Amendment_0002.pdf

PDF 28 KB Posted

Attached to
Poor Fork Channel Modification, City of Cumberland, KY
Solicitation number
W912P5-16-B-0006
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
W912P5-16-B-0006-TSpecs-Am2pgs.pdf PDF
Prebidsitevisitattendancelist.pdf PDF
Amendment0001.pdf PDF
W912P5-16-B-0006-TSpecs-Am1pgs.pdf PDF
W912P5-16-B-0006.pdf PDF
W912P5-16-B-0006-TSpecs.pdf PDF
W912P5-16-B-0006-Plans.pdf PDF
W912P5-16-B-0006-AppA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD60282242

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is to:

1. Extend the bid opening date,

1. Address industry questions/comments,

2. Revise the Technical Specifications, and

3. Revise FAR Provision 52.252-3.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-B-0006

X 9B. DATED (SEE ITEM 11)

21-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2016

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, ROOM A680

NASHVILLE TN 37202-1070

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P5-16-B-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 23-Aug-2016 01:00 PM to 30-Aug-2016 01:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

Q&A Industry Questions/Comments and Government Responses

1. Industry Question/Comment: Will there be multiple contractors using the hilltop disposal area? Who is responsible for permitting? Who is responsible for closing?

Government Response: It is possible another contractor will be using the hilltop disposal area. Each contractor is responsible for hilltop disposal area permitting. A partnering session may be required to discuss overlapping roles. The contractor of this project is responsible for closing the permit.

2. Industry Question/Comment: Are all the trees within the work limits to be removed?

Government Response: Only the amount of vegetation necessary to perform the contract requirements shall be removed unless otherwise directed by the Contracting Officer. There are two bat habitat trees in the area of disposal #2 near the wastewater treatment plant that shall be cut between the months of November 15, 2016 and March 31, 2017.

3. Industry Question/Comment: Are the elevations for excavation in the plans approximate or exact? (i.e. if contractor hits refusal before a given elevation is reached, will the contractor be required to hammer the refusal to reach the desired elevation?)

Government Response: The elevations in the plans are exact.

4. Industry Question/Comment: What is the projected start date and will all utility relocations and structure demolition be complete by that date?

Government Response: A contract award is anticipated to occur in the month of September 2016 but could occur as late as October 2016. The contractor is required to submit performance and payment bonds within ten calendar days of award. Approximately ten calendar days after receipt of acceptable bonds, the contractor shall receive Notice to Proceed (NTP). Considering this and the prework submittals/Government review of submittals, it is anticipated all utility relocations and structure demolitions will be completed well before commencement of on-site work.

5. Industry Question/Comment: There is an eighteen ton weight restriction on the new bridge we used to access the base contract area at the site visit. Is there any other access route for this area? If not, will the weight limit be waived in order to mobilize equipment and haul material to the project site?

Government Response: There is no other access route for the base contract area. The bridge is designed using the AASHTO HS-25 design vehicle which well exceeds the 18 Ton restriction. The contractor shall consider the AASHTO HS-25 design vehicle criteria in preparing their bid. After contract award, for all trips expected to exceed 18 tons the Contractor shall first submit vehicle type, estimated loading and estimated trips for COR approval. COR approval must be given prior to exceeding the 18 ton weight limit.

6. Industry Question/Comment: Can you provide information on the test pits that were excavated?

Government Response: The information provided in the plans and appendix A is the only available information for the project site.

7. Industry Question/Comment: The clearing and grubbing spec states that burning will not be permitted.

Can trees and stumps be placed in the disposal areas?

Government Response: Yes.

8. Industry Question/Comment: The seeding spec requires off-site topsoil be used. Can on-site topsoil salvaged from the excavation be used?

Government Response: Yes, salvaged on-site topsoil can be used and is preferred.

9. Industry Question/Comment: The riprap spec is based on individual stone weights. Can you provide a spec based on size?

Government Response: No. Our engineering analysis was performed using stone weights.

10. Industry Question/Comment: What are the limits for tree and shrub planting areas for the Option 1 area?

Government Response: The bench in option 1 area shall be planted as zone A. Reference technical specification section 32 92 19.

11. Industry Question/Comment: Is tree and shrub planting required at disposal area 1?

Government Response: No. Follow seeding plans and specifications.

12. Industry Question/Comment: Where is the contractor points of access for the Option 1 area?

Government Response: Power Street

13. Industry Question/Comment: What is the designed volume capacity of disposal area 2?

Government Response: Approximately 14,000 Cubic Yards.

14. Industry Question/Comment: In section 1.2.6.2 it lists that there must be a scale on sight for the rock hauled in. Would it be possible to use the tickets that are received from the quarry, the rock weight is supplied on the ticket.

Government Response: Yes, quarry tickets are acceptable.

15. Industry Question/Comment: The ANSI standards book gives a wide range of acceptable shrub sizes.

Our landscaping supplier would like to know a specific size (container or height) for the shrubbery.

Government Response: See technical specification section 32 93 43.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment No. 0001 Summary of Changes:

The purpose of this amendment is to:

1. Revise the Bid Schedule,

2. Revise the Technical Specifications, and

3. Revise FAR Provision 52.252-3.

Amendment No. 0001 Technical Changes:

I. CHANGES TO TECHNICAL SPECIFICATIONS

A. PROJECT TABLE OF CONTENTS

1. Remove the Project Table of Contents in its entirety (1 page), and replace with revised Project Table of Contents (1 page).

B. Section 01 22 00 PRICE AND PAYMENT PROCEDURES

1. Remove Section 01 22 00 in its entirety (11 pages), and replace with revised Section 01 22 00 (15 pages).

C. Section 01 95 00 FORMS AND ATTACHMENTS

1. Remove Submittal Register in its entirety (5 pages), and replace with revised Submittal Register (5

D. Section 32 92 19 SEEDING

1. Remove Section 32 92 19 in its entirety (8 pages), and replace with revised Section 32 92 19 (11

--- END OF AMENDMENT NO. 0001 TECHNICAL CHANGES---

Amendment No. 0002 Summary of Changes:

The purpose of this modification is to:

1. Extend the bid opening date,

1. Address industry questions/comments,

2. Revise the Technical Specifications, and

3. Revise FAR Provision 52.252-3.

Amendment No. 0002 Technical Changes:

I. CHANGES TO TECHNICAL SPECIFICATIONS

A. Section 01 33 00 SUBMITTAL PROCEDURES

1. Remove Section 01 33 00 in its entirety (13 pages), and replace with revised Section 01 33 00 (15

B. Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1. Remove Section 01 35 26 pages 9 and 10 (2 pages), and replace with revised Section 01 35 26 pages

9 and 10 (2 pages).

C. Section 01 95 00 FORMS AND ATTACHMENTS

1. Remove Section 01 95 00 in its entirety (2 pages), and replace with revised Section 01 95 00 (2

2. Remove Submittal Register in its entirety (5 pages), and replace with revised Submittal Register (5

3. Add Submittal Flowchart (1 page) to the back of Section 01 95 00.

--- END OF AMENDMENT NO. 0002 TECHNICAL CHANGES---