W912P524R0004 A0005 Update Section C.pdf
PDF 373 KB Posted
- Attached to
- Wolf Creek GSU Replacement Federal contract opportunity
- Solicitation number
- W912P524R0004
About this file
This is Amendment 0005 to solicitation W912P524R0004 issued by the US Army Corps of Engineers Nashville District for the Wolf Creek GSU Transformers Replacement project.
The amendment updates Section C to clarify the Supply and Construction Contract Line Item Numbers (CLINs). This is a firm-fixed price with economic price adjustment hybrid supply/construction contract for three 3-Phase Generator Step Up Units (GSUs) for Wolf Creek Power Plant. The supply portion (CLINs 0001-0008, 1024-1028) covers the GSUs themselves, while the construction portion (CLINs 1001-1023) covers installation, commissioning, demolition and removal of current transformer banks. The proposal deadline remains December 11, 2024 at 2:00 PM Central Time. The solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) before award can be made.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT: Wolf Creek GSU Transformers Replacement The purpose of this Amendment is to:
1) Update Section C of the Solicitation to clarify the Supply and Construction CLINs.
2) The deadline for receipt of proposals is not extended and remains 11 Dec 2024 at 2:00PM Central Time.
3) Update FAR 52.252-3, Alterations in Solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
K 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Dec-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P524R0004
X 9B. DATED (SEE ITEM 11)
06-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Dec-2024
CODE
US ARMY CORPS OF ENGINEERS-CELRN-CT
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A680
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P524R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SUPPLY CONSTRUCTION CONTRACT
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
This is a firm fixed price with economic price adjustment hybrid Supply / Construction Contract. Provisions and clauses applicable to supply only apply to the supply of the Three (3) 3-Phase Generator Step Up Units (GSUs) for Wolf Creek Power Plant (CLINs 0001 through 0008, 1024 through 1028).
Provisions and clauses applicable to construction only apply to the construction installation and commissioning of the supplied GSUs and demolition and removal of the current transformer banks (CLINs 1001 through 1023).
Provisions and clauses that do not differentiate between supply and construction apply to both CLINs (i.e. both phases of the contract), when applicable.
Please Note: This solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS). The NIST score is required before an award can be made.
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR QUOTERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001:
PROJECT: Wolf Creek GSU Transformer Replacement PURPOSE: the purpose of this Amendment is to:
1) Provide updated Technical Specifications.
2) Provide the Pre-Proposal Teleconference Slides.
3) Update the Instructions, Paragraph 2.0, Bonds and Insurance, to include Bid Guarantee.
4) Incorporate FAR Provision 52.228-1, Bid Guarantee, by full text.
5) Update FAR Clause 52.211-12, Liquidated Damages - Construction.
6) Update FAR Clause 52.217-7, Options for Increased Quantity - Separately Priced Line Item.
7) Provide updated Construction Wage Determinations.
8) Update FAR Provision 52.252-3, Alterations in Solicitation.
Amendment 0002:
PROJECT: Wolf Creek GSU Replacement PURPOSE: the purpose of this Amendment is to:
1) Provide Site Visit Information. A site walk will occur on Wednesday, 9 October 2024 at 10:00AM Central Time.
2) Incorporate FAR 52.236-27 Alternate I, Site Visit (Construction) - Alternate I by Full Text.
3) The deadline for receipt of questions in Projnet Bidder Inquiry has been extended to 11 October 2024.
4) Update FAR Provision 52.252-3, Alterations in Solicitation.
W912P524R0004
Amendment 0003:
PROJECT: Wolf Creek GSU Transformer Replacement Project PURPOSE: the purpose of this Amendment is to:
1.) Provide updated Technical Plans and Specifications, the physical site visit sign-in sheet, and revise the fill-in information for FAR Clause 52.228-1 to be consistent with the Instructions to Offerors.
2.) Provide Government answers to questions received from Industry.
3.) Update FAR Provision 52.252-3, Alterations in Solicitation.
Amendment 0004:
PROJECT: Wolf Creek GSU Transformer Replacement Project PURPOSE: the purpose of this Amendment is to:
1) Provide updated Technical Specifications, Updated Price Breakout Schedule, and revise the fill-in information for FAR Clause 52.246-18, Warranty of Supplies of a Complex Nature.
2) Provide updated Wage Determinations.
3) Extend the deadline for receipt of proposals from 04 December 2024 to 11 December 2024 at 2:00PM Central Time.
4) Update FAR Provision 52.252-3, Alterations in Solicitation.
Amendment 0005:
PROJECT: Wolf Creek GSU Transformers Replacement The purpose of this Amendment is to:
1) Update Section C of the Solicitation to clarify the Supply and Construction CLINs.
2) The deadline for receipt of proposals is not extended and remains 11 Dec 2024 at 2:00PM Central Time.
3) Update FAR 52.252-3, Alterations in Solicitation.
(end of provision)
(End of Summary of Changes)