: W81G6660843808

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

DEMOBILIZATION

FFP

Under this CLIN, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

0003 1 Job

TEMPORARY CONSTRUCTION FACILITIES

FFP

GRAMINOID ONLY KIM NORTH ACCESS

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0004AA through 0004Ab; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0004AA through 0004AB.

0004AA 1.13 Acre

0004AB 1.51 Acre

NATIVE SEEDING

0005 12 Acre

MESIC/WET MESIC PRAIRIE

FFP

Native Seeding

0006 12.51 Acre MESIC PRAIRIE - Native Seeding

FFP

0007 16.56 Acre

GRAMINOID ONLY MESIC PRAIRIE

FFP

MESIC/WET-MESIC SAVANNA

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0008AA through 0008AE; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0008AA through 0008AE.

0008AA 43.68 Acre

0008AB 188.14 Acre

0008AC 5, 128 Each

TREE PLANTING

0008AD 1,551 Each

TREE PLANTING (BR WHIPS)

0008AE 10, 378 Each

SHRUB PLANTING

OAK WOODS

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0009AA through 0009AB; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0009AA through 0009AB.

0009AA 64.69 Acre

0009AB 64.69 Acre

OAK RAVINE

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0010AA through 0010AB; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0010AA through 0010AB.

0010AA 32.69 Acre

0010AB 32.69 Acre

EMERGENT WETLAND

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0011AA through 0011AD; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0011AA through 0011AD.

0011AA 2.86 Acre

0011AB 4.97 Acre

0011AC 822 Each

0011AD 24,868 Each

HERBACEOUS PLUG PLANTING

SEDGE MEADOW

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0012AA through 0012AD; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0012AA through 0012AD.

0012AA 5 Acre

0012AB 9.54 Acre

0012AC 523 Each

0012AD 47, 656 Each

WET PRAIRIE

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0013AA through 0013AC; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0013AA through 0013AC.

0013AA .23 Acre

0013AB 1.36 Acre

0013AC 1,308 Each

SWALE

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0014AA through 0014AC; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0014AA through 0014AC.

0014AA .43 Acre

0014AB 2.67 Acre

0014AC 13, 312 Each

STREAMBANK

FFP

This is a Parent Line Item identifying the work that relates directly to its Sub-line Items 0015AA through 0015AD; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0015AA through 0015AD.

0015AA 1.17 Acre

0015AB 1.17 Acre

0015AC 5,844 Each

0015AD 65 Each

0016 Job

SITE PREP, INVASIVE SPECIES &PLANT ESTAB

FFP

Site Preparation, to include Invasive Species Control and Plant Establishment Activities for YEARS 1 - 5. This is a Parent Line Item Identifying the work that relates directly to its Sub-line Items 0016AA through 0016AE; the Sub-line items identify the quantities required to perform said work. Year 1 through Year 5 collectively comprise a complete JOB under this, the Parent CLIN 0016.

Therefore, the Contractor shall provide its pricing separately at Sub-items 0016AA through 0016AE.

0016AA 1 Years

YEAR 1

FFP

Site Preparation, To Include Invasive Species Control and Plant Establishment Activities during YEAR 1.

0016AB 1 Years

YEAR 2

FFP

Activities during YEAR 2.

ITEM NO

SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

0016AC 1 Years

YEAR 3

FFP

Activities during YEAR 3.

0016AD 1 Years

YEAR 4

FFP

Activities during YEAR 4.

0016AD 1 Years

YEAR 5

FFP

Activities during YEAR 5.

0017 2,180 Cubic

Yard

GULLY EARTHWORK

0018 1 Job

BOUNDARY SURVEY

0019 1 Job

SIGNS

0020 1 Job

DEBRIS & FENCE REMOVAL

0021 1 Lot

PERFORMANCE AND PAYMENT BONDS

FFP

Bonds for CLINs 0001 through 0020: The Government will reimburse the contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

OPTION PARKING LOT- OPTIONS

FFP

This is a Parent Line Item identifying the option work that relates directly to its Sub-line Items 0022AA through 0022AD; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0022AA through 0022AD.

0022AA 1 Job OPTION Bailey SE

Option Item.

0022AB 1 Job Bundalo

0022AC 1 Job Quail Hollow

Option Item

0022AD 1 Lot

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

Bonds for sub-CLINs 0022AA, 0022AB, and 0022AC. The Government will reimburse the Contractor for the actual cost of acceptable funds, upon receiving evidence of payment (i.e. paid invoice) form the bonding company or agency, not to exceed the total amount of this contract line item. If the actual bond costs are less than the line item amount, the contact will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract changes.

OPTION GATES and FENCING - OPTIONS

FFP

This is a Parent Line Item identifying the option work that relates directly to its Sub-line Items 0023AA through 0023AC; the Sub-line items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-items 0023AA through 0023AC.

0023AA 25,000 Linear

Foot

OPTION FARM FIELD FENCE

0023AB 6 Each

OPTION A-FRAME GATES

0023AC 1 Lot

OPTION PERFORMANCE AND PAYMENT BONDS

FFP

Bonds for sub-CLINs 0023AA and 0023AB. The Government will reimburse the Contractor for the actual cost of acceptable funds, upon receiving evidence of payment (i.e. paid invoice) form the bonding company or agency, not to exceed the total amount of this contract line item. If the actual bond costs are less than the line item amount, the contact will be modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions associated with contract changes.

TOTAL PROPOSED PRICE (CLINs 0001 THROUGH 0023AC to include the sub-items):

IMPORTANT PROPOSAL NOTES

a. The contractor shall submit a price for ALL items that are contained in Section 00010

(SOLICITATION CONTRACT FORM) of this solicitation, which will serve as the contractor’s price proposal. Should a contractor fail to fully complete the solicitation contract form, its price will not be considered responsive to the solicitation and eligible for the resultant contract award. Therefore, the offeror’s total price for the work shall be based upon the TOTAL of all line items included in the solicitation contract form. The contractor shall enter both unit and extended prices for each line item.

b. The Government intends to award all Base line Items to the responsive, responsible offeror submitting the lowest aggregate fair and reasonable price for all line items.

c. Split awards or multiple award contracts will not result from this Solicitation.

d. Evaluation of Options: Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). FAR 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

e. Option provisions: Any, all, or none of the Options Items 0022AA, 0022AB, 0022AC, 0022AD, 0023AA, 0023AB, and 0023AC may be exercised by the Government within 90 days of the Contractor’s acknowledgement of their receipt of the Notice to Proceed (NTP). No time will be added to the contract completion date if an option is exercised.

Also, one or more of the option item(s) may be exercised at time of contract award.

f. This Amendment updates the CLIN numbering at FAR Clause 52.217‐7 OPTION FOR INCREASED QUANTITY‐‐SEPARATELY PRICED LINE ITEM (MAR 1989), which was incorporated into Section 00700 of the RFP via Amendment No. 0002. The Government may require the delivery of the numbered line items, 0022AA, 0022AB, 0022AC, 0022AD, 0023AA, 0023AB, and 0023AC, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within ninety (90) days of the contractor’s acknowledge of their receipt of the Notice to Proceed (NTP).

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

Updated WAGE DETERMINATION –

General Decision Number: IN160001 09/09/2016 IN1

Superseded General Decision Number: IN20150001

State: Indiana

Construction Types: Building, Heavy and Highway

Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/22/2016 2 01/29/2016 3 02/26/2016 4 03/04/2016 5 04/01/2016 6 04/08/2016 7 04/15/2016 8 04/29/2016 9 05/20/2016 10 06/10/2016 11 06/24/2016 12 07/01/2016 13 07/22/2016 14 08/19/2016 15 08/26/2016 16 09/09/2016

ASBE0017-002 06/01/2015

LAKE AND PORTER COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 48.45 24.35

HAZARDOUS MATERIAL HANDLER

(INCLUDES PREPARATION,

WETTING, STRIPPING REMOVAL

SCRAPPING, VACUUMING, BAGGING

AND DISPOSAL OF ALL

INSULATION MATERIALS, WHETHER

THEY CONTAIN ASBESTOS OR NOT,

FROM MECHANICAL SYSTEMS).........$ 36.34 23.15

ASBE0075-001 06/01/2016

REMAINING COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 31.50 20.79

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 19.49 10.95

BOIL0001-005 01/01/2014

LAKE COUNTY, City of Hammond; North of 114th Street

Rates Fringes

BOILERMAKER......................$ 42.13 25.45

BOIL0374-003 01/01/2013

Rates Fringes

BOILERMAKER......................$ 33.78 25.19

BRIN0004-011 06/01/2015

MERRILLVILLE

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

BRICKLAYER

Bricklayer; Stone Mason;

Pointer, Cleaner, Caulker...$ 36.12 20.20 Marble Finisher; Tile Finisher....................$ 28.29 10.68 Marble Mason; Terrazzo Worker; Tile Layer..........$ 36.80 20.37 Terrazzo Finisher...........$ 29.29 10.68

BRIN0004-018 06/01/2015

SOUTH BEND: ST. JOSEPH COUNTY

Rates Fringes

BRICKLAYER

BRICKLAYER; STONE MASON;

POINTER, CAULKER, CLEANER...$ 28.15 13.21

MARBLE AND TILE FINISHER....$ 28.29 12.04

MARBLE AND TILE LAYER.......$ 29.30 14.59

TERRAZZO FINISHER...........$ 29.29 12.04

TERRAZZO WORKER.............$ 30.30 14.59

CARP0413-002 04/01/2016

St. Joseph County

Rates Fringes

CARPENTER........................$ 26.44 18.84

CARP0765-001 01/01/2016

HEAVY, HIGHWAY AND BUILDING CONSTRUCTION

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

CARPENTER........................$ 37.42 25.78

MILLWRIGHT.......................$ 37.52 25.96

CARP1029-001 06/01/2016

ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,

HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.

JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES

MILLWRIGHT.......................$ 25.46 21.83

ELEC0153-001 06/06/2016

ST JOSEPH COUNTY

Communication Technician.........$ 25.00 14.17

ELECTRICIAN......................$ 32.75 20.87

Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.

ELEC0531-001 02/28/2016

LAPORTE and PORTER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 39.00 24.95

ELEC0697-001 05/30/2016

LAKE COUNTY

Rates Fringes

ELECTRICIAN......................$ 40.34 28.72

* ELEC0697-004 08/29/2016

LAKE COUNTY

Rates Fringes

Telecommunication Technician.....$ 30.50 24.42

Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).

Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC1393-003 12/01/2014

LAKE & PORTER COUNTIES

(Calumet Area, North of U.S. Hwy 30)

Rates Fringes

Line Construction:

EQUIPMENT OPERATOR 1:

(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 29.98 13.84

EQUIPMENT OPERATOR 3

(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 36.79 15.82

GROUNDMAN...................$ 17.88 10.34

GROUNDMAN-TRUCK DRIVER......$ 20.87 11.21

LINEMAN.....................$ 39.01 16.46

ELEV0002-005 01/01/2015

ELEVATOR CONSTRUCTION

LAKE AND PORTER COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 50.80 28.39+a+b

FOOTNOTES:

a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.

b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.

ELEV0044-005 01/01/2015

LAPORTE AND ST. JOSEPH COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 44.77 28.39+a+b

a) Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and the Friday after Thanksgiving, and Christmas Day.

b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years service; 6% for less than 5 years' service.

ENGI0150-001 06/01/2016

BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:

LAKE, LAPORTE, and PORTER COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.00 31.53

GROUP 2.....................$ 39.20 31.53

GROUP 3.....................$ 34.90 31.53

GROUP 4.....................$ 32.70 31.53

GROUP 5.....................$ 27.25 31.53

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;

Concrete paver 27E cu. ft. & under; Concrete placing boom;

Concrete pump/grout pump with boom (truck mounted);

Concrete pump with boom (truck mounted); concrete tower;

Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);

Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);

Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;

Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks

GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;

Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;

Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches

GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen

GROUP 5: Fork lifts (Housing and commercial only)

ENGI0150-012 06/01/2016

BUILDING CONSTRUCTION

ST. JOSEPH COUNTY

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 28.65 25.95

GROUP 2.....................$ 27.30 25.95

GROUP 3.....................$ 26.50 25.95

GROUP 4.....................$ 25.70 25.95

GROUP 5.....................$ 23.10 25.95

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.

GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.

capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with "a" frame.

GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).

GROUP 4: Bobcat (up to and including 3/4 cu. yd.).

Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4

cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).

GROUP 5: Bobcats and forklifts (commercial or residential).

ENGI0150-014 05/01/2016

POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY

LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.00 30.80

GROUP 2.....................$ 39.55 30.80

GROUP 3.....................$ 39.10 30.80

GROUP 4.....................$ 37.90 30.80

GROUP 5.....................$ 36.85 30.80

POWER EQUITMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine (1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).

GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.

GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor (with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.

GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine (self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.

GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.

IRON0292-001 06/01/2016

ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES

IRONWORKER.......................$ 28.81 20.16

IRON0395-001 06/01/2015

LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50

MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE

ON W. TO 3 MILES E. OF IN. COUNTIES

IRONWORKER

SHEETER.....................$ 39.75 27.77

STRUCTURAL & ORNAMENTAL.....$ 39.50 27.77

LABO0041-001…