This document provides details for a federal solicitation seeking the supply of two generation step-up power transformers for the Old Hickory Power Plant. The solicitation will result in a firm fixed price supply contract awarded under NAICS code 335311. Proposals are due by May 22, 2020 and will be evaluated based on a best value tradeoff analysis considering technical evaluation, price evaluation, and a cost/technical tradeoff. The scope of work involves design, manufacture, factory testing, and delivery of two 75,000/100,000 kVA power transformers with 161x69kV voltages and ONAN/ONAF cooling to the Old Hickory Power Plant in Hendersonville, Tennessee by the awarded contractor. Key requirements include resin-impregnated synthetic bushings and stainless steel control cabinets. The pre-proposal presentation provides additional technical requirements and project background information.

View the file

Other files

File Type Posted
Section 48 19 23_04 26 Page 16.pdf PDF
Drawing G-003.pdf PDF
Site Visit Attendees.pdf PDF
W912P519R0004-0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING STRONG®

OLD HICKORY POWER PLANT

GSU REPLACEMENT PROJECT

USACE NASHVILLE DISTRICT

Solicitation # W912P519R0004

PRE-BID MEETING

04/23/2020

Sam Jaser: Project Manager Brandon Bouwman: Design Engineer Eugenia Corder: Contract Specialist

Contract Clauses and Contract Issues

Contract Specialist: Eugenia Corder Contracting Officer: Stephen P. Hutchens

Attendees must submit an email to Eugenia Corder at Eugenia.J.Corder@usace.army.mil with company information, CAGE code and a list of all attendees.

Contract Clauses and Contract Issues

Contract Specialist: Eugenia Corder Contracting Officer: Stephen P. Hutchens

This acquisition is for Full and Open Competition. Proposals from firms organized as joint ventures (JV) that have associated specifically for this project must include a copy of the legal joint venture agreement in the proposal submission.

Type of contract: Firm Fixed Price Supply Contract NAICS code: The NAICS code for this project is 335311, entitled “Power, Distribution and Specialty Transformer Manufacturing.”

Basis of Selection of Award: This is a “Best Value – Tradeoff” solicitation, as it may be in the best interest of the Government to consider award to other than the lowest priced Offeror or other than the highest technically rated Offeror.

Contract Clauses and Contract Issues, Cont.

Evaluation Factors for Award (in Solicitation on page 36 through 57). The evaluation process consists of four (4) parts: proposal compliance review and responsibility determination, technical evaluation, price evaluation, and cost/technical trade-off analysis.

Questions are Due by 27 April 2020 at 10:00 AM Central Time.

Proposals are Due on 14 May 2020 (subject to change) at 10:00 AM Central

Time.

All documentation must be submitted through the https://safe.apps.mil/.

Following instructions in Section 2.2 on page 36.

SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION:

Contractors must be registered in the System for Award Management (SAM) database (www.sam.gov) to receive an award. Contractors shall have representations and certifications completed in SAM OR provide completed representation and certification applicable provisions as listed in 52.204-8 of this solicitation.

For SAM Customer Service contact:

Federal Service Desk URL: https://www.fsd.gov/fsd-gov/home.do Hours: 8am - 8pm Eastern Time US Calls: (866) 606-8220 International Calls: (334) 206-7828

We will address any questions to the best of our ability, however anything said today is not official unless it is in writing in the issued amendment to this solicitation. Questions shall be in writing and sent to Eugenia Corder at email address Eugenia.J.Corder@usace.army.mil no later than 27 April 2020 at 10:00 AM Central Time. Questions received after this deadline will not be addressed. If there is a discrepancy between what is said here today and what is written in the solicitation, the document governs.

► An amendment will be posted with the information and questions from today’s meeting.

Project Manager Sam Jaser

Design, manufacture, factory test and deliver two (2) 75,000/100,000 kVA, 161x69kV GrdY/13.2 kV Delta, Class ONAN/ONAF cooling, with nitrogen blanket oil preservation systems, three-phase generation step up (GSU) power transformers and accessories complete from the manufacturing facility to the Old Hickory Power Plant, Hendersonville, TN.

CONTRACT SCOPE

PROJECT BACKGROUND

Located at Mile 216.2 on the Cumberland River and is approximately 20 miles northeast of Nashville, TN.

The project was completed for full beneficial use in December 1957 with the placement of the final hydropower unit in operation.

Total of 4 generating units with each as commissioned rating of 31.25MVA and 115% overload capacity.

The plant is undergoing major rehabilitation efforts to uprate the generating units to 46MVA.

EXISTING

TRANSFORMERS

POTENTIAL

LAYDOWN/OFFLOAD

AREA #2

Approximate location of new transformers

69KV Lines

APPROXIMATE LOCATION OF

TRANSFOREMER VAULT

CONTRACT DOCUMENTS

https://beta.sam.gov Solicitation was posted on April 10th 2020 Amendment 001 was posted on April 20th 2020

W912P519R0004_Solicitation.pdf W912P519R0004_Tplans.pdf W912P519R0004_Tspecs.pdf

TECHNICAL SPECIFICATIONS

Division 01 – General Requirements Division 25 – Integrated Automation Division 26 – Electrical Division 48 – Electrical Power Generation

Solicitation Document CLINs

ITEM # SUPPLY/SERVICE QTY UNIT UNIT

PRICE

AMOUNT

001 Design Transformers 1 JOB

002 Manufacture Transformers 2 EACH

003 Test Transformers 2 EACH

004 Offload Transformers 2 EACH

005 Furnish Spare Parts 1 JOB

NOTE: PROGRESS PAYMENTS ARE AUTHORIZED

Design Engineer Brandon Bouwman

1) …_Tplans.pdf Sheet G-003 Summary of technical requirements for manufacturer / designers to help with quote development

2) …_Tspecs.pdf Section 48 19 23.04 Paragraph 2.1.5 Summary of key electrical characteristics of the transformer

3) …_Tplans.pdf Sheets E-101 through E-105 Summary of general layout requirements and limiting dimensions *if a limiting dimension is not listed (e.g: height) there is no limiting dimension

4) …_Tplans.pdf Sheet S-101 and …_Tspecs.pdf Section 48 19 23.04 Paragraph 2.2

Summary of seismic design / analysis requirements

Overall Technical Summary

Voltages Dual voltage rated secondary / high voltage winding – not autotransformer construction

Transformer is a GSU application with voltages and impedances studied through grid simulation to provide the best possible range of generator support to transmission operations. At the time of installation, the transformer will be installed in a 69 kV system.

In the future, the switchyard may be upgraded to 161 kV.

Multiple design solutions are possible, but the impedances and number of external bushings (only 3 high voltage leads brought out) may not be changed.

Impedance, high-low, at ONAN rated current, subject to IEEE tolerances:

(1) 69 kV: 7.5 (required impedance)

(2) 161 kV: minimum 7.5, maximum 12 (anywhere in this range)

High Voltage and High Voltage Neutral Section 48 19 23.04, paragraph 2.8.2 Resin-impregnated Synthetic (RIS) design

Low Voltage Bushings Section 48 19 23.04, paragraph 2.8.3 Porcelain or low-corona solid bulk Viton gaskets used for installation

Bushings

Section 48 19 23.04, paragraph 2.14 Sheets E-106, E-107, and E-108

Stainless steel construction Separate power and control cabinets Viewing Windows Solar shielding and drip shield Vibration isolation mounting Internal door-mounted laptop tray Internal door-mounted document pockets

Control Cabinet Construction

Section 48 20 00.04 26 gives overall shipment, hauling, and assembly requirements paragraph 1.8 Erecting Engineer Services note oversight requirements for movement, test, assembly by experienced paragraph 3.8.1 Transformer Movement and Site Placement assembly and oil filling on temporary cribbing / containment with final movement to mounting pad. Mounting pad and anchorage to pad prepared by others.

Onsite Assembly

Questions

Questions must be submitted by email to Eugenia Corder at Eugenia.J.Corder@usace.army.mil.

Questions are Due by 27 April 2020 at 10:00 AM Central