This document is a solicitation for a fixed-price, supply/construction contract to replace three generator step-up (GSU) transformers at the Wolf Creek Power Plant. The government is seeking proposals to design, manufacture, deliver, offload, install, and commission three 90,000/150,000 kVA, 161 kV GSU transformers. The contract includes a mix of firm-fixed-price and fixed-price economic price adjustment line items for the supply portion and firm-fixed-price construction line items for the installation work. The delivery date for the transformers is 1,358 calendar days after contract award, with the construction work to be completed within 613 calendar days after issuance of the construction notice to proceed. The solicitation includes wage determinations, options for additional design and construction work, and various FAR and DFARS clauses. Proposals are due by 02:00 PM local time on 04 Dec 2024.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 04 Dec 2024
X
A
X B
X C
D
EX
X
G
F 83 - 93
X H alison.t.abernathy@usace.army .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-C2 1 149
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912P5 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
PIEE.gov conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ALISON T ABERNATHY (615)736-7921
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 6
7 - 24
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
25 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
26 - 27
28 - 31 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 32 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 33 - 35 M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
36 - 81
PART II - CO NTRACT CLAUSES
CONTRACTING DIVISION
110 9TH AVE N
NASHVILLE TN 37203
615-736-7986
615-736-7124FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
06 Aug 2024
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912P524R0004
Section 00900 - Wage Determinations
WAGE DETERMINATION
"General Decision Number: KY20240058 07/05/2024
Superseded General Decision Number: KY20230058
State: Kentucky
Construction Type: Heavy
Counties: Adair, Barren, Casey, Clinton, Cumberland, Green, Hart, Knox, Laurel, Logan, Marion, McCreary, Metcalfe, Pulaski, Russell, Simpson, Taylor, Wayne and Whitley Counties in Kentucky.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.20 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2024. |
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $12.90 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/05/2024
1 03/01/2024
2 05/31/2024
3 07/05/2024
CARP0064-007 04/01/2024
Rates Fringes
CARPENTER (Form Work Only).......$ 32.90 23.37
ELEC0369-004 09/04/2023
LINE CONSTRUCTION
Equipment Operator..........$ 38.76 23%+7.00
Groundman...................$ 25.51 23%+7.00
Lineman.....................$ 43.41 23%+7.00
* ENGI0181-010 07/01/2024
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.05 19.10
GROUP 2.....................$ 37.19 19.10
GROUP 4.....................$ 36.87 19.10
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Crane; Drill; Grader/Blade; Mechanic; Scraper
GROUP 2 - Bobcat/Skid Steer/Skid Loader; Forklift
GROUP 4 - Oiler
Operators on cranes with booms 150 feet and over (including jib) shall receive $1.00 above Group 1 rate; 250 feet and over including jib shall receive $1.50 above Class 1 rate.
Combination Rate: All crane operators operating cranes, where the length of the boom in combination with the length of the piling leads equal or exceeds 150 feet, shall receive $1.00 above the Group 1 rate.
Employees assigned to work below ground level are to be paid 10% above basic wage rate. This does not apply to open cut work.
IRON0782-010 08/01/2023
IRONWORKER (Reinforcing &
Structural)
Projects over
$20,000,000.00..............$ 34.75 25.52
Projects under
$20,000,000.00..............$ 33.01 25.52
LABO0189-014 07/01/2023
LABORER
Concrete Saw (Hand
Held/Walk Behind)...........$ 24.21 17.57
Concrete Worker.............$ 23.96 17.57
SUKY2011-014 06/25/2014
CEMENT MASON/CONCRETE FINISHER...$ 21.60 10.35
ELECTRICIAN......................$ 32.35 2.18
LABORER: Common or General......$ 20.60 9.39
LABORER: Flagger................$ 18.31 8.89
LABORER: Pipelayer..............$ 20.13 8.63
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 23.60 12.65
OPERATOR: Bulldozer.............$ 21.72 7.45
OPERATOR: Loader................$ 30.35 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after
January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is ike family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than
""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-
0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R �1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and
Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information
(wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
Section B - Supplies or Services and Prices
PRICE BREAKOUT SCHEDULE
Price Schedule
Wolf Creek Power Plant GSU Transformer Replacement
Item No. Description Est Quantity Unit Amount
0001 Design three (3) 90,000/150,000 kVA, 161 kV Grd. Y high-volage winding, 13.2kV delta low- voltage winding, Class OFAF/OFAF, three-phase GSU power transformers
1 JOB $__________
0002 Manufacture and factory test three (3)
90,000/150,000 kVA, 161 kV Grd. Y high-volage winding, 13.2kV delta low- voltage winding, Class OFAF/OFAF, three-phase
GSU power transformers
0003 Deliver three (3) 90,000/150,000 kVA, 161 kV Grd. Y high-volage winding, 13.2kV delta low- voltage winding, Class OFAF/OFAF, 0004 Offload three 90,000/150,000 kVA, 161 kV transformers and accessories at the Wolf
Creek power plant, perform inspections, perform cleaning, perform reassembly, move the transformers to the long-term transformer storage location, furnish transformer oil and perform oil-filling and processing, perform field tests, and provide the of services of an
Erecting Engineer, provide transformer specific training, 1 JOB $__________
Provide long-term transformer storage for three 90,000/150,000 kVA, 161 kV transformers
1 JOB $__________
0006 Perform pre-move field tests, move the three transformers from the long-term transformer storage location to the switchyard locations, perform post move field tests, and provide the services of an erecting engineer.
1 JOB $__________
0007 Furnish Transformer Spare Parts. 1 JOB $__________
0008 Materials
The Government will make an Economic
Price Adjustment (EPA) limited to the Steel, Copper, and Transformer Oil listed below, as
FAR clause 52.216-4. In accordance with
FAR 52.216-4(a), supporting data shall include, but is not limited to, material invoices.
0008AA Cold-Rolled Steel Pound (lbs) $__________
0008AB Standard Plate Steel Pound (lbs) $__________
0008AC Copper Pound (lbs) $__________
0008AD
Transformer Oil
Total Base Items Amount
Option 1 Items
Gallon (gal) $__________
1001 Design the oil containment and foundations for Transformers 1 & 3.
1 JOB $__________
1002 Design the oil containment and foundations for Transformer 2.
1 JOB $__________
1003 Design the medium-voltage tubular bus system for Transformers 1 & 3.
1 JOB $__________
1004 Design the medium-voltage tubular bus system for Transformer 2.
1 JOB $__________
1005 Design the 161kV strain bus system for
Transformers 1, 2, and 3.
1 JOB $__________
1006 Mobilization And Demobilization. 1 JOB $__________
1007 Removal of first switchyard 480V AC feeder. 1 JOB $__________
1008 Install of first switchyard 480V AC feeder. 1 JOB $__________
1009 Removal of second switchyard 480V AC feeder.
1 JOB $__________
1010 Install of second switchyard 480V AC feeder. 1 JOB $__________
1011 Demolition and Removal of the First
Transformer Bank and Spare Transformer.
1 JOB $__________
1012 Construction of the First Oil Containment and
Foundation.
1 JOB $__________
1013 Installation of the First Transformer. 1 JOB $__________
1014 Commissioning of the First Transformer. 1 JOB $__________
1015 Demolition and Removal of the Second
Transformer Bank.
1016 Construction of the Second oil Containment and Foundation.
1 JOB $__________
1017 Installation of the Second Transformer 1 JOB $__________
1018 Commissioning of the Second Transformer
1019 Demolition and Removal of the Third
Transformer Bank.
1 JOB $__________
1020 Construction of the Third Oil Containment and Foundation.
1 JOB $__________
1021 Installation of the Third Transformer. 1 JOB $__________
1022 Commissioning of the Third Transformer. 1 JOB $__________
1023 Provide Training on non-transformer systems. 1 JOB $__________
Total Option Items Amount $ _________________
Total Estimated Contract Price (Base + Option Items) $__________________
1.0 The quantity for Item's marked EST is estimated and may be increased or decreased, or may not be used at all, at the discretion of the Government.
2.0 Contractor's Excise Tax applies to this project.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Design Three (3) GSU Power Transformers
FFP
Design three (3) 90,000/150,000 kVA, 161 kV Grd. Y high-volage winding, 13.2kV delta low- voltage winding, Class OFAF/OFAF, three-phase GSU power transformers
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: N061
NET AMT
0002 1 Job Manufacture and Test Three (3) GSUs
FFP
Manufacture and factory test three (3) 90,000/150,000 kVA, 161 kV Grd. Y high-volage winding, 13.2kV delta low- voltage winding, Class OFAF/OFAF, three-phase GSU power transformers unique identification or a DoD recognized unique identification equivalent.
0003 1 Job Deliver Three (3) GSU Power Transformers
FFP
Deliver three (3) 90,000/150,000 kVA, 161 kV Grd. Y high-volage winding, 13.2kV delta low- voltage winding, Class OFAF/OFAF, unique identification or a DoD recognized unique identification equivalent.
0004 1 Job Offload Three (3) GSU Power Transformers
FFP
Offload three 90,000/150,000 kVA, 161 kV transformers and accessories at the
Wolf Creek power plant, perform inspections, perform cleaning, perform reassembly, move the transformers to the long-term transformer storage location, furnish transformer oil and perform oil-filling and processing, perform field tests, and provide the of services of an Erecting Engineer, provide transformer specific training, unique identification or a DoD recognized unique identification equivalent.
0005 1 Job Longterm Storage Three(3) GSU
FFP
Provide long-term transformer storage for three 90,000/150,000 kVA, 161 kV transformers.
0006 1 Job Pre and Post Move Field Tests
FFP
Perform pre-move field tests, move the three transformers from the long-term transformer storage location to the switchyard locations, perform post move field tests, and provide the services of an erecting engineer.
0007 1 Job Furnish Transformer Spare Parts
FFP
Furnish Transformer Spare Parts.
unique identification or a DoD recognized unique identification equivalent.
Materials- FOR INFO ONLY
FP-EPA
The Government will make an Economic Price Adjustment (EPA) limited to the
Steel, Copper, and Transformer Oil listed below, as FAR clause 52.216-4. In accordance with FAR 52.216-4(a), supporting data shall include, but is not limited to, material invoices.
0008AA 1 Pound
Cold Rolled Steel
FP-EPA
0008AB 1 Pound
Standard Plate Steel
FP-EPA
0008AC 1 Pound
Copper
FP-EPA
0008AD 1 Gallon
Transformer Oil
FP-EPA
1001 1 Job OPTION Design Oil Containment and Foundations
FFP
Design the oil containment and foundations for Transformers 1 & 3. - Construction
CLIN.
1002 1 Job OPTION Design Oil Containment and Foundations
FFP
Design the oil containment and foundations for Transformer 2 -.Construction
CLIN.
1003 1 Job OPTION Design Med Volt Tubular- Transformer 1&3
FFP
Design the medium-voltage tubular bus system for Transformers 1 & 3.-
Construction CLIN.
1004 1 Job OPTION Design Med Volt Tubular- Transformer 2
FFP
Design the medium-voltage tubular bus system for Transformer 2.- Construction
CLIN.
1005 1 Job OPTION Design 161kV Strain Bus System
FFP
Design the 161kV strain bus system for Transformers 1, 2, and 3.- Construction
CLIN.
1006 1 Job OPTION Mobilization and Demobilization
FFP
Mobilization and Demobilization- Construction CLIN.
1007 1 Job OPTION Remove First Switchyard 480V AC feeder
FFP
Removal of first switchyard 480V AC feeder.- Construction CLIN.
1008 1 Job OPTION Install First Switchyard 480V AC feeder
FFP
Install of first switchyard 480V AC feeder.- Construction CLIN.
1009 1 Job OPTION Remove Second Switchyard 480V AC feeder
FFP
Removal of second switchyard 480V AC feeder. - Construction CLIN.
1010 1 Job OPTION Install Second Switchyard 480V AC feeder
FFP
Install of second switchyard 480V AC feeder. - Construction CLIN.
1011 1 Job OPTION Demo & Removal
FFP
Demolition and Removal of the First Transformer Bank and Spare Transformer. -
Construction CLIN.
1012 1 Job OPTION Construct First Oil Containment & Founda
FFP
Construction of the First Oil Containment and Foundation. - Construction CLIN.
1013 1 Job OPTION Installation of the First Transformer
FFP
Installation of the First Transformer. - Construction CLIN.
1014 1 Job OPTION Commissioning of the First Transformer
FFP
Commissioning of the First Transformer. - Construction CLIN.
1015 1 Job OPTION Demo & Removal of Second Transformer Ban
FFP
Demolition and Removal of the Second Transformer Bank -Construction CLIN.
1016 1 Job OPTION Construct Second Oil Containment Foundat
FFP
Construction of the Second oil Containment and Foundation. - Construction CLIN.
1017 1 Job OPTION Installation of the Second Transformer
FFP
Installation of the Second Transformer - Construction CLIN.
1018 1 Job OPTION Commisioning of the Second Transformer
FFP
Commissioning of the Second Transformer - Construction CLIN.
1019 1 Job OPTION Demo & Removal of Third Transformer
FFP
Demolition and Removal of the Third Transformer Bank. - Construction CLIN.
1020 1 Job OPTION Construct Third Oil Containment & Founda
FFP
Construction of the Third Oil Containment and Foundation. Construction CLIN.
1021 1 Job OPTION Installation of the Third Transformer
FFP
Installation of the Third Transformer. - Construction CLIN.
1022 1 Job OPTION Commissioning Third Transformer
FFP
Commissioning of the Third Transformer.- Construction CLIN.
1023 1 Job OPTION Provide Training- non-transformer system
FFP
Provide Training on non-transformer systems. - Construction CLIN.
Section C - Descriptions and Specifications
SUPPLY CONSTRUCTION CONTRACT
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
This is a firm fixed price with economic price adjustment hybrid Supply / Construction Contract. Provisions and clauses applicable to supply only apply to the supply of the Three (3) 3-Phase Generator Step Up Units (GSUs) for
Wolf Creek Power Plant (CLINs 0001 through 0008).
Provisions and clauses applicable to construction only apply to the construction installation and commissioning of the supplied GSUs and demolition and removal of the current transformer banks (CLINs 1001 through 1023).
Provisions and clauses that do not differentiate between supply and construction apply to both CLINs (i.e. both phases of the contract), when applicable.
Please Note: This solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS). The NIST score is required before an award can be made.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 N/A N/A N/A N/A
0008AA Destination Government Destination Government
0008AB Destination Government Destination Government
0008AC Destination Government Destination Government
0008AD Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
1007 Destination Government Destination Government
1008 Destination Government Destination Government
1009 Destination Government Destination Government
1010 Destination Government Destination Government
1011 Destination Government Destination Government
1012 Destination Government Destination Government
1013 Destination Government Destination Government
1014 Destination Government Destination Government
1015 Destination Government Destination Government
1016 Destination Government Destination Government
1017 Destination Government Destination Government
1018 Destination Government Destination Government
1019 Destination Government Destination Government
1020 Destination Government Destination Government
1021 Destination Government Destination Government
1022 Destination Government Destination Government
1023 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-12 Inspection of Construction AUG 1996
52.246-13 Inspection--Dismantling, Demolition, or Removal of
Improvements
AUG 1996
52.246-16 Responsibility For Supplies APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Design, manufacture, factory test, and deliver three (3) 90,000/150,000 kVA, 161 kV Grd. Y high-voltage winding, 13.2kV delta low-voltage winding, Class OFAF/OFAF three phase generator step up (GSU) power transformers and accessories complete from the manufacturing facility to the Wolf Creek Power Plant in Jamestown, Kentucky.
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 1358 dys. ANP 1 EAST.KY AREA OFC,WOLF CREEK PP
SAM JASER
980 POWER PLANT RD.
JAMESTOWN KY 42629
(615)736-7279
W912P5
0002 1358 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0003 1358 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0004 1358 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0005 1358 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0006 1358 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0007 1358 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0008 N/A N/A N/A N/A
0008AA 1358 dys. ANP 1 EAST.KY AREA OFC,WOLF CREEK PP
980 POWER PLANT RD.
JAMESTOWN KY 42629
(615)736-7279
0008AB N/A N/A N/A N/A
0008AC 1358 dys. ANP 1 EAST.KY AREA OFC,WOLF CREEK PP
980 POWER PLANT RD.
JAMESTOWN KY 42629
(615)736-7279
0008AD 1358 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1001 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1002 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1003 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1004 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1005 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1006 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1007 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1008 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1009 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1010 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1011 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1012 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1013 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1014 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1015 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1016 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1017 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1018 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1019 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1020 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1021 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1022 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
1023 613 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
52.211-17 Delivery of Excess Quantities SEP 1989
52.242-15 Stop-Work Order AUG 1989
52.242-17 Government Delay Of Work APR 1984
52.247-34 F.O.B. Destination NOV 1991
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the period of performance durations, in calendar days, listed below. The time stated for completion shall include final cleanup of the premises.
Supply (base) duration - Supply NTP + 1,358 calendar days
The contractor will make delivery of all transformers and any other materials and equipment necessary for transformer installation not later than 1, 358 calendar days after receipt of notice to proceed with supply work, referred to as the Supply NTP.
Construction (option) duration - Construction NTP + 613 calendar days.
The Contractor will not begin on-site construction until the Government has issued the notice to proceed with construction, referred to as the Construction NTP. The Contractor will complete all scope items associated with this contract not later than 613 calendar days after receipt of the Construction NTP. The Government intends to issue the Construction NTP at a time that is mutually beneficial to both the Contractor and the Government but not later than Supply NTP + 1,238 calendar days.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $6,733.53 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section G - Contract Administration Data
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
Weather conditions applicable to the Option (construction) portion of the contract:
Month Calendar Days 6 Day Workweek 5 Day Workweek 4 Day Workweek
January 10 9 8 6
February 8 7 6 5
March 6 6 5 4
April 4 4 3 3
May 4 4 3 3
June 5 5 4 3
July 5 5 4 3
August 4 4 3 3
September 4 4 3 3
October 3 3 3 2
November 4 4 3 3
December 7 6 5 4
Note: There are no applicable weather days to the Base (supply) Contract.
Section H - Special Contract Requirements
SPECIAL CONTRACT REQUIREMENTS
1. SCHEDULE OF INSURANCE:
a. The contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, the minimum amounts of required insurance types listed below:
Workmen’s Compensation and Employer’s Liability Insurance $100,000
General Liability Insurance for Bodily Injury Liability
Minimum Per Occurrence for Bodily Liability $500,000
Minimum Per Each Accident for Property Damage $100,000
Minimum Aggregate for Bodily Injury $500,000
Automobile Liability Insurance
Minimum Per Person $200,000
Minimum Per Occurrence for Bodily Injury $500,000
Minimum Per Occurrence for Property Damage $20,000
b. Before commencing work under this contract, the contractor shall certify to the Contracting Officer in writing, that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed or prescribed, and (2) until 30 days after the insurer of the contractor gives written notice to the Contracting Officer.
c. The contractor shall insert the substance of the clause entitled “Insurance-Work on a Government Installation
(FAR 52.228-5)”, in subcontracts under this contract, that require work on a Government Installation, and shall require subcontractors to provide and maintain the insurance required above.
2. TIME EXTENSION FOR UNUSUALLY SEVERE WEATHER:
a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with FAR clause 52.249-10, “Default (Fixed Price Construction)”. In order for the Contracting
Officer to award a time extension the following conditions must be satisfied.
1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor. See FAR clause 52.236-4, “Physical Data”, for the typical number of anticipated adverse weather days. The number of days shall be exceeded for a given month before a time extension is granted.
b. Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the
Contractor will record on the daily contractor’s quality control (CQC) report, the occurrence of adverse weather and resultant impact to the normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the contractor’s scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in a previous month), be calculated chronologically from the first to the last day of each month and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in FAR clause 52.236-4, the
Contracting Officer will convert any qualifying days to calendar days, giving full consideration for equivalent fairweather workdays, and issue a modification in accordance with FAR clause 52.249-10.
3. ADMINISTRATIVE DISPUTE RESOLUTION:
In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990, ADR Act, Pub. L. 101-
552, the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of the parties. Interested parties are encouraged to use alternative resolution procedures to the maximum extent practicable in accordance with the authority and the requirement of ADR ACT.
4. ANTI-TERRORISTM OPERATIONAL SECURITY REQUIREMENTS:
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative
(e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USAGE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT
Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).
Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime
Information Center-Interstate Identification Index (commonly referred to as "NCIC-111") and Terrorist Screening
Database (commonly referred to as "TSDB"). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USAGE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at
(https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR
22.102-1 (i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form 1-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
UAI 5152.211-9000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)
Item No. 0008 is subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of provision)
Section I - Contract Clauses
52.202-1 Definitions JUN 2020
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020
52.203-7 Anti-Kickback Procedures JUN 2020
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-13 Contractor Code of Business Ethics and Conduct NOV 2021
52.204-7 System for Award Management OCT 2018
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018
52.204-16 Commercial and Government Entity Code Reporting AUG 2020
52.204-18 Commercial and Government Entity Code Maintenance AUG 2020
52.204-22 Alternative Line Item Proposal JAN 2017
52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab Covered
Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023
52.204-29 Federal Acquisition Supply Chain Security Act Orders--
Representation and Disclosures.
DEC 2023
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
NOV 2021
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.210-1 Market Research NOV 2021
52.211-5 Material Requirements AUG 2000
52.211-13 Time Extensions SEP 2000
52.211-15 Defense Priority And Allocation Requirements APR 2008
52.211-18 Variation in Estimated Quantity APR 1984
52.215-2 Audit and Records--Negotiation JUN 2020
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011
52.215-11 (Dev) Price Reduction for Defective Certified Cost or Pricing Data--
Modifications (DEVIATION 2022-O0001)
OCT 2021
52.215-12 (Dev) Subcontractor Certified Cost or Pricing Data (DEVIATION
2022-O0001)
OCT 2021
52.215-13 (Dev) Subcontractor Certified Cost or Pricing Data - Modifications
(Deviation 2022-O0001)
OCT 2021
52.215-14 Integrity of Unit Prices NOV 2021
52.215-15 Pension Adjustments and Asset Reversions OCT 2010
52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits
(PRB) Other than Pensions
JUL 2005
52.215-19 Notification of Ownership Changes OCT 1997
52.215-21 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data -- Modifications
NOV 2021
52.216-2 Economic Price Adjustment - Standard Supplies NOV 2021
52.216-4 Economic Price Adjustment-Labor and Material JAN 2017
52.219-4 Notice of Price Evaluation Preference for HUBZone Small
Business Concerns
OCT 2022
52.219-8 Utilization of Small Business Concerns SEP 2023
52.219-9 Alt II Small Business Subcontracting Plan (SEP 2023) Alternate II NOV 2016
52.219-16 Liquidated Damages-Subcontracting Plan SEP 2021
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards - Overtime
Compensation
MAY 2018
52.222-6 Construction Wage Rate Requirements AUG 2018
52.222-7 Withholding of Funds MAY 2014
52.222-8 Payrolls and Basic Records JUL 2021
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination-Debarment MAY 2014
52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-19 Child Labor -- Cooperation with Authorities and Remedies NOV 2023
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment JUN 2020
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity OCT 2016
52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-37 Employment Reports on Veterans JUN 2020
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons NOV 2021
52.222-54 Employment Eligibility Verification MAY 2022
52.222-55 Minimum Wages for Contractor Workers Under Executive
Order 14026
JAN 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-20 Aerosols JUN 2016
52.223-21 Foams JUN 2016
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021
52.226-7 Drug-Free Workplace MAY 2024
52.226-8 Encouraging Contractor Policies To Ban Text Messaging
While Driving
MAY 2024
52.227-1 Authorization and Consent JUN 2020
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
JUN 2020
52.227-4 Patent Indemnity-Construction Contracts DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.228-11 (Dev) Individual Surety--Pledge of Assets (DEVIATION 2020-
O0016)
FEB 2021
52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022
52.229-3 Federal, State And Local Taxes FEB 2013
52.229-12 Tax on Certain Foreign Procurements FEB 2021
52.230-1 Cost Accounting Standards Notices And Certification JUN 2020
52.232-1 Payments APR 1984
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-11 Extras APR 1984
52.232-17 Interest MAY 2014
52.232-23 Assignment Of Claims MAY 2014
52.232-27 Prompt Payment for Construction Contracts JAN 2017
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
MAR 2023
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.23…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .