W912P612R0004_CUP McCook Reservoir Rockwall Stabilization 1B-RTA_Dwg_Sheets_1-17.pdf

PDF 16 MB Posted

Attached to
CHICAGOLAND UNDERFLOW PLAN (CUP) MCCOOK ROCKWALL STABILIZATION 1B, MCCOOK RESERVOIR, COOK COUNTY, ILLINOIS
Solicitation number
W912P6-12-R-0004
Issued by

About this file

This file contains Part 1 of 2 of the Drawing Sheets Pages 1 through 17

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G-001

L O

C A

T

IO

N A

N D V

IC

IN

IT

Y M

A P

LOCATION

PROJECT

T H

O M

A S D

A V

ID

S O

N J

U N

E

J

U N

E

J

U N

E

M

IC

H A

E L P

A D

IL

L A

J O

S E

P H J S

C H

M

ID

T P .E

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t im e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

fiof Engineers

US Army Corps of Engineers

US Army Corps

Chicago District

P R

O J E

C T M

A N

A G

E R

C H

IE

F

D E

S

IG

N B

R A

N C

H

D A

T E

D A

T E

D A

T E

A L L D

R A

W

IN

G S I

N T

H

IS

S

E T

IN

D

IC

A T

E O

F F

IC

IA

L R

E C

O M

M E

N D

A T

IO

N O

F

R E

Q U

IR

E D B

Y E

R

-1 -8

S

IG

N A

T U

R

S

T H

E S

C O

P E O

F T

H E

IR

E

M P

L O

Y M

E N

T A

N T

H E

S E P

R O J E

C T D

O C

U M

E N

T S W

IT

IN

T

IO

N D

E S

IG

N A

T

IO

N S O

F I

N D

IV

ID

U A

L S A

P P

E

IN

IT

IA

L S O

R S

IG

N A

T U

R E

S A

N D R

E G

IS

T R

A

C H

IC

A G

O D

IS

T R

IC

T C

O R

P S O

F E

N G

IN

E E

R S T

H E

T H

IS

P

R O J E

C T W

A S D

E S

IG

N E

D B

Y T

D

A W

IN

G S C

O N

T A

IN

E D I

N T

H E S

H E

E T I

N D

E X

R E

C O

M M

E N

D A

T

IO

D A

P P

R O

V A

L F

O R A

L

IG

N A

T U

R E A

F F

IX

E D B

E L

O W I

N D

IC

A T

E O

F F

IC

V

IE

W E

D B

Y

A P

P R

O V

E D B

Y

A P

P R

O V

A L R

E C

O M

M E

N D

E D B

Y

A T

R T

E A

M L

E A

D E

R

LOCATION MAP VICINITY MAP

(N.T.S.) (N.T.S.)

NN NN

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A

K

J

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

McCOOK RESERVOIR

STAGE 1B

A S S

H O

W N

ROCK STABILIZATION

JULY 2012

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

Certified Final Documents - RTA W912P6-12-R-0004

GENERAL NOTES:

UTILITIES SHOWN AND LOCATED ON THE PLANS, ARE NOT GUARANTEED ACCURATE

ABBREVIATIONS & SYMBOLS:

CC

CJ

CL

CL

CRV

CENTER TO CENTER

NUMBERNO.

CONSTRUCTION JOINT

CENTER LINE

CLEAR

CURVE

DIAMETER

ON CENTERS

OD OUTSIDE DIAMETER

PL PLATE

PC POINT OF CURVATURE

POINT OF INTERSECTION

DEFL.

EL.

FIN.

H.P.

ID

INV.

JT.

DEFLECTION

ELEVATION

FINISH

HIGH POINT

INSIDE DIAMETER

INVERT

JOINT

PI

POT

PRC

PT

SH.

POINT ON TANGENT

POINT OF REVERSE CURVE

PROJECTION

POINT OF TANGENCY

ROUND

SHEET

STATION

L

L.P.

MAX.

MIN.

LENGTH ALONG CURVE

LOW POINT

MAXIMUM

MANHOLE

MINIMUM

SYM.

t

T

(TYP.)

VERT.

W.P.

STANDARD

SYMMETRICAL

CONCRETE WALL THICKNESS

TANGENT LENGTH

TYPICAL

VERTICAL

WORKING POINT

BL BOTTOM LAYER

DWL DOWEL

EF EACH FACE

EL EACH LAYER

EW EACH WAY

FF FAR FACE

IF INSIDE FACE

IL INSIDE LAYERBF BOTTOM FACE

NF

OC

OF

OL

TF

TL TOP LAYER

TOP FACE

STIRRUPS

OUTSIDE LAYER

OUTSIDE FACE

ON CENTERS

NEAR FACE

ML MIDDLE LAYER

BY THE ENGINEER. THE CONTRACTOR SHALL VERIFY ALL SUCH DETAILS AND NOTES

AL.

DIA.

STA.

PROJ.

V.C.P.

REINFORCED CONCRETE

VITRIFIED CLAY PIPE

GENERAL NOTES FOR SOIL AND ROCK BORINGS AND DRILL HOLE DATA:

C.I.P.

R.C.

R.C.P.

REINF.

REINFORCED CONCRETE PIPE

REINFORCEMENT

ABT. ABOUT

D.I. DUCTILE IRON

CAST-IN-PLACE

STIRR.

STD.

C.I. CAST IRON

N.T.S. NOT TO SCALE

M.L. MATCH LINE

MW MONITORING WELL

S.S. STAINLESS STEEL

T.B.M. TUNNEL BORING MACHINE

1. ALL DETAILS AND NOTES, RELATIVE TO EXISTING SURFACE AND UNDERGROUND

C.M.P. CORRUGATED METAL PIPE

CONT. CONTINUOUS

MH

R.O.W. RIGHT OF WAY

B/ BOTTOM OF

T/ TOP OF

ADD’L. ADDITIONAL

WS WATERSTOP

GENERAL NOTES FOR TRAFFIC CONTROL:

G. ALL PROPERTY OWNERS WHERE CONSTRUCTION IS LOCATED

D. AMERITECH

TI TUNNEL INTERSECTION

DWLS

E/B EASTBOUND

GALV. GALVANIZED

SCH. SCHEDULE

SECT. SECTION

ABBREVIATIONS FOR REINFORCEMENT:

F. METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO (MWRDGC) AND

BNDL BUNDLE

C.S.K. COUNTERSUNK

GA.

PROVISIONS, TRAFFIC CONTROL STANDARDS, TRAFFIC SPECIFICATIONS AND THE "ILLINOIS MANUAL ON

UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS" (MUTCD). NO MODIFICATION OF THESE

REQUIREMENTS WILL BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER.

GAGE

ANY CHANGES OR MODIFICATIONS TO THESE EXISTING FACILITIES, DUE TO

CONSTRUCTION UNDER THIS CONTRACT, SHALL BE AT THE CONTRACTOR’S EXPENSE.

4. THE CONTRACTOR SHALL MAINTAIN IN SERVICE ALL EXISTING SEWERS, CULVERTS,

3. FOR HORIZONTAL AND VERTICAL CONTROL, SEE CONTROL DATA INFORMATION

COE CORPS OF ENGINEERS

P.O.A. POINT ON ALIGNMENT

T.O.R. TOP OF ROCK

E. AT & T

C. NICOR

A. VILLAGE OF HODGKINS

IN THE FIELD AND WITH, BUT NOT LIMITED TO, THE FOLLOWING:

B. COMED

3.

O.C.

EOB END OF BORING

2.

REPORTS. FOR REFERENCE TO THE REPORTS, SEE THE SPECIFICATIONS.

BORINGS AND DRILL HOLES; OR IN SUBSURFACE INVESTIGATIONS AND GEOTECHNICAL DESIGN

AS OTHERWISE INDICATED. DATES OF DRILLING ARE SHOWN ON THE LOGS OF SOIL AND ROCK

THE DATA ON THE LOGS ARE AS DETERMINED AT THE TIME OF DRILLING OF THE BORINGS OR

OF ROCK STRATIGRAPHY AND GEOLOGIC FORMATION NAMES USED ON THE PROFILES.

NOV. 1999", PREPARED BY THE CORPS OF ENGINEERS - CHICAGO DISTRICT FOR DESCRIPTIONS

SEE "CUP-McCOOK RESERVOIR, ILLINOIS, DESIGN DOCUMENTATION REPORT, VOL II OF VIII,

1. THE CONTRACTOR IS ADVISED TO READ THE VARIOUS GEOTECHNICAL REPORTS LISTED IN

1. ALL TRAFFIC CONTROL DEVICES USED ON THIS PROJECT SHALL CONFORM TO THE SPECIAL

Rx RADIUS (HORIZONTAL DIRECTION)

ALT. ALTERNATE

ALUMINUM

APPROX. APPROXIMATE

BOT BOTTOM

CONC. CONCRETE

COLUMNSCOL.

DRAWINGDWG.

DOWELS

EMB. EMBEDDMENT

EXP. EXPANSION

EXP. JT. EXPANSION JOINT

EXT. EXTERIOR

FL. FLOOR

FDN. FOUNDATION

NOM.

NAT. NATURAL

NOMINAL

R.D. ROOF DRAIN

T&B TOP AND BOTTOM

U.N.O. UNLESS NOTED OTHERWISE

H. J.U.L.I.E. (1-800-892-0123)

LONG LEG VERTICALLLV

2. ALL ELEVATIONS SHOWN ON THE PLANS REFER TO CHICAGO CITY DATUM (CCD)

FIBER FIBER OPTIC LINE

G GAS LINE

THE CONTRACT DOCUMENTS FOR ADDITIONAL INFORMATION.

UTILITIES, AND OTHER SITE FEATURES ARE APPROXIMATE AND SHALL

BE VERIFIED BY THE CONTRACTOR IN THE FIELD. THE CONTRACTOR

ANY SIGNIFICANT DISCREPANCIES THAT WILL INTERFERE WITH THE WORK.

THE CONTRACTING OFFICER REPRESENTATIVE SHALL DETERMINE MEASURES

AS MAY BE REQUIRED TO RESOLVE THE DISCREPANCY.

SHALL IMMEDIATELY REPORT TO THE CONTRACTING OFFICER’S REPRESENTATIVE

CONTRACTOR COORDINATION MEETINGS.

MWRDGC, AND OTHER CONTRACTORS AT THE SITE BY ATTENDING WEEKLY

THE CONTRACTOR SHALL COORDINATE ALL SITE WORK WITH THE GOVERNMENT,

FACILITIES WITHIN LIMITS OF CONSTRUCTION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR FLOOD PROTECTION OF

OF MWRDGC.

NOISE REQUIREMENTS ON OR OFF THE JOB SITE, INCLUDING REQUIREMENTS

WITH TRAFFIC SIGNAGE, PLACARDS, SPEED LIMITS, DIRT, DUST, LIGHT, AND

CONTRACTORS OPERATING AT THE SITE. THE CONTRACTOR SHALL COMPLY

2. THE CONTRACTOR WILL SHARE COMMON ACCESS ROADS WITH OTHER

OR NAVD88. 0.00 (CCD) = 579.19 FEET (NAVD88)

I. NGPL (KINDER MORGAN)

COMPLIANCE WITH RAILROAD CROSSINGS.

3. THE CONTRACTOR’S SITE TRAFFIC CONTROL PLAN SHALL INCLUDE

WITH RAILROAD CROSSINGS.

5. THE CONTRACTOR�S SITE TRAFFIC CONTROL PLAN SHALL INCLUDE COMPLIANCE

REQUIREMENTS OF MWRDGC.

NOISE CONTROL REQUIREMENTS ON OR OFF THE JOB SITE, INCLUDING

WITH TRAFFIC SIGNAGE, PLACARDS, SPEED LIMITS, DIRT, DUST, LIGHT, AND

CONTRACTORS OPERATING AT THE SITE. THE CONTRACTOR SHALL COMPLY

4. THE CONTRACTOR WILL SHARE COMMON ACCESS ROADS WITH OTHER

LEASEE’S OF MWRDGC PROPERTY

DITCHES, DRAINS, MANHOLES AND ALL OTHER UTILITIES DURING CONSTRUCTION.

G-002

SHOWN ON SH. NO. G-003.

5. FOR ACCESS TO SITE, SEE SHEET G-004.

SHEET TITLENUMBER NUMBER

SHEET SHEET REF

6. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING STRUCTURES,

7.

AFFECTING THE WORK.

THE CONTRACT CLAUSE 52-236-3, SITE INVESTIGATIONS AND CONDITIONS

THE CONTRACTOR SHALL INVESTIGATE THE SITE IN ACCORDANCE WITH

8.

9.

10.

OF MWRDGC AND ITS CONTRACTORS BEYOND LIMITS OF CONSTRUCTION.

THE CONTRACTOR SHALL NOT IMPACT OR IMPEDE SLUDGE DRYING OPERATIONS

A N

D G

E N

E R

A L N

O T

E S

S H

E E

T I

N D

E X L E

G E

N D

A B

B R

E V

IA

T

IO

N S

STATIONING SIGNAGE DETAILSC-50335

ROCK SUPPORT DETAILSC-50234

ROCK SUPPORT DETAILSC-50133

ROCK WALL ELEVATION STA. 1158+00 TO STA. 1161+00C-21932

ROCK WALL ELEVATION STA. 1155+00 TO STA. 1158+00C-21831

ROCK WALL ELEVATION STA. 1152+00 TO STA. 1155+00C-21730

ROCK WALL ELEVATION STA. 1149+00 TO STA. 1152+00C-21629

ROCK WALL ELEVATION STA. 1146+00 TO STA. 1149+00C-21528

ROCK WALL ELEVATION STA. 1142+00 TO STA. 1146+00C-21427

ROCK WALL ELEVATION STA. 1138+00 TO STA. 1142+00C-21326

ROCK WALL ELEVATION STA. 1135+00 TO STA. 1138+00C-21225

ROCK WALL ELEVATION STA. 1132+00 TO STA. 1135+00C-21124

ROCK WALL ELEVATION STA. 1129+00 TO STA. 1132+00C-21023

ROCK WALL ELEVATION STA. 1126+00 TO STA. 1129+00C-20922

ROCK WALL ELEVATION STA. 1123+00 TO STA. 1126+00C-20821

ROCK WALL ELEVATION STA. 1120+00 TO STA. 1123+00C-20720

ROCK WALL ELEVATION STA. 1117+00 TO STA. 1120+00C-20619

ROCK WALL ELEVATION STA. 1114+00 TO STA. 1117+00C-20518

ROCK WALL ELEVATION STA. 1111+00 TO STA. 1114+00C-20417

ROCK WALL ELEVATION STA. 1109+00 TO STA. 1111+00C-20316

ROCK WALL ELEVATION STA. 1107+00 TO STA. 1109+00C-20215

ROCK WALL ELEVATION STA. 1105+00 TO STA. 1107+00C-20114

PLAN AND PROFILE AND WORK LIMITSC-10113

BOREHOLE LOCATION PLANB-10212

BORING LEGENDB-10111

PROJECT SITE CONDITIONSG-01010

EXISTING SITE CONDITION PHOTOSG-00909

EXISTING SITE CONDITION PHOTOSG-00808

EXISTING SITE CONDITION PHOTOSG-00707

EXISTING SITE CONDITION PHOTOSG-00606

EXISTING SITE CONDITION PHOTOSG-00505

SITE PLAN, STORAGE, STAGING AND ACCESSG-00404

SURVEY CONTROL AND BENCHMARKSG-00303

SHEET INDEX, LEGEND, ABBREVIATIONS AND GENERAL NOTESG-00202

LOCATION AND VICINITY MAPG-00101

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t im e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

G-003

N

NAVD88

IL EAST NAD83 STATEPLANE COORDINATES

1.

2.

3.

HORIZONTAL & VERTICAL CONTROL POINTS

POINT

NORTHING (Y) EASTING (X)

DESCRIPTION

ELEV. ELEV.

4.

GENERAL NOTES

BRASS DISK

OF 1983 (NAD83) U.S. FEET.

PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM

ALL COORDINATES SHOWN ARE REFERENCED TO THE ILLINOIS STATE

BRASS DISK

BRASS DISK

CCD

24.81

23.74

20.08599.27

602.93

604.00BLA 1

BLA 3

ASE 1

1854988.39 1116133.82

1122382.601864087.53

1123312.471865608.32

DATUM U.S. FEET.

ALL ELEVATIONS SHOWN ARE REFERENCED TO THE CHICAGO CITY

TO NGS MONUMENTS ME1716, ME1780, ME1788, AND AJ2798.

ALL HORIZONTAL AND VERTICAL CONTROL POINTS ARE REFERENCED

TIME OF BIDDING, AND INCLUDE COST ACCORDINGLY IN THE BID.

NECESSARY ACTIONS TO ASSESS THE EXISTING CONDITIONS AT THE

DIFFER FROM THOSE SHOWN. THE CONTRACTOR SHALL TAKE ALL

TIME. EXISTING CONDITIONS DURING CONSTRUCTION MAY VARY AND

ENGINEERING, P.C. AND REPRESENTS CONDITIONS EXISTING AT THAT

JULY 2010 SURVEY PERFORMED BY AMERICAN SURVEYING &

THE SURVEY CONDITIONS SHOWN ON THESE DRAWINGS ARE FROM A

1200 0 1200 2400

SCALE IN FEET

BLA 1

BLA 3

ASE 1

S U

R V

E Y C

O N

T R

O L A

N D B

E N

C H

M A

R K

S

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t im e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

G

A N

G E

R

O A

D

(U .S . 4

D E S

P L

A

IN

IV

E R

FOLLOW LASMA MARKED

TRUCK ACCESS ROUTE

S

H

IP

C

A N

A L

C H

IC

A G

O

S

A N

IT

A R

Y

S

IT

E

T O

N

N

SCALE: N.T.S.

1.

2.

3. CONTRACTOR SHALL COOPERATE WITH MWRDGC’S CONSTRUCTION

CONTRACTORS WHO WILL ALSO BE WORKING WITHIN THE PROJECT

MWRDGC CONSTRUCTION MAINTENANCE AND OPERATION

TRAFFIC WILL ALSO BE USING THE DESIGNATED SITE ACCESS

ROUTE. CONTRACTOR SHALL TAKE FULL PRECAUTIONS

FOR SITE SAFETY. MWRDGC/LASMA TRAFFIC HAS ACCESS PRIORITY.

CONTRACTOR SITE ACCESS SHALL BE LIMITED TO THE

DESIGNATED ROUTES, UNLESS OTHERWISE APPROVED

NOTES:

WORK LIMITS AND SHALL COORDINATE AREAS OF WORK ACTIVITES

BY THE CONTRACTING OFFICER REPRESENTATIVE.

4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING HIS

STORED MATERIALS FROM DAMAGE DUE TO STORM EVENTS

OR GROUNDWATER FLUCTUATIONS.

CONTRACTOR HAS RIGHT OF ACCESS IN THE PERFORMANCE

OF HIS WORK TO THE FOLLOWING LASMA LOCATIONS OUTSIDE

THE DESIGNATED WORK LIMITS AND SITE ACCESS ROUTE:

B. CHICAGO SANITARY AND SHIP CANAL DATUM POINT

C. DES PLAINES RIVER STAFF GAGE

A. BENCHMARK BLA-1, BLA-2, BLA-3

SITE ACCESS ROUTE

LEGEND

D E S

P L

A

IN

E R

D E S

P

L A

IN

E R

A N

A D

A N

A D

ASPHALT ACCESS ROAD

SITE ACCESS ROUTE

D E S

IG

N A T

E D

S

IT

C

C E

U T

E

MWRDGC/LASMA MAINTENANCE AREA

MWRDGC/LASMA VISITOR CENTER

C H

IC

A G

O

S

A N

IT

A

Y

D

S

IP

N A L

C H

IC

A G

O

S

A N

IT

A

Y

D

S

N A L

S E

W A

D

IS

P O S

A L

L

A G

O O

N S

IN

T E R S T

A T E

I-

IN

T E

R S T

A T E

I-

SEE DETAIL A

DETAIL A

USACE TRAILER LOCATION

(FOR REFERENCE ONLY)

NUMBERS (TYP)

FORMER LAGOON

CSX RAILROAD

ILLINOIS CENTRAL GOLF RAILROAD

MWRD RAILROAD

S T

A G

IN

G A

N D A

C C

E S

S S

IT

E P

L A

N S

T O

R A

G E

G-004

5.

6.

BY THE QUARRY OPERATOR.

THE CONTRACTOR MUST FOLLOW ALL SAFETY RESTRICTIONS AS DETERMINED

OCCURRING DAILY IN THE VICINITY OF THE STAGING AND WORK AREAS.

WITH MWRDGC’S CONTRACTORS. BLASTING WILL BE

I-294

ANY ACCESS REQUIRED FOR THE USE OF RAMP 10.

CONTRACT. THE CONTRACTOR SHALL COORDINATE WITH COR FOR

ANY TEMPORARY RAMPS MUST BE REMOVED PRIOR TO COMPLETION OF THE

MWRD AND MAY NOT IMPACT EXISTING CONSTRUCTION OR MINING OPERATIONS.

IF ANY TEMPORARY RAMPS ARE NECESSARY, THEY MUST BE APPROVD BY

UNDER I-294

ACCESS ROAD CROSSES

ACCESS ROAD

FROM LaGRANGE ROAD

ACCESS/ENTRANCE

WORK AREA

RAMP 10 LOCATION

CANAL SIDE RAMP LOCATION

(APPROX. 60’x90’)

AREA

STAGING & STORAGE

CONTRACTOR

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t i m e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

G-005

P H

O T

O S

E X

IS

T

IN

G S

IT

E C

O N

D

IT

IO

N

ARROWS INDICATE DIRECTION OF VIEW IN PHOTO

NOTE:

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t i m e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

G-006

P H

O T

O S

E X

IS

T

IN

G S

IT

E C

O N

D

IT

IO

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t i m e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

G-007

P H

O T

O S

E X

IS

T

IN

G S

IT

E C

O N

D

IT

IO

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t i m e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

G-008

P H

O T

O S

E X

IS

T

IN

G S

IT

E C

O N

D

IT

IO

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t i m e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

G-009

P H

O T

O S

E X

IS

T

IN

G S

IT

E C

O N

D

IT

IO

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t i m e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

G-010

RAMP 10

HAUL TUNNEL LOCATION

MINING HAUL RAMP

ACCESS TO ROCK BENCH

ACCESS TO ROCK BENCH

LOCATION

CANAL SIDE RAMP

P R

O J E

C T S

IT

E C

O N

D

IT

IO

N S

MINING DEWATERING POND

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t i m e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

G -0

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

G -0

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

Parting

Band

Thin Bed

Medium Bed

Thick Bed

Massive

< 0.02’

0.02’ - 0.2’

0.2’ - 0.5’

0.5’ - 1.0’

1.0’ - 2.0’

> 2.0’

TERMS FOR THICKNESS

OF BEDDING

Very soft or plastic

Soft

Moderately hard

Can be indented easily with thumb

Can be scratched with fingernail

Can be scratched easily with knife;

cannot be scratched with fingernail

Hard

Very hard

Difficult to scratch with knife

Cannot be scratched with knife

SCALE OF HARDNESS

TERMS FOR HARDNESS OF BEDROCK

DESCRIPTION

LEGEND FOR BORING TYPE

SHOWN ON EXPLORATION PLANS

Standard Penetration & Cored

DESCRIPTIONSYMBOL

Auger Hole

Standard Penetration

Vertical Core Hole

Angle Core Hole

Cone Penetrometer

Observation Well Installation

Bore Hole with Piezometer or

Resonant Sonic Boring and if sticky, the specimen should be spread out in a thin layer and allowed to lose some moisture by evaporation. Then the specimen is rolled out by hand on a smooth surface or between the palms into a thread about one-eighth inch in diameter. The thread is then folded and rolled repeatedly. During the manipulation the moisture content is gradually reduced is reached.

continued until the lump crumbles.

the more potent is the colloidal clay fraction in the soil. Weakness of the thread at the plastic limit and quick loss of coherence of the lump below the plastic limit indicate either which occur below the A-line.

Highly organic clays have a very weak and spongy feel at the plastic limit.

After removing particles larger than the No. 40 sieve size, a specimen of soil about one-halfAfter removing particles larger then No. 40 sieve size, prepare a pat of water if necessary to make the soil soft but not sticky.

Place the pat in the open palm of one hand and shake horizontally, reaction consists of the appearance of water on the surface of the pat sample is squeezed between the fingers, the water and gloss disappear from the surface, the pat stiffens, and finally it cracks or crumbles.

The rapidity of appearance of water during shaking and of its disap-pearance during squeezing assist in identifying the character of the fines in a soil.

Very fine clean sands give the quickest and most distinct reaction striking vigorously against the other hand several times. A positive which changes to a livery consistency and becomes glossy. When the whereas a plastic clay has no reaction. Inorganic silts, such as a typical

(1) Boundary classifications. Soils possessing characteristics of two groups are designated by combinations of group symbols. For example GW-GC, well-graded gravel-sand mixture with clay binder.

FIELD IDENTIFICATION PROCEDURES FOR FINE-GRAINED SOIL OR FRACTIONS

crumbling between the fingers. This strength is a measure contained in the soil. The dry strength increases with of the character and quantity of the colloidal fraction

After removing particles larger than No. 40 sieve size, mold a necessary. Allow the pat to dry completely by oven, sun, strength. Silty fine sands and silts have about the same slight dry strength, but can be distinguished by the feel when powdering the dried specimen. Fine sand feels gritty feel of flour.

High dry strength is characteristic for clays of the CH group.

A typical inorganic silt possesses only very slight dry whereas a typical silt has the smooth

GW

GP

GM

GC

SW

SP

SM

SC

Well-graded gravels, gravel-sand mixtures, little or no fines.

Poorly-graded gravels, gravel-sand mixtures, little or no fines.

Clayey gravels, gravel-sand-clay mixtures

Well-graded sands, gravelly sands, little or no fines.

Poorly-graded sands, gravelly sands, little or no fines.

Silty sands, sand-silt mixtures.

Clayey sands, sand-clay mixtures.

Typical Names Group

Symbols Major Divisions

1 2 3 4

C o a r s e g r a in e d

S o il s

S a n d s

G r a v e ls

M o r e t h a n h a lf o f c o a r s e f r a c t io n M o r e t h a n h a lf o f c o a r s e f r a c t io n

F o r v is u a l c la s s if ic a t io n t h e in s iz e m a y b e u s e d a s e q u iv a le n t t o

C le n r a v e ls

L it t le o r n o f in e s

G r a v ls w it h

F in e s

A p p r e c ia b le a m o u n t o f f in e s

C le a n

S a n d s

L it t le o f in e s

S a n d s w it h

F in e s

A p p r e c ia b le a m o u n t o f f in e s

Field Identification Procedures

(Excluding particles larger than 3 inches and basing fractions on estimated weights)

Wide range in grain sizes and substantial amounts

Predominantly one size or a range of sizes with some intermediate sizes missing

Nonplastic fines or fines with low plasticity (for

Plastic fines (for identification procedures see CL below)

Wide range in grain size and substantial amounts

Predominantly one size or a range of sizes with some intermediate sizes missing

Nonplastic fines or fines with low plasticity (for

Plastic fines (for identification procedures see

CL below).

Identification Procedures on Fraction Smaller than NO. 40 Sieve Size identification procedures see ML below).

of all intermediate particle sizes.

identification procedures see ML below).

of all intermediate particle sizes

Silty gravels, gravel-sand-silt mixtures

Information Required for

Describing Soils

For undisturbed soils add information on drainage characteristics and hardness of the coarse grains;

pertinent descriptive information, Example:

cementation, moisture conditions and local or geologic name and other and symbol in parentheses.

angular gravel particles 1/2-inch well-compacted and moist in place;

alluvial sand; (SM).

maximum size; rounded and subangular

Give typical name; indicate approximate stratification, degree of compactness percentages of sand and gravel, max.

Silty sand, gravelly; about 20% hard, sand grains coarse to fine; about 15% size, angularity, surface condition, D e t e r m in e p e r c e n t a g e s o f g r a v e l a n d s a n d f r g a in s iz e c u r v e s ie v e s iz e c o a r s e g r a in e d s o il s a r e c la s s if ie d a s f o ll o w s

L e s s t h a n

M o r e t h a n t o

G W

G P

S W

S P

G M

G C

S M

S C

B o r d e r li n e c a s e s r e q u ir in g u s e o f d u a l s y m b o ls

U s e g r a in s iz e c u r v e in id e n t if y in g t h e f r a c t io n s a s g iv e n u n d e r f ie ld id e n t if ic a t io n

Laboratory Classification

Criteria

Atterberg limits above "A" line with PI greater than 7

Atterberg limits below "A" line Limits plotting in hatched zone with

PI between 4 and 7 are borderline cases requiring use of dual symbols.

or PI less than 4

Not meeting all gradation requirements for SW x10

D

D

D60 u

D C =

D

Cc Between 1 and 3

Atterberg limits below "A" line or PI less than 4

Atterberg limits above "A" line with PI greater than 7

Not meeting all gradation requirements for GW

Above "A" line with

PI between 4 and 7 are borderline cases requiring use of dual symbols.

x10

D

D

D60 u

D C = Greater than 6

D

Cc Between 1 and 3

Greater than 4

0 10 20 30 40 50 60 70 80 90 100

CL-ML

CL

CH

OH

MH

ML

Toughness and Dry Strength Increase with Increasing Plasticity Index

A- Lin e

P L

A S

T

IC

IT

Y

IN

D E

X

LIQUID LIMIT

PLASTICITY CHART

For laboratory classification of fine-grained soils

Comparing Soils at Equal Liquid Limit

Dry Strength

(Crushing characteristics)

Dilatancy

(Reaction to shaking)

Toughness

(Consistency near PL)

None to slight Quick to slow None

Medium to high None to very slow Medium

Slight to medium Slow Slight

Slight to medium Slow to none Slight to medium

High to very high None High

None to very slow Slight to medium

Readily identified by color, odor, spongy feel and frequently by fibrous texture.

Example:

For undisturbed soils add information on structure, stratification, consistency in undisturbed and remolded states, moisture and drainage condition.

character of plasticity, amount and maximum size of coarse grains, color geologic name, and other pertinent in parentheses.

in wet condition, odor if any, local or small percentage of fine sand, Give typical name, indicate degree and descriptive information, and symbol

Clayey silt, brown, slightly plastic, numerous vertical root holes, firm and dry in place, loess, (ML).

F in e g r a in e d

S o il s

S il t s a la y s

L iq u id li m it g r e a t e r t h a n

ML

CL

OL

MH

CH

OH

PtHighly Organic Soils Peat and other highly organic soils.

Organic clays of medium to high plasticity organic silts.

Organic silts and organic silty clays of low plasticity.

Inorganic clays of low to medium plasticity, or lean clays.

clayey silts with slight plasticity.

Medium to high

Inorganic silts and very fine sands, rock flour, silty or clayey fine sands or

Organic silts, micaceous or diatomaceous fine sandy or silty soils, elastic silts.

Inorganic clays of high plasticity, fat clays.

gravelly clays, sandy clays, silty clays, S il t s a la y s

L iq u id li m it le s s t h a n

U N I F I E D S O I L C L A S S I F I C A T I O N (Including Identification and Description)

M o r e t h a n h a lf f t e r ia l is la r g e r t h s ie v e s iz e is la r g e r t h s ie v e s iz e is s m a ll e r t h s ie v e s iz e t h s ie v e s iz e

M o r e t h a n h a lf f t e r ia l is s m a ll e r t h s ie v e s iz e

T h s ie v e s iz e is a b o u t t h e s m a ll e s t p a r t ic le v is ib le t o t h e n a k e d e y e

D e p e n d in g o n p e r c e n t a g e o f f in e s f r a c t io n s m a ll e r t h nonplastic fines with low dry strength;

moist soil with a volume of about one-half cubic inch. Add enough rock flour, show a moderately quick reaction.

DILATANCY (Reaction to shaking)

DRY STRENGTH (Crushing characteristics) screening is not intended, simply remove by hand the coarse particles that interfere with the tests.

pat of soil to the consistency of putty, adding water if or air drying, and then test its strength by breaking and

These procedures are to be performed on the minus No. 40 sieve size particles, approximately in. For field classification purposes

After the thread crumbles, the pieces should be lumped together and a slight kneading action inorganic clay of low plasticity, or materials such as kaolin-type clays and organic clays and the specimen stiffens, finally loses its plasticity, and crumbles when the plastic limit inch cube in size, is molded to the consistency of putty. If too dry, water must be added

TOUGHNESS (Consistency near plastic limit)

(2) All sieve sizes on this chart are U.S. standard.

increasiny plasticity.

(BORING NUMBER)

(BORING LOCATION)

LB-101-98

(PROJ. 30’ NW)

NOTE:

LEGEND

(ROCK QUALITY DESIGNATION, %)

G =2.84 166.4

93 11,920

(12/9/98)

-325.0 FINAL ELEV.(CCD)

(DENOTES OVERBURDEN)

-5

E 634501

N 1860810

MEASURED BY ASTM D 2938)

STRENGTH (PSI) AS

(UNCONFINED COMPRESSIVE

GRAVITY)

(DENOTES SPECIFIC

DENSITY, PCF)

(DENOTES WET

SI=0.0242

SD=99.25

BD=1,000

(SWELLING INDEX, ASTM D 4546)

ASTM D 4644)

(SLAKE DURABILITY, 2ND CYCLE %

ASTM D 3967)

(BRAZILIAN DISK TENSILE, PSI

(YOUNG’S MODULUS, PSI)

(BULK MODULUS, PSI

(SHEAR MODULUS, PSI)

(POISSON’S RATIO)

B ó

=6,739,465

=4,314,444

=2,718,283

=0.2397

PROFILE)

PROJECTED ONTO

(DISTANCE BORING

AFTER DRILLING)

READING, 24 HOURS

(DATE OF WATER LEVEL

PROVIDED AS EXAMPLE ONLY

DATA IS NOT FOR LB-101-98,

L=20.0 k=1x10

(LUGEON VALUE)

CM/SEC)

(HYDRAULIC CONDUCTIVITY,

B O

R

IN

G L

E G

E N

D accum at accumulated

A B B R E V I A T I O N S sd sdy sh shy si sis siy sl slcs slick sml sand sandy shale shaly silt siltstone silty slight, slightly siliceous slickenside small scat scattered ln lo ls lt med mic min mod mot mss mst mtl mtx nod

NR

num

OB

occ ool op org lense loose limestone light medium micaceous mineralized, -ization moderate, moderately mottling, mottled massive moist material matrix nodule no recovery numerous overburden (unclassified) occasional, -ally oolite, oolitic open,opened organic part pbl petro

PI

pit

PL

pl pla pln pwdr prob pt

PT

ptg qtz rec partially pebble petroleum, petroliferous plasticity index pit, pitted, pitting plastic limit plastic platy plane powder, powdered probable, probably paper-thin pressure test parting quartz recovered

LL liquid limit el est excl extr f fe fld fm fos frac frag fri fsl gen glau gr gra grad grn grt gvl gyp elevation estimate,-ed excluding extremely fine, finely iron filled formation fossil, fossiliferous fracture fragment friable fissle generally glauconite, -itic gray grain, grained gradational green grout gravel, gravelly gypsum h/a hd hem hld hor imbdd incl intbdd intlam irr jt l/a lam

LC

LDW

lea lg lig lim high angle hard hematite healed horizontal imbedded including interbed, interbedded interlaminated irregular, irregularly joint low angle lamina, -ae, -ated lost core lost drill water leached large lignitic limonite

DWR drill water retained drv drive bky bl bld

BOH

blocky black boulder bottom of hole br brec brk c cal calc brown brecciated broken coarse calcite calcareous carb cav cbl

CD

cem

CH

cht circl cl cly cmtd col conc congl crm d dis dk dmp dol carbonaceous cavity cobble corrected depth cement core in hole chert circulation clay clayey cemented columnar concrete conglomerate crumbly dense disseminated dark damp dolomite, dolomitic drl drilling

BK back alt ang approx argil bbl bdd bdr bifur angular alternating approximate, -mately argillaceous barrel bedded, bedding bedrock bifurcating

AH ahead rk rnd

RQD

sat rock round rock quality designation saturated

REF refusal so soln soft solution, -tioned, -tioning ss st stf strg styl stylc sur ti

TR

sandstone stain, -ed, -ing stiff stringer stylolite stylolitic surface tight top of rock tr

UL

unacct var v vert vgy w/ wea wht

WL

WT

x-bdd xl xln yel trace unaccountable loss unaccountable variable very vertical vuggy with weathered white water level water table cross-bedded crystal crystalline yellow

SPT std. penetration test smpl sample

* When using as the plural form add "s"

BE DETERMINED BY SEPARATE OBSERVATIONS. WATER LEVEL READINGS WERE NOT TAKEN ON EVERY

HOLE FOR VARIOUS REASONS. THE ABSENCE OF A READING DOES NOT INDICATE THE ABSENCE OF

SOME OF THE EXPLORATORY BORINGS ARE PROJECTED ON THE SOIL AND ROCK PROFILES.

GENERAL NOTES

FOR DISTANCES, SEE PLANS OF EXPLORATION.

ACTUAL LEVEL OF GROUNDWATER ON ANY DATE OTHER THAN THAT SHOWN ON THE LOGS MUST

"DRILLING REFUSAL" IS DEFINED AS THE POINT BEYOND WHICH FURTHER PENETRATION IS

IMPRACTICABLE WITH THE EXPLORATION METHOD USED.

SOILS NOT CLASSIFIED OR OTHERWISE DIFFERENTIATED OVERLYING TOP OF ROCK IS DENOTED

AS "OVERBURDEN."

WHICH SHOULD HAVE BEEN RECOVERED AND EXPRESSED AS A PERCENTAGE.

RECOVERED OVER 4 INCHES IN LENGTH ARE ADDED THEN DIVIDED BY THE TOTAL LENGTH OF CORE

GROUNDWATER LEVELS WILL VARY IN ACCORDANCE WITH RAINFALL AND POOL STAGES, THEREFORE

GROUNDWATER.

RQD IS A MEASURE OF THE ROCK QUALITY AS DEFINED BY DR. DAN DEERE. ALL LENGTHS OF CORE

WATER ELEVATIONS INDICATED ON BORING LOGS MAY HAVE BEEN INFLUENCED BY DRILLING FLUID

WATER ELEVATION.

OR AN INSUFFICIENT PASSAGE OF TIME TO PERMIT BORING TO REFLECT ACTUAL GROUND

ALL ELEVATIONS ARE IN FEET AND REFER CHICAGO CITY DATUM (CCD).

TOP OF ROCK ELEVATION MAY VARY LOCALLY.

2.

3.

4.

5.

6.

7.

8.

9.

DRILLING INFORMATION.

BORING LOGS FOR THIS WORK ARE INCLUDED IN SPECIFICATIONS SECTON 00 31 32.00 01 SUBSURFACE1.

"SPLITSPOON REFUSAL" IS DEFINED AS A BLOW COUNT GREATER THAN 50 BLOWS-PER-HALF FOOT

OF TOOL ADVANCEMENT WHEN CONDUCTING STANDARD PENETRATION DRILLING.

ENGINEERING PURPOSES", L. KIRKALDIE, ED., ASTM 1984.

2. DEERE, D.U., AND DEERE, D.W. 1988. "THE ROCK QUALITY DESIGNATION (RQD) INDEXING PRACTICE FOR

U.S. SYMP. ROCK MECH., AIME, NEW YORK, PP. 237 - 302.

1. DEERE ET AL (1967). "DESIGN OF SURFACE AND NEAR SURFACE CONSTRUCTION IN ROCK", PROC, 8TH

REFERENCES:

B-101

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps auto _tim e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

B -1

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

B -1

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps auto_time

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R S

Y P

S

B -1

.d g n c p w w o rk in g \d m s \M

C

R S

Y P

S

B -1

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

LB-105-98

LB-102-98

LB-101-98

LB-107-98

LB-104-98

LB-103-98

STS-B-1

STS-B-4

STS-B-5

LB-110-98

LB-111-98

LB-106-98

JO

LI

ET

RD.

I.

C .G

.R

D E S

P

L A

IN

E R

S T E

V E

N S

O N

E X P

R E S S

W A

Y

67TH ST.

LB-118-98

LB-104A-98

LB-117-98

LB-115-98

LB-114-98

LB-113-98

LB-103A-98

LB-116-98

LB-112-98

STS-B-119A

STS-B-119

STS-B-101A

STS-B-101

STS-B-102

STS-B-103

STS-B-103A

STS-B-104

STS-B-105

STS-B-106

STS-B-105A

STS-B-107

STS-B-107A

TSC-B-8

TSC-B-20A

TSC-B-19A

TSC-B-18A

TSC-B-17A

TSC-B-9

TSC-B-16A

TSC-B-15A

TSC-B-14A

TSC-B-13A

TSC-B-12A

TSC-B-10

TSC-B-11A

TSC-B-10A

TSC-B-11

TSC-B-9A

TSC-B-8A

TSC-B-6A

TSC-B-12

TSC-B-5A

TSC-B-4A

TSC-B-3A

TSC-B-2A

TSC-B-1A

TSC-B-7A

S A

N

IT

A R

Y

S

N A L

STS-B-104A

STS-B-104B

LAGOON 2

LAGOON 1

LAGOON 3

LAGOON 4

LAGOON 5

LAGOON 6

LAGOON 7

LAGOON 8

LAGOON 9

LAGOON 10

LAGOON 16

CUT-OFF WALL

LB-104B-99

LB-115A-99

LAGOON 17

LAGOON 18

TP3-2-98

TP3-1-98

TP10-1-98

TP10-2-98

M

N

O

P

Q

R

S

T

U

V

W

X

Y

Z

A A

C C

B B

+0

+0

+0

+0

IL

L

IN

IS

N T

R

U

F

C

X

SECTION

TEST

C H

IC

A G

O

STS-B-2

LB-108-98

D

P

A

IN

E R

D

P

A

IN

E R

SEECO-B-50

LB-111-98

TSC-B-7A

STS-B-119

TP10-2-98

ACCESS SHAFT 8

N

PLATFORM

*UNDER WORK

BACKFILL

*UNDER

TRANSDUCER

*PACKED W/

PREVIOUS INVESTIGATIONS

BOREHOLE COMPLETED BY OTHERS DURING

BOREHOLE COMPLETED BY

PATRICK ENGINEERING INC., 1998

PATRICK ENGINEERING INC., 1998

APPROXIMATE LOCATION OF TEST

PIT COMPLETED BY

LEGEND:

LAGOON 19

LAGOON 20

LAGOON 21

LAGOON 22

LAGOON 23

NOTES:

1.

2.

S T

A G

E

S T

A G

E

2 INCLUDED IN SPECIFICATION SECTION 00 31 32.00 01.

LOGS FOR BOREHOLES LOCATED WITHIN STAGE 1 AREA ARE

AT USACE OFFICE FOR INSPECTION.

LOGS FOR BOREHOLES LOCATED IN STAGE 2 AREA ARE AVAILABLE

SEECO-B-61

SEECO-B-62

SEECO-B-68

SEECO-B-77

SEECO-B-78

SEECO-B-81

SEECO-B-82

SEECO-B-48

SEECO-B-57

SEECO-B-65

SEECO-B-66

SEECO-B-74

SEECO-B-80

SEECO-B-83

SEECO-B-79

SEECO-B-82 BOREHOLE COMPLETED BY SEECO 2001

B O

R E

H O

L E L

O C

A T

IO

N P

L A

N

SCALE: 1" = 400’

400’400’

B-102

N 1,864,111.73

E 1,121,996.03

D

D

Office Shop Concrete Pad

ComEd

NORTH FACE OF GABION WALL

D

D

D

D

D

D D

D

1131+00

1132+00

1133+0

1134+00

1165+00

1166+00

1167+00

1168+00

1169+00

1170+00

1171+00

1172+00

1103+00

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps a u t o t im e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R R

Y P

S

C -1

.d g n c p w w o rk in g \d m s \M

C

R R

Y P

S

C -1

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A

K

J

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

EL. -283

EL. -30 +/-

EL. -204

WIER CREST

EL. -200

WEIR LIP

EL. -30 +/-

EL. -284

PROPOSED RESERVOIR LONGITUDINAL SECTION A-A

RAMP @ 10%

RESERVOIR

AROUND ENTIRE

APPROX 25’ WIDE BENCH FUTURE

FUTURE

FUTURE R

AMP @ 10

(FUTURE)

TUNNEL WITH FLAP GATE

1 - 11.5 ’ DIA. CONNECTING

ROCK FACE

EXISTING

FUTURE RAMP @ 10%

C-101

600’0 300’

SCALE:1"=300’

NN

A

MINING LINE

FLOOR ELEV. -284

STAGE 1

600’0 300’

SCALE:1"=300’

A

300’0 150’

SCALE:1"=150’

HORIZONTAL

VERTICAL

WL02

WL01

WL08

WL07

WL06

WL05

WL04

WL03

1120467.29WL08 1861482.16

1119739.16WL07 1861966.18

1119831.96WL06 1862200.01

WL05 1862338.89 1119814.24

1120117.96WL04 1862770.38

1121340.12WL03 1863740.99

1121812.34WL02 1864251.71

1122184.97WL01 1863995.11

POINT NORTHING EASTING

WORK LIMITS

(NOT INCLUDED)

FLOOR ELEV. -283

STAGE 2

EL. -283

STAGE 2

STAGE 1

A N

D W

O R

K L

IM

IT

S

P L

A N A

N D P

R O

F

IL

E

OPTION 2 STA 1131+65 TO 1134+20

OPTION 1 STA 1100+00 TO 1131+65

BASE STA 1134+20 TO 1164+00

MESH IS PLANNED TO BE INSTALLED.

THE BASE OF THE ROCK WALL BELOW AREAS WHERE

OF THE RESERVOIR. THIS LINE IS LOCATED AT

THE EDGE OF THE MINING HAUL RAMP INTO STAGE 1

HDPE STORMWATER DISCHARGE PIPE LOCATED ALONG

CONTRACTOR SHALL PROTECT IN PLACE EXISTING

NOTE:

1160 1861856.72 1120682.89

1155 1862269.80 1120964.59

1150 1862683.57 1121244.09

1145 1863088.74 1121536.90

1140 1863497.52 1121824.34

1135 1863911.25 1122103.04

1134 1863981.46 1122074.47

1131 1864132.86 1121822.12

1121739.691130 1864117.29

1125 1863747.29 1121403.73

1121027.661120 1863418.78

1120629.741115 1863116.31

1120232.441110 1862812.58

1119864.301104 1862341.62

SIGN NORTHING EASTING

SIGN LOCATIONS

FUTURE RAMP

TO CURRENT FLOOR ELEVATION

EXISTING MINING HAUL RAMP

FUTURE RAMP

RESERVOIR PLAN

(NOT EXCAVATED)

TO CURRENT FLOOR ELEVATION

EXISTING MINING HAUL RAMP

THIS AREA.

FOR ANY CONSTRUCTION OPERATIONS IN

VULCAN MATERIALS (QUARRY OPERATOR)

CONTRACTOR MUST COORDINATE WITH

ALL OF STAGE 1 IS A WORKING QUARRY.

NOTE:

ROCK JOINT CONDITIONS

BE MODIFIED BASED ON

ALIGNMENT OF WEIR FACE MAY

FUTURE WEIR CREST -204

EXISTING RAMP 10

(EST. COMPLETION DEC 2012)

FUTURE CANAL SIDE RAMP

EXISTING GABION WALL

1105+00 1106+00 1107+00

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps au to

_t im e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R R

Y P

S

C -2

.d g n c p w w o rk in g \d m s \M

C

R R

Y P

S

C -2

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

C-201

S T

A T

O S

T A

R O

C K W

A L L E

L E

V A

T

IO

N

LEGEND

TIGHT, NO FILL

N48E/85NW

J1105+35.00

RUBBLE PILE

FULL CASTS BEHIND WEDGE

1-3 FT. OVERHANGS WITH

CLAY FILLED

GREEN

TIGHT-3�,

N51W/89SE

J1105+82.05

1-3�

GREEN CLAY FILLED BEDS

CLAY FILLED VUGS 1-2 FT.

WALL STRIKE APPROX. N42E

SEEP

DISPLACEMENT

DIRECTION INTO WALL

ARROW DENOTES PLUNGE

SUB-PARALLEL JOINT

PERPENDICULAR TO WALL

STRIKE ROUGHLY

ORTHOGONAL JOINT

SPOT DOWELS

MECHANICAL SCALING

N35E

J1106+15.12

CLAY FILLED

3� GREEN

N50W/90

J1106+24.00

TIGHT

N35E/85NW

J1106+53.15

0.5�, NO FILL

N35E/84SW

J1106+50.25

WALL STIKE APPROX. N34E

1 FT. OFFSET

CLAY FILLED

6� GREEN

N40W/81SE

J1106+60.00

CLAY FILLED

3� GREEN

N30W/89SW

J11060+55.00

TIGHT

N37W/85SW

J1106+91.00

3� OFFSET

1-2�

GREEN CLAY BEDS

1. ELEVATIONS, STATIONING, DEPTHS, AND LOCATIONS OF FEATURES ARE APPROXIMATE.

NOTES:

10 FT EMBEDMENT

2 - #8 ROCK DOWELS

APPROX DEPTH (FT)

1107+00 1108+00 1109+00

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps au to

_t im e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R R

Y P

S

C -2

.d g n c p w w o rk in g \d m s \M

C

R R

Y P

S

C -2

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

C-202

LEGEND

SEEP

DISPLACEMENT

DIRECTION INTO WALL

ARROW DENOTES PLUNGE

SUB-PARALLEL JOINT

PERPENDICULAR TO WALL

STRIKE ROUGHLY

ORTHOGONAL JOINT

SPOT DOWELS

MECHANICAL SCALING

1. ELEVATIONS, STATIONING, DEPTHS, AND LOCATIONS OF FEATURES ARE APPROXIMATE.

NOTES:

S T

A T

O S

T A

R O

C K W

A L L E

L E

V A

T

IO

N

N35E/85NW

J1107+05.15

RUBBLE PILE

CHERT BEDS 1-2�

GREEN CLAY BEDS 1-2�

GREEN CLAY FILLED

TIGHT-3� APERTURE

N40W/90

J1107+42.00

N35E/85SW

J1107+65.12

CHERT BEDS 1-2�

N40E/85NW (APPROX.)

SEEP, DRIPPING

NE SET

0.5�, NO FILL

N45W/90

J1108+48.00

WET

CLAY FILLED

6� GREEN

N45W/90

J1108+57.00

TIGHT

N45W/85SE

J1108+51.00

N10W/57NE (APPROX.)

N45W/90 (APPROX.)

J1108+59.00

CLAY FILLED

1� GREEN

N45W/90

J1108+95.00

SURFACE RUNOFF, FLOWING

DISPLACEMENT

6� HORIZONTAL

10 FT EMBEDMENT

5 - #8 ROCK DOWELS

DEPTH (FT)

1109+00 1110+00 1111+00

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps au to

_t im e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R R

Y P

S

C -2

.d g n c p w w o rk in g \d m s \M

C

R R

Y P

S

C -2

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

LEGEND

SEEP

DISPLACEMENT

DIRECTION INTO WALL

ARROW DENOTES PLUNGE

SUB-PARALLEL JOINT

PERPENDICULAR TO WALL

STRIKE ROUGHLY

ORTHOGONAL JOINT

SPOT DOWELS

MECHANICAL SCALING

1. ELEVATIONS, STATIONING, DEPTHS, AND LOCATIONS OF FEATURES ARE APPROXIMATE.

NOTES:

S T

A T

O S

T A

R O

C K W

A L L E

L E

V A

T

IO

N

C-203

SEEP, DRIPPING

SEEP, DRIPPING SEEP, DAMP

SEEP, DRIPPING

SEEP, DRIPPING

CLAY FILLED

1� GREEN

N45W/85SE

J1109+35.00

TIGHT

N45W/80NE

J1190+41.00

0.25-1.0� GREEN CLAY FILLED

N60W/85SE

J1109+70.00

SEEP, DAMP

1-3� GREEN CLAY FILLED

N40W/90

J1110+11.00

1-2� GREEN CLAY

N40W/90

J1110+43.00.00

SEEP, DAMP

FACE OBSCURED BY RUBBLE PILE

1� GREEN CLAY

N40W/90

J1110+60.00

N40W/90

J1110+78.10

DEPTH (FT)

1111+00 1112+00 1113+00 1114+00

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D

2 3

C

4 5

A

B

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D of Engineers

US Army Corps auto _tim e

Chicago District

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

/1

/2

M C

R R

Y P

S

C -2

.d g n c p w w o rk in g \d m s \M

C

R R

Y P

S

C -2

.d g n

SHEET OF

D E

S C

R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E D

E S

C R

IP

T

IO

N M

A R

K T

R A

C K

IN

G N

O

A C

T

IO

N D

A T

E

A R

K

J O

H N G

R O

B O

S K I, P .E

/7 /1

C O

N -0

-B -N

U M

B

M R -P -6

/2

S T

A G

E

B R

O C

K W

A L L S

T A

B

IL

IZ

A T

IO

N P

S M c C

O O

K R

E S

E R

V O

IR

A S S

H O

W N

R O

B E

R T G P

A L

U C

H P .E

D R

S W

P -1

-R -0

C-204

S T

A T

O S

T A

R O

C K W

A L L E

L E

V A

T

IO

N

LEGEND

1. ELEVATIONS, STATIONING, DEPTHS, AND LOCATIONS OF FEATURES ARE APPROXIMATE.

NOTES:

APPROX. N40E/90

J1111+20.15

SURFACE RUNOFF, DRIPPING

WALL STRIKE APPROX. N62E

GREEN CLAY FILLED

2-7� APERTURE

N59W/90

J1111+38.00

N40E/90

J1112+00.05

WALL STRIKE APPROX. N55E

NE SET

NW SET

NE SET

0.5�, NO FILL

N47E/85SW

J1112+90.00

FILLED

GREEN CLAY

0.5-1.0�

N45W/90

J1112+68.93

WALL STRIKE APPROX. N70E

0.25-0.5� APERTURE

N45E/90

J1113+20.55

GREEN CLAY FILLED

1� APERTURE

N40W/90

J1113+20.00 0.5�

N45E/90

J1113+50.00

0.5-1.0� APERTURE

N45E/90 (APROX.)

J1113+35.55

SEEP

DISPLACEMENT

DIRECTION INTO WALL

ARROW DENOTES PLUNGE

SUB-PARALLEL JOINT

PERPENDICULAR TO WALL

STRIKE ROUGHLY

ORTHOGONAL JOINT

SPOT DOWELS

MECHANICAL SCALING

10 FT EMBEDMENT

4 - #8 ROCK DOWELS

15 FT EMBEDMENT

50 - #8 ROCK DOWELS

DEPTH (FT)

RUBBLE PILE

File details come from the government source that posted it. Updated .