Text version

W38XDD70827781

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912P517B0008 HEADWORKS INTAKE LIFTING EQUIPMENT FOR CEN/DAL/WOL

The solicitation is being amended to answ er questions received during the question period, update draw ings, update technical specif ication, update the bid schedule, and to extend the bid due date. The bid due date is extended to 6 June 2018 at 2:00 pm central time.

FAR 52.252-3 has been updated.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P517B0008

X 9B. DATED (SEE ITEM 11)

30-Mar-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0003

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-May-2018

CODE

CELRN-RC-N CONTRACTING BRANCH

A405, 110 9TH AVE S

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P517B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

CHANGES TO REFERENCE DRAWINGS

Solicitation No. W912P517B0008 Amendment No. 0003

CHANGES TO TECHNICAL SPECIFICATIONS

Section 01 22 00 PRICE AND PAYMENT PROCEDURES

Remove Section 01 22 00 in its entirety (10 pages), and replace with revised Section 01 22 00 (12 pages.)

Section 05 50 14.01 HEADGATE FEEDER AND SWITCH REPLACEMENTS

Remove Section 05 50 14.01 in its entirety (7 pages), and replace with revised Section

05 50 14.01 (7 pages.)

Section 26 05 01 HEADGATE FEEDER AND SWITCH REPLACEMENTS

Remove Section 26 05 01 in its entirety (17 pages), and replace with revised Section 26 05 01 (19 pages.)

Section 35 20 20 HEADGATE FEEDER AND SWITCH REPLACEMENTS

Remove Section 26 05 01 in its entirety (30 pages), and replace with revised Section 26

05 01 (30 pages.)

Section 41 00 01 MECHANICAL WORK AND EQUIPMENT

Remove Section 41 00 01 in its entirety (14 pages), and replace with revised Section 41 00 01 (17 pages.)

CHANGES TO CONTRACT DRAWINGS

The following CONTRACT DRAWINGS have been revised and replaced:

Drawing No. Description

C04-M-3 GENERAL LAYOUT

C05-M-9 DRUM ASSEMBLY, DETAILS AND SECTIONS

C03-E-6 PUSHBUTTON PANEL, LAYOUT

CHANGES TO REFERENCE DRAWINGS

The following new drawings have been added to the set of REFERENCE DRAWINGS:

Drawing No. Description

Q-2/836.6 CONDUIT AND CONDUCTOR SCHEDULE I

Q-2/836B.2 CONDUIT AND CONDUCTOR SCHEDULE III

Q-2/836C.2 CONDUIT AND CONDUCTOR SCHEDULE IV

Q-2/836D.5 CONDUIT AND CONDUCTOR SCHEDULE V

Q-2/836E.5 CONDUIT AND CONDUCTOR SCHEDULE VI

Q-2/836F.4 CONDUIT AND CONDUCTOR SCHEDULE VII

Q-2/836G.7 CONDUIT AND CONDUCTOR SCHEDULE VIII

Q-2/836H.4 CONDUIT AND CONDUCTOR SCHEDULE IX

Q-2/836J.4 CONDUIT AND CONDUCTOR SCHEDULE X

Q-2/836K.3 CONDUIT AND CONDUCTOR SCHEDULE XI

Q-2/836L.ID CONDUIT AND CONDUCTOR SCHEDULE XII

Q-3/832.4 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832A.7 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832B.4 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832C.9 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832D.3 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832E.5 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832F.5 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832G.3 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832H.4 CONDUIT AND CONDUCTOR SCHEDULE

Q-3/832J.2 CABLE AND CONDUIT SCHEDULE

Q-4/836.7 CONDUIT & CONDUCTOR SCHEDULE I

Q-4/836A.6 CONDUIT & CONDUCTOR SCHEDULE II

Q-4/836B.7 CONDUIT & CONDUCTOR SCHEDULE III

Q-4/836C.7 CONDUIT AND CONDUCTOR SCHEDULE IV

Q-4/836D.4 CONDUIT AND CONDUCTOR SCHEDULE V

Q-4/836E.6 CONDUIT & CONDUCTOR SCHEDULE VI

Q-4/836F.5 CONDUIT AND CONDUCTOR SCHEDULE VII

Q-4/836G.6 CONDUIT AND CONDUCTOR SCHEDULE VIII

Q-4/836H.2 CABLE & CONDUIT SCHEDULE

--- END OF AMENDMENT NO. 0003 TECHNICAL CHANGES---

QUESTIONS AND ANSWERS

Solicitation No. W912P5-17-B-000B Questions & Answers

1. Industry Question/Comment: Is this a built to print project without any contractor responsibility on the equipment design?

Government Response: No. See updates to Specification 41 00 01 and 26 05 01.

2. Industry Question/Comment: Is this a built to print project with contractor responsibility on the equipment design?

Government Response: See Government Response to Question #1.

3. Industry Question/Comment: Are we allowed to make some modifications to the proposed equipment design?

Government Response: Reference Section 01 33 00 paragraph 1.9.

4. Industry Question/Comment: Can we use our own design for these hoist systems?

Government Response: See the Government’s Response to Question #3.

5. Industry Question/Comment: Are we required to supply one pendant per site for a total of 3 or one per hoist for a total of 15?

Government Response: 1 Pendant per site see drawing C03-E-6 amendment 0003.

6. Industry Question/Comment: Can feeder cables be six single conductors for parallel runs? Cable schedule call for 2-3 conductor cables.

Government Response: See amendment 0003 specifications section 26 05 01. That would be acceptable as long as the contractor submits voltage drop calculations showing the following:

- Assumptions -reference Code/Standard used

- Type of insulation and temperature rating used in the calculations

- Feeder sizing calculation.

- Max 3% voltage drop at rated voltage

- De-rating of ampacity due to parallel conductors Also, need to verify if termination point at either end will accept multi-conductor.

7. Industry Question/Comment: Are any or all of the gates controlled remotely by the SCADA system?

Government Response: The Emergency Gates at Center Hill and Dale Hollow are remotely operated by the SCADA system. All other gates are controlled locally.

8. Industry Question/Comment: Is funding for the base contract available?

Government Response: Yes.

9. Industry Question/Comment: How will progress payments work?

Government Response: Pursuant to FAR Clause 52.212-4, which is incorporated by reference in the Solicitation, progress payment and contract financing are not applicable to this procurement. Reference FAR Clause 52.212-4 for the payment terms applicable to the Solicitation and resulting contract. As allowed by 52.212-4(j), for the contract resulting from this solicitation the Government will specifically require the risk of loss or damage to the supplies provided under this contract to remain with the Contractor until those supplies have been installed in their final location and accepted by the Government.

10. Industry Question/Comment: Are the bottom sheaves to be replaced?

Government Response: No. The bottom sheaves are outside the scope of this contract.

11. Industry Question/Comment: Drawings of the 20 Ton Hoist notes shows 1 3/4 " diameter wire rope but details shows 3/4". Is the 3/4" diameter correct?

Government Response: Reference Amendment 0003. Drawing C05-M-9 was revised to clarify a 20 ton hoist with ¾” diameter wire rope. Drawing C05-M-9 amendment 0003

12. Industry Question/Comment: Drawings show 7.5. 25. 60 HP but Section 35 20 20 page 8. 2.1.2 how 7.5. 30. 60. HP. Is the 25 HP correct?

Government Response: Reference Amendment 0003. Drawing C04-M-3 was revised to clarify the 112 Ton hoist is driven by a 30 HP motor.

13. Industry Question/Comment: What is the government estimate for the base bid of the contract?

Government Response: The Independent Government Estimate (IGE) is considered “source selection information” under FAR 2.101 and, as a consequence, is not disclosed until the bid opening.

14. Industry Question/Comment: Is there already a Barge at each site?

Government Response: No.

15. Industry Question/Comment: Can a barge be used against the dam at each site?

Government Response: No

16. Industry Question/Comment: If barges can be used how can they be tied off against the dam at each site?

Government Response: See Government Response to Question #15.

17. Industry Question/Comment: What is the weight limit on top of each dam in the case of setting a mobile crane on top of the dam at each site?

Government Response: Bridges are rated for legal highway vehicular loads. Oversized or other specialized vehicle configurations will require Government approval.

18. Industry Question/Comment: What are the cable lengths for each of the hoists at each site?

Government Response: Wire rope lengths shall be verified by contractor based on exiting lower sheaves, new upper sheaves, drum design, and reference drawings for gate elevations. Reference Drawings Q-4/374, Q-3/311, Q2-50/20, etc.

19. Industry Question/Comment: Can we use the existing structural beams to hold the gates up while being tied off?

Government Response: No. It is the Contractor’s responsibility to provide any necessary equipment.

20. Industry Question/Comment: Is there an estimated cost based on the engineers estimate associated with this project?

Government Response: See the Government’s Response to Question #13.

21. Industry Question/Comment: Does the new equipment need to be the exact same dimensions as existing equipment or can the new equipment be smaller if it will perform the safe functions with the same capabilities?

Government Response: See the Government’s Response to Question #3.

22. Industry Question/Comment: Can we get drawings of the bottom block assemblies, sheaves, pins, lifting beams and lifting beam connections?

Government Response: See Reference Drawing Q-4/374A.

23. Industry Question/Comment: At meeting it was indicated that drawings exist showing the length of the cables for the runs from the gate hoists for the feeds and the control cables. Please provide these drawings.

Government Response: See Reference Drawings: Wolf Creek drawing Q-2/836J.4; Dale Hollow drawing Q-3/832D.3; and Center Hill drawing Q-4/836F.7.

24. Industry Question/Comment: W912P517B0008, Under Summary of Work page 12 of 73 the last sentence says that the Contractor shall follow the sequence of work prescribed in the technical specifications. Can all the hoists be manufactured at the same time rather than in the sequences a prescribed in the technical specification?

Government Response: Reference Specifications Section 41 00 01 paragraph 1.2 Sequence of Work.

25. Industry Question/Comment: W912P517B0008 Section 41 00 01 page 7 paragraph 2.7.1 Speed reducers: What is meant by “Speed reducers shall “either” be commercially produced standard speed reducers?

Government Response: Either was removed, See Amendment 0003. Technical Specification Section 41 00 01, Paragraph. 2.7.1

26: Industry Question/Comment: W912P517B0008 Section 41 00 01 page 9 paragraph 2.10 a, and b.

Wire Rope: Drawings show this wire rope is to be stainless steel. Is wire rope to be lubricated and if so by what method and what type of lubrication is desired?

Government Response: See Amendment 0003 section 41 00 01 par.2.10.

27: Industry Question/Comment: Drawings for 20 ton Station Service Hoist Sheet ID C05-M-14 show a hand wheel however we can find no mention in the other specifications for supply of a hand wheel. Is this to be included in the specification?

Government Response: Reference Amendment 0003. Specification Section 41 00 01 Paragraph 2.11 was revised.

28. Industry Question/Comment: In section 26 05 01 1.1.1 a. A line here mentions the placement of new station service switchgear breakers. This should be clarified as some of these breakers will be replaced prior to this work. The question is what breakers if any get replace at any of the three sites on the station service switchgear?

Government Response: Removed. See Amendment 0003.

29. Industry Question/Comment: Can we get a time extension of 2 weeks to the bid date?

Government Response: The bid due date is extended. Reference Amendment 0003.

30. Industry Question/Comment: Regarding the Load Test: From our understanding of the testing requirements for each hoist, we must test the entire assembly and move the rated load 2 feet as opposed to simply conducting a drum pull test. This will required the engineering and construction of a significant structure in order to perform these tests unless an appropriate facility can be located to conduct the tests.

Is our understanding of the government test requirements correct? Is the government aware of a facility that is capable of executing this testing?

Government Response: Maximum load test cannot be completed on site. Yes, the Government is aware of facilities to perform this load testing.

31. Industry Question/Comment: Does the government have spare lower blocks for each hoist to supply for load testing or will supplier have to include the design and fabrication of the lower blocks for testing?

Government Response: No. Technical Specification Section 41 00 01 par 3.4 only requires testing of the hoist and not the lower block.

32. Industry Question/Comment: Will the government want to see engineered and stamped plans and drawings for suspending the gate during hoist replacement?

Government Response: Yes. Contractor will need to follow load handling to meet requirements in EM 385-1-1.

33. Industry Question/Comment: Will government provide bridge loading details for all three sites?

Government Response: See the Government’s Response to Question # 17.

34. Industry Question/Comment: Can the government provide historic lake level details? Due to the limitations on road closures and the size of crane needed to install the hoist units it is likely that the setting of the hoist may have to be completed from a floating plant.

Government Response: Historic lake levels are provided as a separate attachment, provided with Amendment 0003.

35. Industry Question/Comment: This Solicitation has been set aside for Service Disabled Veteran Owned Small Businesses. Due to the fact that there are companies that will misrepresent themselves as Service Disabled Veteran Owned Small Businesses how will the government insure that the project is awarded to a SDVOSB company?

Government Response: Reference FAR Subsection 19.302, entitled “Protesting a Small Business Representation or Re-representation.”

36. Industry Question/Comment: Can we use non stainless steel wire rope for load testing?

Government Response: Yes, Reference Amendment 0003 section. Technical Specification Section 41 00 01 par., Paragraph 3.4 was revised.

37. Industry Question/Comment: Do we have to do a full load capacity testing on only on the drum grooves and not under overwrapped condition?

Government Response: Yes. Load test while not over wrapped will be acceptable.

38. Industry Question/Comment: Refer section 05 50 14.01 Para #3.3.2. Do we have to paint the entire aluminum enclosure or just the areas it contacts with other components?

Government Response: No, do not paint the entire aluminum enclosure, Reference Amendment 0003 section. Technical Specification Section 05 50 14.01 was revised.

39. Industry Question/Comment: In section 01 78 00 1.4 spare parts data says: “Supply one item of each part for spare parts inventory”. Does that mean that we have to supply one spare part for each type of item supplied, for eg. motors, brakes, sheaves, wire rope etc. Can you include a list of items for which you need spares?

Government Response: Minimum spare parts list section 35 20 20 para. 2.9

40. Industry Question/Comment: Please verify that the entire spare parts package is required at each location.

Government Response: Answer: See the Government’s Response to Question #39.

41. Industry Question/Comment: Do we need to supply structural steel dogs/support beams at all gates? Do those become government property at the end of the contract?

Government Response: See Government Response to Question #19. Structural steel dogs/support beams used in execution of this work may be left on site at no cost to the government if in the best interest of the government and approved in writing by the Contracting Officer.

42. Industry Question/Comment: Is there any official way that the government immobilizes the gates when the units are reeved?

Government Response: Answer: Contractor shall determine safe means for reeving.

43. Industry Question/Comment: Are there any limitations of time on road closure at the three locations?

Government Response: Road closures should be coordinated with the appropriate Department of Transportation and shall be approved by the Government.

44. Industry Question/Comment: Does the government want right hand and left hand lay wire rope for the double drum hoists?

Government Response: This shall be as recommended by hoist manufacturers.

45. Industry Question/Comment: Mondell MBE brakes have some cast iron parts other than those listed in sect 35 20 20 #2.2.4., is this acceptable? These standard Mondell brakes are commercial off the shelf brakes, changing the parts will be additional cost to the government.

Government Response: Answer: See Government Response to Question #3.

46. Industry Question/Comment: Brake enclosing case is requested in the spec, but the case is not reflected in the drawing or dimensionally accounted for. Is it to be included or not?

Government Response: Reference Technical Specification Section 35 20 20, Paragraph 2.2.6. Brake enclosure will be required.

47. Industry Question/Comment: Brake routine test is not a standard practice with these types of brakes, however if government still wants to do it, it will be additional cost. Please confirm if the government wants to do these test for each brake or just one example brake of each type used.

Government Response: Reference Technical Specification Section 35 20 20, Paragraph 2.8.2. Yes, one (1) brake of each type used will be complete tested the others shall be routine.

48. Industry Question/Comment: In section 35 20 20 para# 2.1.3.1 Standard Nema D motor has higher than 280% of full load torque. Is this allowable? Does the government anticipate any design changes due to higher full load torque of standard design Nema D motor?

Government Response: Reference Specification Section 35 20 20 paragraph 2.5.10.4.

49. Industry Question/Comment: Can the government clarify what calculations are required specifically for this contract, does the government want PE to review the design and reverse engineering the system or there are only certain calculations required, please list those calculations.

Government Response: For section 05 50 14 design calculations are covered in par. 1.3. Design information added in sec 41 00 01 paragraph 1.6. See amend 0003.

50. Industry Question/Comment: When we remove the control wire to power house, how does the government anticipate controlling the hoists? Is there a requirement to supply a 24 hour support while the control wiring is removed?

Government Response: Contractor shall provide a 30 day notice to the Government before control cabling is replaced. Plant personnel anticipate having the unit in question tagged out during this time with a gate block on. All wiring needs to be replaced at once for the unit being worked on at that time. Control wiring for each head gate is routed through individual conduits and the replacement of this wiring will not affect the control of the other head gates. Reference amendment 0003 cable and conduit schedule drawings.

51. Industry Question/Comment: Section 35 20 20 Para #2.1.2 says the for 112 ton hoist the he motor size is 30HP. The drawing C04-M3 says its 25HP. Which one is correct size?

Government Response: See the Government’s Response to Question #12.

52. Industry Question/Comment: Drawing C05-M9 shows ¾” wire rope in the drawing (see groove detail), in the notes (point #7) it says the wire rope is 1 3/8” diameter wire rope. Please verify the correct wire rope diameter.

Government Response: See the Government’s Response Question #11.

53. Industry Question/Comment: If there are any deficiencies found in the design, will the contractor be compensated for the design changes?

Government Response: The contractor is responsible for the final product and performance of the hoist.

Compensation is available under the Changes clause, if necessary.

54. Industry Question/Comment: In section 35 20 20 #2.8.3 and 2.8.4: Can the control test be done at the controls manufacturing facility?

Government Response: Factory acceptance tests should be performed at the manufacturing facility prior to delivery.

55. Industry Question/Comment: In section 35 20 20 para# 8.4 wiring tests: does that include only the power feed wires or all the wires in the control cabinets, hoists and control circuits to powerhouse. This will require huge amount of time to test all the circuit combinations, esp. in the multi conductor control feed. Please confirm the government’s expectations.

Government Response: Testing is at the discretion of the COR in accordance with specification section 35 20 20 paragraph 3.4.2.

56. Industry Question/Comment: In section 35 20 20 para# 2.8.1.2 Routine Motor Tests: the following shows the standard manufacturer testing procedures, please confirm which test is to be performed on each motor.

Government Response: Bid as specified.

57. Industry Question/Comment: ROUTINE TESTS (STANDARD COMMERCIAL TEST) Each motor is given a standard commercial test to be sure it is free from electric or mechanical defects and to be certain it meets design specifications. This test consists of: (1) No load current (2) Winding resistance (3) High potential (hi-pot) (4) locked torque (squirrel cage only) (5) breakdown torque (6) efficiency and power factor at 100%, 75%, and 50% loads.

WITNESSED TESTS Routine and complete tests may be witnessed by the customer or his representative. All prices for tests are based on the customer furnishing the witness at the customer’s expense. We would recommend doing a complete test on one motor of each type and routine tests for other, please confirm the government’s expectations.

Government Response: Reference Technical Specification 35 20 20, Paragraph 2.8.

58. Industry Question/Comment: Question regarding the definitive responsibility criteria. Usually a contractor has to show some type of experience managing a larger project successfully. I don’t see any required experience history of a proposing contractor in this solicitation. I would recommend the government require contractors to show successful current ongoing work or past performance on a project at least 4 to 5 Million as a prime contractor. This will show they have the experience to manage the difficulties of a project this size successfully.

Government Response: The Contracting Officer has determined the definitive responsibility criteria set forth in the IFB are adequate to protect the interests of the Government.

59. Industry Question/Comment: There is a problem with the weldability of the 4140 shaft to the drum and we are being told that if you want good welds we should use 4130. All other material would be A572- 50.

Government Response: See Government Response to Question #3.

60. Industry Question/Comment: We are also being told that the rolled plate drums that thick are more expensive than forged steel cylinder (A350-LF2 material) with equal material properties to that specified.

To the tune of $340,000 to $360,000.

60. Industry Question/Comment: The design of the drum ie... (for all intents and purposes, “deflection-less”) allows the use of the ½ coupling on the end of the drum to the gear box output shaft. The use of a “barrel type drum coupling” with a drum with some deflection would lessen the cost of the drums considerably more. The barrel couplings are even specified as “mandatory” by the Navy Crane Center due to the fact that they handle high radial loads and do not transmit any deflections into the gear box output shaft. Barrel coupling from companies like Malmedie. (See enclosed power point pdf) Would this design be an acceptable alternative?

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 31-May-2018 02:00 PM to 06-Jun-2018 02:00 PM.

The following have been modified:

BID SCHEDULE

ITEM

NO.

DESCRIPTION EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

BASE

0001 Performance and Payment Bonds 1 JOB $ $

CENTER HILL DAM

0002 Fabricate, Test, and Deliver 250 TON Head Gate Hoist, Machinery Base Assembly

3 EA $ $

0003 Fabricate and Deliver 250 TON Covers 3 EA 0004 Fabricate, Test, and Deliver 20 TON Station Service

Head Gate Hoist, Machinery Base Assembly

1 EA $ $

0005 Fabricate and Deliver 20 TON Station Service Cover 1 EA

0006 ASME B30.2 Vertical Load Test Hoist Assembly 4 EA $

CENTER HILL DAM Estimated Amount $

DALE HOLLOW DAM

0007 Demolition and Abatement of Existing Conditions 1 JOB $ $

0008 Fabricate, Test, and Deliver 112 TON Head Gate Hoist, Machinery Base Assembly

3 EA $ $

0009 Fabricate and Deliver 112 TON Covers 3 EA 0010 Fabricate, Test, and Deliver 20 TON Station Service

Head Gate Hoist, Machinery Base Assembly

1 EA $ $

0011 Fabricate and Deliver 20 TON Station Service Cover 1 EA

0012 ASME B30.2 Vertical Load Test Hoist Assembly 4 EA $ $

0013 Install 112 TON Head Gate Hoist, Machinery Base Assembly and Covers

3 EA $ $

0014 Install 20 TON Station Service Head Gate Hoist, Machinery Base Assembly and Cover

1 EA $ $

0015 Head Gate Feeder Replacement 1 JOB $ $ 0016 Head Gate Control Replacement, Double Throw Safety

Switch Replacement, and Machinery Lighting Addition

4 EA $ $

0017 Headgate Gate Conduit and Wiring Replacement 4 EA $ $

DALE HOLLOW DAM Estimated Amount $

WOLF CREEK DAM

0018 Demolition and Abatement of Existing Conditions 1 JOB $ $

0019 Fabricate, Test, and Deliver 250 TON Head Gate Hoist, Machinery Base Assembly

6 EA $ $

0020 Fabricate and Deliver 250 TON Covers 6 EA 0021 Fabricate, Test, and Deliver 20 TON Station Service

Head Gate Hoist, Machinery Base Assembly

1 EA $ $

0022 Fabricate and Deliver 20 TON Station Service Cover 1 EA

0023 ASME B30.2 Vertical Load Test Hoist Assembly 7 EA $ $ 0024 Install 250 TON Head Gate Hoist, Machinery Base

Assembly and Covers

6 EA $ $

0025 Install 20 TON Station Service Head Gate Hoist, Machinery Base Assembly and Cover

1 EA $ $

0026 Head Gate Feeder Replacement 1 JOB $ $ 0027 Head Gate Control Replacement, Double Throw Safety

Switch Replacement, and Machinery Lighting Addition

7 EA $ $

0028 Headgate Gate Conduit and Wiring Replacement 7 EA $ $

WOLF CREEK DAM Estimated Amount $

TOTAL ESTIMATED BASE AMOUNT $

OPTION 1 CENTER HILL INSTALLATION

1001 Performance and Payment Bonds 1 JOB $ $ 1002 Demolition and Abatement of Existing Conditions 1 JOB $ $

1003 Install 250 TON Head Gate Hoist, Machinery Base Assembly

3 EA $ $

1004 Install 250 TON Head Gate Hoist, Machinery Base Covers

3 EA

1005 Install 20 TON Station Service Head Gate Hoist, Machinery Base Assembly

1 EA $ $

1006 Install 20 TON Station Service Head Gate Hoist, Machinery Base Cover

1 EA

1007 Head Gate Feeder Replacement 1 JOB $ $ 1008 Head Gate Control Replacement, Double Throw Safety

Switch Replacement, and Machinery Lighting Addition

4 EA $ $

1009 Headgate Gate Conduit and Wiring Replacement 4 EA $ $

OPTION 1 CENTER HILL INSTALLATION Estimated Amount $

TOTAL ESTIMATED AMOUNT (BASE + OPTION 1) $

SPECIAL CONTRACT REQUIREMENTS

ADMINISTRATIVE DISPUTE RESOLUTION

In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990, ADR Act, Pub. L. 101-552, the Contracting Officer will try and resolve all post award acquisition issues in controversy by mutual agreement of the parties. Interested parties are encouraged to use alternative resolution procedures to the maximum extent practicable in accordance with the authority and the requirement of ADR ACT.

VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

U.S. Department of Labor Veterans employment: www.vets.gov/ Federal veteran employment information: www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS): http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program:

http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index:

wtc.army.mil/modules/employers/index.html Hiring Our Heroes initiative: www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans:

https://obamawhitehouse.archives.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf.

SAFETY AND HEALTH MANUAL

The U.S. Army Corps of Engineers Safety and Health Requirement Manual, EM 385-1-1 is posted on the Headquarters Website located at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

NOTICE: Use of Class I Ozone-Depleting Substances

a. In accordance with Section 326 of P.L. 102-484, the Government is prohibited from awarding any contract which includes a specification or standard that requires the use of a Class I ozone-depleting substance (ODS) identified in Section 601(a) of the Clean Air Act, (42 U.S.C 767a(a)), or that can be met only through the use of such a substance unless such use has been approved, on an individual basis, by a senior acquisitions official who determines that there is no suitable substitute available.

b. To comply with this statute, the Government has conducted a best effort screening of the specifications and standards associated with this acquisition to determine whether they contain any ODS requirements.

This requirement has no relationship to ODSs.

SCHEDULE OF INSURANCE

a. The contractor shall, at its own expense, provide and maintain during the entire performance period of this contract at least the kinds and minimum amounts of insurance required below:

Workmen’s Compensation and Employer’s Liability Insurance $100,000 General Liability Insurance for Bodily Injury Liability Minimum Per Occurrence for Bodily Liability $500,000 Minimum Per Each Accident for Property Damage $100,000 Minimum Aggregate for Bodily Injury $500,000 Automobile Liability Insurance Minimum Per Person $200,000 Minimum Per Occurrence for Bodily Injury $500,000 Minimum Per Occurrence for Property Damage $ 20,000

b. Before commencing work under this contract, the contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed or prescribed, and (2) until 30 days after the insurer of the contractor gives written notice to the Contracting Officer.

c. The contractor shall insert the substance of the clause entitled “Insurance-Work on a Government Installation (FAR 52.228-5)”, in subcontracts under this contract that require work on a Government Installation and shall require subcontractors to provide and maintain the insurance required above.

ADMINISTRATIVE DISPUTE RESOLUTION

“In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990, ADR Act, Pub. L. 101- 552, the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of the parties. Interested parties are encouraged to use alternative resolution procedures to the maximum extent practicable in accordance with the authority and the requirement of ADR ACT.”

CONSTRUCTION LABOR CLAUSES

The construction labor standards clauses incorporated into this solicitation/contract apply to all work performed at the Government facilities. Reference FAR 22.407(c).

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001

W912P517B0008 HEADWORKS INTAKE LIFTING EQUIPMENT FOR CEN/DAL/WOL

This solicitation is being amended to extend the bid due date to allow the Government sufficient time to answer the questions received during the question and answer period and to add the site visit sign in sheet/agenda. The questions will be answered in a forthcoming amendment. The bid due date is extended to 25 May 2018 at 2:00 pm central time.

FAR 52.252-3 has been updated.

Amendment 0002

W912P517B0008 HEADWORKS INTAKE LIFTING EQUIPMENT FOR CEN/DAL/WOL

The solicitation is being amended to extend the bid due date to allow the Government sufficient time to answer the questions received during the question and answer period. The questions will be added in a forthcoming amendment. The bid due date is extended to 31 May 2018 at 2:00 p.m. central time.

FAR 52.252-3 has been updated.

Amendment 0003

W912P517B0008 HEADWORKS INTAKE LIFTING EQUIPMENT FOR CEN/DAL/WOL

The solicitation is being amended to answer questions received during the question period, update drawings, update techncial specification, update the bid schedule, and to extend the bid due date. The bid due date is extended to 6 June 2018 at 2:00 pm central time.

FAR 52.252-3 has been updated..

(End of Summary of Changes)

(End of Summary of Changes)

File details come from the government source that posted it.