This document contains an amendment to a federal solicitation and the related federal contract opportunity. The amendment extends the response date for solicitation number W912P521B0012 for the Old Hickory Power Plant Switchyard Cable and Conduit Replacement project in Hendersonville, Tennessee from June 28, 2021 to July 1, 2021 at 10:00 AM Central Time. The amendment also incorporates reference drawings from sheet G-003 and makes minor changes to instructions and clauses.
The federal contract opportunity provides additional details on the project. The U.S. Army Corps of Engineers Nashville District will issue a firm fixed price construction contract to install a new cable, conduit and cable trench system from the switchyard vault to switchgear and add new termination cabinets at Old Hickory Power Plant. An optional item is replacing cable from the new termination cabinet to the first termination point in the powerhouse. The estimated value is between $1,000,000 to $5,000,000. The required work includes installing a new precast concrete cable trench, new termination cabinets, and routing new cables between the switchyard vault and switchgear loads.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 - OLD HICKORY SWITCHYARD - page 1.pdf | ||
| OLD HICKORY CABLE AND CONDUIT REPLACEMENT Amendment 0005 REFERENCE DRAWINGS.pdf | ||
| W912P521B00120004.pdf | ||
| W912P521B00120003.pdf | ||
| W912P521B00120002.pdf | ||
| W912P521B0012 Site Visit SignIn.pdf | ||
| W912P521B00120001.pdf | ||
| W912P521B0012 final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912P521B0012 for the Old Hickory Pow erplant Sw itchyard Cable and Conduit Replacement, Hendersonville, TN is hereby amended as follow s:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P521B0012
X 9B. DATED (SEE ITEM 11)
25-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jun-2021
CODE
CELRN-RC-N CONTRACTING BRANCH
110 9TH AVE SOUTH, A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P521B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
Amendment 0005:
W912P521B0012 for the Old Hickory Power Plant Switchyard Cable and Conduit Replacement, Hendersonville, TN is hereby amended as follows:
a) Reference Drawings from Sheet G-003 are hereby incorporated and made a part of this solicitation.
b) The due date for bids is hereby extended from 28 June 2021 at 10:00 AM Central Time to 1 July 2021 at 10:00 AM Central Time.
c) FAR Clause 52.252-3 is hereby updated.
d) All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 25-Jun-2021 10:00 AM to 01-Jul-2021 10:00 AM.
The number of offeror copies required 1 has been added.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001:
PROJECT: Old Hickory Power Plant Switchyard Cable and Conduit Replacement, Hendersonville, Tennessee
PURPOSE: The purpose of this amendment is to:
1. Extend the receipt of questions period from Tuesday, June 1, 2021 at 10:00 a.m. Central Tie to Monday, June 7, 2021 at 10:00 a.m. Central Time.
2. Correct the bid opening due date from Saturday, June 26, 2021 at 1:00 p.m. Central Time to Friday, June 25, 2021 at 10:00 a.m. Central Time.
3. Include special contract requirements in Section 00 73 00 - Supplementary Conditions.
4. Provide the site visit sign-in sheet as a separate attachment.
Amendment 0002:
PROJECT: Old Hickory Power Plant Switchyard Cable and Conduit Replacement, Hendersonville, Tennessee
W912P521B0012
PURPOSE: The purpose of this amendment is to provide revised Division 01 technical specifications as a separate attachment.
Amendment 0003:
PROJECT: Old Hickory Power Plant Switchyard Cable and Conduit Replacement, Hendersonville, Tennessee
PURPOSE: The purpose of this amendment is to provide revised instructions in Section 00 21 13 - Instructions to Bidders.
Amendment 0004:
PROJECT: Old Hickory Power Plant Switchyard Cable and Conduit Replacement, Hendersonville, Tennessee.
PURPOSE: The purpose of this amendment is to provide answers to questions that were received and change the quantities on CLINs 0007 & 0009.
Revised Technical Specifications are included as a separate document.
Due to these changes, the due date for Bids is now 10:00am Central Time on Monday, 28 June 2021.
Amendment 0005:
W912P521B0012 for the Old Hickory Power Plant Switchyard Cable and Conduit Replacement, Hendersonville, TN is hereby amended as follows:
e) Reference Drawings from Sheet G-003 are hereby incorporated and made a part of this solicitation.
f) The due date for bids is hereby extended from 28 June 2021 at 10:00 AM Central Time to 1 July 2021 at 10:00 AM Central Time.
(End of Summary of Changes)