Amendment 0001 Technical Specifications

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
W912P5-16-B-0006-TSpecs-Am2pgs.pdf PDF
Amendment_0002.pdf PDF
Prebidsitevisitattendancelist.pdf PDF
Amendment0001.pdf PDF
W912P5-16-B-0006.pdf PDF
W912P5-16-B-0006-TSpecs.pdf PDF
W912P5-16-B-0006-Plans.pdf PDF
W912P5-16-B-0006-AppA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Poor Fork City of Cumberland, Kentucky W912P5-16-B-0006 Amendment No. 0001

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

01 22 00 PRICE AND PAYMENT PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01 QUALITY CONTROL

01 45 02 QUALITY CONTROL SYSTEM (QCS)

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 00 CLOSEOUT SUBMITTALS

01 95 00 FORMS AND ATTACHMENTS

DIVISION 02 - EXISTING CONDITIONS

02 41 16 DEMOLITION AND REMOVAL

DIVISION 31 - EARTHWORK

31 05 22 GEOTEXTILES USED AS FILTERS

31 11 00 CLEARING, GRUBBING, AND EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 32 92 19 32 93 43

AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

SEEDING

PLANTING TREES

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 31 19 STONE PROTECTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

THIS PAGE INTENTIONALLY LEFT BLANK

FOR DUPLEX PRINTING

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 GENERAL

1.2 BASE CONTRACT PAYMENT ITEMS

1.2.1 Mobilization and Preparatory Work

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Performance and Payment Bonds

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 Geotextile Fabric

1.2.3.1 Payment

1.2.3.2 Measurement

1.2.3.3 Unit of Measure

1.2.4 Clearing and Grubbing

1.2.4.1 Payment

1.2.4.2 Measurement

1.2.4.3 Unit of Measure

1.2.5 Excavation

1.2.5.1 Payment

1.2.5.2 Measurement

1.2.5.3 Unit of Measure

1.2.6 Graded Chrushed Aggregate Base

1.2.6.1 Payment

1.2.6.2 Measurement

1.2.6.3 Unit of Measure

1.2.7 Demolition and Removal

1.2.7.1 Payment

1.2.7.2 Unit of Measure

1.2.8 Permanent Turf Grass Seeding

1.2.8.1 Payment

1.2.8.2 Measurement

1.2.8.3 Unit of Measure

1.2.9 Temporary Seeding

1.2.9.1 Payment

1.2.9.2 Measurement

1.2.9.3 Unit of Measure

1.2.10 Trees and Shrubbery

1.2.10.1 Payment

1.2.10.2 Unit of Measure

1.2.11 Rip Rap Channel Lining

1.2.11.1 Payment

1.2.11.2 Measurement

1.2.11.3 Unit of Measure

1.2.12 Chain Link Fence (Remove and Relocate)

1.2.12.1 Payment

SECTION 01 22 00 Page 1

1.2.12.2 Unit of Measure

1.3 OPTION 1 PAYMENT ITEMS

1.3.1 Geotextile Fabric

1.3.1.1 Payment

1.3.1.2 Measurement

1.3.1.3 Unit of Measure

1.3.2 Clearing and Grubbing

1.3.2.1 Payment

1.3.2.2 Measurement

1.3.2.3 Unit of Measure

1.3.3 Excavation

1.3.3.1 Payment

1.3.3.2 Measurement

1.3.3.3 Unit of Measure

1.3.4 Permanent Turf Grass Seeding

1.3.4.1 Payment

1.3.4.2 Measurement

1.3.4.3 Unit of Measure

1.3.5 Temporary Seeding

1.3.5.1 Payment

1.3.5.2 Measurement

1.3.5.3 Unit of Measure

1.3.6 Trees and Shrubbery

1.3.6.1 Payment

1.3.6.2 Unit of Measure

1.3.7 Rip Rap Channel Lining

1.3.7.1 Payment

1.3.7.2 Measurement

1.3.7.3 Unit of Measure

1.3.8 Stock Fence (Remove and Relocate)

1.3.8.1 Payment

1.3.8.2 Unit of Measure

1.3.9 Dog Kennel (Remove and Relocate)

1.3.9.1 Payment

1.3.9.2 Unit of Measure

1.3.10 Shed on Foundation (Remove and Relocate)

1.3.10.1 Payment

1.3.10.2 Unit of Measure

1.3.11 Shed Without Foundation (Relocate)

1.3.11.1 Payment

1.3.11.2 Unit of Measure

1.3.12 Carport Without Foundation (Relocate)

1.3.12.1 Payment

1.3.12.2 Unit of Measure

1.3.13 Driveway Restoration

1.3.13.1 Payment

1.3.13.2 Unit of Measure

1.4 FIELD SURVEYS

1.4.1 Surveys of Riprap Areas

1.4.2 Surveys of Excavated Areas

1.5 SUBMITTALS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 CONTRACT COST BREAKDOWN

SECTION 01 22 00 Page 2

-- End of Section Table of Contents --

SECTION 01 22 00 Page 3

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 GENERAL

Payment items for the work of this contract for which payments will be made are listed in the BIDDING SCHEDULE and described in this section. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2 BASE CONTRACT PAYMENT ITEMS

1.2.1 Mobilization and Preparatory Work

1.2.1.1 Payment

Mobilization and preparatory work shall be paid for at the contract price per Job for "Mobilization and Preparatory Work". Payment shall be done in accordance with FAR 252.236-7003, PAYMENT FOR MOBILIZATION AND PREPARATORY WORK, and as described below:

The Contractor shall receive payment from the Government under the procedures in this paragraph for mobilization and preparatory work. Payment shall be made to the Contractor for construction of plant(s), rental equipment, material, computers, office trailers, and supporting expenditures to establish access roads, temporary construction entrances, trailer courts, disposal areas, and other site development needed for the job prior to the start of construction. The Contractor shall provide supporting documentation for payment of each item and shall not receive payment until the Contracting Officer has receipts to prove that payment for all items claimed have been validated. All construction plant, material, equipment, and the mobilization and preparatory work shall be performed and determined to be suitable for efficiency in performing the work before payment is made.

1.2.1.2 Unit of Measure

Unit of measure: Job.

1.2.2 Performance and Payment Bonds

1.2.2.1 Payment

Payment will be made for costs associated with performance and payment bonds. In accordance with Contract Clause 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, the premiums for performance and

SECTION 01 22 00 Page 4 payment bonds shall be included in the contract price. Payment for the premiums for performance and payment bonds will be made at the contract price per Job for "Performance & Payment Bonds." Payments made under this provision shall not exceed the amount included for "Performance & Payment Bonds," which payment shall take into consideration any discounts or rebates to the Contractor from the Surety. The Contractor is advised that the pay item "Performance & Payment Bonds" is only for the cost of bonds.

Other costs should be allocated to the appropriate bid items.

1.2.2.2 Unit of Measure

Unit of measure: Job.

1.2.3 Geotextile Fabric

1.2.3.1 Payment

Payment will be made for costs associated with procuring and installing geotextile as shown in the contract drawings and specified in Section 31 05 22 GEOTEXTILES USED AS FILTERS. Payment for placing geotextile fabric will be made at the contract unit price per square yard (SY) for "Geotextile Fabric," and will constitute full compensation to the Contractor for providing all plant, labor, material, and equipment and performing all operations necessary for the complete and satisfactory installation of the geotextile.

1.2.3.2 Measurement

Installed geotextiles will be measured for payment in place to the nearest square yard of protected area. The following items are included in the unit price for Geotextiles and will not be counted a second time in the process of determining the extent of geotextile placed: Material and associated equipment and operation used in laps, seams, or extra length;

securing pins and associated material, equipment, and operations. No payment will be made for geotextiles replaced because of waste, contamination, damage, repair, or due to Contractor fault or negligence.

1.2.3.3 Unit of Measure

Unit of measure: square yard (SY).

1.2.4 Clearing and Grubbing

1.2.4.1 Payment

Payment will be made for clearing and grubbing satisfactorily performed in accordance with the contract drawings and specified in Section 31 11 00 CLEARING, GRUBBING, AND EARTHWORK. Payment for clearing and grubbing will be made at the contract unit price per Acre for "Clearing and Grubbing".

This price shall include consideration for all required equipment, materials and associated work, and disposal of all associated materials.

1.2.4.2 Measurement

Measurement for payment will be made to the nearest acre of satisfactorily cleared and grubbed areas.

SECTION 01 22 00 Page 5

1.2.4.3 Unit of Measure

Unit of measure: Acre.

1.2.5 Excavation

1.2.5.1 Payment

Payment will be made for costs associated with excavation activities as shown in the contract drawings and specified in Section 31 11 00 CLEARING, GRUBBING, AND EARTHWORK. Payment for excavation will be made at the contract unit price per cubic yard (CY) for "Excavation". Payment will constitute full compensation for all labor, equipment, tools, supplies, and incidentals necessary to complete all the work required under this section. Disposal of excavated materials shall be considered incidental to this pay item.

1.2.5.2 Measurement

Excavation will be measured by the cubic yard in place, based on the average end area method from cross sections taken before and after the excavation operations.

1.2.5.3 Unit of Measure

Unit of measure: Cubic Yard (CY).

1.2.6 Graded Chrushed Aggregate Base

1.2.6.1 Payment

Payment will be made for costs associated with furnishing, transporting, stockpiling (if applicable), and placing Graded Chrushed Aggregate Base, as specified in Section 32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE and as shown in the drawings. Payment will be made at the contract unit price per ton for "Graded Chrushed Aggregate Base".

1.2.6.2 Measurement

Measure Graded Chrushed Aggregate Base for payment by the ton (2,000 pounds) by weighing each truckload to the nearest 0.1 ton, and the final quantity of each truckload is rounded to the nearest whole ton. Weigh for payment on approved scales before being placed in the work. Quarry weights will not be accepted. Use scales of sufficient length to permit simultaneous weighing all axle loads. Scales must be inspected, tested and sealed as directed to assure accuracy with 0.5 percent throughout the range of the scales. Certify scales located at the site of the work as to accuracy by an acceptable scales company representative prior to weighing any material. Scales will be checked and certified before hauling and rechecked and recertified whenever a variance is suspected. Furnish the scales. If commercial scales are readily available in close proximity, 10 miles of site of work, the Contracting Officer may approve the use of the scales. Weigh material in the presence of the Government representative.

The Contracting Officer may elect to accept certified weight certificates furnished by a public weighmaster in lieu of scale weights at the jobsite.

1.2.6.3 Unit of Measure

Unit of measure: TON (2,000 pounds).

SECTION 01 22 00 Page 6

1.2.7 Demolition and Removal

1.2.7.1 Payment

Payment will be made for costs associated with demolition and removal of items as shown in the contract drawings and specified in Section 02 41 16 DEMOLITION AND REMOVAL. Payment for demolition and removal will be made per job for "Demolition and Removal".

1.2.7.2 Unit of Measure

Unit of measure: Job (JOB).

1.2.8 Permanent Turf Grass Seeding

1.2.8.1 Payment

Payment will be made for costs associated with installing permanent turf grass seeding as specified in Section 32 92 19 TOPSOILING AND SEEDING.

Payment for the complete turf grass seeding operation will be made at the contract unit price per MSF for "Permanent Turf Grass Seeding"; which price shall include all costs in connection with tilling, seeding, fertilizing, erosion control blanket, incorporating, protecting, and maintaining.

1.2.8.2 Measurement

The unit of measurement for permanent turf grass seeding will be per 1,000

sq. ft. (MSF). The areas to be paid for shall be those actually seeded computed to the nearest 1,000 sq. ft. Measurement and payment will also be made of areas that are required to be reseeded by the Contracting Officer, if such reseeding is necessitated through no fault of the Contractor.

1.2.8.3 Unit of Measure

Unit of measure: Thousand Square Feet (MSF).

1.2.9 Temporary Seeding

1.2.9.1 Payment

Payment will be made for costs associated with installing temporary grass seeding as specified in Section 32 92 19 TOPSOILING AND SEEDING. Payment for the temporary seeding operation will be made at the contract unit price per MSF for "Temporary Seeding;" which price shall include all costs in connection with fertilizing, tilling, seeding, incorporating, protecting, and maintaining.

1.2.9.2 Measurement

The unit of measurement for temporary seeding will be per 1,000 sq. ft.

(MSF). The areas to be paid for shall be those actually seeded computed to the nearest 1,000sq. ft.

1.2.9.3 Unit of Measure

Unit of measure: Thousand Square Feet (MSF).

SECTION 01 22 00 Page 7

1.2.10 Trees and Shrubbery

1.2.10.1 Payment

Payment will be made for costs associated with plantings as shown in the contract drawings and specified in Section 32 93 43 PLANTING TREES. Payment for plantings will be made per job for "Trees and Shrubbery".

1.2.10.2 Unit of Measure

Unit of measure: Job (JOB).

1.2.11 Rip Rap Channel Lining

1.2.11.1 Payment

Payment for riprap acceptably placed will be made at the applicable contract unit price per ton for "Rip Rap Channel Lining" and as specified in Section 35 31 19 STONE PROTECTION. Price and payment shall constitute full compensation for furnishing, hauling, handling, placing, and maintaining the riprap until final acceptance by the Government.

1.2.11.2 Measurement

No payment will be made for excess riprap left in place. Existing stone placed in lieu of new stone from off-site sources will be excluded from measurement and payment. Riprap will be measured for payment by the ton in the presence of the Contracting Officer, by weighing on approved, accurately calibrated scales furnished by and at the expense of the Contractor. The scales shall be capable of printing a weight ticket including time, date, truck number, and weight. Weight certificates furnished by a public weighmaster will be acceptable. Quantities shall be computed to the nearest whole ton.

1.2.11.3 Unit of Measure

Unit of measure: Ton (TON).

1.2.12 Chain Link Fence (Remove and Relocate)

1.2.12.1 Payment

Payment will be made for costs associated with removal and relocation of chain link fence as shown in contract drawing no. Q1P-64/109. Payment will be made per job for "Chain Link Fence (Remove and Relocate)".

1.2.12.2 Unit of Measure

Unit of measure: Job (JOB).

SECTION 01 22 00 Page 8

1.3 OPTION 1 PAYMENT ITEMS

1.3.1 Geotextile Fabric

1.3.1.1 Payment

Payment will be made for costs associated with procuring and installing geotextile for Option 1 as shown in the contract drawings and specified in Section 31 05 22 GEOTEXTILES USED AS FILTERS. Payment for placing geotextile fabric will be made at the contract unit price per square yard (SY) for "Geotextile Fabric," and will constitute full compensation to the Contractor for providing all plant, labor, material, and equipment and performing all operations necessary for the complete and satisfactory installation of the geotextile.

1.3.1.2 Measurement

Installed geotextiles will be measured for payment in place to the nearest square yard of protected area. The following items are included in the unit price for Geotextiles and will not be counted a second time in the process of determining the extent of geotextile placed: Material and associated equipment and operation used in laps, seams, or extra length;

securing pins and associated material, equipment, and operations. No payment will be made for geotextiles replaced because of waste, contamination, damage, repair, or due to Contractor fault or negligence.

1.3.1.3 Unit of Measure

Unit of measure: square yard (SY).

1.3.2 Clearing and Grubbing

1.3.2.1 Payment

Payment will be made for clearing and grubbing for Option 1 satisfactorily performed in accordance with the contract drawings and specified in Section 31 11 00 CLEARING, GRUBBING, AND EARTHWORK. Payment for clearing and grubbing will be made at the contract unit price per Acre for "Clearing and Grubbing". This price shall include consideration for all required equipment, materials and associated work, and disposal of all associated materials.

1.3.2.2 Measurement

Measurement for payment will be made to the nearest acre of satisfactorily cleared and grubbed areas.

1.3.2.3 Unit of Measure

Unit of measure: Acre.

SECTION 01 22 00 Page 9

1.3.3 Excavation

1.3.3.1 Payment

Payment will be made for costs associated with excavation activities for Option 1 as shown in the contract drawings and specified in Section 31 11 00 CLEARING, GRUBBING, AND EARTHWORK. Payment for excavation will be made at the contract unit price per cubic yard (CY) for "Excavation". Payment will constitute full compensation for all labor, equipment, tools, supplies, and incidentals necessary to complete all the work required under this section. Disposal of excavated materials shall be considered incidental to this pay item.

1.3.3.2 Measurement

Excavation will be measured by the cubic yard in place, based on the average end area method from cross sections taken before and after the excavation operations.

1.3.3.3 Unit of Measure

Unit of measure: Cubic Yard (CY).

1.3.4 Permanent Turf Grass Seeding

1.3.4.1 Payment

Payment will be made for costs associated with installing permanent turf grass seeding for Option 1 as specified in Section 32 92 19 TOPSOILING AND SEEDING. Payment for the complete turf grass seeding operation will be made at the contract unit price per MSF for "Permanent Turf Grass Seeding";

which price shall include all costs in connection with tilling, seeding, fertilizing, erosion control blanket, incorporating, protecting, and maintaining.

1.3.4.2 Measurement

The unit of measurement for permanent turf grass seeding will be per 1,000

sq. ft. (MSF). The areas to be paid for shall be those actually seeded computed to the nearest 1,000 sq. ft. Measurement and payment will also be made of areas that are required to be reseeded by the Contracting Officer, if such reseeding is necessitated through no fault of the Contractor.

1.3.4.3 Unit of Measure

Unit of measure: Thousand Square Feet (MSF).

1.3.5 Temporary Seeding

1.3.5.1 Payment

Payment will be made for costs associated with installing temporary grass seeding for Option 1 as specified in Section 32 92 19 TOPSOILING AND SEEDING. Payment for the temporary seeding operation will be made at the contract unit price per MSF for "Temporary Seeding;" which price shall include all costs in connection with fertilizing, tilling, seeding, incorporating, protecting, and maintaining.

SECTION 01 22 00 Page 10

1.3.5.2 Measurement

The unit of measurement for temporary seeding will be per 1,000 sq. ft.

(MSF). The areas to be paid for shall be those actually seeded computed to the nearest 1,000sq. ft.

1.3.5.3 Unit of Measure

Unit of measure: Thousand Square Feet (MSF).

1.3.6 Trees and Shrubbery

1.3.6.1 Payment

Payment will be made for costs associated with plantings for Option 1 as shown in the contract drawings and specified in Section 32 93 43 PLANTING TREES. Payment for plantings will be made per job for "Trees and Shrubbery".

1.3.6.2 Unit of Measure

Unit of measure: Job (JOB).

1.3.7 Rip Rap Channel Lining

1.3.7.1 Payment

Payment for riprap for Option 1 acceptably placed will be made at the applicable contract unit price per ton for "Rip Rap Channel Lining" and as specified in Section 35 31 19 STONE PROTECTION. Price and payment shall constitute full compensation for furnishing, hauling, handling, placing, and maintaining the riprap until final acceptance by the Government.

1.3.7.2 Measurement

No payment will be made for excess riprap left in place. Existing stone placed in lieu of new stone from off-site sources will be excluded from measurement and payment. Riprap will be measured for payment by the ton in the presence of the Contracting Officer, by weighing on approved, accurately calibrated scales furnished by and at the expense of the Contractor. The scales shall be capable of printing a weight ticket including time, date, truck number, and weight. Weight certificates furnished by a public weighmaster will be acceptable. Quantities shall be computed to the nearest whole ton.

1.3.7.3 Unit of Measure

Unit of measure: Ton (TON).

1.3.8 Stock Fence (Remove and Relocate)

1.3.8.1 Payment

Payment will be made for costs associated with removal and relocation of stock fence as shown in contract drawing no. Q1P-64/109. Payment will be made per job for "Stock Fence (Remove and Relocate)".

1.3.8.2 Unit of Measure

Unit of measure: Job (JOB).

SECTION 01 22 00 Page 11

1.3.9 Dog Kennel (Remove and Relocate)

1.3.9.1 Payment

Payment will be made for costs associated with removal and relocation of chain link fence as shown in contract drawing no. Q1P-64/109. Payment will be made per job for "Dog Kennel (Remove and Relocate)".

1.3.9.2 Unit of Measure

Unit of measure: Job (JOB).

1.3.10 Shed on Foundation (Remove and Relocate)

1.3.10.1 Payment

Payment will be made for costs associated with removal and relocation of shed with foundation as shown in contract drawing no. Q1P-64/109. Payment will be made per job for "Shed on Foundation (Remove and Relocate)".

1.3.10.2 Unit of Measure

Unit of measure: Job (JOB).

1.3.11 Shed Without Foundation (Relocate)

1.3.11.1 Payment

Payment will be made for costs associated with relocation of shed without foundation as shown in contract drawing no. Q1P-64/109. Payment will be made per job for "Shed Without Foundation (Relocate)".

1.3.11.2 Unit of Measure

Unit of measure: Job (JOB).

1.3.12 Carport Without Foundation (Relocate)

1.3.12.1 Payment

Payment will be made for costs associated with relocation of car port without foundation as shown in contract drawing no. Q1P-64/109. Payment will be made per job for "Carport Without Foundation (Relocate)".

1.3.12.2 Unit of Measure

Unit of measure: Job (JOB).

1.3.13 Driveway Restoration

1.3.13.1 Payment

Payment will be made for costs associated with restoration of driveway as shown in contract drawing no. Q1P-64/109. Payment will be made per job for "Driveway Restoration".

SECTION 01 22 00 Page 12

1.3.13.2 Unit of Measure

Unit of measure: Job (JOB).

1.4 FIELD SURVEYS

No separate payment will be made for field surveys. All costs for surveys shall be considered incidental to the closest associated feature of work.

The volume of material for payment of excavation shall be determined by the average end area method and the pre- and post excavation surveys. The Contractor will not be paid for material remaining outside of the specified tolerances.

Pre- and post-placement survey cross sections shall be performed for the excavation, embankment fill, and riprap; and the results submitted to the Contracting Officer. Surveys shall be performed by a land surveyor with current Commonwealth registration. The Contractor shall notify the Contracting Officer not less than three working days in advance of each survey. Surveys shall be conducted in the presence of the Contracting Officer or his designated representative unless this requirement is waived.

In the event of unavailability of the Contracting Officer, the Contractor shall perform the survey and certify that it complies with the specifications.

The Contractor will be responsible for establishing, protecting and maintaining a baseline. A schematic of the baseline shall be provided to the Contracting Officer along with horizontal coordinates at the endpoints and at all changes in alignment. These horizontal coordinates shall be in the Kentucky State Plane, NAD 83 coordinate system and shall be to the nearest foot with accuracy of +/- 0.5 foot.

Drawings shall utilize A/E/C CADD standards, Latest Release. All electronic drawings shall be submitted to the Government in MicroStation ".dgn" format and ".pdf" portable document format. Drawings should be developed using Arial Font for text, and A/E/C CADD standard ".dgnlibs" for level assignment, line weights, line styles, and line color. A copy of the "dgnlibs" will be furnished. Civil site plan drawings shall utilize a standard engineering drawing scale. Additionally, provide all CAD files to include but not limited to .dtm, .alg, .eav, .xyz, .xls, .xsc, and .ASCII or .XML file types used to generate electronic drawings such as contours, .dtms, plan views, profiles, and cross sections so that USACE may be able to regenerate those profiles, cross sections, contours, alignments, etc as needed during the design process.

Cross-sections shall be surveyed perpendicular to the channel alignment and shall be no more than 25 feet apart as measured along the baseline. The readings shall be at 5-foot intervals and at breaks in grade unless otherwise specified. Additional sections at closer spacing for significant changes in topography may be required as determined appropriate by the Contracting Officer. The station at which the cross-section intersects the baseline shall be used to identify it. Surveyed elevations shall reference the same datum used on the drawings and shall be to the nearest tenth of a foot with an accuracy of +/- 0.1 foot. Additional elevations shall be taken if the Contracting Officer deems such to be necessary or advisable.

The top elevation of placed riprap shall be determined by the use of a leveling instrument and a rod having a base 12 inches in diameter.

SECTION 01 22 00 Page 13

1.4.1 Surveys of Riprap Areas

In order to define the original ground surface, the Contractor shall take cross sections of the area to receive riprap after preparation of the foundation and prior to placing material. Another survey at the same sections shall be performed after riprap has been placed. The Contractor shall perform partial surveys as the work progresses to verify lines, grades and thickness established for completed work. Surveys made are required to determine that the material has been acceptably placed. At least one in-progress survey shall be made by the Contractor as determined appropriate by the Contracting Officer. Following placement, the cross-sections shall be approved by the Contracting Officer before proceeding with the next section of work. Approval of cross-sections based upon in-progress surveys shall not constitute final acceptance of the work.

A final as-built survey shall be performed after all riprap has been placed. Survey results shall include electronic scaled drawings of data submitted as cross section plots. The Contracting Officer may also require the Contractor to submit survey field notes. For the purpose of coordinating with the Government, the Contractor shall schedule surveys during the normal business hours of Monday through Friday 7:00 a.m. to 3:30 p.m. Central Time with the exception of Federal Holidays.

1.4.2 Surveys of Excavated Areas

For surveys of excavation, the same procedures specified above shall be followed. The initial survey shall be taken after clearing and grubbing has been completed and prior to excavation. The final survey shall be taken after excavation and grading is complete. The volume of excavated material for payment shall be determined by the average end area method based on these two surveys. Survey results shall be submitted to the Government.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Weight Certificates

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 CONTRACT COST BREAKDOWN

The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late

SECTION 01 22 00 Page 14 payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.

-- End of Section --

SECTION 01 22 00 Page 15

S U

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

W

2P 5-

-B

-0

P oo r F or k P ro je ct

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

G A re a

U se

P la n

S

D -0

P ro du ct D at a

1.

2.

6.

W ei gh t C er tif ic at es

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

P ro je ct

S ch ed ul er Q ua lif ic at io ns

3.

4.

G

P re lim in ar y

P ro je ct

S ch ed ul e 3.

4.

G In iti al

P ro je ct

S ch ed ul e 3.

6.

G P er io di c

S ch ed ul e U pd at e

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

S ub m itt al

R eg is te r

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

A cc id en t P re ve nt io n

P la n (A

P P

S

D -0

Te st R ep or ts 1.

N ot ifi ca tio ns a nd R ep or ts 1.

.2

G A cc id en t R ep or ts 1.

.3

LH

E

In sp ec tio n R ep or ts S

D -0

C er tif ic at es 1.

5.

1.

C ra ne

O pe ra to rs /R ig ge rs 1.

6.

2.

G

S ta nd ar d Li ft P la n

1.

6.

2.

G C rit ic al L ift P la n

1.

A ct iv ity

H az ar d

A na ly si s (A

H A

1.

8.

C on fin ed

S pa ce E nt ry

P er m it

1.

8.

H ot W or k

P er m it

1.

.4 C er tif ic at e of

C om pl ia nc e

S D

-0

P re co ns tru ct io n

S ub m itt al s

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

W

2P 5-

-B

-0

P oo r F or k P ro je ct

3.

G C on tra ct or

Q ua lit y

C on tro l (

C Q

C

P la n S

D -0

Te st R ep or ts 3.

V er ifi ca tio n S ta te m en t S

D -1

C lo se ou t S ub m itt al s 3.

P ro gr es s an d

W or k P ho to gr ap hs

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

6.

P re co ns tru ct io n

S ur ve y

1.

G S ol id

W as te M an ag em en t P er m it

1.

6.

G

R eg ul at or y

N ot ifi ca tio ns

1.

G E nv iro nm en ta l P ro te ct io n P la n

3.

3.

1.

G S to rm w at er N ot ic e of

In te nt G

D irt a nd

D us t C on tro l P la n

1.

6.

G

E m pl oy ee T ra in in g

R ec or ds

1.

6.

G

E nv iro nm en ta l M an ag er

Q ua lif ic at io ns S

D -0

Te st R ep or ts La bo ra to ry

A na ly si s 3.

3.

1.

In sp ec tio n

R ep or ts

G S ol id

W as te M an ag em en t R ep or t

S D

-0

C er tif ic at es

1.

6.

G

E m pl oy ee T ra in in g

R ec or ds

C er tif ic at e of C om pe te nc y E ro si on a nd S ed im en t C on tro l In sp ec to r

S D

-1

C lo se ou t S ub m itt al sSU

B M

IT

TA

L R

EG

IS

TE

R

C O

N

TR

A C

T N

O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

W

2P 5-

-B

-0

P oo r F or k P ro je ct

3.

3.

1.

G S to rm w at er P ol lu tio n

P re ve nt io n

P la n C om pl ia nc e N ot eb oo k

3.

3.

1.

G S to rm w at er N ot ic e of

T er m in at io n G

W as te D et er m in at io n D oc um en ta tio n

G D is po sa l D oc um en ta tio n fo r

H az ar do us a nd R eg ul at ed

W as te 1.

6.

G A ss em bl ed

E m pl oy ee T ra in in g

R ec or ds

1.

G S ol id

W as te M an ag em en t P er m it

G S ol id

W as te M an ag em en t R ep or t

G H az ar do us

W as te /D eb ris

M an ag em en t

1.

6.

G

R eg ul at or y

N ot ifi ca tio ns

G S al es

D oc um en ta tio n C on tra ct or

C er tif ic at io n 3.

3.

1.

A s- B ui lt

To po gr ap hi c

S ur ve y

S D

-0

P ro du ct

D at a 1.

6.

W ar ra nt y M an ag em en t P la n S

D -1

C lo se ou t S ub m itt al s 3.

G

A s-

B ui lt D ra w in gs

3.

G R ec or d D ra w in gs

S D

-0

S am pl es

G eo te xt ile S am pl es G

; C D

-S S

D -0

C er tif ic at es

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

W

2P 5-

-B

-0

P oo r F or k P ro je ct

G G eo te xt ile

M an uf ac tu re r's C er tif ic at io n

S D

-0

P re co ns tru ct io n

S ub m itt al s

G C le ar in g an d

E ar th w or k

P la n

S

D -0

P ro du ct D at a

2.

P la nt , E qu ip m en t, an d To ol s

W ay bi lls a nd

D el iv er y Ti ck et s S

D -0

Te st R ep or ts 1.

G

S am pl in g an d Te st in g 1.

4.

2.

G

Fi el d D en si ty T es ts

S D

-0

P ro du ct

D at a 2.

5.

W oo d ce llu lo se fi be r m ul ch

2.

Fe rti liz er

H ay o r S tra w

M ul ch S

D -0

Te st R ep or ts 2.

2.

To ps oi l c om po si tio n te st s

G Fe rti liz er a nd L im e

S D

-0

C er tif ic at es

2.

se ed

S D

-0

M an uf ac tu re r’s In st ru ct io ns 2.

E ro si on C on tro l M at er ia ls

S

D -0

P re co ns tru ct io n S ub m itt al s G

P la nt in g P la n

S D

-0

P ro du ct

D at a V eg et at iv e M ul ch

Fe rti liz er

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

W

2P 5-

-B

-0

P oo r F or k P ro je ct

E qu ip m en t

S D

-0

C er tif ic at es

S ta te C er tif ic at io n an d

A pp ro va l N ur se ry C er tif ic at io ns

C er tif ic at es o f I ns pe ct io n S

D -1

O pe ra tio n an d

M ai nt en an ce

D at a G

M ai nt en an ce

R ec or ds

G Fi na l P ro je ct R ep or t

S

D -0

P ro du ct D at a

G R ip ra p S ou rc es G

C on ve yi ng a nd P la ci ng S

D -0

S am pl es 1.

7.

G S to ne

S D

-0

Te st

R ep or ts

G G ra da tio n

Te st

S D

-0

C er tif ic at es

1.

7.

S to ne

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

SECTION TABLE OF CONTENTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 32 92 19

SEEDING

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Stand of Turf

1.3 SUBMITTALS

1.4 DELIVERY, STORAGE, AND HANDLING

1.4.1 Delivery

1.4.1.1 Seed Protection

1.4.1.2 Fertilizer Delivery

1.4.2 Storage

1.4.2.1 Seed, Fertilizer Limestone, Gypsum, Micronutrients, and

Biological Inoculants Storage

1.4.2.2 Topsoil

1.4.2.3 Handling

1.5 TIME RESTRICTIONS AND PLANTING CONDITIONS

1.5.1 Restrictions

1.6 TIME LIMITATIONS

1.6.1 Seed

PART 2 PRODUCTS

2.1 SEED

2.1.1 Classification

2.1.2 Planting Dates

2.1.3 Seed Purity

2.1.4 Seed Mixture by Weight

2.2 TOPSOIL

2.2.1 On-Site Topsoil

2.2.2 Off-Site Topsoil

2.2.3 Composition

2.3 SOIL CONDITIONERS

2.3.1 Lime

2.3.2 Gypsum

2.3.3 Sulfur

2.3.4 Iron

2.3.5 Peat

2.3.6 Sand

2.3.7 Perlite

2.3.8 Composted Derivatives

2.3.8.1 Particle Size

2.3.8.2 Nitrogen Content

2.3.9 Calcined Clay

2.4 FERTILIZER

2.4.1 Granular Fertilizer

2.5 MULCH

SECTION 32 92 19 Page 1

2.5.1 Straw

2.5.2 Hay

2.5.3 Wood Cellulose Fiber Mulch

2.6 WATER

2.7 EROSION CONTROL MATERIALS

2.7.1 Erosion Control Blanket

2.7.2 Erosion Control Net

2.7.3 Hydrophilic Colloids

2.7.4 Erosion Control Material Anchors

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 EXTENT OF WORK

3.1.1.1 Topsoil

3.2 SEEDING

3.2.1 Seed Application Seasons and Conditions

3.2.2 Seed Application Method

3.2.2.1 Broadcast Seeding

3.2.2.2 Drill Seeding

3.2.3 Mulching

3.2.3.1 Straw Mulch

3.2.3.2 Erosion Control Material

3.2.4 Watering

3.3 PROTECTION OF TURF AREAS

3.4 RESTORATION

-- End of Section Table of Contents --

SECTION 32 92 19 Page 2

SECTION 32 92 19

SEEDING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AOAC INTERNATIONAL (AOAC)

AOAC Methods (2012) Official Methods of Analysis - 19th Edition

ASTM INTERNATIONAL (ASTM)

ASTM D4427 (2013) Peat Samples by Laboratory Testing

ASTM D4972 (2013) pH of Soils

U.S. DEPARTMENT OF AGRICULTURE (USDA)

AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act

DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey Laboratory Methods Manual, Version 3.0

1.2 DEFINITIONS

1.2.1 Stand of Turf

95 percent ground cover of the established species.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data

Wood cellulose fiber mulch

Fertilizer

Include physical characteristics, and recommendations.

Hay or Straw Mulch

The COR shall be notified of sources from which mulch materials are available and the quantities thereof, and representative

SECTION 32 92 19 Page 3 samples of the materials proposed for the use shall be submitted for approval. Mulch and straw delivered to the job will be reviewed for quality, weed, and weed seed content prior to application.

SD-06 Test Reports

Topsoil composition tests (reports and recommendations).

Fertilizer and Lime; G

Triplicate copies of invoices shall be furnished. Invoices shall show quantity, grade of fertilizer, percentage of calcium oxide or magnesium oxide, as applicable, and the percentages of lime that pass the 20 and 100 mesh sieves. Samples of each lot of fertilizer and lime shall be furnished for testing as directed. Samples will be tested at Government expense, in accordance with Official Methods of Analysis (AOAC Methods) of the Association of Official Analytical Chemists, at the discretion of the Contracting Officer.

Upon completion of the project, a final check of total quantities of fertilizer and lime used will be made against total area treated, and if minimum rates of application have not been met, additional quantities of these materials to make up minimum application specified shall be distributed as directed.

SD-07 Certificates

State certification and approval for seed

The Contracting Officer shall be furnished triplicate signed copies of statement from vendor, certifying that each container of seed delivered is labeled in accordance with the AMS Seed Act and is at least equal to requirements previously specified. This certification shall be obtained from vendor and shall be furnished on or with all copies of seed invoices. Each lot of seed will be sampled and tested, in accordance with latest Rules and Regulations under the AMS Seed Act, at the discretion of the Contracting Officer.

SD-08 Manufacturer's Instructions

Erosion Control Materials

1.4 DELIVERY, STORAGE, AND HANDLING

1.4.1 Delivery

1.4.1.1 Seed Protection

Seed shall be uniformly mixed and shipped to the job site in bags fully labeled stating the seed mixture, name and address of the supplier, net weight and contents. Protect from drying out and from contamination during delivery, on-site storage, and handling.

1.4.1.2 Fertilizer Delivery

Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer

SECTION 32 92 19 Page 4 may be furnished in bulk with certificate indicating the above information.

1.4.2 Storage

1.4.2.1 Seed, Fertilizer Limestone, Gypsum, Micronutrients, and Biological Inoculants Storage

Store in cool, dry locations away from contaminants.

1.4.2.2 Topsoil

Where applicable, prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non-selective herbicide approved for use in/near water. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil.

1.4.2.3 Handling

Do not drop or dump materials from vehicles.

1.5 TIME RESTRICTIONS AND PLANTING CONDITIONS

1.5.1 Restrictions

Do not plant when the ground is frozen, muddy, or when air temperature exceeds 90 degrees Fahrenheit.

1.6 TIME LIMITATIONS

1.6.1 Seed

Apply seed within twenty four hours after seed bed preparation.

PART 2 PRODUCTS

2.1 SEED

2.1.1 Classification

Provide Roundstone Native Seed Company, Mix 168 - Southern Riparian Buffer Mix. Wet, moldy, or otherwise damaged seed will be rejected. A temporary seeding of annual ryegrass (Lotium multiflorum) will also be provided for immediate stabilization.

2.1.2 Planting Dates

Planting Season Planting Dates Permanent Seeding 01 October to 31 March Temporary Ryegrass Seeding 01 October to 31 March Disposal Area Seeding 01 October to 31 March

2.1.3 Seed Purity

See Manufacturer Specifications.

2.1.4 Seed Mixture by Weight

Planting Variety Rate

SECTION 32 92 19 Page 5

Permanent Seeding Roundstone, Mix 168 8 lbs./acre

Temporary Ryegrass Seeding Lotium multiflorum 100 lbs./acre

Disposal Area Seeding Ryegrass (Lotium m.) 40 lbs./acre Starr Millet 40 lbs./acre Sudangrass 40 lbs./acre

Roundstone, Mix 168, Southern Riparian Buffer (Permanent Seeding) shall be applied at 8 lbs/acre. Temporary ryegrass seeding will be sown with the permanent mix at a rate of 100 lbs./acre. For the Disposal Area described in paragraph 3.16 of section 31 23 00 EXCAVATION AND FILL, ryegrass, Starr millet, and Sudangrass will be each sown at 40 lbs./acre. Crimped straw shall be placed at a rate of not less than 500 pounds/acre and not to exceed 1 ton/acre. Straw shall be clean and free of weeds and other foreign material and must be approved by the contracting officer prior to placement.

2.2 TOPSOIL

2.2.1 On-Site Topsoil

Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on-site in accordance with Section 31 23 00

EXCAVATION AND FILL.

2.2.2 Off-Site Topsoil

Conform to requirements specified in paragraph entitled "Composition."

Additional topsoil shall be furnished by the Contractor. Off-site topsoil must be from a location approved by the Contracting Officer prior to placement.

2.2.3 Composition

Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits:

Silt 25-50 percent

Clay 10-30 percent

Sand 20-35 percent pH 5.5 to 7.0

Soluble Salts 600 ppm maximum

2.3 SOIL CONDITIONERS

Add conditioners to topsoil as required to bring into compliance with

SECTION 32 92 19 Page 6

"composition" standard for topsoil as specified herein.

2.3.1 Lime

Lime shall be ground agricultural lime containing a total neutralizing power of not less than 90 and shall be of such fineness that at least 50 percent will pass through a 100 mesh sieve and at least 90 percent will pass through a 20 mesh sieve. Coarser materials will be acceptable provided the specified rates of application are increased proportionately on the basis of quantities passing the 100 mesh sieve, but no additional payment will be made for the increased quantity.

2.3.2 Gypsum

Coarsely ground gypsum comprised of calcium sulfate dihydrate 61 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen.

2.3.3 Sulfur

100 percent elemental

2.3.4 Iron

100 percent elemental

2.3.5 Peat

Natural product of peat moss derived from a freshwater site and conforming to ASTM D4427. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation.

2.3.6 Sand

Clean and free of materials harmful to plants.

2.3.7 Perlite

Horticultural grade.

2.3.8 Composted Derivatives

Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties:

2.3.8.1 Particle Size

Minimum percent by weight passing:

No. 4 mesh screen 95 No. 8 mesh screen 80

2.3.8.2 Nitrogen Content

Minimum percent based on dry weight:

Fir Sawdust 0.7 Fir or Pine Bark 1.0

SECTION 32 92 19 Page 7

2.3.9 Calcined Clay

Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum 90 percent shall pass a No. 8 sieve; a minimum 99 percent shall be retained on a No. 60 sieve; and a maximum 2 percent shall pass a No. 100 sieve. Bulk density: A maximum 40 pounds per cubic foot.

2.4 FERTILIZER

Fertilizer for seeding shall be a commercial grade fertilizer, uniform in composition, granular, free flowing, and suitable for application with approved equipment. The fertilizer shall be contained in bags fully labeled stating the net weight, brand and grade, guaranteed analysis, and name and address of the manufacturer. Fertilizer shall comply with local, state, and Federal fertilizer laws.

2.4.1 Granular Fertilizer

Organic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:

19 percent available nitrogen 19 percent available phosphorus 19 percent available potassium

2.5 MULCH

Mulch shall be free from noxious weeds, mold, and other deleterious materials.

2.5.1 Straw

Stalks from oats, wheat, rye, barley, or rice. Furnish in air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Straw shall contain no fertile seed.

2.5.2 Hay

Air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Hay shall be sterile, containing no fertile seed.

2.5.3 Wood Cellulose Fiber Mulch

Use recovered materials of either paper-based (100 percent) or wood-based (100 percent) hydraulic mulch. Processed to contain no growth or germination-inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 5.5 to 8.2. Use with hydraulic application of grass seed and fertilizer.

2.6 WATER

Source of water shall be approved by Contracting Officer and of suitable quality for irrigation, containing no elements toxic to plant life.

SECTION 32 92 19 Page 8

2.7 EROSION CONTROL MATERIALS

Erosion control material shall conform to the following:

2.7.1 Erosion Control Blanket

70 percent agricultural straw/30 percent coconut fiber matrix stitched with a degradable nettings, designed to degrade within 12 months.

2.7.2 Erosion Control Net

Net shall be heavy, twisted jute mesh, weighing approximately 1.22 pounds per linear yard and 4 feet wide with mesh openings of approximately 1 inch square.

2.7.3 Hydrophilic Colloids

Hydrophilic colloids shall be physiologically harmless to plant and animal life without phytotoxic agents. Colloids shall be naturally occurring, silicate powder based, and shall form a water insoluble membrane after curing. Colloids shall resist mold growth.

2.7.4 Erosion Control Material Anchors

Erosion control anchors shall be as recommended by the manufacturer.

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 EXTENT OF WORK

Provide soil preparation (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.

3.1.1.1 Topsoil

Provide 4 inches of off-site topsoil to meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate fertilizer into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.

3.2 SEEDING

3.2.1 Seed Application Seasons and Conditions

Immediately before seeding, restore soil to proper grade. Do not seed when ground is muddy, frozen, snow covered, or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the above seeding dates or conditions, submit a written request to the Contracting Officer stating the special conditions and proposed variance.

Apply seed within twenty four hours after seedbed preparation. Sow seed by

SECTION 32 92 19 Page 9 approved sowing equipment. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing.

3.2.2 Seed Application Method

Seeding method…