AMENDMENT NO. 0003 IS CONTAINED IN THIS FILE. A REVISED BID SCHEDULE IS INCLUDED THEREIN AND MUST BE SUBMITTED ALONG WITH THE OTHER ITEMS CALLED OUT IN THE IFB.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P6-09-B-0011
W81G6690691047
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30 STANDARD FORM 30 (Rev 10-83)
SUBJECT: INVITATION FOR BIDS NUMBER W912P6-09-B-0011, CHICAGO LOCK GATES REPLACEMENT AT THE CHICAGO HARBOR LOCK, CHICAGO HARBOR, CHICAGO, IL
The government is issuing this Amendment Number 0003 to its previously issued Solicitation W912P6-09-B-0011 for the purpose of amending various areas of the Solicitation package as delineated on the follow ing pages of this Amendment.
THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jun-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-09-B-0011
(Signature of Contracting Officer)(Signature of person authorized to sign)
X 9B. DATED (SEE ITEM 11)
22-May-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jun-2009
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
111 NORTH CANAL STREET SUITE 600
CHICAGO IL 60606-7206
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
A. BID OPENING DATE: The BID OPENING DATE AND TIME IS NOT CHANGED by this Amendment; therefore, Bids are due to the USACE-Chicago District no later than 4:00 p.m.
(CDT) on 1 July 2009. Detailed information regarding the submission of bids is located in Section L of the Solicitation document.
B. AMENDED SOLICITATION SECTION:
The ENTIRE Amended/Revised Section B, as provided under Amendment 0002 is hereby deleted in its entirety and replaced with the Revised Bid Schedule contained hereunder. The respective change is as follows:
Bid Item No. 0022 is revised to delete the words “Furnish AND” from the line item description.
C. AMENDED PROJECT SPECIFICATION SECTION: The following Specification Section has been amended as delineated below; bidders shall remove the affected page and replace it with the respective revised page attached hereto.
Measurement and Payment Section 01 22 00.00 has been revised; the change occurs on page 6, paragraph 1.1.15.1 and attached herewith.
D. IMPORTANT NOTES: CLIN 0005 refers to HYDRAULIC POWER SYSTEM not the gates;
furnishing the west gates is identified in CLIN 0003 and the furnishing the east gate is identified in CLIN 0004.
E. POINT OF CONTACT: The point of contact for this Amendment is Regina G. Blair at (312) 846-5371.
(End of Summary of Changes)
REVISED Section B - Supplies or Services and Prices
(AMENDMENT 0003)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum
MOBILIZATION AND DEMOBILIZATION
FIRM-FIXED-PRICE (FFP)
PURCHASE REQUEST NUMBER: W81G6690691047
NET AMT
0002 1 Lump Sum
TEMPORARY CONSTRUCTION FACILITIES
FFP
0003 1 Lump Sum
FABRICATION & PAINTING OF WEST SECTOR
GATES
0004 1 Lump Sum
FABRICATION & PAINTING OF EAST SECTOR
GATES
ITEM NO SUPPLIES/SERVICES
FURNISH & STORAGE HYDRAULIC POWER
SYSTEM
This Line Item identifies the work description that relates directly to Sub-line Items 0005AA AND 0005AB. The Sub-line Items themselves identify the quantities required to execute the work associated with this Line Item. Therefore, the Contractor shall provide its pricing separately at Sub-line Items 0005AA AND
0005AB.
0005AA 1 Lump Sum
FURNISH & STORAGE HYDRAULIC POWER
SYSTEM FOR THE WEST GATES
0005AB 1 Lump Sum
FURNISH & STORAGE HYDRAULIC POWER
SYSTEM FOR THE EAST GATES
0006 1 Lump Sum
BULKHEAD PLACEMENT & DEWATERING - WEST
GATES
0007 1 Lump Sum
DEMOLITION - WEST GATES
0008 1 Lump Sum
INSTALLATION OF WEST SECTOR GATES
- INCLUDES INSTALLATION OF WEST GATES, INSTALLATION OF ALL
HYDRAULIC POWER COMPONENTS, ELECTRICAL POWER & CONTROL
SYSTEM, CONCRETE WORK AND ALL OTHER WORK NECESSARY FOR
INSTALLATION OF WEST GATES.
0009 1 Lump Sum
EMERGENCY STANDBY EQUIPMENT
THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for actual standby costs associated with this bid item, not to exceed its bid price. Therefore, the government will not pay more than the total line item amount for this bid item. Should the contractor exhaust its budget (bid price) for this line item because additional standby time is deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price. However, the contractor shall NOT incur any additional costs or perform any additional services outside of the bid price until the government has authorized the contractor to proceed with the additional standby services.
The contractor shall coordinate the services of this line item with the Contracting Officer’s Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor’s submission of its invoice for this item.
Payment will be made for costs associated with providing additional equipment, towboat, barges, etc. to be available 24/7 for the emergency removal of bulkheads.
The COR is responsible for processing payments. The contractor shall provide the COR with paid invoices and all other supporting cost information for the verification of the Contractor’s expenditures for this line item.
NOT TO EXCEED
0010 20 Days
PHASE I - ALERT
reimburse the Contractor for actual costs associated with this bid item, not to exceed its bid price. Therefore, the government will not pay more than the total line item amount for this bid item. Should the contractor exhaust its budget (bid price) for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price. However, the contractor shall NOT incur any additional costs or perform any additional services outside of the bid price until the government has authorized the contractor to proceed with the additional services.
The contractor shall coordinate the services of this line item with the Contracting Officer’s Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor’s submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
0011 10 Days
PHASE II - INITIATE RECALL & SECURE WORK
AREA
THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for actual costs associated with this bid item, not to exceed its bid price. Therefore, the government will not pay more than the total line item amount for this bid item. Should the contractor exhaust its budget (bid price) for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price. However, the contractor shall NOT incur any additional costs or perform any additional services outside of the bid price until the government has authorized the contractor to proceed with the additional services.
The contractor shall coordinate the services of this line item with the Contracting Officer’s Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor’s submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
0012 1 Each
PHASE III - EVACUATE WORK AREA &
RE-WATER GATE BAY
THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for actual costs associated with this bid item, not to exceed its bid price. Therefore, the government will not pay more than the total line item amount for this bid item. Should the contractor exhaust its budget (bid price) for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price. However, the contractor shall NOT incur any additional costs or perform any additional services outside of the bid price until the government has authorized the contractor to proceed with the additional services.
The contractor shall coordinate the services of this line item with the Contracting Officer’s Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor’s submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
0013 11 Each
PHASE IV - REMOVE BULKHEADS
exceed its bid price. Therefore, the government will not pay more than the total line item amount for this bid item. Should the contractor exhaust its budget (bid price) for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price. However, the contractor shall NOT incur any additional costs or perform any additional services outside of the bid price until the government has authorized the contractor to proceed with the additional services.
The contractor shall coordinate the services of this line item with the Contracting Officer’s Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor’s submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
ITEM NO SUPPLIES/SERVICES
PHASE V - RECOVERY
This Line Item identifies the work description that relates directly to Sub-line Items 0014AA AND 0014AB. The Sub-line Items themselves identify the quantities required to execute the work associated with this Line Item. Therefore, the Contractor shall provide its pricing separately at Sub-line Items 0014AA AND
0014AB.
0014AA 11 Each PHASE V – RECOVERY: Re-install Bulkheads exceed its bid price. Therefore, the government will not pay more than the total line item amount for this bid item. Should the contractor exhaust its budget (bid price) for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price. However, the contractor shall NOT incur any additional costs or perform any additional services outside of the bid price until the government has authorized the contractor to proceed with the additional services.
The contractor shall coordinate the services of this line item with the Contracting Officer’s Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor’s submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
0014AB 1 Lump Sum PHASE V – RECOVERY: Restore Dewatered Area exceed its bid price. Therefore, the government will not pay more than the total line item amount for this bid item. Should the contractor exhaust its budget (bid price) for this line item because additional services are deemed necessary, the government may negotiate a fair and reasonable price with the contractor to make adjustments to the contract price. However, the contractor shall NOT incur any additional costs or perform any additional services outside of the bid price until the government has authorized the contractor to proceed with the additional services.
The contractor shall coordinate the services of this line item with the Contracting Officer’s Representative (COR) such that compliance with the ceiling price of this item and the tasks performed, the associated level of effort, and scheduling can be verified. Therefore, any work performed in association with this line item must be verified by the COR prior to the contractor’s submission of its invoice for this item.
The COR is responsible for processing payments. The contractor shall provide the
0015 400 Linear
Foot
PRESSURE INJECTED CRACK REPAIR -
WEST GATE BLOCK
THIS IS A COST REIMBURSABLE LINE ITEM - Payment will be made for all costs associated with existing crack as determined by the COR. Refer to the Concrete Repair Notes on Sheet-S40 of the Engineering Drawings.
0016 400 Linear
PRESSURE INJECTED CRACK REPAIR -
EAST GATE BLOCK
THIS IS A COST REIMBURSABLE LINE ITEM - Payment will be made for all costs associated with existing crack as determined by the COR. Refer to the Concrete Repair Notes on Sheet-S40 of the Engineering Drawings.
0017 400 Square
CONCRETE SPALL REPAIRS ON VERTICAL
RECESS WALLS - WEST GATE BLOCK
THIS IS A COST REIMBURSABLE LINE ITEM - Payment will be made for all costs associated with spalled and deteriorated areas as determined by the COR.
Refer to the Concrete Repair Notes on Sheet-S40 of the Engineering Drawings.
0018 400 Square
CONCRET SPALL REPAIRS ON VERTICAL
RECESS WALLS - EAST GATE BLOCK
THIS IS A COST REIMBURSABLE LINE ITEM - Payment will be made for all costs associated with spalled and deteriorated areas as determined by the COR.
Refer to the Concrete Repair Notes on Sheet-S40 of the Engineering Drawings.
0019 1 Lump Sum
PERFORMANCE AND PAYMENT BONDS
FOR LINE ITEMS 0001 THROUGH 0018
THIS IS A COST REIMBURSABLE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
0020 1 Lump Sum
OPTION DEMOLITION - EAST GATES
FFP
AWARD OF THIS OPTION ITEM: At the discretion of the government, this item may be unilaterally awarded by the government, at the price set forth herein, no later than 90 calendar days following the contractor's acknowledgement of the Notice to Proceed.
0021 1 Lump Sum
OPTION BULKHEAD PLACEMENT & DEWATERING
EAST GATES
AWARD OF THIS OPTION ITEM: At the discretion of the government, this item may be unilaterally awarded by the government, at the price set forth herein, no later than 90 calendar days following the contractor's acknowledgement of the Notice to Proceed.
0022 1 Lump Sum
OPTION INSTALLATION OF EAST SECTOR GATES
- INCLUDES INSTALLATION OF EAST GATES, INSTALLATION OF ALL
HYDRAULIC POWER COMPONENTS, ELECTRICAL POWER & CONTROL
SYSTEM, CONCRETE WORK AND ALL OTHER WORK NECESSARY FOR
INSTALLATION OF EAST GATES.
AWARD OF THIS OPTION ITEM: At the discretion of the government, this item may be unilaterally awarded by the government, at the price set forth herein, no later 90 calendar days following the contractor's acknowledgement of the Notice to Proceed.
0023 1 Lump Sum
OPTION PERFORMANCE AND PAYMENT BOND
FOR LINE ITEMS 0017 THROUGH 0022
THIS IS A COST REIMBURSABLE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
AWARD OF THIS OPTION ITEM: At the discretion of the government, this item may be unilaterally awarded by the government, at the price set forth herein, no later 90 calendar days following the contractor's acknowledgement of the Notice to Proceed.
TOTAL BID PRICE (ITEMS 0001 THROUGH 0023): $___________________
Lock Gate Replacement, Chicago Lock W912P6-09-B-0011
1.1.11.2 Unit of Measure
Unit of Measure: lump sum (LS)
1.1.12 Performance and Payment Bond (Bid Item 0019)
1.1.12.1 Payment
Payment will be made for the performance and payment bonds that are required as part of this contract for bid items 0001 through 0018. The Government will pay the actual cost of the bonds or the Contractor's bid price, whichever is less.
1.1.11.2 Unit of Measure
Unit of Measure: lump sum (LS)
1.1.13 Demolition - East Gates (Optional Bid Item 0020)
1.1.13.1 Payment
Payment for demolition of designated structures or parts of structures associated with the East Gates will be at the contract lump sum prices.
Off-site disposal of unusable material and debris shall be incidental to Demolition.
1.1.13.2 Unit of Measure
Unit of Measure: lump sum (LS)
1.1.14 Bulkhead Placement and Dewatering - East Sector Gates (Optional Bid Item 0021)
1.1.14.1 Payment
Payment for all labor, transportation of bulkheads and lifting beam, bulkhead placement, dewatering, monitoring concrete floor deflection and pumping for the East Gates installation.
1.1.14.2 Unit of Measure
Unit of Measure: lump sum (LS)
1.1.15 Installation of East Sector Gates (Optional Bid Item 0022)
1.1.15.1 Payment
Payment will be made for costs associated with installing East Gates and appurtenant items, which includes full compensation for the materials, delivery, installation, and testing of sector gates and appurtenant items including concrete work, electrical power & control system, all hydraulic power components, bubbler system, gate leaves, pintle assemblies, hinge assemblies, seal assemblies, rack assemblies, pinion assemblies, walkways, bumpers, fenders, spare parts, and other items necessary for complete installation.
SECTION 01 22 00.00 10 - Page 6
AMD-0003
| AMD 0001 CHICAGO LOCK GATES REPLACEMENT.pdf |
| Page 6 from 01 22 00 00 10 |