Old Hickory Power Plant GSU Transformer Supply
Solicitation number
W912P519R0004-0002
Issued by

About this file

This is an amendment to a solicitation for the supply of two class II GSU power transformers for the Old Hickory Power Plant. The amendment extends the response deadline from May 14th to May 22nd, 2020. It provides answers to questions from prospective offerors regarding delivery schedules, site conditions, commissioning timelines, and technical specifications. The amendment also revises technical drawings and specifications, adds DFARS clauses for Buy American and qualifying country sources, and updates FAR clause 52.252-3.

View the file

Other files

File Type Posted
Section 48 19 23_04 26 Page 16.pdf PDF
Drawing G-003.pdf PDF
Site Visit Attendees.pdf PDF
OLD HICKORY GSU PREPROPOSAL PRESENTATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING BRANCH (EJC)

EUGENIA.J.CORDER@USACE.ARMY.MIL

110 NINTH AVE SOUTH, ROOM A405

NASHVILLE TN 37203-3817

W38XDD91919314

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: Old Hickory Pow er Plant, GSU Transformers The purpose of this amendment is to:

1. Post Questions & Answ ers;

2. Post Site Visit Presentation (OLD HICKORY GSU PREPOPOSAL PRESENTATION.pdf);

3. Post List of Site Visit Attendees (Site Visit Attendees.pdf);

4. Revise Technical Plans, Draw ing G-003 (Draw ing G-003.pdf);

5. Revise Technical Specifications, Section 48 19 23_04 26 Page 16 (Section 48 19 23_04 26 Page 16.pdf)

6. Add DFAR Clauses 252.225-7001, Buy American Act and Balance of Payments Program and 252.225-7002, Qualifying Coutnry Sources as Subcontractors;

7. Extend due date from 14 May 2020 to 22 May 2020; and

8. Update FAR Clause 52.252-3.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P519R0004

X 9B. DATED (SEE ITEM 11)

10-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-May-2020

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, RM A680

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912P5

FACILITY CODECODE

EMAIL:TEL:

W912P519R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 14-May-2020 10:00 AM to 22-May-2020 10:00 AM.

SECTION G - CONTRACT ADMINISTRATION DATA

The following have been added by full text:

QUESTIONS & ANSWERS

This solicitation is being amended to address the questions asked during the question period.

1. QUESTION: Section 48 20 00. Paragraph 1.2 references Clause 52.211-8 “TIME OF DELIVERY”, however this clause is not included in the solicitation.

ANSWER: This Clause will not be included, because the delivery schedule is included in the CLINs.

2. QUESTION: For bidding purposes should we assume that the final pad will be ready for the transformer at the time of delivery?

ANSWER: Reference Specifications section 48 20 00.04 26, paragraph 3.8 for the transformer site movement and assembly requirements. It is the intent of the government to have the transformer pad/vault completed by the time the transformers are offloaded and assembled in the temporary location.

3. QUESTION: Delivery Information in the solicitation states delivery dates of 365 days ANP for the transformers. Will both transformer pads be ready for delivery of both units at the same time?

ANSWER: Reference the Government’s response to Question No. 2. The installation of the final transformer will not begin until the first transformer has been completed, tested, and commissioned.

4. QUESTION: Section 48 20 00.04 26. Paragraph 3.8.1.a. requires the units to be offloaded and assembled in a temporary location prior to moving to final location because of the takeoff tower restricting crane movement at the permanent location. Drawing G-004 has a red box on the overhead view of site access that says “North side of switchyard install area”. Is the red highlighted area the temporary location or final location? Please clearly show where the temporary assembly location and final locations are. We must know this in order to get pricing on moving to final location via goldhofer, jack-slide or other method.

ANSWER: Reference the Government’s response to Question No. 2 and attached document titled “OLD HICKORY GSU PREPROPOSAL PRESENTATION” for the approximate location of the potential offload areas. The red highlighted area located on the north side of the switchyard is the final location.

5. QUESTION: Section 26 08 01. Paragraph 1.1 states that after requirements of Section 48 20 00 are completed, another contractor will complete interconnections to the plant, along with other associated work. This work has to be completed before the CA returns for commissioning activities. What is the estimated time period for the other contractor’s work?

ANSWER: The estimated time for the contractor’s work is two (2) weeks.

6. QUESTION: Will the commissioning required by Section 26 08 01 take place at the same time for each unit or should we anticipate separate trips and separate commissioning for each unit? If separate, how long between each unit commissioning?

ANSWER: Separate trips will be made for the commissioning of each unit. The time period between the commissioning of each unit is approximately two (2) months.

7. QUESTION: Section 26 08 01 requires commissioning of the transformers, in addition to testing required in Section 48 20 00. This commissioning seems to be a joint effort between all parties. How many days should the contractor assume the commissioning will take to complete?

ANSWER: Reference the Government’s response to Question No. 5. Commissioning of each unit will take approximately two (2) weeks.

8. QUESTION: Can you please confirm if there is a Buy American requirement for this project?

ANSWER: The Solicitation has been updated to include DFAR Clauses 252.225-7001, Buy American Act and Balance of Payments Program and 252.225-7002, Qualifying Country Sources as Subcontractors.

9. QUESTION: The losses specified are Load Loss of 180 kw at max. MVA and No-Load Loss of 90 kw. The specification does not mention about auxiliary losses. Are Auxiliary Losses included in specified Load Loss of 180 kw at max. MVA. Please clarify.

ANSWER: Auxiliary losses are not included in the load loss requirement. Auxiliary losses are not evaluated.

10. QUESTION: Please provide picture of the name plate of existing Transformer.

ANSWER: The existing transformer is not being replaced in kind due to potential generating unit up-rates and changes to system requirements. The existing nameplate will not be provided.

11. QUESTION: The specification asks for two De-Energized Tap Changers (tap A 69 kV and tap B 161 kV), one for Std. +- 2 X 2.5% taps and the second to accomplish reconnection switching between 69 kV and 161 kV. We propose to use a link board on top of Core and Coil Assembly to accomplish this reconnection switching between 69 kV and 161 kV, as a Switch for this required rating is commercially unavailable. Please note, with this proposed link board arrangement, it is not required to drain Transformer oil to perform switching. Please confirm this is acceptable.

ANSWER: Reference Specifications section 48 19 23.04 paragraphs 2.1, 2.5.1 and 2.11.7 for the de-energized tap changer requirements.

12. QUESTION: Please note, to accomplish reconnection switching between 69 kV and 161 kV, the DETC on 69 kV will meet the specified +- 2 x 2.5% taps, but DETC on 161 kV will meet +- 2 x 1.07% taps. Please confirm if this is acceptable.

ANSWER: Percentage (%) tap step for the 161kv is not specified. Please reference Specifications Section 48 19 23.04 and Drawing G-003 attached to this amendment.

13. QUESTION: Specifications do not mention CT ratios on HV side. We propose 1/ phase 1000:5, MR, C400 CT’s for 69 kV & 1/ phase 600:5, MR, C400 CT’s for 161 kV. Please confirm this is acceptable, else please provide preferred CT ratios and accuracy class.

ANSWER: HV side CTs are not required. Please reference Specifications section 48 19 23.04, paragraph 2.9.1 attached to this amendment.

14. QUESTION: Please confirm if it is required to conform to maximum dimensions of Overall Depth X Width = 240 in X 197 in per drawing provided in the specifications

ANSWER: Conformance with maximum width and depth dimensions depicted on Sheet E-101 is required.

15. QUESTION: Request extension of bid submission date to 05/22/2020.

ANSWER: The proposal due date has been extended to May 22, 2020, per this Solicitation amendment.

No additional questions will be accepted after this amendment.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

252.225-7001 BUY AMERICAN ACT AND BALANCE OF PAYMENTS

PROGRAM

DEC 2017

252.225-7002 QUALIFYING COUNTRY SOURCES AS

SUBCONTRACTORS

DEC 2017

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF DOCUMENTS

Specifications and Drawings will be provided as separate files and are available on https://beta.sam.gov/ . The following Specifications and Drawings are part of the solicitation/contract and shall be considered in that respect.

The work shall conform to the specifications identified below:

W912P519R0004_Solicitation.pdf W912P519R0004_ReferenceDrawings.pdf W912P519R0004_Tplans.pdf W912P519R0004_Tspecs.pdf

Documents added with Amendment 0002:

OLD HICKORY GSU PREPROPOSAL PRESENTATION.pdf Site Visit Attendees.pdf Drawing G-003.pdf (Technical Plans)(Replace G-003 Drawing) Section 48 19 23_04 26 Page 16.pdf (Class II GSU Power Transformer)(Technical Specification)(Remove Section 48 19 23.04 26 page 16 and replace with revised Section 48 19 23.04 26 page 16.)

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR QUOTERS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001 The purpose of this amendment is to:

1. Revise CLIN 0001, CLIN 0002 and CLIN 0003 descriptions;

2. Add CLIN 0004 and CLIN 0005;

3. Update FAR Clause 52.252-3.

Amendment 0002 The purpose of this amendment is to:

1. Post Questions and Answers;

2. Post Site Visit Presentation (OLD HICKORY GSU PREPROPOSAL PRESENTATION.pdf);

3. Post List of Site Visit Attendees (Site Visit Attendees.pdf);

4. Revise Technical Plans, Drawing G-003 (Drawing G-003.pdf);

5. Revise Technical Specifications, Section 48 19 23_04 26 Page 16 (Section 48 19 23_04 26 Page 16.pdf)

6. Add DFAR Clauses 252.225-7001, Buy American Act and Balance of Payments Program and 252.225-7002, Qualifying Country Sources as Subcontractors;

7. Extend due date from 14 May 2020 to 22 May 2020; and

8. Update FAR Clause 52.252-3.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .