W38XDD129899320001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: JPP Pow erplant Batteries PURPOSE: The purpose of this amendment is to:

a.) Publicize Questions and Answ ers covered during the open question period.

b.) Update FAR Provision 52.252-3, Alterations in Solicitation.

No additional questions w ill be accepted follow ing the issuance of this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Sep-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P522Q0006

X 9B. DATED (SEE ITEM 11)

16-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2022

CODE

CELRN-RC-N CONTRACTING BRANCH

110 9TH AVE SOUTH, A405

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P522Q0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

QUESTIONS AND ANSWERS

W912P522Q0006- Amendment 0001 JPP Powerplant Batteries

Nashville, TN Questions and Answers

1) Question: Do battery pallets provided need to be lift certified per section 1.2? We have used a crane to move like pallets in the past, but they do not have any lift certifications that we are aware of.

Asnwer: The pallets only need to be certified if they have lifting eyes. If slings can go through or under the pallets then we can waive the certification requirement. It is expected that the pallets will be reasonably well constructed. If that is not the case when they show up on site then they may be deemed not safe to use. If you have any product data or photographs of the pallets you would like to send for consideration then that may be helpful.

2) Question: Does the charger AC need to be separated and placed into a conduit, or is it ok as is in the cable tray?

Answer: The installation will be compliant with the National Electric Code. Conductors rated for cable tray and consistent with the contract specs should be acceptable. Cabling leaving the tray will be installed and protected IAW NEC.

3) Question: What is the required re-charge time and continuous site load? This is needed to size the battery chargers.

Answer: The continuous site load is 40A on average. This is normally shared between two chargers. The existing chargers are rated for 50A continuous output by each charger.

IAW IEEE 450, it is expected that the manufacturer of the battery and chargers will determine the re-charge time based upon cell chemistry and construction as well as charger design. We will say that 24 hours is acceptable as long as this time period is consistent with the previous statement and will not cause damage or degradation to the supplied products.

4) Question: Two (2) chargers for redundancy, right? Answer: Correct.

Question: Will they operate in parallel? Answer: Yes, normally.

5) Question: Where is the comprehensive list (vendors document list VDL) of required documents, testing reports, submittals, etc? I see comments at the end of each section in the technical specs, but there should be one comprehensive list indicating all docs required and when they are required.

Answer: There is no comprehensive list of documents. Each section of the specifications describes the required documents to be submitted along with the time period for submission.

6) Question: Testing to be performed?

Answer: This being a Commercial Product the Government relies on the Contractor to apply industry standard product testing for Quality Assurance. As long as the testing is performed in

W912P522Q0006 accordance with industry standards and the product passes the Government inspection for receipt we’re good.

7) Question: What is the model of the current Battery Charger?

Answer: Manufacturer is Exide, Model is US-130-3-50, and Catalog number is 101 371 209

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001 - This amendment to answers questions received during the question period.

(End of Summary of Changes)